DOT Vendor: C31080  Contract: 76323 

IL Project:      From Date: 09/06/2012
Route: FAP 310
Section: 60-15, 60-15B To Date: 09/20/2012
Project: ACNHF-0310/139/ State Job: C-98-108-03
Letting Date: 03/05/2010 Dist/Cnty: 08 - 119 (MADISON )
Airport: 60-15, 60-15B State Job: C-98-108-03
Scope: FAP-310, IL 255; SEMINARY RD TO US67 IN GODFREY.

Payee:

KELLER CONSTRUCTION INC 22 ILLINI DR  GLEN CARBON , IL  62034

 

 

 

 

Percent Completed:  83.26%
Contract Awarded
Amount
Additions Deductions Total Adjusted
Contract Value
Total Amount
Due to Date
21,919,006.63      7,151,728.78      270,477.16      28,800,258.25      23,980,149.30     
Total retainage incld this est held by IDOT:   0.00      
Total due after retainage: 23,980,149.30     
Total paid this estimate:   23,980,149.30     
     Previous payments to contractor: -23,555,841.41     
     Payment to contractor this estimate: 424,307.89     
 
          Voucher #   CC05514 Date: 09/24/2012 1 of 1 424,307.89     

----------------------------------------------------------------------------------------------------------------------------------------------     

Pay Estimate Number:  34 Total: 424,307.89     

 

 

 

 


 

 

 

Report of Resident Engineer
Completed Work-In Place
For This Estimate Only

 

PAY ITEM QUANTITY PAYMENT
Number Description Awarded Net of Adds/
Deducts
Total Adjusted Completed Prior Est. Completed to Date This Estimate $ Unit Price $ This Estimate
M4205050  BR APPROACH PAVT SPL   1,225.000  0.000  1,225.000  472.300  1,225.000  752.700  236.00  177,637.20 
M4820600  HMA SHOULDERS 200   57,234.000  0.000  57,234.000  39,391.530  42,715.950  3,324.420  29.60  98,402.83 
60900240  TY C INLET BOX 609006   6.000  0.000  6.000  5.000  6.000  1.000  2,169.00  2,169.00 
60900315  TY D INLET BOX 609006   6.000  0.000  6.000  5.000  6.000  1.000  2,565.00  2,565.00 
XXX99000  FUEL PRICE ADJ INCREAS   0.000  256,270.610  256,270.610  256,008.410  256,270.610  262.200  1.00  262.20 
XXX99300  BIT PRICE ADJ INCREASE   0.000  86,000.000  86,000.000  85,686.850  86,000.000  313.150  1.00  313.15 
X9802308  TEMPORARY DITCH CHECK   0.000  1,513.000  1,513.000  304.000  330.000  26.000  23.67  615.42 
X9802310  INLET & PIPE PROTECTIO   0.000  7.000  7.000  2.000  6.000  4.000  85.00  340.00 
X9802311  STONE DUMPED RIPRAP CL   0.000  2,766.000  2,766.000  0.000  2,414.430  2,414.430  31.87  76,947.88 
X9802312  FILTER FABRIC   0.000  2,766.000  2,766.000  0.000  2,414.430  2,414.430  3.94  9,512.85 
X9802320  PIPE CULVERT REMOVAL   0.000  1,279.000  1,279.000  392.000  518.000  126.000  11.86  1,494.36 
X9802321  PRC FLARED END SECTION   0.000  3.000  3.000  1.000  3.000  2.000  755.00  1,510.00 
X9802322  END SECTION 12"   0.000  2.000  2.000  0.000  2.000  2.000  702.00  1,404.00 
X9802323  CMP END SECTION 24"   0.000  1.000  1.000  0.000  1.000  1.000  605.00  605.00 
X9802324  REINFORCED CONC PIPE T   0.000  2.000  2.000  1.000  2.000  1.000  1,272.18  1,272.18 
X9802329  INLET TA T1 FRAME OPEN   0.000  2.000  2.000  0.000  2.000  2.000  1,197.35  2,394.70 
X9802330  MEDIAN INLET   0.000  2.000  2.000  0.000  2.000  2.000  3,583.47  7,166.94 

 

 

continued
PAY ITEM QUANTITY PAYMENT
Number Description Awarded Net of Adds/
Deducts
Total Adjusted Completed Prior Est. Completed to Date This Estimate $ Unit Price $ This Estimate
X9802335  PIPE CULVERT CL A T2 2   0.000  168.000  168.000  88.000  168.000  80.000  68.18  5,454.40 
X9802346  CONCRETE COLLAR   0.000  1.000  1.000  0.000  1.000  1.000  535.12  535.12 
X9802347  PIPE DRAIN 24" WITH EL   0.000  170.000  170.000  0.000  156.000  156.000  78.78  12,289.68 
X9802348  INLET TB T1 F&OL   0.000  1.000  1.000  0.000  1.000  1.000  2,233.87  2,233.87 
X9802349  REMOE INLETS   0.000  6.000  6.000  4.000  6.000  2.000  401.34  802.68 
X9802350  CONC THRUST BLOCKS   0.000  1.000  1.000  0.000  1.000  1.000  535.12  535.12 
X9802351  PIPE CULVERT CL A T1 1   0.000  77.000  77.000  0.000  74.500  74.500  75.33  5,612.09 
X9802352  CONC ANCHORS   0.000  9.000  9.000  0.000  9.000  9.000  605.58  5,450.22 
X9802354  FRENCH DRAIN   0.000  200.000  200.000  0.000  200.000  200.000  33.91  6,782.00 
Total:   

$424,307.89

 