State of Illinois Department of Transportation

Contract Search

 07/30/2014 

Invoice Archive
Contract Number
&
Estimate Numbers are listed below



Go to Current Estimate for this Contract Number

Contractor Invoice

Previous Report 10/31/2012
DOT Vendor: C08010  Contract: 60860 

IL Project:      From Date: 09/28/2012
Route: FAP 337
Section: 20R-4 To Date: 10/31/2012
Project: NHF-0337/010/ State Job: C-91-531-99
Letting Date: 01/21/2011 Dist/Cnty: 01 - 097 (LAKE )
Airport: 20R-4 State Job: C-91-531-99
Scope: FAP-337, IL 22 FROM E OF I94 TO W OF US41 IN VILLAGE OF
HIGHLAND PARK & BANNOCKBURN

Payee:

CAPITOL CEMENT CO INC 6231 N PULASKI ROAD  CHICAGO , IL  60646

 

 

 

 

Percent Completed:  92.06%
Contract Awarded
Amount
Additions Deductions Total Adjusted
Contract Value
Total Amount
Due to Date
11,490,843.48      2,296,940.05      858,774.82      12,929,008.71      11,902,552.35     
Total retainage incld this est held by IDOT:   0.00      
Total due after retainage: 11,902,552.35     
Total paid this estimate:   11,902,552.35     
     Previous payments to contractor: -11,747,232.66     
     Payment to contractor this estimate: 155,319.69     
 
          Voucher #   BC03496 Date: 11/02/2012 1 of 1 155,319.69     

----------------------------------------------------------------------------------------------------------------------------------------------     

Pay Estimate Number:  20 Total: 155,319.69     

 

 

 

 


 

 

 

Report of Resident Engineer
Completed Work-In Place
For This Estimate Only

 

PAY ITEM QUANTITY PAYMENT
Number Description Awarded Net of Adds/
Deducts
Total Adjusted Completed Prior Est. Completed to Date This Estimate $ Unit Price $ This Estimate
B2006320  T-SYRG RT IS TF 2-1/2   24.000  -3.000  21.000  9.000  15.750  6.750  250.00  1,687.50 
X0326981  ENGNEERD SOIL F P SPL   350.000  0.000  350.000  0.000  350.000  350.000  52.50  18,375.00 
X7030106  WET TEM PM TAPE T3 6   8,684.000  -1,202.500  7,481.500  2,662.000  2,984.000  322.000  1.95  627.90 
X7030120  WET TEM PM TAP T3 L&S   2,198.000  0.000  2,198.000  767.900  1,022.000  254.100  4.00  1,016.40 
X7030124  WET TEM PM TAPE T3 24   302.000  383.000  685.000  642.000  685.000  43.000  8.00  344.00 
Z0001050  AGG SUBGRADE 12   78,699.000  9,318.120  88,017.120  86,221.000  87,194.620  973.620  11.00  10,709.82 
20100110  TREE REMOV 6-15   150.000  0.000  150.000  12.200  26.800  14.600  25.00  365.00 
21101685  TOPSOIL F & P 24   7,842.000  380.000  8,222.000  7,275.900  8,222.000  946.100  11.75  11,116.67 
25200110  SODDING SALT TOLERANT   21,759.000  0.000  21,759.000  9,806.310  17,747.610  7,941.300  3.25  25,809.22 
28000250  TEMP EROS CONTR SEED   902.000  240.000  1,142.000  471.600  855.600  384.000  3.25  1,248.00 
42000501  PCC PVT 10 JOINTED   57,364.000  7,709.120  65,073.120  63,277.000  63,873.120  596.120  40.00  23,844.80 
42400200  PC CONC SIDEWALK 5   35,896.000  -22,559.400  13,336.600  12,953.000  13,336.600  383.600  6.00  2,301.60 
42400800  DETECTABLE WARNINGS   1,175.000  0.000  1,175.000  926.400  958.400  32.000  45.00  1,440.00 
60221102  MAN TA 5D T1FCL R-PLT   1.000  0.000  1.000  0.000  1.000  1.000  3,750.00  3,750.00 
67000400  ENGR FIELD OFFICE A   14.000  3.000  17.000  16.000  17.000  1.000  2,750.00  2,750.00 
72000100  SIGN PANEL T1   988.000  48.000  1,036.000  997.800  1,028.300  30.500  22.00  671.00 
72900100  METAL POST TY A   812.000  84.000  896.000  600.500  614.000  13.500  10.50  141.75 

 

 

continued
PAY ITEM QUANTITY PAYMENT
Number Description Awarded Net of Adds/
Deducts
Total Adjusted Completed Prior Est. Completed to Date This Estimate $ Unit Price $ This Estimate
78000400  THPL PVT MK LINE 6   1,641.000  232.500  1,873.500  99.500  443.000  343.500  1.10  377.85 
78000600  THPL PVT MK LINE 12   484.000  195.000  679.000  38.800  306.800  268.000  2.15  576.20 
78008200  POLYUREA PM T1 LTR-SY   2,188.000  0.000  2,188.000  1,618.000  1,654.400  36.400  5.00  182.00 
FRC01001  DRAINAGE MODIFICATIONS   0.000  30,000.000  30,000.000  19,469.410  29,485.000  10,015.590  1.00  10,015.59 
FRC01601  NON-SPL WASTE DISP   0.000  75,000.000  75,000.000  61,066.550  65,161.980  4,095.430  1.00  4,095.43 
FRC03001  MULCH METHOD 3   0.000  10,000.000  10,000.000  1,774.070  4,694.970  2,920.900  1.00  2,920.90 
FRC04501  DRAINAGE DESIGN ERROR   0.000  10,000.000  10,000.000  2,102.620  3,879.740  1,777.120  1.00  1,777.12 
FRC05301  SANITARY CONFLICT WITH   0.000  8,000.000  8,000.000  6,076.960  6,531.640  454.680  1.00  454.68 
FRC06401  DRIVEWAY MODIFICATION   0.000  3,300.000  3,300.000  0.000  1,692.860  1,692.860  1.00  1,692.86 
FRC06601  RAILROAD CROSSING   0.000  12,000.000  12,000.000  0.000  5,487.930  5,487.930  1.00  5,487.93 
FRC06901  DRAINAGE REVISION   0.000  12,000.000  12,000.000  7,201.900  12,000.000  4,798.100  1.00  4,798.10 
FRC07901  GROUND MOUNTED SERVICE   0.000  5,400.000  5,400.000  0.000  2,206.990  2,206.990  1.00  2,206.99 
FRC08401  C&G R&R   0.000  4,500.000  4,500.000  204.150  1,137.020  932.870  1.00  932.87 
FRC08801  TELEGRAPH DETOUR   0.000  4,903.260  4,903.260  0.000  4,903.260  4,903.260  1.00  4,903.26 
FRC09101  DITCH SEDIMENT REMOVA   0.000  11,000.000  11,000.000  0.000  7,644.080  7,644.080  1.00  7,644.08 
FRC10601  PARKWAY RE-GRADING (SP   0.000  5,000.000  5,000.000  0.000  1,055.170  1,055.170  1.00  1,055.17 
Total:   

$155,319.69

 