CONSTRUCTION UPDATE REPORT
Will
Effective: 08/13/10 2:57 PM
| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
143rd Street, ComEd right-of-way Construction of a bituminous bike trail |
Homer Glen 7/2010 12/2010 $1.081 |
IMPACT ON TRAVEL:
Project consists of the construction of a bituminous bike trail and the installation of pedestrian signals including excavation, HMA, curb and gutter, sidewalk, pavement markings, storm sewers, landscaping and all other incidental items to complete the work from Parker Road south of 143rd Street to south of 135th Street and from Bell Road south of 143rd Street northeast to the Will-Cook Road and on the ComEd right-of-way with roadway crossings at Parker Road, Golden Oak Drive, Pine Grove Drive, Bell Road, and 143rd Street and on the ComEd right-of-way from Pin oak Drive to Beaver Lake Drive in the Village of Homer Glen. |
|
151st Street. Widening and resurfacing. |
Lockport 5/2008 7/2010 $2.955 |
IMPACT ON TRAVEL:
83956 Widen and resurface 151st Street from Archer Avenue easterly for 0.72 mile and 0.30 mile on Archer Avenue north and south of 151st Street, also includes 0.04 mile reconfiguration of an access driveway as the 4th leg of the intersection with proposed 151st Street at Archer Avenue (total 1.06 miles) including drainage, curb & gutter and traffic signals in Lockport. |
|
191st Street Street light installation |
Tinley Park 9/2010 6/2011 $0.418 |
IMPACT ON TRAVEL:
63288 1.36 miles street light installation along 191st Street from 80th Avenue to Harlem Avenue in Tinley Park. |
|
63332 Intersection reconstruction, bridge removal, noise barrier. |
Crete 3/2010 10/2010 $7.548 |
IMPACT ON TRAVEL:
62542 1.88 km intersection reconstruction, resurfacing, bridge removal, noise barrier and bridge Superstructure on IL 394/IL 1 at IL 1 and Goodenow Road and over Plum Creek in Crete. TRAFFIC ALERT: One lane closed in each direction of IL 394. |
|
At the northbound Bolingbrook Weigh Station. Weigh Station improvement. |
Bolingbrook 9/2009 6/2010 $0.281 |
IMPACT ON TRAVEL:
60G16 Weigh Station improvement at the northbound Bolingbrook Weigh Station along I-55 at Bolingbrook. |
|
Brandon Road over the Des Plaines River Bridge Deck reconstruction. |
Will County 7/2010 11/2010 $2.029 |
IMPACT ON TRAVEL:
63442 Bridge deck reconstruction and superstructure rehabilitation consisting of structural steel removal, furnishing and erecting structural steel, cleaning and painting steel bridge, removal of existing concrete deck, construction of a new bridge deck, bridge approach pavement, pavement markings and all other incidental items to complete the work on Brandon Road over the Des Plaines River. |
|
Bruce Road/163rd Street Resurfacing, sidewalks. |
Lockport 5/2010 7/2010 $0.391 |
IMPACT ON TRAVEL:
63352 1.21 miles surface removal, leveling binder, HMA surface, aggregate shoulders, curb and gutter, sidewalks and detectable warnings on Bruce Road from Farrell Road to Gougar Road and on 163rd Street from Farrell Road to I 355 in Lockport. |
|
Cedar Road Replacement of Cedar Road Bridge, and guardrail. |
Will County 5/2010 10/2010 $0.823 |
IMPACT ON TRAVEL:
83894 This project consists of the removal and replacement of Cedar Road Bridge including shoulder and guardrail removal and replacement, earth excavation, pavement removal, seeding and all other incidental items to complete the work on FAU Route 369 (Cedar Road) over Jackson Creek in Will County. |
|
Dixie Highway Traffic signals |
Beecher 7/2010 9/2010 $0.265 |
IMPACT ON TRAVEL:
83909 New traffic signals on Dixie Highway at Chestnut Lane, fiber optic interconnection to existing signals at Church Road, conduits, detector loops, curb and gutter, sidewalks and pavement marking on Dixie Highway from Chestnut Lane to Church Road in Beecher. |
|
Draper Avenue, Theodore St, Black Road, Washington St., Raynor Ave., Western Avenue. Resurfacing |
Joliet 6/2010 9/2010 $0.997 |
IMPACT ON TRAVEL:
63400 Resurfacing project consisting of HMA surface removal, combination concrete curb and gutter removal and replacement, resurfacing with surface and binder courses, placement of thermoplastic pavement markings and all other incidental items to complete the work on Draper Avenue from Woodruff Road to Route 6 on Theodore Street from River Road to Route 59, on Black Road from Prairie Avenue to Raynor Avenue, on Washington Street from the E J & E Railroad to Briggs Street, on Raynor Avenue from John Street to Glenwood Avenue and on Western Avenue from William Street to Raynor Avenue in the City of Joliet. |
|
Druaden Road Resurfacing |
Plainfield 5/2010 6/2010 $0.139 |
IMPACT ON TRAVEL:
63227 This project consists of patching, resurfacing, aggregate shoulder installation, pavement markings and all other incidental items to complete the work on Druaden Road from Catherine Drive to 600 feet south of Rock Drive in the Village of Plainfield. |
|
DuPage River Trail Bike trail construction |
Plainfield Park District in Plainfield 7/2010 12/2010 $1.819 |
IMPACT ON TRAVEL:
63325 Improvement consists of (0.77 miles) of bike trail construction including HMA 10 foot surface, one pre-fabricated bridge structure and two box culverts, retaining wall, prairie seeding and paint pavement marking on the DuPage River Trail from north of the intersection of IL Rte. 59 and Naperville Road northerly thru Riverview Park to Prairie Creek Development in Plainfield Park District in Plainfield |
|
I-55 Installation of noise barrier. |
Bolingbrook, Plainfield, Romeoville and Joliet. 10/2009 10/2010 $8.55 |
IMPACT ON TRAVEL:
60B04 2.52 miles of installation of noise barrier (ground and structure mounted) along I-55 from U.S. Route 30 (Plainfield Road) to Weber Road in Bolingbrook, Plainfield, Romeoville and Joliet. TRAFFIC ALERT: One land closed on northboun I-55 starting 7/6/2010. |
|
I-55 Bridge rehabilitation |
Wilmington 6/2010 10/2010 $4.866 |
IMPACT ON TRAVEL:
62930 Bridge rehabilitation for the structures carrying I-55 over the Kankakee River in Wilmington. OTHER COMMENTS: one land closed northbound starting July 12, 2010. |
|
I-55 Noise abatement walls. |
Joliet and Plainfield 10/2009 10/2010 $8.162 |
IMPACT ON TRAVEL:
60B03 Noise abatement walls to be constructed along I-55 from Black Road to U.S. Route 30 (Plainfield Road) in Joliet and Plainfield. TRAFFIC ALERT: Frontage Road traffic will be impacted. |
|
I-55 Resurfacing |
Diamond and Braidwood 5/2010 8/2010 $8.281 |
IMPACT ON TRAVEL:
60I53 7.25 miles of resurfacing on I-55 from the Grundy County line to the Kankakee River in Diamond and Braidwood. TRAFFIC ALERT: Night-time lane closures. |
|
I-55 Weigh Station improvement |
Bolingbrook 9/2010 12/2010 $0.297 |
IMPACT ON TRAVEL:
60K43 Weigh station improvement on southbound I-55 near Naperville Road at the Bolingbrook Weigh Station in Bolingbrook. |
|
i-55 Resurfacing |
Shorewood 9/2010 10/2010 $0.169 |
IMPACT ON TRAVEL:
60K25 Resurfacing on I-55 E. Frontage Road (NB) from U.S. Route 52 to Black Road in Shorewood. |
|
I-55 Fiber optic cable installation for highway surveillance. |
Shorewood and Romeoville 10/2010 7/2011 $2.998 |
IMPACT ON TRAVEL:
60K06 Fiber optic cable installation for highway surveillance on I-55 from I-80 to Naperville Road (Shorewood to Romeoville). |
|
I-55 Resurfacing |
Wilmington Township 7/2010 9/2010 $0.576 |
IMPACT ON TRAVEL:
60J74 1.85 miles of milling and resurfacing on I-55 west frontage road from Cavanaugh Road to Murphy Road in Wilmington Township. |
|
I-55 Fiber optic cable installation |
Will County 10/2010 6/2011 $2.089 |
IMPACT ON TRAVEL:
60J24 Fiber optic cable installation for highway surveillance along I-55 from Lorenzo Road to I-80 in Will County. |
|
I-55 Fiber optic cable installation |
Will County 10/2010 6/2010 $2.089 |
IMPACT ON TRAVEL:
60J24 Fiber optic cable installation for highway surveillance along I-55 from Lorenzo Road to I-80 in Will County. |
|
I-55/IL 59 Interchange. Interchange reconstruction, adding lanes, retaining walls & bridge replacement |
Shorewood/Joliet 10/2008 9/2010 $25.978 |
IMPACT ON TRAVEL:
60363 Interchange reconstruction, addition of auxiliary lanes, construction of retaining walls and bridge replacement on I-55/IL 59 Interchange, Seil Road and East Frontage Road located in Shorewood and Joliet. OTHER COMMENTS: 2 lane highway with day time lane closures from I-55 to IL 126 in shorewood and Plainfield. Ramp from IL 59 to southbound I-55 is closed. Detour posted to US Route 52. Motorists should expect delays. |
|
I-57 Bridge rehabilitation |
Peotone 7/2010 10/2010 $0.949 |
IMPACT ON TRAVEL:
60J25 Bridge rehabilitation for the structure carrying I-57 (northbound and southbound) over an abandoned railroad located 12.8 miles south of U.S. Route 30 in Peotone. |
|
I-57 Roadway lighting |
Matteson, Monee, Richton Park 9/2009 7/2010 $2.238 |
IMPACT ON TRAVEL:
60f84 Continuous roadway lighting along 8.38 miles of I-57 from U.S. Route 30 interchange to rest areas south of Pauling Road in Cook and Will Counties OTHER COMMENTS: Also in Cook County. |
|
I-57 Manhattan-Monee Road entrance & exit ramps to I-57. Resurfacing, widening, and additional auxiliary lane. |
Monee 10/2008 6/2010 $9.886 |
IMPACT ON TRAVEL:
62253 Resurfacing, widening, pavement reconstruction, addition of an auxiliary lane and other work on I-57 Manhattan-Monee Road entrance and exit ramps to I-57, structure replacement and construction of a retaining wall, all located in and near Monee. TRAFFIC ALERT: Narrow ramps - motorists should approach with caustion. OTHER COMMENTS: No lane closures expected on I-57 north and southbound. The right and left shoulders will be closed and lanes are reduced on Manhattan-Monee Rd. & SB exit to I-57 @ Manhattan--Monee Rd. |
|
I-80 Intermittent pavement resurfacing |
Will County 9/2010 10/2010 $0.239 |
IMPACT ON TRAVEL:
60J28 Intermittent pavement resurfacing on I-80 between Center Street and west of U.S. Route 30 in Will County. |
|
I-80 Installation of a weigh-in-motion scale |
Will County 9/2010 11/2010 $0.279 |
IMPACT ON TRAVEL:
60K45 Installation of a weigh-in-motion scale and upgrade to the communication cable at the I-80 eastbound Frankfort Weigh Station in Will County. |
|
IL 1 Bridge deck patching. |
Unincorporated Will County 5/2009 8/2010 $0.54 |
IMPACT ON TRAVEL:
60D81 Bridge deck patching and overlay project for IL Route 1 over Trim Creek within Washington Township in unincorporated Will County. TRAFFIC ALERT: Traffic will be reduced to one lane with temporary signals. Motorists should expect delays. |
|
IL 1 Resurfacing |
Beecher 8/2010 10/2010 $0.798 |
IMPACT ON TRAVEL:
60I40 2.41 miles of milling and resurfacing on IL Route 1 from Church Road to IL Route 394 in Beecher. |
|
IL 1 (Main Street) Resurfacing |
Crete 6/2010 8/2010 $0.762 |
IMPACT ON TRAVEL:
60I39 1.69 miles of milling, HMA surface, striping and other work on IL Route 1 (Main Street) from Union Avenue to Burville Road in Crete. |
|
IL 1 from Elmscourt Lane to north of Goodenow Road Resurfacing and widening of roadway. |
Crete 5/2009 3/2010 $2.778 |
IMPACT ON TRAVEL:
60E52 1.78 km of milling, hot mix asphalt surface, widening and roadway realignment on IL 1 from Elmscourt Lane to north of Goodenow Road located in Crete. |
|
IL 113 Resurfacing |
Braidwood and Custer Park 7/2010 9/2010 $0.562 |
IMPACT ON TRAVEL:
60J62 1.47 miles of milling and resurfacing on IL 113 from River Road to 0.2 mile south of Smiley Road in Braidwood and Custer Park. |
|
IL 113 Street lighting, light poles and decorative luminaires. |
Braidwood 7/2010 10/2010 $0.216 |
IMPACT ON TRAVEL:
63433 0.33 mile street lighting including metal foundations, lighting controller, ornamental light poles and decorative luminaires along IL Route 113 from +/-500 ft west of Center Road +/-500 west of Mitchell Street in the City of Braidwood |
|
IL 113 Concrete overlay and bridge repairs. |
Custer Park 7/2010 10/2010 $0.621 |
IMPACT ON TRAVEL:
60H86 Concrete overlay and bridge repairs on the structure carrying IL 113 (River Street) over Horse Creek in Custer Park. |
|
IL 113 (Main St.) Intersection reconstruction/traffic signal & railroad crossing improvements. |
Braidwood 6/2008 5/2010 $4.09 |
IMPACT ON TRAVEL:
62910 Intersection reconstruction, traffic signal installation and railroad crossing improvement of IL 113 (Main St.) at IL 129 (Washington St.), IL 53 (Front St.) & the Union Pacific Railroad crossing located in Braidwood. |
|
IL 126 Resurfacing and striping. |
Plainfield 5/2010 7/2010 $0.629 |
IMPACT ON TRAVEL:
60H98 2.27 miles of milling, HMA surface, striping and other work on IL Route 126 from I-55 to U.S. Route 30 (Lockport Street) in Plainfield. |
|
IL 126 Resurfacing |
Plainfield 6/2010 9/2010 $0.874 |
IMPACT ON TRAVEL:
60J95 1.96 miles of resurfacing on IL Route 126 from County Line Road to Wallin Drive in Plainfield. |
|
IL 126, IL 171, and IL 53 Traffic signal modernization at the intersections. |
Plainfield, Joliet, Crest Hill, Romeoville 9/2009 6/2010 $0.376 |
IMPACT ON TRAVEL:
60G44 Traffic signal modernization on intersections along IL 126, IL 171 and IL 53 at various locations. |
|
IL 129 Resurfacing |
Wilmington 6/2010 8/2010 $0.382 |
IMPACT ON TRAVEL:
60I69 1.42 miles of milling and resurfacing on Il 129 from Coal City Road to I-55 in Wilmington. |
|
IL 43 Fiber optic interconnect. |
Tinley Park 12/2009 7/2010 $0.207 |
IMPACT ON TRAVEL:
60F59 Fiber optic interconnect on IL Route 43 from Oak Park Avenue to St. Francis Avenue along Will/Cook County line southeast of Tinley Park. |
|
IL 53 Construction of right and left turn lanes |
Wilmington 9/2010 11/2010 $0.411 |
IMPACT ON TRAVEL:
60G46 Construction of right and left turn lanes from IL 53 into the Midewin National Tallgrass Prairie entrance, 0.8 mile south of Prairie Creek in Wilmington. |
|
IL 53 (Baltimore St.) and IL 102 (Water Street) Traffic signal modernization, fiber optic interconnect. |
Wilmington Township 6/2010 9/2010 $0.214 |
IMPACT ON TRAVEL:
60F80 Traffic signal modernization and fiber optic interconnect on IL Route 53 (Baltimore Street) and IL Route 102 (Water Street) in Wilmington Township in Will County. |
|
IL 59 Resurfacing, sidewalk, and detector loop replacement. |
Naperville 8/2010 11/2010 $1.46 |
IMPACT ON TRAVEL:
63244 Project consists of scarification and HMA pavement resurfacing with sidewalk removal and replacement, detector loop replacement, thermoplastic pavement markings and all other incidental items to complete the work on 95th Street from the west approach of IL Route 59 to the east approach of Plainfield/Naperville Road in the City of Naperville. |
|
IL 59 Reconstruction, widening, sewers, water main & traffic signals. |
Plainfield, Joliet 9/2008 9/2010 $20.972 |
IMPACT ON TRAVEL:
62417 2.5 miles of roadway reconstruction, widening, resurfacing and installation of storm sewers, water main and traffic signals on IL Route 59 in Plainfield and Joliet. TRAFFIC ALERT: 2 lane hwy with day time lane closures from I-55 to Il 126 in shorewood and Plainfieldl. Ramp from IL 59 to SB I-55 is closed. Detour posted to US route 52. OTHER COMMENTS: Motorists should expect delays. |
|
IL 59 from US 52 to Caton Farm Road. Resurfacing, add lanes, retaining walls, and traffic signals. |
Shorewood & Joliet 10/2008 7/2010 $28.723 |
IMPACT ON TRAVEL:
62416 3.05 miles of roadway reconstruction, additional lanes, retaining walls, culvert replacement and traffic signal modernization on IL Route 59 from US Route 52 (West Jefferson St.) to Caton Farm Road in Shorewood and Joliet. TRAFFIC ALERT: 2 lane hwy with daytime lane closures fro I-55 to IL 126 in Shorewood and Plainfield. Ramp from IL 59 to SB I-55 is closed. Detrour posted to US route 52. OTHER COMMENTS: Motorists should expect delays. |
|
IL 59 over the DuPage River Replacement of bridge. |
Joliet 4/2008 8/2010 $5.449 |
IMPACT ON TRAVEL:
60C19 Replacement of the bridge carrying IL 59 over the DuPage River located in Joliet. OTHER COMMENTS: May be lane closures, please watch for signs. |
|
IL 59/US 30 Intersection reconstruction, new storm sewer, water main, traffic signals. |
Plainfield 6/2009 10/2010 $7.913 |
IMPACT ON TRAVEL:
60E73 Intersection reconstruction of IL Route 59 and US Route 30, new storm sewer, water main, traffic signals, lighting and other work located in Plainfield. OTHER COMMENTS: Utillity work currently being performed. Please watch for signs. |
|
IL 7 Sidewalk, curb and gutter, handrails, landscape. |
Lockport 7/2010 9/2010 $0.331 |
IMPACT ON TRAVEL:
63438 Sidewalk project consisting of earthwork, PCC sidewalks, curb and gutter removal and replacement, driveway pavement removal and replacement, drainage structure adjustments, modular concrete retaining walls, installation of pipe handrails, thermoplastic pavement markings, landscape restoration and all other incidental items to complete the work on IL Rte. 7 from Lincoln Street to Farrell Road in the City of Lockport. |
|
IL 7 Resurfacing |
Lockport 5/2010 8/2010 $1.417 |
IMPACT ON TRAVEL:
60H62 2.31 miles of milling and resurfacing along IL Route 7 from IL Route 53 to I-355 in Lockport. |
|
IL 7 (Larkin Avenue) Resurfacing, and striping |
Joliet and Crest Hill 4/2010 7/2010 $1.739 |
IMPACT ON TRAVEL:
60H74 2.65 miles of milling, HMA surface, striping and other work on IL Route 7 (Larkin Avenue) south of McDonough St. northerly to north of Theodore St at Hillcrest Shopping Center in Joliet and Crest Hill. |
|
Intersection of Essington Road and Hennepin Drive. Widening and resurfacing, sidewalks and traffic signals. |
Joliet 11/2009 10/2010 $2.687 |
IMPACT ON TRAVEL:
63185 The project consists of widening and resurfacing, precast box culvert, paved ditch, sidewalks and traffic signal modernization at the intersection of Essington Road and Hennepin Drive in the City of Joliet. |
|
Intersection of US 52 & Laraway Road. Traffic signal installation |
Joliet 6/2010 10/2010 $0.166 |
IMPACT ON TRAVEL:
60I56 Traffic signal installation at the intersection of US 52 and Laraway Road located southeast of Joliet. |
|
Jackson Street Bridge repairs |
Joliet 10/2010 11/2010 $0.108 |
IMPACT ON TRAVEL:
60J06 Bridge repairs consisting of replacing the pinion rack and fabricating and delivering a second rack for the bridge carrying Jackson Street over the Des Plaines River in Joliet. |
|
Kankakee Street Widening 5 feet on each side and resurfacing. |
Wilmington 8/2009 6/2010 $0.79 |
IMPACT ON TRAVEL:
63171 Project consists of widening 5 feet on each side and resurfacing including curb and gutter removal and replacement, sidewalk removal and replacement, new storm sewer structures, HMA surface construction, thermoplastic pavement markings and all other incidental items to complete the work on FAU Route 321 (Kankakee Street) from Baltimore Street to IL Route 102 in the City of Wilmington. |
|
Laraway Road Traffic signals, PCC sidewalks, concrete curb and gutters |
Frankfort Township 7/2010 9/2010 $0.205 |
IMPACT ON TRAVEL:
0.13 mile traffic signals, PCC sidewalks, concrete curb and gutters and crosswalk pavement markings on Laraway Road at Wolf Road in Frankfort Township. |
|
Lily Cache Lane Widening to two 11' lanes in each direction, left turn lanes. |
Bolingbrook 10/2009 10/2010 $3.569 |
IMPACT ON TRAVEL:
63093 Project consists of widening to two eleven-foot lanes in each direction, left turn lanes at intersections and a raised median including an enclosed drainage system, combination concrete curb and gutter, a full-depth pavement structure, concrete sidewalk, side road improvements, private and commercial entrance improvements, traffic signal improvements, lighting improvements, culvert replacement, landscaping, pavement markings and all other incidental items to complete the work on Lily Cache Lane from Schmidt Road to IL Route 53 in the Village of Bolingbrook. |
|
Manhattan Road Resurfacing, storm sewers, pedestrian push button signalization. |
Manhattan 5/2010 6/2010 $0.79 |
IMPACT ON TRAVEL:
63309 Sidewalk extension project consisting of 5' sidewalk, grading and shaping ditches, storm sewer removal, storm sewer installation, HMA pavement removal, HMA pavement installation, pedestrian push button signalization installation and all other incidental items to complete the work on Manhattan Road from U.S. Route 52 to 1,000 feet west of U.S. Route 52 in the Village of Manhattan. |
|
Rathje Road Sidewalk, curb and gutter and landscaping. |
Peotone 5/2010 8/2010 $0.36 |
IMPACT ON TRAVEL:
63260 0.14 mile PCC sidewalk including excavation, curb and gutter and landscaping along Rathje Road from Corning Avenue to North Street in Peotone. |
|
Raven Road Resurfacing, patching and sidewalk. |
Shorewood 5/2010 7/2010 $0.157 |
IMPACT ON TRAVEL:
63326 Project consists of HMA surface removal, HMA pavement patching, sidewalk removal and replacement, HMA resurfacing, adjustment of structures, aggregate shoulder installation, thermoplastic pavement markings and all incidental items to complete the work on Raven Road from Seil Road to Valencia Drive in the village of Shorewood. |
|
River Road Resurfacing and drainage structures. |
Wilmington Township 5/2010 7/2010 $1.116 |
IMPACT ON TRAVEL:
63263 3.65 miles surface removal, HMA resurfacing, aggregate shoulders and drainage structure adjustments on River Road from IL 53 to Interstate I-55 in Wilmington Township. |
|
Schmidt Road (intersection with Remington Blvd.) Traffic signals. |
Bolingbrook 5/2010 7/2010 $0.238 |
IMPACT ON TRAVEL:
63312 Project consists of the removal of the existing temporary traffic signals and installation of combination mast arm assemblies for traffic signals and video detection, sidewalk, pavement markings and all other incidental items to complete the work on Schmidt Road at the intersection of Remington Boulevard in the Village of Bolingbrook. |
|
South Arsenal Road between Jordan Creek Tributary & Old Chicago Road. Reconstruction, sewers, and markings. |
Wilmington 10/2008 6/2010 $4.419 |
IMPACT ON TRAVEL:
63066 1.26 miles pavement reconstruction including earth excavation, storm sewers, drainage, full-depth HMA, curb and gutter and pavement marking on South Arsenal Road between Jordan Creek Tributary and Old Chicago Road in Wilmington. |
|
Thomas Dillon Drive Partial depth patching, resurfacing and pavement markings. |
Channahon 5/2010 7/2010 $0.147 |
IMPACT ON TRAVEL:
63245 1.10 mile partial depth patching, hot mix asphalt resurfacing and pavement marking on Thomas Dillon Drive from US Route 6 to Winchester Drive in Channahon. |
|
University Parkway Resurfacing and crack control. |
University Park 5/2010 8/2010 $0.323 |
IMPACT ON TRAVEL:
63328 Project consists of HMA resurfacing including placement of HMA level binder, surface course and area reflective crack control treatment, pavement markings, signage and all other incidental items to complete the work on University Parkway from Crawford Avenue to Steger-Monee Road in the Village of University Park. |
|
US 30 Tree removal |
Mokena, New Lenox, Frankfort 9/2010 10/2010 $0.268 |
IMPACT ON TRAVEL:
60L33 Tree removal along US 30 from Williams Street to IL 43 in Mokena, New Lenox, and Frankfort. |
|
US 30 & Wolf Road. Reconstruction of the intersection. |
Mokena 10/2008 3/2010 $5.627 |
IMPACT ON TRAVEL:
60C25 Reconstruction of the intersection of U.S. Route 30 and Wolf Road located in Mokena. |
|
US 30 (Jefferson Street) Bridge repairs. |
Joliet 3/2010 6/2010 $0.198 |
IMPACT ON TRAVEL:
60E92 Replacing the pinion racks of the bridge carrying US Route 30 (Jefferson Street) eastbound over the Des Plaines River in Joliet. OTHER COMMENTS: "Road closed starting 7/6/2010. |
|
US 30 (Lincoln Highway) temporary pavement and traffic signals. |
New Lenox 6/2010 10/2010 $0.459 |
IMPACT ON TRAVEL:
60I52 0.72 mile of temporary pavement and traffic signal installation on U.S. Route 30 (Lincoln Highway) from William Street to Vancina Lane in New Lenox. |
|
US 52/IL 53 (Chicago Street) Resurfacing |
Joliet 7/2010 9/2010 $0.276 |
IMPACT ON TRAVEL:
60J46 0.41 mile of resurfacing on U.S. Route 52/IL Route 53 (Chicago Street) from Doris Avenue to I-80 in Joliet. |
|
US 6 (Channahon Road/Railroad Street) Resurfacing, and striping. |
Channahon and Rockdale 4/2010 7/2010 $1.729 |
IMPACT ON TRAVEL:
60H61 3.0 miles of milling, HMA surface, striping and other work on US 6 (Channahon Road/Railroad Street) from Terry Drive to US 52 (McDonough Street) in Channahon and Rockdale. |
|
Various Steel plate beam guardrail and traffic barrier terminals |
Northern Will County 5/2010 8/2010 $0.248 |
IMPACT ON TRAVEL:
60I43 Replacement of steel plate beam guardrail and traffic barrier terminals at various locations in northern Will County. |
|
Various Guardrail and traffic barrier terminal sections |
Eastern Will County 5/2010 8/2001 $0.348 |
IMPACT ON TRAVEL:
60I45 Replacement of guardrail and traffic barrier terminal sections at various locations in eastern Will County. |
|
Various Resurfacing, detector loops, pavement markings. |
New Lenox 5/2010 7/2010 $0.241 |
IMPACT ON TRAVEL:
63354 Project consists of HMA surface removal, HMA resurfacing, thermoplastic pavement markings, detector loops replacement and all other incidental items to complete the work at various locations on Haven Avenue, Vine Street, Cedar Road, Gougar Road and Nelson Road in the Village of New Lenox. |
|
Various Replacement of steel plate beam guardrail and traffic barrier terminals. |
Southern Will County 5/2010 8/2010 $0.404 |
IMPACT ON TRAVEL:
60I44 Replacement of steel plate beam guardrail and traffic barrier terminals at various locations in southern Will County. |
|
Various locations along I-55 Closed circuit television installation and fiber optic cable. |
Will, DuPage, and Cook County. 9/2009 7/2010 $2.452 |
IMPACT ON TRAVEL:
60E01 Closed circuit television installation and fiber optic cable installation at various locations along I-55 in Will, DuPage and Cook Counties. TRAFFIC ALERT: No impacts to traffic. OTHER COMMENTS: Also in DuPage and Cook County. |
|
Various routes Intermittent resurfacing |
DuPage County 7/2010 9/2010 $0.428 |
IMPACT ON TRAVEL:
60K31 Intermittent resurfacing on various routes in Will County. |
|
Various routes Pavement patching |
Will County 8/2010 9/2010 $0.242 |
IMPACT ON TRAVEL:
60K35 Pavement patching on various routes in Will County. |
|
Wallin Drive Resurfacing |
Plainfield 5/2010 6/2010 $0.147 |
IMPACT ON TRAVEL:
63226 Project consists of patching, resurfacing, aggregate shoulder installation, pavement markings and all other incidental items to complete the work on Wallin Drive from Lockport Street (IL 126) to 143rd Street in the Village of Plainfield. |
|
West River Road Box culvert replacement. |
Wilmington 5/2010 7/2010 $0.312 |
IMPACT ON TRAVEL:
60G54 7.25 miles of resurfacing on I-55 from the Grundy County line to the Kankakee River in Diamond and Braidwood. |