80th Avenue

Resurfacing and sidewalk
Frankfort
6/2014
8/2014
$0.64
IMPACT ON TRAVEL: j61A32 Project consists of the removal of existing sidewalk and construction of new sidewalk, curb and gutter removal and replacement, pavement markings and all other incidental items to complete the work on 80th Avenue from Laraway Road to Sauk Trail in the Village of Frankfort.
95th St.

New roadway, new bridge over the DuPage River.
Naperville, Bolingbrook
5/2013
11/2014
$12.368
IMPACT ON TRAVEL: 63647 Project consists of new roadway construction, reconstruction, resurfacing and the construction of a 2-span, 302'-8 1/2 structure over the DuPage River for the extension of 95th Street from Plainfield - Naperville Road to Boughton Road, located within the City of Naperville and the Village of Bolingbrook.
Divisiion St. over the L&M Canal

Bridge replacement
Lockport
5/2014
11/2014
$1.1
IMPACT ON TRAVEL: 63864 Project consists of complete bridge replacement with approach slabs, approach pavement widening and resurfacing, watermain and all other incidental items to complete the work on Division Street Bridge over the I&M Canal in Lockport.
Exchange Street

Box culvert, curb and gutter, storm sewer, and water main.
Crete
5/2014
11/2014
$0.5178
IMPACT ON TRAVEL: 63672 Work consists of constructing Exchange Street on a new alignment from just west of Crete Road to South Country Lane to include storm sewer installation, box culvert installation, pavement removal, HMA pavement, combination curb and gutter, earth excavation, HMA removal and water main replacement in Crete.
Garfield Ave.

Resurfacing and sidewalk, landscaping.
Lockport
6/2014
10/2014
$1.081
IMPACT ON TRAVEL: 61A26 this project consists of removing the existing pavement and replacing it with full-depth HOT Mix Asphalt pavment, combination curb and gutter, sidewalk pavement markings, landscaping, storm sewers and lighting from Dvision St. to IL 7 in the City of Lockport.
I-55

Bridge deck overlay and joint repair
Channahon
6/2013
10/2014
$7.65
IMPACT ON TRAVEL: 60R62 Bridge deck overlay and joint repair for the structure carrying I-55 (1,700 feet north of its intersection with Arsenal Road bridge) and extends in a northerly direction along the centerline of Interstate 55 over the Des Plaines River in Channahon.
I-55 Weigh Station

Pavement patching
Bolingbrook
6/2014
8/2014
$0.162
IMPACT ON TRAVEL: 60X54 Pavement patching at the southbound Bolingbrook Weigh Station located along I-55 in Bolingbrook.
I-57

Pavement patching
Peotone
6/2014
8/2014
$0
IMPACT ON TRAVEL: 60X55 Pavement patching along I-57 at the southbound Peotone Weigh Station in Peotone.
I-57 at Stuenkel Road

Interchange reconstruction widening, and stream relocation,
University Park, Monee Township
5/2014
10/2015
$0.2885
IMPACT ON TRAVEL: 60L69 1.33 miles of interchange reconstruction including new interchange ramps, pavement reconstruction and widening, new culverts, stream relocation, striping, traffic signals and other related work on I-57 at Stuenkel Rd. in University Park and Monee Township.
SUGGESTIONS TO MOTORISTS: Motorists should expect delays and use caution when workers are present.
IL 53 (Baltimore Avenue)

Bridge deck overlay
Wilmington
5/2014
10/2014
$0.553
IMPACT ON TRAVEL: 60R63 Bridge deck overlay and bridge joint repair on IL 53 (Baltimore Avenue) over the Kankakee River in Wilmington.
Intersection of 143rd St. at Lemont Road

Resurfacing, sewers, traffic lights
Homer Glen
10/2013
10/2014
$2.354
IMPACT ON TRAVEL: 63147 Widen and reconstruct the intersection of 143rd Street at Lemont Road, full depth HMA pavement, storm sewer, combination curb and gutter, and the installation of traffic signals and roadway lighting, located in the Village of Homer Glen.
Intersection of 151st and Peskes Rd.

Widening, curb and gutter, and traffic signals
Homer Glen
5/2014
9/2014
$1.663
IMPACT ON TRAVEL: 63888 This project consists of an intersection improvement, including widening with HMA binder and surface course, combination curb and gutter, storm sewer, drainage structures, traffic signals and thermoplastic pavement markings at the intersection of 151st St. and Peskes Rd in the Village of Homer Glenn.
Manhattan-Monee Road

Resurfacing
Manhattan, Green Garden Townships
9/2013
11/2014
$1.829
IMPACT ON TRAVEL: 60N71 4.08 milles of resurfacing on Manhattan-Monee Road from Schoolhouse Road to Center Road in Manhattan and Green Garden Townships.
SUGGESTIONS TO MOTORISTS: Motorists can expect daily lane closrues with flaggers.
TRAFFIC ALERT: Two lane highway with daytime closures. Traffic will be rediuced to one lane with flaggers once construction begins.
Material Road @ IL 53

Widening, resurfacing, and turn lanes.
Romeoville
4/2014
11/2014
$1.817
IMPACT ON TRAVEL: 63753 Project consists of widening IL 53 to accommodate northbound and southbound right turn lanes, northbound and southbound left turn lanes, widening of the travel lanes, the realignment of Material Road at IL 53 and the installation of traffic signals, located at the intersection of IL 53 at Material Road in the Village of Romeoville
New Ave.

Milled rumble strip and guardrail replacement
Lockport, Romeoville and Lemont
4/2014
7/2014
$1.629
IMPACT ON TRAVEL: 60R86 Milled rumble strip and guardrail replacement on New Ave. from the Cook County Line to IL 171 (Archer Ave.)
Plainfield/Naperville Road and Rodeo Drive

Widening of intersection with left turn lanes and traffic signals
Bolingbrook
7/2012
8/2014
$5.594
IMPACT ON TRAVEL: 63671 Complete reconstruction and widening of the intersection of Plainfield/Naperville Road and Rodeo Drive. Includes new bituminous pavement, left turn lanes, curb and gutter, storm sewers, traffic signal installation and landscaping located 1.4 miles east of Illinois Route 59 in the Village of Bolingbrook.
Richton Road

Replacing bridge and roadway reconstaruciton
Crete Township
5/2014
10/2014
$1.043
IMPACT ON TRAVEL: 61A02 Project consists of replaceing the existing bridge with precast prestressed concrete bulb T-Beam 72; bridge and roadway reconstruction along Richton Road located 1.40 miles east of IL 394 over Plum Creeek in Crete Township..
State St.

Resurfacing , HMA patches, detector loop replacement and pavement markings
Crete
5/2014
7/2014
$0.82
IMPACT ON TRAVEL: 63889 Resurfacing with leveling binder and surface courses, HMA patches, detector loop replacement and pavement markings located on State St. from Steger Rd. to south of Berk Ln. in the Village of Crete
US 30 and I-55

Left lane turn addition to two ramps.
Joliet
8/2014
12/2014
$2.538
IMPACT ON TRAVEL: 60W13 Addition to left turn lane to the ramps at two intersections of US 30 with I-55 located in Joliet.
SUGGESTIONS TO MOTORISTS: Expect heavier than normal traffic on I-55 exit ramps to US 30.
TRAFFIC ALERT: Lane widths will be reduced on ramps at the intersections. One shoulder will always be clear and no width restructions will be applied.
OTHER COMMENTS: Presently SB traffic exiting I-55 to US 30 should perhaps chose another exit to avoid as much delay as possible.
Various

LED installation
Bolingbrook, Joliet
12/2013
10/2014
$0.746
IMPACT ON TRAVEL: 60W21 LED installation at various locations in Bolingbrook and Joliet.
Various

Riprap improvements
Glenwood, Harvey, Matteson, Naperville, Joliet, Braidwood, Peotone
6/2014
8/2014
$0.288
IMPACT ON TRAVEL: 60T53 Rliprap improvements at 8 various bridge locations, in Cook and Will Counties.
OTHER COMMENTS: Vincennes Road over the Thorn Creek, 0.7 Miles south of 183rd Street in Glenwood, Cook County. IL 83 (147th street) over the Little Calumet River, 1.0 Miles East of IL Rte 1 Harvey, Cook County. Governorís Highway over the Butterfield Creek, 0.05 Miles south of US Rte 30, in Matteson, Cook County. US Rte 52 over DuPage River, 0.2 Miles east of IL Rte 59 in Shorewood, Will County.IL Rte 59 over Clow Creek, 0.28 Miles north of 111th Street, in Naperville, Will County. IL Rte 53 over Sugar Creek, 0.5 Miles south of I-80, in Joliet, Will County. I-55 Southbound Ramp from IL Rte 113 over Clay Pool Creek, just south of IL Rte 113, in Braidwood, Will County. I-57 over Rock Creek, 12.5 Miles south of US Rte 30, in Peotone, Will County.
Various

LED installations
Will County
12/2013
8/2014
$0.399
IMPACT ON TRAVEL: 60W22 Installation of light emitting Diode (LED) signals at 44 locations.
various locations

resurfacing, drainage
Lockport
5/2014
8/2014
$0.247
IMPACT ON TRAVEL: 63898 This project consists of the construction of PCC sidewalks, earthwork, curb and gutter removal and replacement, driveway pavement removal and replacement, drainage structure adjustments, pavement markings and landscape restoration at various locations within the City of Lockport.
Various locations

Wrong way driving signage
Will County
9/2013
6/2014
$0.235
IMPACT ON TRAVEL: 60W51 Wrong way driving signage and pavement marking at various locations in Cook and Will Counties.
OTHER COMMENTS: Also in Cook County.
Weber Road

Curb and gutter, traffic signals, drainage, landscaping.
Crest Hill, Romeoville
6/2012
8/2014
$10.008
IMPACT ON TRAVEL: 63570 This project consists of curb and gutter, new traffic signals, earth excavation, new storm sewers and drainage structures, PCC pavement, roadway lighting, pavement marking, landscaping and all other incidental items to complete the work on Weber Road at Renwick Road.