CONSTRUCTION UPDATE REPORT

Will

Effective: 03/31/14 7:49 AM

LOCATION AND DESCRIPTION MUNICIPALITY
START DATE
EST. STOP DATE
COST (millions)
COMMENTS
143rd

Pavement widening and drainage.
Homer Glen
5/2013
5/2014
$2.106
IMPACT ON TRAVEL: 63752 Project consists of pavement widening, shoulder removal, pavement removal, resurfacing, new curb and gutter, storm sewer, drainage structures, excavation, pavement markings and all other incidental items to complete the work on143rd Street, from east of the Center Line of I-355 and continues east to State St. (Lemont Road) in Homer Glen.
95th St.

New roadway, new bridge over the DuPage River.
Naperville, Bolingbrook
5/2013
11/2014
$12.368
IMPACT ON TRAVEL: 63647 Project consists of new roadway construction, reconstruction, resurfacing and the construction of a 2-span, 302'-8 1/2 structure over the DuPage River for the extension of 95th Street from Plainfield - Naperville Road to Boughton Road, located within the City of Naperville and the Village of Bolingbrook.
Black Road over the DuPage River

Bridge replacement
Shorewood
6/2013
5/2014
$2.345
IMPACT ON TRAVEL: 63803 This project consists of removal and replacement of existing deck, removal and replacement of the east and west slabs, removal of slope wall gutters, extension of slope walls at east and west abutments, replacement of existing concrete abutments and wingwalls, replacement of bearing, cleaning and painting structural steel and pavement reconstruction located on Black Road over the Dupage River in Shorewood.
Exchange Street

Box culvert, curb and gutter, storm sewer, and water main.
Crete
5/2014
6/2014
$0.5178
IMPACT ON TRAVEL: 63672 Work consists of constructing Exchange Street on a new alignment from just west of Crete Road to South Country Lane to include storm sewer installation, box culvert installation, pavement removal, HMA pavement, combination curb and gutter, earth excavation, HMA removal and water main replacement in Crete.
Green Garden Place

Sidewalks and accessibility ramps
Lockport Township
8/2013
6/2014
$0.38
IMPACT ON TRAVEL: 63820 Project consists of sidewalk construction including accessibility ramps with detectable warnings, pavement marking and all other incidental items to complete the work on Green Garden Place from Oak Avenue to Nobes Avenue in Lockport Township.
I-55

Bridge deck overlay and joint repair
Channahon
6/2013
7/2014
$7.65
IMPACT ON TRAVEL: 60R62 Bridge deck overlay and joint repair for the structure carrying I-55 (1,700 feet north of its intersection with Arsenal Road bridge) and extends in a northerly direction along the centerline of Interstate 55 over the Des Plaines River in Channahon.
OTHER COMMENTS: Current work will be done in 11./2013 lanes will open-lanes will again close in Spring 2014 - April for completion of northbound structure.
I-55 at Arsenal Road

Bridge removal/demolition relocation
Channahon
8/2011
5/2014
$37.473
IMPACT ON TRAVEL: 60F12 Interchange reconstruction to relocate the I-55 at Arsenal Road Interchange including construction of the new interchange, flyover bridge, Arsenal bridge, lighting, removal of the existing interchange and bridge, beginning south of the existing Arsenal Bridge in Channahon, continuing north on I-55.
IL 171 @ 13th St. intersection.

Widening, resurfacing, landscaping, and traffic signals.
Lockport
8/2013
6/2014
$1.054
IMPACT ON TRAVEL: 63788 Project consists of intersection widening and signalization of the intersection including earth excavation, placement of aggregate subgrade, HMA base course, HMA surface course, combination concrete curb and gutter, storm sewer installation, pavement marking, sidewalk, roadway signage, landscaping, traffic signals and all other incidental items to complete the work at the intersection of IL 171 and 13th Street in the City of Lockport.
IL 53

Addition of landscape median, and retaining walls.
Bolingbrook
7/2013
6/2014
$0.765
IMPACT ON TRAVEL: 63714 This project consists of the improvement and addition of landscape median retaining walls, irrigation system, trees and shrubs, located on IL 53 from Remington Boulevard to Royce Road in the Village of Bolingbrook.
Intersection of 143rd St. at Lemont Road

Resurfacing, sewers, traffic lights
Homer Glen
10/2013
10/2014
$2.354
IMPACT ON TRAVEL: 63147 Widen and reconstruct the intersection of 143rd Street at Lemont Road, full depth HMA pavement, storm sewer, combination curb and gutter, and the installation of traffic signals and roadway lighting, located in the Village of Homer Glen.
Jackson Street, Jefferson Street, and Broadway Street

Bridge repairs
Joliet
9/2012
4/2014
$0.723
IMPACT ON TRAVEL: 60P84 Structural steel repairs to bascule bridges carrying Jackson St., Jefferson St., and Broadway St. over the Des Plaines River in Joliet.
Manhattan-Monee Road

Resurfacing
Manhattan, Green Garden Townships
9/2013
5/2014
$1.829
IMPACT ON TRAVEL: 60N71 4.08 milles of resurfacing on Manhattan-Monee Road from Schoolhouse Road to Center Road in Manhattan and Green Garden Townships.
Material Road @ IL 53

Widening, resurfacing, and turn lanes.
Romeoville
4/2014
11/2014
$1.817
IMPACT ON TRAVEL: 63753 Project consists of widening IL 53 to accommodate northbound and southbound right turn lanes, northbound and southbound left turn lanes, widening of the travel lanes, the realignment of Material Road at IL 53 and the installation of traffic signals, located at the intersection of IL 53 at Material Road in the Village of Romeoville
New Ave.

Milled rumble strip and guardrail replacement
Lockport, Romeoville and Lemont
4/2014
7/2014
$1529805.53
IMPACT ON TRAVEL: 60R86 Milled rumble strip and guardrail replacement on New Ave. from the Cook County Line to IL 171 (Archer Ave.)
Plainfield/Naperville Road and Rodeo Drive

Widening of intersection with left turn lanes and traffic signals
Bolingbrook
7/2012
5/2014
$5.594
IMPACT ON TRAVEL: 63671 Complete reconstruction and widening of the intersection of Plainfield/Naperville Road and Rodeo Drive. Includes new bituminous pavement, left turn lanes, curb and gutter, storm sewers, traffic signal installation and landscaping located 1.4 miles east of Illinois Route 59 in the Village of Bolingbrook.
State St.

Resurfacing with leveling binder and surface courses, HMA patches, detector loop replacement and pavement markings
Crete
5/2014
6/2014
$0
IMPACT ON TRAVEL: 63889 Resurfacing with leveling binder and surface courses, HMA patches, detector loop replacement and pavement markings located on State St. from Steger Rd. to south of Berk Ln. in the Village of Crete
US 30

Resurfacing
Joliet
5/2013
5/2014
$0.535
IMPACT ON TRAVEL: 60V75 1.03 miles of resurfacing on US 30 from US 6 (Collins St.) to US 30 (Jefferson St.) in Joliet
US 52 (Jefferson St.)

Resurfacing
Joliet
7/2013
5/2014
$1.664
IMPACT ON TRAVEL: 60V93 2.06 miles of resurfacing on US 52 (Jefferson St.) from Joyce Road to Raynor Avenue in Joliet.
Various

LED installation
Bolingbrook, Joliet
12/2013
10/2014
$0.746
IMPACT ON TRAVEL: 60W21 LED installation at various locations in Bolingbrook and Joliet.
Various

LED installations
Will County
12/2013
8/2014
$0.399
IMPACT ON TRAVEL: 60W22 Installation of light emitting Diode (LED) signals at 44 locations.
Various locations

Wrong way driving signage
Will County
9/2013
3/2014
$0.235
IMPACT ON TRAVEL: 60W51 Wrong way driving signage and pavement marking at various locations in Cook and Will Counties.
Various routes

Resurfacing
South Cook & Will
9/2013
4/2014
$0.776
IMPACT ON TRAVEL: 60W70 Intermittent resurfacing on various routes in southern Cook and Will Counties.
Weber Road

Curb and gutter, traffic signals, drainage, landscaping.
Crest Hill, Romeoville
6/2012
5/2014
$10.008
IMPACT ON TRAVEL: 63570 This project consists of curb and gutter, new traffic signals, earth excavation, new storm sewers and drainage structures, PCC pavement, roadway lighting, pavement marking, landscaping and all other incidental items to complete the work on Weber Road at Renwick Road.