CONSTRUCTION UPDATE REPORT

McHenry

Effective: 03/31/14 7:49 AM

LOCATION AND DESCRIPTION MUNICIPALITY
START DATE
EST. STOP DATE
COST (millions)
COMMENTS
Algonquin Bypass

Construction of a 4 lane, divided highway.
Algonquin
9/2012
8/2014
$33.346
IMPACT ON TRAVEL: 60F72 2.11 miles of construction of a 4-lane divided highway, diamond interchange, 4 new bridges, retaining walls and noise abatement walls, all for the Algonquin Bypass located in Algonquin in McHenry County.
Hilltop Dr.

Bridge removal and replacement, curb and gutter
Lake in the Hills
5/2014
8/2014
$427225.37
IMPACT ON TRAVEL: 63857 Superstructure removal and replacement including precast, prestressed concrete deck beams (21" depth), steel bridge railing, HMA pavement (full depth), pavement removal, curb and gutter on Hilltop Dr. over Woods Creek.
IL 120

Bridge replacement, traffic signal, resurfacing.
McHenry
12/2013
11/2014
$7.188
IMPACT ON TRAVEL: 63750 This project consists of pavement reconstruction, widening and resurfacing, bridge replacement, traffic signal modernization, roadway lighting, storm sewers, storm water processing system and pavement markings located on IL 120 from Front Street to Green Street and IL 31 from IL 120 to McCullom Lake Road in the City of McHenry.
IL 176 & Smith Rd.

Traffic signal installation and channelization
Nunda Township
5/2014
11/2014
$1539547.46
IMPACT ON TRAVEL: 60K20 Traffic signal installation and channelization at the intersection of IL 176 and Smith Rd. located in unincorporated Nunda Township
IL 22

Resurfacing
Fox River Grove, Lake Barrington, North Barrington
8/2013
6/2014
$1.614
IMPACT ON TRAVEL: 60N33 5.13 miles of resurfacing on IL 22 from US 14 to US 12 (Rand Rd) in Fox River Grove, Lake Barrington and North Barrington.
OTHER COMMENTS: also in Lake
IL 31 at Il 176 & at Terra Cotta Ave.

Intersection and traffic signal reconstruction
Crystal Lake, Nunda Township and Unincorporated McHenry County.
7/2012
6/2014
$10.189
IMPACT ON TRAVEL: 62537 Intersection reconstruction and traffic signal modernization of IL 31 at IL 176 and at Terra Cotta Ave. in Crystal Lake, Nunda Township and unincorporated McHenry County.
Jessie Rd.

Reconstruction of culvert, pavement and shoulders
Lake in the Hills
5/2014
8/2014
$330316.7
IMPACT ON TRAVEL: 63877 Removal and replacement of the existing culvert, pavement removal and replacement, aggregate shoulders and all other incidental items to complete the work on Jessie Rd. over Crystal Creek in the Village of Lake in the Hills.
Johnsburg Rd.

Roundabout intersection at Johnsburg Rd. and Chapel Hill Rd. Full depth HMA pavement, sidwealks, curb and gutter, storm sewer, box culvert repl., lighting, crosswalks and landscaping
Johnsburg
5/2014
9/2014
$2708847.4
IMPACT ON TRAVEL: 63870 Roundabout intersection and Johnsburg Rd. and Chapel Hill Rd. Full depth HMA pavement, sidewalks, curb and gutter, storm sewer, box culvert replacement, decorative pedestrian lighting, roadway lighting, brick paved crosswalks with decorative banding and landscaping located within the Village of Johnsburg
Kreutzer Road

New roadway and bridge construction
Huntley
7/2013
6/2014
$4.171
IMPACT ON TRAVEL: 63743 This project consists of new roadway construction, intersection improvements and construction of a new bridge over Kishwaukee River, located on Kreutzer Road from IL Route 47 to Main St. in the Village of Huntley.
McHenry Avenue

Resurfacing and retaining wall
Crystal Lake
6/2013
7/2014
$1.468
IMPACT ON TRAVEL: 63806 Project consists of resurfacing, storm sewer removal and replacement, shared use path construction, existing surface course removal, pavement patching, intermittent curb and gutter replacement, driveway replacement, HMA leveling binder and surface courses, pavement markings, precast modular retaining wall, erosion control and landscaping and all other incidental items to complete work on FAU Route 120 (McHenry Avenue) from James R. Rakow Road to US Route 14 in the City of Crystal Lake.
Prospect Street intersection of IL 76 to US 20

Widening and traffic signals.
Marengo
9/2013
7/2014
$2.886
IMPACT ON TRAVEL: 63532 Reconstruct and widening of Prospect Street from US 20 to IL 176, intersection improvements at IL 176 and US 20, to include the installation of traffic signals located in Marengo.
Various local roads

Bikeway corridor improvements
Crystal Lake
9/2013
5/2014
$0.156
IMPACT ON TRAVEL: 63827 Preoject consists of bikeway corridor improvements imcluding installation of new pavement markings and signage along various local roads in Crystal Lake.
Various locations in Cook, Lake & McHenry Counties

Wrong way driving signing and striping on ramps
Prospect Hts., Buffalo Grove, Arlington Hts., Lake Forest, Highland Pk., Wauconda, Waukegan, Niles, N. Chicago, Crystal Lk., Gurnee, Wheeling, Palatine
5/2014
7/2014
$160840
IMPACT ON TRAVEL: 60X30 Wrong way driving signage and striping on ramps at various locations in Cook, Lake and McHenry Counties.