CONSTRUCTION UPDATE REPORT
McHenry
Effective: 05/16/13 3:22 PM
| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
Algonquin Bypass Construction of a 4 lane divided highway. |
Algonquin 9/2012 8/2014 $33.346 |
IMPACT ON TRAVEL:
60F72 2.11 miles of construction of a 4-lane divided highway, diamond interchange, 4 new bridges, retaining walls and noise abatement walls, all for the Algonquin Bypass located in Algonquin in McHenry County. |
|
Charles J. Miller Road Widening and resurfacing |
McHenry 11/2012 10/2013 $10.94 |
IMPACT ON TRAVEL:
63633 Reconstruction, widening, resurfacing on Charles J. Miller Road from 1,300 feet east of Greet Street to River Road intersection improvement at River Road and the construction of a new
structure over the Fox River. |
|
East Crystal Lake Avenue Widening and resurfacing. |
Crystal Lake 6/2011 5/2013 $0.928 |
IMPACT ON TRAVEL:
63524 Widen and resurface, storm sewer replacement, curb and gutter, sidewalk construction and water main improvements on East Crystal Lake Avenue from East Main Street to west of Erick Street in Crystal Lake. |
|
East of IL 31/west of Chapel Hill Road Widening and resurfacing, traffic signals, and curb and gutter. |
Johnsburg 5/2013 10/2013 $4.893 |
IMPACT ON TRAVEL:
63515 Reconstruction, widening and resurfacing, traffic signals, roadway and pedestrian lighting, storm sewer, curb and gutter and sidewalks, from east of IL 31 to west of Chapel Hill Road in the Village of Johnsburg. |
|
Edgewood Drive Box culvert, widening, multi use path |
Algonquin 4/2012 5/2013 $3.038 |
IMPACT ON TRAVEL:
63655 Project consists of the widening and reconstruction of Edgewood Drive, replacement of the box culvert over Ratt Creek Tributary, replace the deck and repair abutments to the structure over Ratt Creek and the construction of a multi-use path, all located between IL Rte. 31 and Hanson Road in the village of Algonquin. |
|
Hill Road Bridge reconstruction |
Richmond Township 3/2013 8/2013 $1.824 |
IMPACT ON TRAVEL:
63666 This project consists of concrete superstructure removal, removal of existing abutments and pier, construction of new abutments, new pier, new PCC deck beam superstructure with reinforced concrete overlay, embankment, bridge and connector pavement, pavement removal, HMA pavement shoulders, aggregate shoulders, guardrail, pavement marking and landscaping located on Hill Road over the North Branch of Nippersink Creek. |
|
IL 176 Roadway widening, traffic signal, and lighting. |
Crystal Lake 5/2012 3/2013 $1.751 |
IMPACT ON TRAVEL:
63551 Project consists of roadway widening and resurfacing, traffic signal installation, lighting installations, storm sewers and all other items to complete the work at the intersection of IL 176 and Briarwood/Ohnstad Roads in the City of Crystal Lake. |
|
IL 176/Walkup Road Intersection widening |
Crystal Lake, Bull Valley, McHenry 11/2011 6/2013 $11.411 |
IMPACT ON TRAVEL:
63522 Reconstruct the intersection of IL Route 176 and Walkup Road to widen the pavement from three to six lanes, the reconstruction of Walkup Road to widen the pavement to three lanes from the Union Pacific Railroad just south of IL Route 76 to Burning Bush Road, construction of a shared use path along the east side of Walkup Road from Gates Street to Burning Bush Road and the reconstruction of Walkup Road from north of Crystal Springs Road to south of Bull Valley Road, located in Crystal Lake, Bull Valley and the City of McHenry. OTHER COMMENTS: Crystal Lake Avenue closed south of IL 176. |
|
Il 31 Building removal, storm sewer |
Algonquin 5/2012 4/2013 $4.893 |
IMPACT ON TRAVEL:
60F78 Earth excavation, building removal and construction of storm sewer and drainage structures along Algonquin Bypass from IL 31 (N. Junction) to IL 31 (S. Junction) in Algonquin. |
|
IL 31 at Il 176 & at Terra Cotta Ave. Intersection and traffic signal reconstruction |
Crystal Lake, Nunda Township and Unincorporated McHenry County. 7/2012 9/2013 $10.189 |
IMPACT ON TRAVEL:
62537 Intersection reconstruction and traffic signal modernization of IL 31 at IL 176 and at Terra Cotta Ave. in Crystal Lake, Nunda Township and unincorporated McHenry County. |
|
IL 31, Virginia Road, Klasen Road intersections. Reconstruction, bike path and traffic signals. |
Algonquin, Lake in the Hills, Cary, Crystal Lake 4/2012 5/2013 $8.463 |
IMPACT ON TRAVEL:
63553 Project consists of the reconstruction of IL 31 with PCC pavement, the realignment of the Virginia Road intersection and the reconstruction of the Klasen Road intersection. Work also includes HMA full-depth pavement, storm sewers, combination curb and gutter, an asphalt bike path and the installation of traffic signals; located along IL 31 approximately 3,457 feet south of Klasen Road to 1,720 feet north of Trinity Drive, in Algonquin, Lake in the Hills, Cary, and Crystal Lake. |
|
Lawrence Road Bridge reconstruction, widening |
Harvard 3/2013 10/2013 $1.677 |
IMPACT ON TRAVEL:
63694 Project consists of the removal of the existing structure and replacement with a precast prestressed concrete deck beam bridge (17" depth), pavement reconstruction and widening, shoulder work, milling and resurfacing, pavement markings and all other incidental items to complete the work on Lawrence Road over Piscasaw Creek near the town of Harvard. |
|
Pingree Road/Congress Parkway Widening, resurfacing, and traffic signal improvements |
Crystal Lake 5/2012 5/2013 $1.574 |
IMPACT ON TRAVEL:
63519 Project consists of roadway widening, reconstruction and resurfacing, storm sewer replacement, curb and gutter, retaining wall, sidewalk construction and traffic signal improvements on Pingree Road from south of Congress Parkway to north of the Union Pacific Railroad and improvements to Congress Parkway and Rickert Road at Pingree Road, located in the city of Crystal Lake. |
|
Rakow Road Roadway widening and channelized intersections. |
Crystal Lake, Lake in the Hills 3/2011 5/2013 $26.61 |
IMPACT ON TRAVEL:
63398 Pavement removal, concrete curb and gutter removal and replacement, pavement reconstruction, including roadway widening and channelized intersections, shoulder construction, median construction, traffic signal installation, grading, storm sewer and drainage structure reconstruction, maintenance of traffic, erosion control, installation of pavement markings, landscaping and signing, lighting, culvert extension, noise wall construction, bicycle path bridge construction and utility coordination, relocation and adjustments on Rakow Road from south of Ackman Road and continuing in a northeasterly direction to IL Route 31 for a total of 3.1 miles, located in the City of Crystal Lake and the Village of Lake in the Hills. |
|
US 14 Traffic signal modernization |
Woodstock 8/2012 7/2013 $0.133 |
IMPACT ON TRAVEL:
60P15 Traffic signal modernization - LED installation, UPS, controller cabinets and other work along US 14 from Kishwaukee Valley Rd. to Lake Ave. in Woodstock. |
|
US 14 Resurfacing |
Harvard, Unincorporated McHenry County 5/2013 9/2013 $1.413 |
IMPACT ON TRAVEL:
60N28 4.20 miles of resurfacing on US 14 from IL 23 to Bunker Hill Road in Harvard and Unincorporated McHenry County. |
|
US 20 (Grant Highway) Culvert replacement |
Marengo 4/2012 5/2013 $0.573 |
IMPACT ON TRAVEL:
60M53 Culvert replacement at the structure carrying US 20 (Grant Highway) over Drainage Ditch located 0.4 mile northwest of Coral Road in Marengo. OTHER COMMENTS: Temporary signals allows only one lane of traffic to go through. Please watch your signals for traffic safety. |
|
Various routes Traffic signal modernization |
Kane and McHenry Counties 6/2012 6/2013 $0.673 |
IMPACT ON TRAVEL:
60R37 Installation of light emitting diodes (LED) for traffic signal modernization at various locations in McHenry and Kane Counties. OTHER COMMENTS: Also in Kane County. |
|
Winn Road Reconstruction of the Winn Road Bridge |
Spring Grove 5/2012 5/2013 $1.464 |
IMPACT ON TRAVEL:
63544 Project consists of the removal of the existing structure (the Winn Road Bridge), and construction of a precast, prestressed concrete deck beam bridge (27" depth), HMA pavement reconstruction, shoulder, shared use path, guardrail replacement and all other incidental items to complete the work on Winn Road over Nippersink Creek in the Village of Spring Grove. |