CONSTRUCTION UPDATE REPORT

McHenry

Effective: 07/28/14 3:32 PM

LOCATION AND DESCRIPTION MUNICIPALITY
START DATE
EST. STOP DATE
COST (millions)
COMMENTS
Algonquin Bypass

Construction of a 4 lane, divided highway.
Algonquin
9/2012
8/2014
$33.346
IMPACT ON TRAVEL: 60F72 2.11 miles of construction of a 4-lane divided highway, diamond interchange, 4 new bridges, retaining walls and noise abatement walls, all for the Algonquin Bypass located in Algonquin in McHenry County.
Bunker Hill Drive

Roadway Reconstruction
Algonquin
5/2014
10/2014
$1.027
IMPACT ON TRAVEL: 63399 Surface removal, HMA binder course, HMA surface course, combination curb and gutter removal & replacement, brick paver removal & replacement on Bunker Hill Drive from Square Barn Rd to Saratoga Circle
TRAFFIC ALERT: Bunker Hill Drive is permanently closed to traffic until job complete.
Country Club Road

Resurfacing
Bull Valley, Woodstock, Dorr Township
7/2014
9/2014
$1.446
IMPACT ON TRAVEL: 63846 This project consists of HMA surface removal, pavement patching, polymerized leveling binder, HMA surface course, pavement markings and aggregate shoulders located on Country Club Road from West Village Limit to East Village Limit and Bull Valley Road from Valley Hill Road to East Nunda Township Limit in the Village of Bull Valley, Woodstock, Dorr Township and Nunda Township
Dean Street

Construction of sidewalk, pavement patching and storm sewers.
Woodstock
7/2014
11/2014
$0.17
IMPACT ON TRAVEL: 61A15 This project consists of the construction of sidewalk, detectable warnings, pavement patching, storm sewer and pavement markings on Dean Street from Kimball Avenue to Prairie Ridge Drive in the City of Woodstock.
Franklinville Road

Bridge construction and resurfacing
Unincorporated McHenery Countiy
6/2014
9/2014
$1.017
IMPACT ON TRAVEL: 61A22 This project consists of the removal of the existing structure and the construction of a PPC I-beam bridge, construction of bridge approach and connector pavement, HMA surface removal, HMA binder and surface course, pavement markings, HMA shoulder and patching on Franklinville Road located, 0.3 mile North of IL 176 over the Kishwaukee River in Unincorporated McHenry County.
Hilltop Dr.

Bridge removal and replacement, curb and gutter
Lake in the Hills
5/2014
8/2014
$0.427
IMPACT ON TRAVEL: 63857 Superstructure removal and replacement including precast, prestressed concrete deck beams (21" depth), steel bridge railing, HMA pavement (full depth), pavement removal, curb and gutter on Hilltop Dr. over Woods Creek.
TRAFFIC ALERT: Lane closures on Hill Top Drive over Woods Creek A signal light is installed for traffic to move through the one lane that they share going either way. Please be careful and watch for other cars and lights, and go through only on your signal light and when it is safe to do so.
OTHER COMMENTS: Just to say again that a signal light and one lane open is shared.
IL 120

Bridge replacement, traffic signal, resurfacing.
McHenry
12/2013
11/2014
$7.188
IMPACT ON TRAVEL: 63750 This project consists of pavement reconstruction, widening and resurfacing, bridge replacement, traffic signal modernization, roadway lighting, storm sewers, storm water processing system and pavement markings located on IL 120 from Front Street to Green Street and IL 31 from IL 120 to McCullom Lake Road in the City of McHenry.
IL 120 (Elm St.)

Bridge repair
McHenry
6/2014
8/2014
$0.487
IMPACT ON TRAVEL: 60X22 Bridge repair including joint reconstructin, structural repair of concrete and other work on the structure carrying IL 120 (Elm St.) over the Fox river located in McHenry.
SUGGESTIONS TO MOTORISTS: Motorists can expect delays during times when the lane closures are in effect and should allow extra time for trips through this area. Drivers are urged to pay close attention to flaggers and signing in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
TRAFFIC ALERT: New traffic pattern. IL 120 (Elm St.) Bridge over the Fox River will be reduced to one lane in each direction during construction starting September 26, 2014. Be alert for workers.
IL 176 & Smith Rd.

Traffic signal installation and channelization
Nunda Township
5/2014
11/2014
$1.539
IMPACT ON TRAVEL: 60K20 Traffic signal installation and channelization at the intersection of IL 176 and Smith Rd. located in unincorporated Nunda Township
IL 22

Resurfacing
Fox River Grove, Lake Barrington, North Barrington
8/2013
7/2014
$1.614
IMPACT ON TRAVEL: 60N33 5.13 miles of resurfacing on IL 22 from US 14 to US 12 (Rand Rd) in Fox River Grove, Lake Barrington and North Barrington.
OTHER COMMENTS: also in Lake
IL 31

Adding lanes, and wall construction
Cary, Lake in the Hills, Crystal Lake
5/2014
12/2014
$5.194
IMPACT ON TRAVEL: 60V72 0.88 miles of additional lanes, retaining wall construction and other associated work on IL 31 fromTrinity Dr. to Rakow Rd. in Cary, Lake in the Hills, and Crystal Lake.
SUGGESTIONS TO MOTORISTS: Slow down, watch for workers, and be prepared to stop. NO cell phone use is allowed in a construction zone.
TRAFFIC ALERT: Two lanes of traffic will e maintained during constructiom.
OTHER COMMENTS: Oversize/overweight truck permit restructions.
IL 31 at Il 176 & at Terra Cotta Ave.

Intersection and traffic signal reconstruction
Crystal Lake, Nunda Township and Unincorporated McHenry County.
7/2012
9/2014
$10.189
IMPACT ON TRAVEL: 62537 Intersection reconstruction and traffic signal modernization of IL 31 at IL 176 and at Terra Cotta Ave. in Crystal Lake, Nunda Township and unincorporated McHenry County.
Jandus Cut Off Road

Roadway Reconstruction
Cary
5/2014
9/2014
$1.537
IMPACT ON TRAVEL: 63886 Removal and disposal of unsuitable materials, earth excavation, Class D patches, full-depth HMA pavement, combination curb and gutter, HMA driveway pavement, retaining wall, roadway lighting, traffic signal modifications an all other incidental items to complete the work on Jandus Cut Off Road from the Union Pacific RR to US 14.
Jessie Rd.

Reconstruction of culvert, pavement and shoulders
Lake in the Hills
5/2014
9/2014
$0.33
IMPACT ON TRAVEL: 63877 Removal and replacement of the existing culvert, pavement removal and replacement, aggregate shoulders and all other incidental items to complete the work on Jessie Rd. over Crystal Creek in the Village of Lake in the Hills.
TRAFFIC ALERT: Full lane closure on Jessie Road over Crystal Creek.
OTHER COMMENTS: Please watch for signs and obey signals.
Johnsburg Rd.

Roundabout intersection at Johnsburg Rd. and Chapel Hill Rd. sidwallks, storm sewer, box culvert, lighting, and landscaping
Johnsburg
5/2014
9/2014
$2.708
IMPACT ON TRAVEL: 63870 Roundabout intersection at Johnsburg Rd. and Chapel Hill Rd. Full depth HMA pavement, sidewalks, curb and gutter, storm sewer, box culvert replacement, decorative pedestrian lighting, roadway lighting, brick paved crosswalks with decorative banding and landscaping located within the Village of Johnsburg
Kreutzer Road

New roadway and bridge construction
Huntley
7/2013
6/2014
$4.171
IMPACT ON TRAVEL: 63743 This project consists of new roadway construction, intersection improvements and construction of a new bridge over Kishwaukee River, located on Kreutzer Road from IL Route 47 to Main St. in the Village of Huntley.
OTHER COMMENTS: Needs fall plainting of trees and there will be daily lane closures.
Prospect Street intersection of IL 76 to US 20

Widening and traffic signals.
Marengo
9/2013
9/2014
$2.886
IMPACT ON TRAVEL: 63532 Reconstruct and widening of Prospect Street from US 20 to IL 176, intersection improvements at IL 176 and US 20, to include the installation of traffic signals located in Marengo.
South of IL 173 over Mokeler Creek

Box culvert, approach pavement and guardrail installation
Harvard
5/2014
9/2014
$0.492
IMPACT ON TRAVEL: 63899 Remove existing cast-in-place triple box culvert with wingwalls and the construction of a triple precast box culvert 9'x7', approach pavement and guardrail installation located south of IL 173 over Mokeler Creek in Harvard
Various

ADA pedestrian ramps
McHenery County
6/2014
10/2014
$0.438
IMPACT ON TRAVEL: 60X36 ADA pedestrian ramps at various locations in McHenry County.
SUGGESTIONS TO MOTORISTS: Daytime flagging operations. Be alert for workers.
TRAFFIC ALERT: ADA pedestrian ramps to be installed in McHenry County beginning Monday June 9, 2014.
OTHER COMMENTS: Watch for workers and be prepareda to stop..