CONSTRUCTION UPDATE REPORT

Kane

Effective: 03/31/14 7:49 AM

LOCATION AND DESCRIPTION MUNICIPALITY
START DATE
EST. STOP DATE
COST (millions)
COMMENTS
Anderson Road

Extension of Anderson Road/grade separation over the Union Pacific RR.
Elburn
10/2013
5/2015
$14.411
IMPACT ON TRAVEL: 63698 Extension of Anderson Road from south of Keslinger Road to Illinois Route 38, construction of a grade separation structure over the Union Pacific Railroad along with associated improvements to Keslinger Road, Hick Drive and Prairie Valley Street including curb and gutter, median construction, pavement widening and resurfacing, traffic signals, ditch grading, landscaping, new storm sewer, construction of two retaining walls and all other incidental items to complete the project in Elburn.
Austin Avenue

Bridge replacement
Aurora, Aurora Township
5/2012
5/2014
$0.398
IMPACT ON TRAVEL: 63660 Project consists of bridge replacement, maintenance of traffic, detour routing, channel grading for permitting requirements and all other incidental items to complete the work on Austin Avenue over Indian Creek in Kane County. (Aurora, Aurora Township)
OTHER COMMENTS: Detour in place
Fabyan Parkway

Widening and resurfacing
Batavia
8/2013
6/2014
$1.107
IMPACT ON TRAVEL: 63818 Project consists of widening Fabyan Parkway to accommodate bi-directional left turn lanes, from east of IL 25 to Nagel Boulevard in Batavia.
IL 31

Intersection improvement
West Dundee
4/2013
5/2014
$2.966
IMPACT ON TRAVEL: 60A95 Intersection improvement including PCC base course widening, HMA surface, sidewalk, traffic signal modernization and other work to be done on IL 31 at the intersection with IL 72 in West Dundee.
IL 31 @ Watkins st.

Intersection improvement, traffic signals
Montgomery
9/2013
9/2014
$1.362
IMPACT ON TRAVEL: 60V53 Intersection reconstruction and traffic signal installation along IL 31 at watkins St. in Montgomery.
IL 38 at Kautz Road

Grade separation, traffic signals, and drainage.
West Chicago and Geneva
11/2012
8/2014
$25.838
IMPACT ON TRAVEL: 60I22 1.86 miles of grade separation, roadway reconstruction, drainage, traffic signals, striping and other work on IL 38 at Kautz Rd. and the Union Pacific Railroad in Geneva and West Chicago.
OTHER COMMENTS: also in DuPage
IL 47

Intersection reconstruction witih left turn lanes/traffic signals
Sugar Grove
8/2013
5/2014
$1.207
IMPACT ON TRAVEL: 63829 Reconstruct the intersection of IL 47 and Wanbonsee Drive/Old Oaks Road to add left turn lanes and the installation of traffic signals, located in unincorporated Sugar Grove, in Kane County.
IL 47 @ the intersection of Cross Street

Construct right turn lanes, traffic signal, barrier wall
Sugar Grove
9/2012
5/2014
$1.082
IMPACT ON TRAVEL: 63700 Construct right turn lanes on the north, south and east legs of the intersection, traffic signal modifications, storm sewer and a PCC barrier wall, located at the intersection of Cross Street and Illinois 47 in the Village of Sugar Grove.
Indian Trail Road over the Fox River

Widening and deck replacement of two bridges.
Aurora
3/2014
8/2014
$0.9779
IMPACT ON TRAVEL: 63863 Work consists of widening and deck replacement of the two structures carrying Indian Trail Road over the Fox River in the City of Aurora. Project will include pavement removal, PCC pavement, sidewalk, curb and gutter, storm sewer, lighting and all incidental work to complete the project in Aurora.
Maple Avenue

Resurfacing, street lighting
Carpentersville
7/2013
6/2014
$7.218
IMPACT ON TRAVEL: 63745 Full depth pavement reconstruction, storm sewer, water main, sanitary sewer, three sided structure replacement, street lighting and a HMA pedestrian path, on Maple Avenue from Washington Street to L.W, Besinger Dr. in the Village of Carpentersville.
Randall Rd.

Resurfacing the existing roadway, patching, striping and related restoration.
North Aurora
5/2014
8/2014
$651268.19
IMPACT ON TRAVEL: 63879 This project consists of resurfacing the existing roadway, patching, stripig and related restoration located on Randall Rd. from Orchard Rd. to Oak St. in the Village of North Aurora.
Sleepy Hollow Road

Construction of a bicycle path.
Sleepy Hollow
9/2013
6/2014
$0.12
IMPACT ON TRAVEL: 63839 This project consists of the construction of a bicycle path including aggregate base course, pipe culvert, topsoil and seeding located on Sleepy Hollow Rd from the Dundee Township Bird Sanctuary Trailhead to Sleepy Hollow Village Hall in the Village of Sleepy Hollow.
US 20 (Lake St.)/McLean Blvd.

Interchange reconstruction and lighting
Elgin
6/2012
9/2014
$34.731
IMPACT ON TRAVEL: 60H45 Interchange reconstruction of US 20 (Lake St.)/McLean Blvd. and bridge replacement of the structure carrying US 20 over McLean Blvd. Also lighting, traffic signal modernization and other work located in Elgin.
US 30

Roadway reconstruction, adding lanes, walls, bridge replacement, signals
Montgomery, Oswego
3/2013
9/2014
$22.341
IMPACT ON TRAVEL: 60I32 2.40 miles of roadway reconstruction including additional lanes, noise abatement walls, bridge replacement, traffic signal modernization and other work on US 30 from Briarcliff Rd. to US 34 in Montgomery and Oswego.
US 30 @ IL 31 & Burlington Northern and Santa Fe Railway Co. RR

Roadway reconstruction, widening, bridge rehabilitation, and traffic signals.
Montgomery
4/2013
10/2014
$21.175
IMPACT ON TRAVEL: 60I33 0.80 mile of roadway reconstruction including widening for added lanes, bridge rehabilitation, traffic signals, striping and other work on US 30 at IL 31 and Burlington Northern and Santa Fe Railway Company Railroad in Montgomery.
OTHER COMMENTS: Also in Kendall
Van Buren Street, William St, and Elgin Avenue

Resurfacing, curb and gutter and storm sewers.
East Dundee
9/2012
5/2014
$2.578
IMPACT ON TRAVEL: 63507 Project consists of earth excavation, removal of existing pavement in stages, driveways, and sidewalk construction of water main, storm sewers, drainage structures, combination curb and gutter, and bituminous concrete pavement together with pavement markings and all other incidental items to complete the work on Van Buren Street from IL 72 to William Street, and on Elgin Avenue from Barrington Road to the South Corporate Limits in the Village of East Dundee.
Various locations in Cook, DuPage and Kane Counties

Wrong way signage and pavement marking on ramps
Bedford Pk., Melrose Pk., Calumet City, Elgin, Downers Grove, McCook, Lyons, Lombard, Bartlett, Palos Pk., Hanover Pk., Elmhurst, Lisle, Streamwood, Summit, Stone Park, Schaumburg, Oak Brook, Northlake, Sugar Grove
5/2014
7/2014
$172316
IMPACT ON TRAVEL: 60X31 Wrong way signage and pavement marking on ramps at various locations in Cook, DuPage and Kane counties.
Wilson Street

Widening and resurfacing.
Batavia
5/2013
5/2014
$3.728
IMPACT ON TRAVEL: 63763 Work consists of widening and resurfacing for additional parking, reconstruction of pedestrian facilities, traffic signal interconnect and modernization, water main replacement and sanitary sewer rehabilitation on Wilson St. From Batavia Avenue to Island Avenue in the City of Batavia.