CONSTRUCTION UPDATE REPORT
Kane
Effective: 02/07/12 4:26 PM
| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
Baseline Road, Horsemen Trail, Caterpillar Drive, Cannonball Trail Extending Baseline Road, widening of Horsemen Trail and Caterpillar Drive. |
Montgomery 11/2009 9/2011 $1.474 |
IMPACT ON TRAVEL:
63207 The project consists of extending Baseline Road from Orchard Road to the existing Baseline Road, Horsemen Trail will be widened and resurfaced, Caterpillar Drive will be widened and resurfaced and new construction at Cannonball Trail at Caterpillar Drive, all located in the Village of Montgomery. |
|
Big Timber Road Reconstruction of Big Timber Road into two 12' lanes |
Rutland Township 6/2011 8/2012 $2.562 |
IMPACT ON TRAVEL:
63196 Project consists of removing two structures, relocating Tyler Creek, construction of a one-span 34" web girder structure, 95'-9 3/8" in length over the relocated Tyler Creek and Pingree Creek and the reconstruction of Big Timber Road into two-12' lanes, 4' median and 8' shoulders, located in Rutland Township in unincorporated northeast Kane County. |
|
Downers Place Removal and replacement of two historic Downer Place Bridges. |
Aurora 1/2012 10/2012 $6.852 |
IMPACT ON TRAVEL:
63620 Project consists of the removal and replacement of the two historic Downer Place Bridges over Fox River which includes HMA resurfacing, curb and gutter, lighting and all other incidental items to complete the work in the City of Aurora. |
|
Farnsworth Avenue Interconnect system which includes traffic signals. |
Aurora 5/2012 8/2012 $1.012 |
IMPACT ON TRAVEL:
63627 Project consists of installing an interconnect system along Farnsworth Avenue between East New York Street and Molitor Road which includes removal and replacement of the existing traffic signals, new traffic signal controllers and cabinets, the addition of uninterruptable power supply, new pedestrian signal heads and pushbuttons, upgrading existing traffic signal heads with light emitting diodes, and all other incidental items to complete the work in the City of Aurora. |
|
Fen Adaptive Management Plan west of McLean Blvd. Concrete parking lot, nature trail, seeding and planting. |
South Elgin 2/2012 6/2013 $1.146 |
IMPACT ON TRAVEL:
63638 Project consists of grading, construction of a driveway and porous concrete parking lot, nature trail installation, construction of a boardwalk, seeding, planting and erosion control to preserve and enhance the natural recharge area of the McLean Fen Adaptive Management Plan located west of the intersection of McLean Boulevard and 250 feet north of Stearns Road in South Elgin. |
|
Galena Boulevard over IL 56 Bridge deck, traffic signals |
Sugar Grove 4/2012 10/2012 $3.245 |
IMPACT ON TRAVEL:
60K76 New bridge deck, traffic signal installation and other work on the structure carrying Galena Boulevard over IL 56, also includes raising the superstructure to increase vertical clearance. |
|
IL 25 and intersection of IL 25 at Illinois Ave. Drainage improvement and traffic signal modernization |
North Aurora 7/2011 3/2012 $0.323 |
IMPACT ON TRAVEL:
60K07 Drainage improvement on IL 25 from south of IL 56 to north of I-88 and traffic signal modernization at the intersection of IL 25 at Illinois Avenue in North Aurora. |
|
IL 31 over METRA Bridge rehabilitation |
Elgin 4/2012 11/2012 $2.696 |
IMPACT ON TRAVEL:
60C06 Bridge rehabilitation consisting of removal and replacement of the bridge deck, along with other repairs to the structure carrying IL Route 31 over METRA, also includes traffic signals and striping, located in Elgin. |
|
IL 38 @ Meredith Road Widening, patching, resurfacing, and traffic signals. |
Unincorporated Virgil Township 9/2011 12/2011 $1.258 |
IMPACT ON TRAVEL:
60K65 Widening, pavement patching, resurfacing, installation of new traffic signals and other work on IL 38 at Meredith Road in Unincorporated Virgil Township, |
|
IL 47 Reconstruction and traffic signal modernization |
Huntley 4/2010 6/2012 $23.783 |
IMPACT ON TRAVEL:
62882 2.51 miles of roadway reconstruction and traffic signal modernization on IL 47 from Kreutzer Road to Reed Road located in Huntley. TRAFFIC ALERT: One lane in each direction with left turn lanes @ signalized intersections. OTHER COMMENTS: Also in McHenry |
|
IL 56 (Butterfield Road) Resurfacing |
Aurora and North Aurora 6/2011 10/2011 $0.74 |
IMPACT ON TRAVEL:
60K81 Resurfacing at two locations along IL 56 (Butterfield Road) from IL 25 to Mitchell Road and from Farnsworth Avenue to the DuPage County Line located in Aurora and North Aurora. |
|
IL 64/Burlington Road Installation of fiber optic cable and traffic signal interconnection |
St. Charles, Campton Township 8/2011 5/2012 $0.597 |
IMPACT ON TRAVEL:
63594 Project consists of controller upgrades, installation of fiber optic cable and terminations and splicing of fiber optic cable for traffic signal interconnection of IL 64 from Randall Road to Burlington Road and on Burlington Road from IL 64 to the Traffic Management Center, located in St. Charles and Campton Township. OTHER COMMENTS: Watch for daily shoulder closures. |
|
IL 72 at Randall lRoad Intersection improvements and traffic signals |
Elgin 2/0212 10/2012 $4.425 |
IMPACT ON TRAVEL:
60K09 1.2 miles of intersection ilmprovements and ataraffic isgnal modernization on all four legs of the intersection of IL Route 72 at Randall Road in Elgin. |
|
Indian Trail Drive Resurfacing, patching, utility structure replacement. |
Aurora 10/2010 12/2011 $0.609 |
IMPACT ON TRAVEL:
63483 Project consists of pavement patching and resurfacing, removal and replacement of curb and gutter and sidewalk, utility structure replacement and all other incidental items to complete the work on Indian Trail Drive from Randall Road to Highland Avenue in Aurora. |
|
Intersection of Randall Road and Bolcum Road Traffic signals, pavement widening, and shoulders. |
St. Charles Township 5/2011 12/2011 $0.923 |
IMPACT ON TRAVEL:
63547 Project consists of the removal of temporary traffic signals, installation of new traffic signals, pavement removal, HMA pavement widening, HMA shoulders, HMA surface removal, polymerized HMA surface, binder and leveling binder, combination concrete curb and gutter removal and replacement, full-depth asphalt pavement patching, placement of pavement markings, restoration and all other incidental items to complete the work at Randall Road and Bolcum Road. |
|
Intersection of Randall Road at Fabyan Parkway Widening, traffic signals,storm sewers, and lighting. |
Batavia, Geneva 5/2011 5/2012 $2.784 |
IMPACT ON TRAVEL:
63533 Reconstruct the intersection of Randall Road at Fabyan Parkway, pavement widening, traffic signal modernization, storm sewers and lighting, located in the City of Geneva and the City of Batavia. |
|
Intersection on IL 31 at Oak St. Reconstruction and traffic signals |
North Aurora 4/2011 12/2011 $0 |
IMPACT ON TRAVEL:
62914 Intersection reconstruction and traffic signal installation on IL 31 (North Lincolnway Street) at Oak Street in North Aurora. |
|
Kimball Street/National Street Traffic signal interconnection system |
Elgin 8/2011 6/2012 $0.119 |
IMPACT ON TRAVEL:
63529 Work consists of modifications and additions to the central business district traffic signal interconnection system, located on Kimball Street from IL 31 to Dundee Avenue and on National Street from IL 31 to Villa Street in the City of Elgin. |
|
North Avenue over the Fox River bridge Fox River Bridge path and Bikeway |
Aurora 6/2011 5/2012 $1.887 |
IMPACT ON TRAVEL:
63517 This work consists of the construction of a four-span bicycle/pedestrian bridge over the Fox River and 2260 lineal feet of HMA bike path. The bridge will be 12 feet clear width and will have two 80-foot approach spans on the west bank and one 40-foot span on the east bank. The main span over the Fox River will be approximately 175 feet long. The Superstructure will be composed of pre-engineered, prefabricated steel truss spans. The approach spans will be steel Pratt trusses. The main span over the Fox River will be a bowstring truss with overlooks at the center of the bridge. The bridge substructure will consist of reinforced concrete abutments and reinforced concrete piers. The substructure units will be supported on steel piles. The bike path will be 10 feet wide and 2,260 feet long. The work also includes MSE retaining wall, reinforced concrete retaining wall, modification of the North Avenue Bridge railing, storm sewers, pavement markings for a crosswalk, erosion control and site restoration. |
|
Orchard Road Widening and reconstruction |
Kane County 7/2011 10/2012 $9.273 |
IMPACT ON TRAVEL:
63541 This work consists of the widening and reconstruction of the existing two-lane Orchard Road. Work will include new PCC pavement, curb and gutter, a 5-cell 4' x 7.6' cast-in-place box culvert, HMA bike trail, storm sewers, permanent traffic signals at the intersections with Aucutt Road and Rochester Drive, lighting improvements, and collateral work required to complete the project, located just north of US Rte. 30 and extends north for 1.26 miles to Jericho Road. |
|
Orchard Road Traffic signal upgrades, pedestrian pushbutton |
Aurora Township 5/2011 6/2012 $0.868 |
IMPACT ON TRAVEL:
63540 Project consists of traffic signal upgrades, cabinet installations, controller and pedestrian push-button upgrades, installation of fiber optic cable and all other incidental items to complete the work on FAP Route 336 (Orchard Road) from Jericho Road to Randall Road in Aurora Township. |
|
Randall Road Installing fiber optic interconnect cable/traffic signals. |
St. Charles and Geneva 5/2011 6/2012 $1.026 |
IMPACT ON TRAVEL:
63525 Install fiber optic interconnect cable and modifications to the existing traffic signals to incorporate these signals into the Kane County ATMS system located on Randall Road from Dean Street to Main Street, in the City of St. Charles and the City of Geneva. |
|
Square Barn Road/Huntley Road/Randall Road Eleven intersections of traffic signals and sidewalk improvements. |
Carpentersville, Algonquin, West Dundee 5/2011 5/2012 $1.098 |
IMPACT ON TRAVEL:
63520 Project consists of the construction of traffic signal interconnects, traffic signal upgrades and traffic signal installations at eleven intersections along with minor sidewalk and striping work at one of the intersections. Beginning at the intersection of Square Barn Road and Huntley Road and extends east along Huntley Road to the intersection of Sleepy Hollow Road and Huntley Road and is also located along Randall Road from County Line Road and extends south along Randall Road to the intersection of Binnie Road and Randall Road in Carpentersville, Algonquin, and West Dundee. |
|
Stearns Road Bridge reconstruction |
South Elgin 9/2011 9/2012 $2.852 |
IMPACT ON TRAVEL:
63595 Project consists of the removal of the existing roadway bridge across the Chicago Central & Pacific Railroad and construction of a new precast prestressed concrete I-Beam bridge, 42", earth excavation, combination concrete curb and gutter, concrete sidewalk, concrete and HMA pavements, construction of storm sewers, landscape restoration and all other incidental items to complete the work on Stearns Road at Umbdenstock Road in South Elgin. |
|
Stearns Road Permanent landscaping, seed beds, seeding, mowing. |
South Elgin, Unincorporated Kane County, Bartlett 7/2011 6/2012 $1.447 |
IMPACT ON TRAVEL:
63542 Project consists of permanent landscaping which includes preparation of seed beds, permanent seeding, mulching, erosion control blankets, trees, shrubbery, control burns, mowing and all other incidental items to complete the work on FAP Rte. 361 (Stearns Road) from Randall Road to DuPage County Line. |
|
Sullivan Road Resurfacing |
Aurora 5/2011 9/2011 $0.376 |
IMPACT ON TRAVEL:
63543 Project consists of HMA surface removal, HMA resurfacing, combination concrete curb and gutter, PCC sidewalk, pavement patching, pavement striping and all other incidental items to complete the work on Sullivan Road between Orchard Road and Edgelawn Drive in Aurora. |
|
US 20 Bridge repairs and resurfacing |
Elgin 8/2011 12/2011 $8.633 |
IMPACT ON TRAVEL:
60M46 Bridge repairs and resurfacing along 5.95 miles of US 20 from east of Weld Road to west of Shales in Elgin. |
|
US 20 Bridge widening, retaining walls. |
Kane County 11/2011 10/2012 $9.764 |
IMPACT ON TRAVEL:
60K90 1.9 miles of advance work including temporary bridge widening, retaining walls, and roadway reconstruction at Fleetwood Drive and Weld Road all along US 20 over McLean Boulevard in Kane County. |
|
Various Resurfacing, traffic signals |
Carpentersville 5/2011 12/2011 $5.276 |
IMPACT ON TRAVEL:
63504 Work to be performed under this contract consists of the reconstruction of Golfview Lane, reconstruction and resurfacing of Monroe Avenue, resurfacing of Hazard Road and widening and resurfacing of Dundee Road (IL 68). A new traffic signal will be installed at the intersection of Golfview Lane and Dundee Road. A proposed water main will be installed along Golfview Lane and Monroe Avenue between Dundee Road and Tee Lane. This work will include, but not be limited, to earth excavation, pavement removal, HMA surface removal, erosion control, subbase granular material, HMA asphalt surface, binder and base courses, combination concrete curb and gutter, PCC sidewalk, storm sewer, sanitary sewer, storm sewer, street lights, restoration and all incidental and collateral work necessary to complete the project. |
|
Various Pavement patching |
DuPage and Kane Counties 8/2011 11/2011 $2.768 |
IMPACT ON TRAVEL:
60N93 Pavement patching on various routes in Kane and DuPage Counties. OTHER COMMENTS: Also in DuPage |