CONSTRUCTION UPDATE REPORT

DuPage

Effective: 07/17/14 1:35 PM

LOCATION AND DESCRIPTION MUNICIPALITY
START DATE
EST. STOP DATE
COST (millions)
COMMENTS
US 20 over I-290

Bridge repairs
Elmhurst
7/2013
9/2014
$0.645
IMPACT ON TRAVEL: 60M97 Bridge deck overlay and bridge joint repairs on the structure carrying US 20 (Lake st.) over I-290 in Elmhurst.
2 locations on IL 53, 1 location on Tamarack Dr. Location #2: 3S439 Tamarack Drive, Glen Ellyn, IL 60137 Location #3: 22W304 IL Route 53, Glen Ellyn, IL 60137

Building demolition
Glen Ellyn
11/2013
8/2014
$0.93
IMPACT ON TRAVEL: 60W74 Location #1: 22W360 IL Route 53, Glen Ellyn, IL 60137 Location #2: 3S439 Tamarack Drive, Glen Ellyn, IL 60137 Location #3: 22W304 IL Route 53, Glen Ellyn, IL 60137
22nd St.

installation of bridge fence railing
Oak Brook
6/2014
8/2014
$0.266
IMPACT ON TRAVEL: 60W58 Removal of the existing metal railing along the north and south edge of the structure carrying 22nd St. over th east/west connector (I-88 & I-294 ramps) and replacing it with bridge fence railing located in Oak Brook.
3 sites along the Elgin O'Hare Expressway

Building demolition
Itasca, Franklin Park
5/2014
7/2014
$0.451
IMPACT ON TRAVEL: 60X50 Building demolition and site cleanup at 3 sites along the Elgin O'Hare Expressway in Itasca and Franklin Park. Locations: 19W144 Thorndale Ave., Itasca, IL 60143 19W073 Thorndale Ave., Itasca, IL 60143 11535 Franklin Ave., Franklin Park, IL 60131
OTHER COMMENTS: Also in Cook County
55th Street

Resurfacing, curb and gutter
Downers Grove Township
4/2012
6/2014
$4.407
IMPACT ON TRAVEL: 63609 Project consists of PCC widening and HMA resurfacing of 55th Street, the complete removal and replacement of 400 ft of 55th Street with full depth HMA on existing horizontal alignment including combination concrete curb and gutter, PCC sidewalk, widening and resurfacing of 500 ft of Clarendon Hills Road and 900 feet of Cass Avenue, traffic signal removal and replacement at the 55th Street and Cass Avenue intersection and new traffic signals installed at the 55th Street and Clarendon Hill Road intersection in Downers Grove Township.
75th Street

Bike path, traffic signals, sewers and drainage structures, and curb and gutter,
Darien
2/2014
11/2014
$0.12
IMPACT ON TRAVEL: 63851 This project consists of earth and furnished excavation, storm sewers and drainage structures, HMA pavement, combination concrete curb and gutter, HMA bike path, PCC sidewalks, guardrail, traffic signals, landscaping, striping and signing to provide additional lanes and traffic signal interconnection on 75th Street from Adams Street to Plainfield Road in Darien.
Commerce Drive

Resurfacing, retaining wall, and sidewalk.
Oak Brook
6/2014
8/2014
$0.298
IMPACT ON TRAVEL: 61A12 Project consists of the installation of a new sidewalk, the removal and replacement of curb and gutter, construction of retaining wall, pavement resurfacing, driveway apron removal and replacement, sewer adjustments, curb patching, pavement markings and all other incidental items to complete the work on Commerce Drive from McDonalds Drive to Harger Road in Oak Brook.
East New York Street

Widening and reconstructing.
Aurora
10/2013
10/2014
$6.78
IMPACT ON TRAVEL: 63838 Project consists of widening and reconstructing East New York Street, a new storm sewer system, installation of traffic signals at Kautz Road, County Line Road and Vaughn Road and roadway lighting, from west of Welsh Drive to west of Asbury Drive in the City of Aurora.
Gary Avenue @ Travis Parkway

Traffic signal, highway lighting
DuPage County
11/2013
8/2014
$0.332
IMPACT ON TRAVEL: 63821 This project consists of modernization and safety improvements to the existing traffic signals, advance warning sign with flashing warning light and the addition of highway lighting, located on Gary Avenue at Travis Parkway in DuPage County.
Greenway Trail

Reconstruction of driveways, sidewalks and pedestrian railing.
Unincorporated Lombard
5/2014
8/2014
$0.466
IMPACT ON TRAVEL: 63813 This project consists of the construction of a multi-use trail including the removal and replacement of driveways, reconstruction of driveways, construction of paved ditch, extending drainage structures, construction of PCC sidewalks, installation of pedestrian railing and segmental concrete block wall, located at Greenway Trail from Great Western Trail to North Avenue in Unincorporated Lombard.
IL 19

Grade separation, new bridge, and retaining walls.
Bensenville
5/2013
9/2014
$18.488
IMPACT ON TRAVEL: 60W01 Grade separation including construction of a bridge, retaining walls and culvert work all located along IL 19 from just east of the intersection of Irving Park Rd. and York Rd. for 1.26 miles, in Bensenville
SUGGESTIONS TO MOTORISTS: IL Route 19/Irving Park Rd. will be closed at the Canadian Pacific Railroad, just east of York Rd. in Bensenville to allow for the erection of structural steel for the new railroad bridge that will carry Canadian Pacific Railroad over IL Route 19/Irving Park Rd.
TRAFFIC ALERT: IL 19 (Irving Park Road) will be closed beginning at 4:00 AM on July 12, 2014 and will be reopened to all traffic at 4:00 AM on July 14, 2014. If inclimate weather is forecast, the closure will be rescheduled for the following weekend, beginning on July 19, 2014 at 4:00 AM and be re-opened on July 21, 2014 at 4:00 AM.
OTHER COMMENTS: DETOUR: EB IL 19 to NB York Rd. to EB Touhy Ave. to SB Mannheim Rd. WB IL 19 to NB Mannheim Rd. to WB Touhy Ave. to SB York Rd.
IL 19

Grade separation and erosion control
Bensenville
4/2013
8/2014
$1.247
IMPACT ON TRAVEL: 60N06 Railroad embankment, temporary soil retention, erosion control and other work associated with the grade separation of IL 19 and the Canadian Pacific Railway (formerly Soo Line) located in Bensenville at York Road.
IL 38 at Kautz Road

Roadway reconstruction
Geneva and West Chicago
11/2012
8/2014
$25838
IMPACT ON TRAVEL: 60I22 1.63 miles of grade separation, roadway reconstruction, drainage, traffic signals, striping and other work on IL 38 at Kautz Rd. and the Union Pacific Railroad in Geneva and West Chicago.
SUGGESTIONS TO MOTORISTS: Stay alert, Motorists should follow traffic pattern and expect delays. Watch for flaggers and workers. Obey informational construction signing.
TRAFFIC ALERT: Switch to Stage 2 MOT, involving the closure of existing eastbound lanes 1 & 2. Westboudn traffic will be reduced to one lane about 2800' east of Technology Blvd and moved to the outside lane (lane 2) eastbound traffic stagfing will begin west of Kirk Rd. and will reduce traffic to one lane. Eastbound traffic will be shifted to inside lane (lane 1) of the westbound lanes east of Kirk Rd. The result will be one lane eastbound and westbound on northside of RT 38. There will be one left turn lane for eastbound IL 38 to northbound Kautz Rd. Kautz Rd. will still be open for stage 2, but the double left turn lane on Kautz Rd. to eastbound IL 38 will be reduced to one.
OTHER COMMENTS: also in Kane
IL 53

Roadway reconstruction, additional lanes, dry land bridge and traffic signals.
Itasca, Addison
9/2011
9/2014
$45.475
IMPACT ON TRAVEL: 60477 4.10 miles of roadway reconstruction, additional lanes, dry land bridge construction, traffic signal modernization and interconnect on IL 53 from Army Trail Road to the Elgin O'Hare Expressway in Itasca and Addison.
IL 56 (Butterfield Rd.)

Traffic signal modernization
Downers Grove
5/2014
8/2014
$0.614
IMPACT ON TRAVEL: 60T98 Traffic signal modernization on IL 56 (Butterfield Rd.) at I-355 (NB & SB ramps) in Downers Grove.
SUGGESTIONS TO MOTORISTS: Motorists: Please expect delays and use caution when workers are present; should allow extra commuting time; an alternate route is encouraged as delays are anticiipated.
TRAFFIC ALERT: Multilane highway with lane closures. Traffic lanes will be reduced during construction activities.
OTHER COMMENTS: Detour route.
IL 59

Traffic signals, reconstruction
Naperville
8/2013
8/2015
$24.38
IMPACT ON TRAVEL: 60R31 1.19 miles of roadway reconstruction, retaining walls, noise abatement walls, traffic signal modernization and other work on IL 59 from N Aurora Rd. to Diehl Rd. in Naperville and unincorporated DuPage County in Naperville.
IL 59

Construction of 5 retaining walls
Naperville
8/2013
9/2014
$5.163
IMPACT ON TRAVEL: 60P42 Construction of 5 concrete retaining walls along IL 59 from New York St./ Aurora Ave. to Ferry Rd. as an advance contract for future construction on IL 59 in Naperville.
IL 59

Roadway reconstruction, traffic signals and lighting
Naperville, Aurora
8/2013
10/2015
$34.618
IMPACT ON TRAVEL: 60R30 1.57 milels of roadway reconstruction, resurfacing, retaining walls, noise abatement walls, lighting, traffic signals and other work on IL 59 from New York St. to N. Aurora Rd. in Naperville and Aurora.
SUGGESTIONS TO MOTORISTS: Motorists are encouraged to watch for changes in the traffic configurations. Motorists should expect delays, use caution when workers are present and allow extra commuting time.
TRAFFIC ALERT: 500 ft. south of N. Aurora Rd., IL 59 traffic at the BNSF RR viaduct will be reduced from 2 lanes to 1 lane in each direction.
IL 59 (Roadway Interchange)

Resurfacing, walls, bridge replacement, lighting
Naperville
8/2013
10/2015
$25.884
IMPACT ON TRAVEL: 60I31 Roadway and interchange reconstruction consisting of construction of retaining walls, bridge replacement, lighting, surveillance, and other related work on IL 59 from 370 ft. north of Diehl Rd to Ferry Road in Naperville
IL 64

Traffic signal modernization @ 3 intersections.
Lombard
8/2013
10/2014
$0.917
IMPACT ON TRAVEL: 60T80 Highway safety improvement on IL 64 consisting of traffic signal modernization at 3 intersections, LED signal heads, median work, striping and other related work from Swift Rd. to I-355 WB in Lombard.
IL 64 (North Ave.)

Bridge replacement
Villa Park, Elmhurst
3/2014
9/2014
$2.907
IMPACT ON TRAVEL: 60V24 Replacement of the PPC deck beam superstructure with concrete wearing surface, substructure repairs and other related work to the bridge carrying IL 64/North Avenue over Salt Creek in Village Park and Elmhurst.
SUGGESTIONS TO MOTORISTS: Motorists should expect delays and watch for workers.
TRAFFIC ALERT: Motorists should expect delays and use caution when workers are present. Motorists should allow extra commuting time. Alternate routes are encouragaed as delays are anticipated.
OTHER COMMENTS: Multilane highway with permanent lane closures; lanes will be reduced to 2 lanes in each direction.
IL 83 (Kingery Hwy and Busse Road)

Traffic signal modernization
Bensenville, Wood Dale
7/2014
5/2015
$1.649
IMPACT ON TRAVEL: 60X35 Traffic Signal modernization along IL 83 (Kingery Hwy and Busse Road) between Thrid Ave./Oak Meadows Dr. and Mork St. in Bensenville and Wood Dale.
IL 83 over the Salt Creek

Bridge deck joint repair
Villa Park.
3/2014
10/2014
$0.416
IMPACT ON TRAVEL: 60T76 Bridge deck joint repair, structural steel repair and other work on the structure carrying IL 83 over the Salt Creek in Villa Park.
Intersections of Winfield Rd @ Mack Rd/87th St. @Lemont/Maple Ave. @ Burr Oak Rd.

Signals/lighting and/or advanced warning signs/and flashers.
Darien and Lisle
8/2013
8/2014
$0.422
IMPACT ON TRAVEL: 63777 This project consists of signal modernization, lighting and/or advanced warning signs/flashers located at the intersections of Winfield Road at Mack Road, 87th Street at Lemont Road and Maple Avenue at Burr Oak Road in Darien and Lisle.
Madison Street

Resurfacing, widening and shoulder repair.
Burr Ridge
5/2013
12/2014
$0.524
IMPACT ON TRAVEL: 63784 This project consists of pavement resurfacing, pavement widening, pavement marking and shoulder repair, located on Madison Street from 91st Street to 79th Street in Burr Ridge.
Main St. & Washington St.

Traffic signal modernization and sidewalk.
West Chicago
10/2013
8/2014
$0.565
IMPACT ON TRAVEL: 60V59 Traffic signal modernization, sidewalk, timing and progression at Main St. and Washington St. in West Chicago.
Maple Street

Parkway restoration, storm sewer, bridge replacement.
Itasca
5/2014
9/2014
$1.165
IMPACT ON TRAVEL: 63775 This project consists of the removal of the existing bridge and replacement with a three sided pre-cast concrete structure, includes pavement removal, earth excavation, erosion and sediment control, HMA pavement, parkway restoration, curb and gutter, water main, sanitary and storm sewer removal and installation located, on Maple Street South of Irving Park Road over Spring Brook Creek in the Village of Itasca
Park Blvd

Resurfacing, parkway restoration, curb and gutter.
Itasca
5/2014
9/2014
$0.896
IMPACT ON TRAVEL: 63895 This project consists of HMA pavement resurfacing, curb and gutter removal and replacement, pavement markings, adjustment of drainage structures, sidewalk construction and parkway restoration on Park Boulevard from Devon Avenue to Thorndale Avenue in the Village of Itasca.
Pasquinelli Drive @ Ogden Avenue

Addition of turn lanes and traffic signals
Westmont
5/2013
9/2014
$1.063
IMPACT ON TRAVEL: 63579 This project consists of reconstruction, addition of turn lanes and modernize existing traffic signals located on Pasquinelli Drive at Ogden Avenue; includes HMA base course; HMA pavement PCC driveway pavement, PCC sidewalk, pavement removal; combination curb and gutter removal; storm sewers; pavement marking tape; pavement markings; signal heads in the Village of Westmont.
Schmale Road

Traffic signals and interconnect work.
Bloomingdale, Carol Stream, Glendale Heights.
8/2013
8/2014
$0.356
IMPACT ON TRAVEL: 63826 Project consists of the modernization of three traffic signals with traffic signal interconnect work, including full-actuated controllers and cabinets, uninterruptable power supply systems, LED traffic and pedestrian signals, emergency vehicle preemption equipment, fiber optic interconnect cable, fiber optic transceivers, loop detectors and all other incidental items to complete the work on Schmale Road from Fullerton Road to Bloomingdale Court in Bloomingdale, Carol Stream, and Glendale Heights. .
Swift Road

Resurfacing and drainage.
Addison
7/2014
11/2014
$1.511
IMPACT ON TRAVEL: 61A14 Project consists of pavement milling, HMA resurfacing, spot curb and gutter and sidewalk replacement, pavement patching, drainage structure adjustment or reconstruction, pavement marking, landscaping and all other incidental items to complete the work on Swift Road from Army Trail Road to US Route 20 (Lake Street) in the Village of Addison.
US 34

Grade separation.
Aurora
6/2014
11/2014
$25.523
IMPACT ON TRAVEL: 60R06 Grade separation along US 34 where Ogden Ave. crosses Canadian National Railroad including new bridge, retaining walls, PCC pavement, noise abatement walls and traffic signals, all located in Aurora.
US 34 (Ogden Ave.)

Beam and bearing fabrication for proposed overpass
Aurora
5/2014
6/2016
$1.626
IMPACT ON TRAVEL: 60W84 Beam and bearing fabrication for the proposed overpass structure is located along US Route 34 between Long Grove Drive and Meadow Lakes Blvd. US Route 34 crosses the Canadian National Railroad approximately 1.5 miles west of Illinois Route 59 in Aurora, Illinois in DuPage County.
US 34 at IL 59

Traffic signal modernization
Aurora, Naperville
6/2014
10/2014
$0.827
IMPACT ON TRAVEL: 60X34 Traffic signal modernization along US 34 at IL 59 in Aurora and Naperville.
US 34 at the Canadian National Railroad

Reconstruction of access road
Aurora
3/2014
8/2014
$1.419
IMPACT ON TRAVEL: 60T83 Reconstruction of an aggregate access road located on US 34 at the Canadian National Railroad located 1.5 miles west of IL 59 in Aurora.
Various

LED installation traffic signal modernization
DuPage County
8/2013
9/2014
$1.059
IMPACT ON TRAVEL: 60W00 LED installation traffic signal modernization at various locations in DuPage County.
Various

LED installation
DuPage County
11/2013
8/2014
$1.223
IMPACT ON TRAVEL: 60W02 LED installation at various locations in DuPage County.
Various

Bridge repairs
Chicago, West Chicago, Elmhurst, Addison Township
5/2014
9/2014
$0.618
IMPACT ON TRAVEL: 60W94 Bridge repairs (steel beam repairs) at various locations in Cook and DuPage Counties.
SUGGESTIONS TO MOTORISTS: Drive with caution and watch for lane closures - as there will be night time lane closures.
TRAFFIC ALERT: Night lane closures: Traffic lanes will be reduced -- at I-290 at Grand Ave.-Elmhurst; I-290 at Keller Ave - Chicago; I-90/94 at Hubbard St. Chicago; and I-90/94 at Augusta Blvd - Chicago.
OTHER COMMENTS: Location 1: I-90/94 at Augusta Blvd. in the City of Chicago, West Chicago Township, Cook County. ?? Location 3: I-90/94 at Hubbard St. In the City of Chicago, West Chicago Township, Cook County. ? Location 4: I-290 at Keeler Ave. In the City of Chicago, West Chicago Township, Cook County. ? Location 5 and 6: I-290 at Grand Ave. and in the City of Elmhurst, Addison Township, DuPage County.
Various routes

Sidewalk and resurfacing,
Downers Grove
5/2014
8/2014
$0.211
IMPACT ON TRAVEL: 63840 Project consists of sidewalk removal and replacement, curb and gutter removal and replacement, earth excavation, HMA binder and surface courses, Class D patching and all other incidental items to complete the work on various routes in the Village of Downers Grove.
OTHER COMMENTS: Location: 1) Seeley Ave at Grant Ave. 2) Blodgett Avenue at Randall St. 3) Bell ailre School, Venard Road to School Limits; and 4) El sierra School, 68th St. to School Limits.
West 22nd St.

Sidewalks, landscaping and an irrigation system.
Oak Brook
5/2013
9/2014
$0.526
IMPACT ON TRAVEL: 63663 Project consists of earth excavation, PCC sidewalk, raised precast planter curbs, landscaping, construction of an automatic irrigation system and all other incidental items to complete the work on FAU Route 1453 (West 22nd Street) from Spring Road to Salt Creek in the Village of Oak Brook.