CONSTRUCTION UPDATE REPORT

DuPage

Effective: 05/16/13 3:22 PM

LOCATION AND DESCRIPTION MUNICIPALITY
START DATE
EST. STOP DATE
COST (millions)
COMMENTS
55th Street

Resurfacing, curb and gutter
Downers Grove Township
4/2012
5/2013
$4.407
IMPACT ON TRAVEL: 63609 Project consists of PCC widening and HMA resurfacing of 55th Street, the complete removal and replacement of 400 ft of 55th Street with full depth HMA on existing horizontal alignment including combination concrete curb and gutter, PCC sidewalk, widening and resurfacing of 500 ft of Clarendon Hills Road and 900 feet of Cass Avenue, traffic signal removal and replacement at the 55th Street and Cass Avenue intersection and new traffic signals installed at the 55th Street and Clarendon Hill Road intersection in Downers Grove Township.
75th Street

Widening, resurfacing, sewers, traffic and roadway lighting
Woodridge, Downers Grove, Darien
3/2012
5/2013
$11.168
IMPACT ON TRAVEL: 63632 Work will consists of roadway widening, resurfacing, construction of storm sewers, combination curb and gutter, sidewalk removal and replacement, traffic signal modernization and roadway lighting from on 75th Street from I-355 to Lyman Avenue, which is located in Woodridge, Downers Grove, and Darien.
75th Street

Bridge reconstruction
Woodridge
6/2012
5/2013
$1.653
IMPACT ON TRAVEL: 63662 Project consists of bridge removal and reconstruction, resurfacing east and west of the bridge, new combination concrete curb and gutter, resurfaced shoulders, landscaped median, and all other incidental items to complete the work on FAP Route 369 (75th Street) over East Branch DuPage River.
Batavia Road

Widening, resurfacing, and landscaping.
Warrenville
5/2013
8/2013
$0.62
IMPACT ON TRAVEL: 63758 This project consists of the widening and resurfacing including combination curb and gutter removal and replacement, HMA surface course removal, pavement patching, structure adjustment, HMA asphalt surface course, sidewalk removal and replacement, new sidewalk, storm sewer installation, pavement marking and landscaping located on Batavia Road from East of IL Route 56 to Warrenville Road in the City of Warrenville.
Book Road

Resurfacing, ADA detectable warnings
Naperville
5/2012
5/2013
$1.102
IMPACT ON TRAVEL: 63659 This project consists of scarification and HMA asphalt pavement resurfacing, patching, curb and gutter removal and replacement, sidewalk removal and replacement with detectable warnings located on Book Road from 111th Street to 87th Street in the City of Naperville.
Fullerton Ave.

Bridge replacement
Addison Township
5/2013
10/2013
$1.579
IMPACT ON TRAVEL: 63785 Project consists of the removal of the existing structure and construction of a precast prestressed concrete deck beam bridge (27" depth), roadway replacement and all other incidental items to complete the work on Fullerton Avenue over Salt Creek between Villa Avenue and Central Avenue near Addison, IL.
Geneva Road, St. Charles Road, Glen Ellyn Road

Traffic signals
Wheaton, Glen Ellyn, Glendale Heights
7/2012
5/2013
$0.833
IMPACT ON TRAVEL: 63625 Project consists of the modernization of fourteen traffic signals with traffic signal interconnect work which includes full actuated controllers in cabinets, posts and mast arm assemblies, LED traffic and pedestrian signals, fiber optic interconnect cable, fiber optic transceivers, loop detectors and all other incidental and collateral work necessary to complete the work on Geneva Road from Schmale Road to St. Charles Road, on St. Charles Road from Geneva Road to Swift Road and on Glen Ellyn Road from Army Trail Road to Armitage Avenue.
Glen Ellyn Road East Branch of the Forest Preserve

Bike Trail connection to Marquordt Middle School
Glendale Heights
9/2012
6/2013
$0.185
IMPACT ON TRAVEL: 63710 This project consists of an asphalt bike trail to provide a connection to Marguordt Middle School along Glen Ellyn Road through the East Branch of the Forest Preserve.
IL 19

Grade separation and erosion control
Bensenville
4/2013
9/2013
$1.247
IMPACT ON TRAVEL: 60N06 Railroad embankment, temporary soil retention, erosion control and other work associated with the grade separation of IL 19 and the Canadian Pacific Railway (formerly Soo Line) located in Bensenville at York Road.
IL 19

Grade separation, new bridge, and retaining walls.
Bensenville
5/2013
9/2013
$18.488
IMPACT ON TRAVEL: 60W01 Grade separation including construction of a bridge, retaining walls and culvert work all located along IL 19 from just east of the intersection of Irving Park Rd. and York Rd. for 1.26 miles, in Bensenville
IL 38

Widening, resurfacing, roadway lighting and traffic signals.
Elmhurst
5/2012
5/2013
$1.785
IMPACT ON TRAVEL: 63610 Reconstruct the intersection at York Street and IL Rte. 38, pavement widening, resurfacing, storm sewer, roadway lighting and traffic signal modernization, located in Elmhurst.
IL 38 (Roosevelt Road)

Traffic signal modernization
Glen Ellyn, Lombard
5/2013
8/2013
$0.522
IMPACT ON TRAVEL: 60T79 Traffic signal modernization consisting of a complete rebuild, UPS, LED signal heads, timing progression and other work on IL 38 (Roosevelt Rd.) at SB & NB I-355 Ramps in Glen Ellyn and Lombard.
IL 38 at Kautz Road

Roadway reconstruction
Geneva and West Chicago
11/2012
10/2013
$25838
IMPACT ON TRAVEL: 60I22 1.63 miles of grade separation, roadway reconstruction, drainage, traffic signals, striping and other work on IL 38 at Kautz Rd. and the Union Pacific Railroad in Geneva and West Chicago.
OTHER COMMENTS: also in Kane
IL 53

Roadway reconstruction, additional lanes, dry land bridge and traffic signals.
Itasca, Addison
9/2011
11/2013
$45.475
IMPACT ON TRAVEL: 60477 4.10 miles of roadway reconstruction, additional lanes, dry land bridge construction, traffic signal modernization and interconnect on IL 53 from Army Trail Road to the Elgin O'Hare Expressway in Itasca and Addison.
Il 53 (Lincoln Ave.) over St. Joseph's Creek

Bridge replacement
Lisle
4/2013
9/2013
$1.499
IMPACT ON TRAVEL: 60M83 Removal of the existing single span bridge and construction of a three-sided precast concrete structure, concrete retaining walls and 5-lanes of HMA pavement carrying IL53 (Lincoln Ave.) over St. Joseph's Creek located 0.2 miles north of US 34 (Ogden Ave.) in Lisle.
IL 56

Reconstruction, widening, resurfacing, traffic signals
Warrenville
5/2011
6/2013
$26.019
IMPACT ON TRAVEL: 62420 3.13 miles of roadway reconstruction, widening, resurfacing and installation of storm sewers and traffic signals on IL Rte. 56 from west of IL Rte. 59 to east of Winfield Road in Warrenville to provide a four lane divided road with a barrier median.
IL 56 (Butterfield Road)

Reconstruction, widening sewers, and traffic signals.
Wheaton
5/2013
7/2013
$26.538
IMPACT ON TRAVEL: 62419 3.08 miles of roadway reconstruction, widening, resurfacing and installation of storm sewers and traffic signals on IL Rte. 56 from east of Winfield Road to west of Naperville Road to provide a four lane divided road with a 30-ft grassed barrier median in the City of Wheaton.
IL 56 (Butterfield Road)

Pump station rehabilitation
DuPage County
8/2011
12/2013
$2.075
IMPACT ON TRAVEL: 82726 Pump station rehabilitation of Pump Station No. 48 along IL 56 (Butterfield Road) in DuPage County.
Il 56 (Butterfield Road) @ Commonwealth Lane

Roadway resurfaciang and widening. Traffic signals and lighting.
Elmhurst
5/2013
10/2013
$1.742
IMPACT ON TRAVEL: 63742 Work consists of roadway resurfacing and widening storm sewer and drainage structure adjustments and installation, roadway lighting, traffic signal modernization and landscaping, located on the centerline of IL 56 (Butterfield Road) at the intersection with Commonwealth Lane in the City of Elmhurst.
IL 64

Traffic signal modernization @ 3 intersections.
Lombard
6/2013
11/2013
$0.917
IMPACT ON TRAVEL: 60T80 Highway safety improvement on IL 64 consisting of traffic signal modernization at 3 intersections, LED signal heads, median work, striping and other related work from Swift Rd. to I-355WB in Lombard.
IL 64

Additional lanes, and bridge replacement
St. Charles, West Chicago
4/2012
9/2013
$39.568
IMPACT ON TRAVEL: 62410 3.55 miles of adding lanes, bridge replacement of IL 64 over Union Pacific Railroad and Elgin, Joliet & Eastern Railway Company and its parents, lighting, resurfacing and traffic signals all located on IL 64 from Dunham Road to IL 59 is St. Charles and West Chicago.
OTHER COMMENTS: Also in Kane County.
Il 83 East Frontage Road

Resurfacing
Elmhurst
5/2013
6/2013
$0.313
IMPACT ON TRAVEL: 0.56 miles of resurfacing on IL 83 East FrontageRoad from Fay Avenue to Babcock Ave. in Elmhurst.
Joliet Street over Kress Creek

Replace box culvert
West Chicago
5/2012
12/2013
$0.47
IMPACT ON TRAVEL: 63561 Remove and replace in–kind an 8 foot by 12 foot dual cell box culvert carrying Joliet Street over Kress Creek and associated roadway work, located in the City of West Chicago.
OTHER COMMENTS: Please follow posted detour.
Lambert Road

Construction of right turn lane and traffic signals
Glen Ellyn
6/2012
4/2013
$0.428
IMPACT ON TRAVEL: 63567 This project consists of the construction of a right turn lane and the relocation of traffic signal and lighting equipment located on Lambert Road at IL Route 38 (Roosevelt Road) in the Village of Glen Ellyn.
Madison Street

Resurfacing, widening nd shoulder repair.
Burr ridge
5/2013
6/2013
$0.524
IMPACT ON TRAVEL: 63784 This project consists of pavement resurfacing, pavement widening, pavement marking and shoulder repair, located on Madison Street from 91st Street to 79th Street in Burr Ridge.
Main Street

Traffic signals
Downer's Grove
5/2013
10/2013
$0.237
IMPACT ON TRAVEL: 63757 Project consists of modernization the existing traffic signals, temporary traffic signals, sidewalks and curb and gutter will be removed and replaced with ADA compliant ramps and detectable warnings, pavement markings, and the new traffic signals will be interconnected to the existing traffic signal system at the intersection of Main Street and Prairie Avenue in the Village of Downer's Grove.
Manchester Road

Milling and resurfacing.
Winfield
5/2013
8/2013
$0.606
IMPACT ON TRAVEL: 63774 Project consists of milling existing roadway and replacing it with binder and surface courses, patching, PCC sidewalk, striping and all other incidental items to complete the work on Manchester Road from Winfield Road to County Line Road in the Village of Winfield.
Old Great Western Trail Railroad

Construction of 3 bridges and a pedestrian path.
Lombard
5/2012
6/2013
$4.418
IMPACT ON TRAVEL: 63568 Project consists of the construction of three bridges and a pedestrian path and the project is located along the Old Great Western Trail Railroad between Grace Street and St. Charles Road in the Village of Lombard.
Pasquinelli Drive @ Ogden Avenue

Addition of turn lanes and traffic signals
Westmont
5/2013
11/2013
$1.063
IMPACT ON TRAVEL: 63579 This project consists of reconstruction, addition of turn lanes and modernize existing traffic signals located on Pasquinelli Drive at Ogden Avenue; includes HMA base course; HMA pavement PCC driveway pavement, PCC sidewalk, pavement removal; combination curb and gutter removal; storm sewers; pavement marking tape; pavement markings; signal heads in the Village of Westmont.
US 12/20 (95th St.)

Traffic signal modernization
Oak Lawn
9/2012
5/2013
$0.363
IMPACT ON TRAVEL: 60T81 This project is located on US Route 12/20 (95th Street) from the intersection of IL Route 50 (Cicero Avenue) to Kostner Avenue in the Village of Oak Lawn.
US 20 (Lake St.) and I-290 and Walnut St.

Interchange reconstruction, traffic signals & lighting.
Elmhurst
3/2011
7/2013
$6.156
IMPACT ON TRAVEL: 62093 Interchange reconstruction, traffic signals, lighting and other work on US 20 (Lake Street) at York Road, and on I-290 and Walnut Street to York Road in Elmhurst.
Various

Sidewalk, curb and gutter
Westmont
7/2011
6/2013
$0.408
IMPACT ON TRAVEL: 63132 Construct sidewalk, curb and gutter removal and replacement, driveway pavement removal and replacement at various locations in Westmont.
Various intersections

Pedestrian countdown signal heads
DuPage County
1/2013
5/2013
$0.76
IMPACT ON TRAVEL: 63718 Project consists of installation of pedestrian countdown signal heads at various intersections in DuPage County.
West 22nd St.

Sidewalks, landscaping and an irrigation system.
Oak Brook
5/2013
7/2013
$0.526
IMPACT ON TRAVEL: 63663 Project consists of earth excavation, PCC sidewalk, raised precast planter curbs, landscaping, construction of an automatic irrigation system and all other incidental items to complete the work on FAU Route 1453 (West 22nd Street) from Spring Road to Salt Creek in the Village of Oak Brook.