CONSTRUCTION UPDATE REPORT

DuPage

Effective: 03/31/14 7:49 AM

LOCATION AND DESCRIPTION MUNICIPALITY
START DATE
EST. STOP DATE
COST (millions)
COMMENTS
US 34 (Ogden Ave.)

Beam and bearing fabrication
Aurora
5/2014
6/2016
$1626272
IMPACT ON TRAVEL: 60W84 Beam and bearing fabrication for the proposed overpass structure carrying US 34 (Ogden Ave.) over the Canadian National and IT's Parents Railroad located 1.5 miles west of IL 59 in Aurora.
IL 64 (North Ave.)

Bridge replacement
Villa Park, Elmhurst
3/2014
9/2014
$2907563.8
IMPACT ON TRAVEL: 60V24 Replacement of the PPC deck beam superstructure with concrete wearing surface, substructure repairs and other related work to the bridge carrying IL 64/North Avenue over Salt Creek in Village Park and Elmhurst.
2 locations on IL 53, 1 location on Tamarack Dr. Location #2: 3S439 Tamarack Drive, Glen Ellyn, IL 60137 Location #3: 22W304 IL Route 53, Glen Ellyn, IL 60137

Building demolition
Glen Ellyn
11/2013
6/2014
$0.93
IMPACT ON TRAVEL: 60W74 Location #1: 22W360 IL Route 53, Glen Ellyn, IL 60137 Location #2: 3S439 Tamarack Drive, Glen Ellyn, IL 60137 Location #3: 22W304 IL Route 53, Glen Ellyn, IL 60137
55th Street

Resurfacing, curb and gutter
Downers Grove Township
4/2012
6/2014
$4.407
IMPACT ON TRAVEL: 63609 Project consists of PCC widening and HMA resurfacing of 55th Street, the complete removal and replacement of 400 ft of 55th Street with full depth HMA on existing horizontal alignment including combination concrete curb and gutter, PCC sidewalk, widening and resurfacing of 500 ft of Clarendon Hills Road and 900 feet of Cass Avenue, traffic signal removal and replacement at the 55th Street and Cass Avenue intersection and new traffic signals installed at the 55th Street and Clarendon Hill Road intersection in Downers Grove Township.
75th Street

Bike path, traffic signals, sewers and drainage structures, and curb and gutter,
Darien
2/2014
11/2014
$0.12
IMPACT ON TRAVEL: 63851 This project consists of earth and furnished excavation, storm sewers and drainage structures, HMA pavement, combination concrete curb and gutter, HMA bike path, PCC sidewalks, guardrail, traffic signals, landscaping, striping and signing to provide additional lanes and traffic signal interconnection on 75th Street from Adams Street to Plainfield Road in Darien.
Continental Drive

Resurfacing, landscaping, and traffic signals
Warrenville
6/2013
6/2014
$0.24
IMPACT ON TRAVEL: 63760 Project consists of shared-use path, sidewalk construction and traffic signal modifications including placement of aggregate base course, HMA binder course, HMA surface course, pavement markings, sidewalk, landscaping, traffic signals and all other incidental items to complete the work on Continental Drive from Johnson Elementary to Kiwanis Park in the City of Warrenville.
East New York Street

Widening and reconstructing.
Aurora
10/2013
10/2014
$6.78
IMPACT ON TRAVEL: 63838 Project consists of widening and reconstructing East New York Street, a new storm sewer system, installation of traffic signals at Kautz Road, County Line Road and Vaughn Road and roadway lighting, from west of Welsh Drive to west of Asbury Drive in the City of Aurora.
Gary Avenue @ Travis Parkway

Traffic signal, highway lighting
DuPage County
11/2013
6/2014
$0.332
IMPACT ON TRAVEL: 63821 This project consists of modernization and safety improvements to the existing traffic signals, advance warning sign with flashing warning light and the addition of highway lighting, located on Gary Avenue at Travis Parkway in DuPage County.
Greenway Trail

Reconsatruction of driveways, sidewalks and pedestrian railing.
Unincorporated Lombard
10/2013
7/2014
$0.466
IMPACT ON TRAVEL: 63813 This project consists of the construction of a multi-use trail including the removal and replacement of driveways, reconstruction of driveways, construction of paved ditch, extending drainage structures, construction of PCC sidewalks, installation of pedestrian railing and segmental concrete block wall, located at Greenway Trail from Great Western Trail to North Avenue in Unincorporated Lombard.
IL 19

Grade separation and erosion control
Bensenville
4/2013
6/2014
$1.247
IMPACT ON TRAVEL: 60N06 Railroad embankment, temporary soil retention, erosion control and other work associated with the grade separation of IL 19 and the Canadian Pacific Railway (formerly Soo Line) located in Bensenville at York Road.
IL 19

Grade separation, new bridge, and retaining walls.
Bensenville
5/2013
7/2014
$18.488
IMPACT ON TRAVEL: 60W01 Grade separation including construction of a bridge, retaining walls and culvert work all located along IL 19 from just east of the intersection of Irving Park Rd. and York Rd. for 1.26 miles, in Bensenville
IL 38 (Roosevelt Rd.)

New Bridge
Oakbrook
8/2013
5/2014
$1.062
IMPACT ON TRAVEL: 60N77 Bridge deck overlay and bridge joint repairs on the structure carrying IL 38 (Roosevelt Rd.) at IL 56 (Butterfield Rd.) (S.N. 022-0114) in Oakbrook.
IL 38 (Roosevelt Road)

New bridge overlay
West Chicago
8/2013
6/2014
$0.358
IMPACT ON TRAVEL: 60P86 Deck overlay and joint reconstruction along with other related work on IL 38 (Roosevelt Rd.) over west branch DuPage River in West Chicago.
IL 38 at Kautz Road

Roadway reconstruction
Geneva and West Chicago
11/2012
10/2013
$25838
IMPACT ON TRAVEL: 60I22 1.63 miles of grade separation, roadway reconstruction, drainage, traffic signals, striping and other work on IL 38 at Kautz Rd. and the Union Pacific Railroad in Geneva and West Chicago.
OTHER COMMENTS: also in Kane
IL 53

Roadway reconstruction, additional lanes, dry land bridge and traffic signals.
Itasca, Addison
9/2011
6/2014
$45.475
IMPACT ON TRAVEL: 60477 4.10 miles of roadway reconstruction, additional lanes, dry land bridge construction, traffic signal modernization and interconnect on IL 53 from Army Trail Road to the Elgin O'Hare Expressway in Itasca and Addison.
IL 53 (Lincoln Ave.) over St. Joseph's Creek

Bridge replacement
Lisle
4/2013
5/2014
$1.499
IMPACT ON TRAVEL: 60M83 Removal of the existing single span bridge and construction of a three-sided precast concrete structure, concrete retaining walls and 5-lanes of HMA pavement carrying IL 53 (Lincoln Ave.) over St. Joseph's Creek located 0.2 miles north of US 34 (Ogden Ave.) in Lisle.
OTHER COMMENTS: Spring pla nting.
IL 56

Reconstruction, widening, resurfacing, traffic signals
Warrenville
5/2011
5/2015
$26.019
IMPACT ON TRAVEL: 62420 3.13 miles of roadway reconstruction, widening, resurfacing and installation of storm sewers and traffic signals on IL Rte. 56 from west of IL Rte. 59 to east of Winfield Road in Warrenville to provide a four lane divided road with a barrier median.
IL 56 (Butterfield Road)

Reconstruction, widening sewers, and traffic signals.
Wheaton
5/2011
5/2015
$26.538
IMPACT ON TRAVEL: 62419 3.08 miles of roadway reconstruction, widening, resurfacing and installation of storm sewers and traffic signals on IL Rte. 56 from east of Winfield Road to west of Naperville Road to provide a four lane divided road with a 30-ft grassed barrier median in the City of Wheaton.
Il 56 (Butterfield Road) @ Commonwealth Lane

Roadway resurfacing and widening. Traffic signals and lighting.
Elmhurst
5/2013
5/2014
$1.742
IMPACT ON TRAVEL: 63742 Work consists of roadway resurfacing and widening storm sewer and drainage structure adjustments and installation, roadway lighting, traffic signal modernization and landscaping, located on the centerline of IL 56 (Butterfield Road) at the intersection with Commonwealth Lane in the City of Elmhurst.
IL 59

Traffic signals, resurfacing.
Naperville
8/2013
8/2015
$24.38
IMPACT ON TRAVEL: 60R31 1.19 miles of roadway reconstruction, retaining walls, noise abatement walls, traffic signal modernization and other work on IL 59 from N Aurora Rd. to Diehl Rd. in Naperville and unincorporated DuPage County in Naperville.
IL 59

Construction of 5 retaining walls
Naperville
8/2013
7/2014
$5.163
IMPACT ON TRAVEL: 60P42 Construction of 5 concrete retaining walls along IL 59 from New York St./ Aurora Ave. to Ferry Rd. as an advance contract for future construction on IL 59 in Naperville.
IL 59

Roadway reconstruction, traffic signals and lighting
Naperville, Aurora
8/2013
8/2015
$34.618
IMPACT ON TRAVEL: 60R30 1.57 milels of roadway reconstruciton, resurfacing, retaining walls, noise abatement walls, lighting, traffic signals and other work on IL 59 from New York St. to N. Aurora Rd. in Naperville and Aurora.
IL 59 (Roadway Interchange)

Resurfacing, walls, bridge replacement, lighting
Naperville
8/2013
10/2015
$25.884
IMPACT ON TRAVEL: 60I31 Roadway and interchange reconstruction consisting of construction of retaining walls, bridge replacement, lighting, surveillance, and other related work on IL 59 from 370 ft. north of Diehl Rd to Ferry Road in Naperville
IL 64

Traffic signal modernization @ 3 intersections.
Lombard
6/2013
5/2014
$0.917
IMPACT ON TRAVEL: 60T80 Highway safety improvement on IL 64 consisting of traffic signal modernization at 3 intersections, LED signal heads, median work, striping and other related work from Swift Rd. to I-355 WB in Lombard.
IL 64 (North Avenue)

Resurfacing
Elmhurst, Villa Park
6/2013
6/2014
$0.773
IMPACT ON TRAVEL: 60N47 2.44 miles of resurfacing on IL 64 (North Ave.) from Villa Ave. to DuPage County Line in Elmhurst and Villa Park.
IL 83

Resurfacing
Elmhurst, Addison, Wood Dale, Bensenville
6/2013
5/2014
$5.878
IMPACT ON TRAVEL: 60V54 3.44 miles of resurfacing on IL 83 from IL 64 to IL 19 in Elmhurst, Addison, Wood Dale, and Bensenville.
IL 83

Resurfacing, and drainage.
Elk Grove Village, Bensenville, Wood Dale.
8/2013
5/2014
$6.985
IMPACT ON TRAVEL: 60N49 3.85 miles of milling, resurfacing, drainage and other work on IL 83 from IL 19 to IL 72 in Elk Grove Village, Bensenville, and Wood Dale.
IL 83 over the Salt Creek

Bridge deck joint repair
Villa Park.
3/2014
7/2014
$0.416
IMPACT ON TRAVEL: 60T76 Bridge deck joint repair, structural steel repair and other work on the structure carrying IL 83 over the Salt Creek in Villa Park.
Intersections of Winfield Rd @ Mack Rd/87th St. @Lemont/Maple Ave. @ Burr Oak Rd.

Signals/lighting and/or advanced warning signs/and flashers.
Darien and Lisle
8/2013
6/2014
$0.422
IMPACT ON TRAVEL: 63777 This project consists of signal modernization, lighting and/or advanced warning signs/flashers located at the intersections of Winfield Road at Mack Road, 87th Street at Lemont Road and Maple Avenue at Burr Oak Road in Darien and Lisle.
Joliet Street over Kress Creek

Replace box culvert
West Chicago
5/2012
5/2014
$0.47
IMPACT ON TRAVEL: 63561 Remove and replace in kind an 8 foot by 12 foot dual cell box culvert carrying Joliet Street over Kress Creek and associated roadway work, located in the City of West Chicago.
OTHER COMMENTS: Please follow posted detour.
Madison Street

Resurfacing, widening and shoulder repair.
Burr Ridge
5/2013
12/2014
$0.524
IMPACT ON TRAVEL: 63784 This project consists of pavement resurfacing, pavement widening, pavement marking and shoulder repair, located on Madison Street from 91st Street to 79th Street in Burr Ridge.
Main St. & Washington St.

Traffic signal modernization and sidewalk.
West Chicago
10/2013
7/2014
$0.565
IMPACT ON TRAVEL: 60V59 Traffic signal modernization, sidewalk, timing and progression at Main St. and Washington St. in West Chicago.
Manchester Road

Milling and resurfacing.
Winfield
5/2013
6/2014
$0.606
IMPACT ON TRAVEL: 63774 Project consists of milling existing roadway and replacing it with binder and surface courses, patching, PCC sidewalk, striping and all other incidental items to complete the work on Manchester Road from Winfield Road to County Line Road in the Village of Winfield.
Pasquinelli Drive @ Ogden Avenue

Addition of turn lanes and traffic signals
Westmont
5/2013
6/2014
$1.063
IMPACT ON TRAVEL: 63579 This project consists of reconstruction, addition of turn lanes and modernize existing traffic signals located on Pasquinelli Drive at Ogden Avenue; includes HMA base course; HMA pavement PCC driveway pavement, PCC sidewalk, pavement removal; combination curb and gutter removal; storm sewers; pavement marking tape; pavement markings; signal heads in the Village of Westmont.
Schmale Road

Traffic signals and interconnect work.
Bloomingdale, Carol Stream, Glendale Heights.
8/2013
6/2014
$0.356
IMPACT ON TRAVEL: 63826 Project consists of the modernization of three traffic signals with traffic signal interconnect work, including full-actuated controllers and cabinets, uninterruptable power supply systems, LED traffic and pedestrian signals, emergency vehicle preemption equipment, fiber optic interconnect cable, fiber optic transceivers, loop detectors and all other incidental items to complete the work on Schmale Road from Fullerton Road to Bloomingdale Court in Bloomingdale, Carol Stream, and Glendale Heights. .
US 20 over I-290

Bridge repairs
Elmhurst
7/2013
5/2014
$0.645
IMPACT ON TRAVEL: 60M97 Bridge deck overlay and bridge joint repairs on the structure carrying US 20 (Lake st.) over I-290 in Elmhurst.
US 34

Resurfacing, landscaping
Lisle
7/2013
5/2014
$0.15
IMPACT ON TRAVEL: 63819 This project consists of sidewalk construction, earthwork, curb and gutter removal and replacement, driveway pavement removal and replacement, drainage structure adjustments, segmental concrete block wall, thermoplastic pavement markings and landscaping, located on US 34 from Yackley Avenue to Schwartz Avenue in the Village of Lisle.
US 34 at the Canadian National Railroad

Reconstruction of access road
Aurora
3/2014
7/2014
$1.419
IMPACT ON TRAVEL: 60T83 Reconstruction of an aggregate access road located on US 34 at the Canadian National Railroad located 1.5 miles west of IL 59 in Aurora.
Various

LED installation traffic signal modernization
DuPage County
8/2013
3/2014
$1.059
IMPACT ON TRAVEL: 60W00 LED installation traffic signal modernization at various locations in DuPage County.
Various

Riprap placement at 6 bridges
Cicago, Maywood, Northbrook, Palatine, rosemont, Itasca
7/2013
6/2014
$0.495
IMPACT ON TRAVEL: 60T52 Riprap placement at 6 bridges located in chicago, Maywood, Northbrook, Palatine, Rosemont, and Itasca.
OTHER COMMENTS: Also in Cook
Various

LED installation
DuPage County
11/2013
8/2014
$1.223
IMPACT ON TRAVEL: 60W02 LED installation at various locations in DuPage County.
Various locations

Installation of street signs & pavement markings
Glendale Heights
8/2013
8/2014
$0.34
IMPACT ON TRAVEL: 63832 This project consists of the installation of street signs and pavement markings at various locations within the Village of Glendale Heights.
various locations

Sidewalk construction
Naperville
7/2013
5/2014
$0.267
IMPACT ON TRAVEL: 63810 This project consists of sidewalk construction, curb and gutter replacement, HMA and PCC driveway pavement, brick pavers and segmental block retaining wall, located at various locations in the City of Naperville.
Various locations in Cook, DuPage and Kane Counties

Wrong way signage and pavement marking on ramps
Bedford Pk., Melrose Pk., Calumet City, Elgin, Downers Grove, McCook, Lyons, Lombard, Bartlett, Palos Pk., Hanover Pk., Elmhurst, Lisle, Streamwood, Summit, Stone Park, Schaumburg, Oak Brook, Northlake, Sugar Grove
5/2014
7/2014
$172316
IMPACT ON TRAVEL: 60X31 Wrong way signage and pavement marking on ramps at various locations in Cook, DuPage and Kane counties.
West 22nd St.

Sidewalks, landscaping and an irrigation system.
Oak Brook
5/2013
6/2014
$0.526
IMPACT ON TRAVEL: 63663 Project consists of earth excavation, PCC sidewalk, raised precast planter curbs, landscaping, construction of an automatic irrigation system and all other incidental items to complete the work on FAU Route 1453 (West 22nd Street) from Spring Road to Salt Creek in the Village of Oak Brook.
Winfield Road

Bridge reconstruciton
Winfield
7/2013
5/2014
$0.448
IMPACT ON TRAVEL: 63812 Project consists of the complete removal of the existing structure and replacement with a single span cast in- place structure, bridge approach pavement, sidewalk removal and replacement, curb and gutter removal and replacement and all other incidental items to complete the work to carryWinfield Road over Spring Brook in the Village of Winfield.
Wolf's Crossing road and East New York Street

Traffic signals interconnect
Aurora
7/2013
5/2014
$1.352
IMPACT ON TRAVEL: 63786 This project consists of interconnecting the traffic signals between Wolf's Crossing Road and East New York Street and the integration into the Aurora Centralized Traffic Management System in Aurora.
OTHER COMMENTS: Also in Will County