CONSTRUCTION UPDATE REPORT
City of Chicago
Effective: 05/16/13 3:22 PM
| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
39th Street Bridge repair |
Chicago 5/2012 4/2013 $0.412 |
IMPACT ON TRAVEL:
60P87 Repairs to the substructure and structural steel carrying 39th St. over Racine Ave. and I-90/94 over Ashland Ave. in Chicago. |
|
Congress Parkway Rehabilitation of the existing bridge. |
Chicago 3/2010 5/2013 $33.012 |
IMPACT ON TRAVEL:
60D61 Rehabilitation of the existing bridge carrying Congress Parkway over the south branch of the Chicago River and bridge painting with other repairs to the structure carrying Congress Parkway between Chicago River and Post Office all located in the City of Chicago. |
|
East side of Doty Avenue Rehabilitation of existing IDOT pumping station |
Chicago 8/2010 6/2013 $6.668 |
IMPACT ON TRAVEL:
60799 Complete rehabilitation of the existing IDOT pumping station number 27 located at the east side of Doty Avenue at 110th Street along I-94/Bishop Ford Expressway. |
|
I-190/I-294 (Tri-State Tollway) Storm sewer installation |
Chicago, Rosemont 4/2012 3/2013 $9.397 |
IMPACT ON TRAVEL:
60F90 Storm sewer installation at I-190/I-294 (Tri-State Tollway) from the Canadian National Railroad to the Des Plaines River in Chicago and Rosemont. |
|
I-90/94 (Dan Ryan Expressway) Rehabilitation of two Pump stations |
Chicago 8/2010 6/2013 $4.004 |
IMPACT ON TRAVEL:
60828 Rehabilitation of Pump Station 26 along I-90/94 (Dan Ryan Expressway) at Roosevelt Road and Union Avenue near UIC in Chicago. |
|
I-90/94 (Dan Ryan Expressway) Painting 54 bridges |
Chicago 8/2011 9/2013 $2.948 |
IMPACT ON TRAVEL:
60N01 Painting 54 bridges at various locations along I-90/94 (Dan Ryan Expressway) from Cermak Road to Canal Street in Chicago. |
|
I-90/94/290 Barrier wall installation, signing, drainage, and retaining wall, shoulder widening. |
Chicago 4/2012 5/2013 $1.704 |
IMPACT ON TRAVEL:
60P67 Barrier wall installation, signing modification, drainage revisions, retaining wall, shoulder widening and other work along I-90/94/290 (Circle Interchange at Hubbard Street to Polk Street and Western Street to Wells Street) in Chicago. |
|
I-94/90 New retaining walls, ramp pavement, and signing. |
Chicago 6/2009 5/2013 $9.272 |
IMPACT ON TRAVEL:
62408 Construction of new retaining walls, ramp pavement, signing and other work on I-94/90 from Hubbard's Cave to I-290 in Chicago. |
|
IL 21 Traffic signal modernizatrion at 8 intersections. |
Chicago, Niles, Morton Grove 10/2012 6/2013 $1.995 |
IMPACT ON TRAVEL:
60R44 kTraffic signal modernization along IL 21 at 8 intersections including new mast arms, controllers, LED signal heads and pavement markings. OTHER COMMENTS: Also in Niles and Morton Grove. |
|
IL 43 (Harlem Avenue) Bridge painting |
Chicago 6/2013 8/2013 $0.247 |
IMPACT ON TRAVEL:
60V89 Bridge painting of 2 existing structures carrying IL 43 (Harlem Ave.) over Illinois Central Railway in Chicago. |
|
IL 50 Safety project |
Cicero, Stickney, Chicago 8/2012 6/2013 $0.529 |
IMPACT ON TRAVEL:
60L26 Safety project on IL 50 from 34th St. to Pershing Road in cicero, Stickney and Chicago. OTHER COMMENTS: Also in Stickney and Cicero. |
|
Ogden Avenue Bridge deck patching, and sidewalk replacement |
Chicago 8/2012 8/2013 $0.62 |
IMPACT ON TRAVEL:
60T39 Bridge deck patching, joint replacement and sidewalk replacement on the structure carrying Ogden Ave. over I-290 (Eisenhower Expy.) in Chicago. |
|
Ohio St. Feeder over N. Branch Chicago River, Kingsbury St, & Union Pacific RR Bridge painting and cleaning. |
Chicago 4/2013 7/2013 $1.099 |
IMPACT ON TRAVEL:
60L32 Removing asbestos panels and replacing with fiberglass panels cleaning and painting of the existing structures at various locations carrying the Ohio St. Feeder over N. Branch Chicago River and Ohio St. Feeder East approach over Kingsbury St., and Ohio St. Feeder over Union Pacific Railroad located in Chicago. |
|
Ohio Street Feeder Cleaning and painting of existing structures at 3 locations. |
Chicago 4/2013 7/2013 $1.099 |
IMPACT ON TRAVEL:
60L32 Removing asbestos panels and replacing with fiberglass panels cleaning and painting of the existing structures at various locations carrying the Ohio St. Feeder over N. Branch Chicago River and Ohio St. Feeder East approach over Kingsbury St., and Ohio St. Feeder over Union Pacific Railroad located in Chicago. |
|
Roosevelt Road Bridge deck sealing, joint reconstruction |
Chicago 4/2012 4/2013 $0.238 |
IMPACT ON TRAVEL:
60P89 Bridge deck sealing and joint reconstruction on the structure at the Dan Ryan Expressway and Roosevelt Rd. in Chicago. |
|
Sheridan Road Resurfacing, traffic signals, and roadway lighting. |
Chicago 11/2012 4/2013 $1.21 |
IMPACT ON TRAVEL:
63715 Project consists of roadway resurfacing with intersection improvements which includes ADA ramps, traffic signal modernization, concrete curb and gutter
removal and replacement, sidewalk reconstruction, constructing planters at
designated locations, roadway lighting, construction of a plaza, drainage improvements, landscaping and all other incidental items to complete the work on Sheridan Road at Loyola Avenue at Loyola University in Chicago. |
|
US 14 (Peterson Ave) Bridge repair |
Chicago 3/2013 6/2013 $0.441 |
IMPACT ON TRAVEL:
60T67 Substructure and structural steel repair on the structure carrying US 14 (Peterson Ave.) over the North Shore Channel in Chicago. |
|
Various Cleaning and painting bridges |
Chicago 8/2012 7/2013 $2.147 |
IMPACT ON TRAVEL:
60P73 Cleaning and painting of steel structures at various locations along I-90/94 from Canal St. to 28th St. in Chicago. |
|
Various locations Sidewalk and curb and gutter repairs |
Chicago 5/2012 4/2013 $0.219 |
IMPACT ON TRAVEL:
60P99 Curb and gutter repair and sidewalk repairs at various locations near Midway Airport. |
|
various locations near Midway Airporat Curb and gutter |
Chicago 10/2012 5/2013 $0.219 |
IMPACT ON TRAVEL:
60V31 Curb and gutter repairs at various locations near Midway Airport in Chicago |