CONSTRUCTION UPDATE REPORT

Central Cook

Effective: 06/19/13 3:42 PM

LOCATION AND DESCRIPTION MUNICIPALITY
START DATE
EST. STOP DATE
COST (millions)
COMMENTS
5th Avenue over Silver Creek

Bridge replacement
Melrose Park
4/2012
5/2013
$0.939
IMPACT ON TRAVEL: 62116 Bridge replacement for the structure carrying 5th Avenue over Silver Creek in Melrose Park.
95th Street

Intersection reconstruction and traffic signal installation
Palos Township
6/2012
5/2013
$2.829
IMPACT ON TRAVEL: 62377 Intersection reconstruction and traffic signal installation along 95th Street at 104th Avenue/Flavin Road in Palos Township.
Central Avenue over I-55

Interchange reconstruction/bridge rehabilitation
Forest View
9/2011
9/2013
$37.657
IMPACT ON TRAVEL: 60999 Interchange reconstruction and bridge rehabilitation at Central Avenue over I-55 in Forest View.
Hillside Avenue

Resurfacing
Hillside
9/2012
5/2013
$0.138
IMPACT ON TRAVEL: 63720 This project consists of 0.16 miles of milling, HMA resurfacing, aggregate base repair and pavement marking, located on Hillside Avenue from Harrison Street to Darmstadt Road in the Village of Hillside.
OTHER COMMENTS: Day lane closures.
I-55 at Central Avenue

Bridge work
Forest View
1/2011
5/2013
$8.474
IMPACT ON TRAVEL: 60L39 Beam, bearing and modular expansion joint fabrication for I-55 at Central Avenue interchange modification contract located in Forest View.
I-94 & I-290

Protective shielding on 3 structures
Berkeley, Broadview, Lincolnwood
4/2013
6/2013
$0.147
IMPACT ON TRAVEL: 60T69 Permanent protective shielding on 3 structures along I-94 and I-290 in Berkeley, Broadview, and Lincolnwood.
IL 171 (1st Ave.)

Resurfacing and drainage
McCook, Lyons
8/2012
6/2013
$2.423
IMPACT ON TRAVEL: 60T38 1.0 mile of resurfacing and drainage correction along IL 171 (1st Ave.) from south of 44th St. to I-55 (Stevenson Expressway) in McCook and Lyons.
IL 43

Installation of concrete deck beam
Forest View, Stickney Township, Burnham, Clumet City Township
8/2012
5/2013
$0.169
IMPACT ON TRAVEL: 60T55 The improvement consist of prestressed concrete deck beams that are located on the structures carrying, 1) IL 43 NB (Harlem Ave.) over CN & MWRD (Sludge) RR in the Village of Forest View, Stickney Township and 2) Torrence Ave. over the Grand Calumet River in the Village of Burnham, Calumet City Township.
IL 43 (Harlem Ave.)

Bridge painting
Forest View
6/2013
8/2013
$0.697
IMPACT ON TRAVEL: 60V87 Bridge painting of the structures carrying IL 43 (Harlem Ave.) over the Sanitary & Ship Canal in Forest View.
IL 43 (Harlem Ave.)

Horizontal realignment
Stickney, Lyons
5/2013
7/2013
$0.217
IMPACT ON TRAVEL: 60T14 Horizontal realignment on IL 43 (Harlem Ave.) from 39th St./Pershing Rd. to 40th Place in Stickney and Lyons.
IL 43 (Harlem Avenue)

Resurfacing
Chicago, Berwyn, Riverside, Forest Park, Oak Park, River Forest, Elmwood Park, Norridge
4/2012
6/2013
$3.949
IMPACT ON TRAVEL: 60L86 5.69 miles of resurfacing on IL 43 (Harlem Avenue) from 26th Street to Cullom Avenue in Chicago, Berwyn, Riverside, Forest Park, Oak Park, River Forest, Elmwood Park and Norridge.
IL 43 (Harlem Avenue)

Resurfacing and drainage improvements.
Bridgeview, Bedford Park, Summit, Burbank
4/2012
5/2013
$1.508
IMPACT ON TRAVEL: 60L78 1.92 miles of resurfacing and drainage improvements on IL 43 (Harlem Avenue) from 65th Street to 79th Street in Bridgeview, Bedford Park, Summit and Burbank.
IL 64 (North Avenue)

Resurfacing
Oak Park, Chicago
4/2012
5/2013
$0.639
IMPACT ON TRAVEL: 60R02 0.63 mile of resurfacing on IL 64 (North Avenue) from Elmwood Avenue to Ridgeland Avenue and Austin Avenue to Central Avenue in Oak Park and Chicago.
IL 83 (Kingery Highway)

Bridge painting
Lemont
7/2013
11/2013
$0.982
IMPACT ON TRAVEL: 60V60 Bridge painting on the structure carrying IL 83 (Kingery Highway) over the S & S and I & M Canals in Lemont.
Intersection of Joliet Road and Lenzi Ave.

Widening, storm sewers
McCook, Hodgkins
5/2013
7/2013
$0.133
IMPACT ON TRAVEL: 60T48 Intersection improvement consisting of widening, HMA surface, curb and gutter, televising and cleaning storm sewer and other work at the intersection of Joliet Rd. and Lenzi Ave. in McCook and Hodgkins.
Lemont Road

Cleaning and repairing damaged drainage
Melrose Park
6/2012
5/2013
$0.296
IMPACT ON TRAVEL: 60T31 Cleaning and repairing damaged drainage scuppers and downspouts on structures located on Lemont Rd. over Des Plaines River, I&M Canal and Railroad in Lemont and Mannheim Rd. over Proviso Railroad Yard in Melrose Park.
McCarthy Road and Walker Road

Channelization and traffic signal modernization
Lemont
4/2013
9/2013
$1.766
IMPACT ON TRAVEL: 60L79 Channelization and traffic signal modernization on McCarthy Road and Walker Road, located 0.5 miles west of Archer Ave. in Lemont.
Southwest Highway

5' wide sidewalk, seeding, sodding, and traffic signals
Palos Heights
5/2013
7/2013
$0.194
IMPACT ON TRAVEL: 63732 Project consists of the construction of the 5 foot wide PCC sidewalk, seeding, sodding, traffic signal modification and all other incidental items to complete the work on Southwest Highway south of 117th Street to the Cal-Sag Channel in the City of Palos Heights.
St. Charles Road

Resurfacing, sidewalk, storm sewer and pavement markings
Maywood
5/2010
5/2013
$1.477
IMPACT ON TRAVEL: 63428 Reconstruction and resurfacing with removal and replacement of curb and gutter, sidewalk, driveway apron, storm sewer and drainage structures, pavement markings and all other incidental items to complete the work on FAU Rte. 1397 (St. Charles Road) from 21st Avenue to 5th Avenue in the Village of Maywood.
Various

Guardrail improvements
North Riverside, Riverside, Summit, Justice, Willow Springs, Oak Lawn, Evergreen Park
5/2012
5/2013
$0.682
IMPACT ON TRAVEL: 60R21 Guardrail imporvements at 24 locations in Cook County.
Various routes

Bridge painting
Cook County
5/2013
8/2013
$0.323
IMPACT ON TRAVEL: 60V84 Bridge painting of 5 steel structures at various routes in Cook County.