Illinois Department of Transportation, Ann L. Schneider, Secretary
Loading
Patrick J. Quinn, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info



District 1
Counties include: Cook, DuPage, Kane, Lake, McHenry, Will

CURRENT CONSTRUCTION PROJECTS

Chicago and Suburb Construction Details - Chicago area construction projects for McHenry, Lake, Kane, Dupage, Will, and Cook counties.
Illinois 53 (Rohlwing Road) Widening and Reconstruction Project - Illinois Route 53 (Rohlwing Road) from Army Trail Road on the southern limits to the Elgin O’ Hare Expressway on the northern limits.
Illinois 56 (Butterfield Road) Reconstruction and Widening Project - Illinois Route 56 (Butterfield Road) West of Illinois Route 59 to Naperville Road
Illinois 64 Improvement Project - Illinois Route 64 from 7th Avenue  to Illinois 59.
Interstate 55 @ Arsenal Road - Relocate and reconfigure the Interstate 55 interchange at Arsenal Road in Will County.
Interstate 55 at Central Avenue - Rehabilitation and reconstruct the Interstate 55 at Central Avenue Interchange.
Interstate 57 / Interstate 294 Interchange Project - Construct a full interchange for the Interstate 57 overpass at Interstate 294
U.S. Route 20 at McLean Blvd. - Total reconstruction of the US 20 (Lake Street) over McLean Boulevard interchange
U.S. Route 30 at Illinois Route 31 Widening and Reconstruction - NEW - Widening and reconstruction of US Route 30 at Illinois Route 31
U.S. Route 30 Reconstruction Project - Williams Street in New Lenox to Harlem Avenue in Frankfort.
Western Algonquin Bypass - Illinois Route 31 North Junction to Illinois 31 South Junction
Willow Road Reconstruction - NEW - Willow Road Reconstruction from IL 43 to Interstate 94

O'HARE INTERNATIONAL AIRPORT AREA PROJECTS

Illinois 19 (Irving Park Road) at York Road - NEW - Intersection Reconstruction & Bridge Construction
U.S. Route 12/45 (Mannheim Road) - NEW - Widening and Reconstruction from IL. 19 to I-190 and from I-190 to IL 72

PROJECT STUDIES

Circle Interchange - The Circle Interchange Project is a two-year planning and design project which will identify the scope of improvements and the potential cost and construction schedule. The project is located in the heart of downtown Chicago, adjacent to the west end of the central business district.
47th Street at East Avenue Study - NEW - Phase 1 study for the intersection improvements at 47th Street and East Avenue in La Grange, IL.
I-55 Managed Lane Project - preliminary engineering and environmental (Phase I) Study for potential improvements to Interstate 55 corridor from I-355 to I-90/I-94.
95th Street and Stony Island Avenue - preliminary engineering and environmental (Phase I) Study for potential improvements to the 95th Street at Stony Island Avenue intersection.
US Route 30- Phase I study from IL 47 to IL 31 in Kane and Kendall Counties
Barrington Road at I-90 Interchange - Phase 1 Study of potential improvements to the Barrington Road interchange on the Jane Addams Memorial Tollway (I-90).
Illinois 83/Illinois 137 Study - Phase I Study from IL 83/Grande Avenue to IL 137/Buckley Road in Lake County
Wood Street / Ashland Avenue - South of US Route 6 (159th Street) to 138th Street in Cook County
U.S. Route 14 Grade Separation at CN/EJ&E Railway- Preliminary Engineering Study for a potential grade separation of U.S. Route 14 (Northwest Highway) at the CN/EJ&E Railway at-grade crossing.
Interstate 55 Bus-On-Shoulder Demonstration - Two year demonstration of transit bus operations on the Interstate 55 (Stevenson Expressway) left shoulder.
Illinois Route 31 Phase I Study -From IL Route 176 to IL Route 120 in McHenry County
Central Avenue Corridor Project Study
Illinois 131 (Green Bay Road) Project Study
Interstate 55 at Weber Road Study  - Interstate 55 (I-55) interchange at Weber Road.
Illiana Corridor - Phase I (Tiered Process) Study which includes a study of funding, financing and implementation options, including the feasibility of Public-Private Partnerships (P3). The study area generally was located between I-65 on the east, I-55 on the west, U.S. 30 on the north, and north Kankakee County on the south.
Interstate 80 Phase 1 Study - Ridge Road to US Route 30
Interstate 294 / Interstate 57 - I-294 / I-57 Interchange Environmental Assessment
Interstate 290(Eisenhower) Preliminary Engineering Study
South Suburban Airport News - Information about the proposed South Suburban Airport
Elgin O’Hare – West Bypass
US 34 and the CN Railroad Crossing in Aurora
Illinois 60 / 83 - From IL Route 176 to the intersection of IL Route 60 and IL Route 83 in Lake County
Interstate 55 at Airport/Lockport Road
Interstate Route 55 at Lorenzo/IL 129 in Will County
Illinois 47 - Reed Street to US-14
Willow Road Study - Illinois 43 to Edens Expressway
Illinois 173 - Phase I Study process and schedule.

SECTION 4(F) DOCUMENTS

SRA REPORTS

District One SRA Resources


District 2
Counties include: Boone, Carroll, Henry, JoDaviess, Lee, Ogle, Rock Island, Stephenson, Whiteside, Winnebago

U.S. 52/IL 64 Over the Mississippi River Study
Interstate 39/US 20 Improvement Project
U.S. 20 Freeport to Galena Project
U.S. 20 Galena Bypass - Phase II Engineering
U.S. 20 (Rockford Bypass): IL 2 to I-39
U.S. 30 Fulton to Rock Falls - Located in Whiteside County
Illinois 2 Study - Auburn Street to Riverside Blvd - Rockford, Illinois
Illinois 40 - IL 40 (1st Avenue) Rock River bridge replacement study between Sterling and Rock Falls.
 


District 3
Counties include: Bureau, DeKalb, Ford, Grundy, Iroquois, Kankakee, Kendall, LaSalle, Livingston

Illinois 47 Improvement - Kennedy Road in Yorkville to Cross Street in Sugar Grove
 

PROJECT STUDIES

Illinois 47 Study - Kendall County  - From Illinois Route 71 on the north to Caton Farm Road on the south
Illinois 71 Study - Kendall County, 5.41 miles of reconstruction & adding lanes.
Interstate 57 Interchange at Illinois 17 - NEW - Preliminary engineering study to reconstruct interchange 312 at Kankakee
Prairie Parkway Corridor Protection Study - Grundy, Kendall and Kane Counties
US 34 Sandwich to Plano - preliminary engineering study of possible improvements to the US 34 Corridor
 


District 4
Counties include: Fulton, Henderson, Knox, McDonough, Marshall, Mercer, Peoria, Putnam, Stark, Tazewell, Warren, Woodford

Peoria Area Traffic Cameras
Eastern Bypass - Proposed Study of new highway connecting I-74 with IL-6
Illinois 29 - IL Route 29 Study in Peoria, Marshall, Putnam, and Bureau Counties.
Interstate 74 / Interstate 155 - NEW -  Improvements to a section of I-74 and I-155 near Morton in Tazewell County
Peoria to Macomb Study
U.S. 67 Corridor
US 34 Project


District 5
Counties include: Champaign, DeWitt, Douglas, Edgar, McLean, Piatt, Vermilion

U.S. 136 Danville Main Street Reconstruction Project
 


District 6
Counties include: Adams, Brown, Cass, Christian, Hancock, Logan, Macoupin, Mason, Menard, Montgomery, Morgan, Pike, Sangamon, Schuyler, Scott


Bus I-55/South Sixth Street Expansion Study - From Stanford Avenue to Interstate 72/6th Street Interchange
I-55 Reconstruction - Design study and environment assessment to improve the interstate through Springfield and Sangamon County
Illinois 104 - IL Route 104 over Illinois River Study
Illinois River Bridge at Florence – River crossing alternates feasibility study and context sensitive solutions
U.S. 67 Corridor
U.S. 136 Realignment Study - NEW - US Route 136 from the Mississippi River Bridge to Main Street in Hamilton, IL.
 


District 7
Counties include: Clark, Clay, Coles, Crawford, Cumberland, Edwards, Effingham, Fayette, Jasper, Lawrence, Macon, Moultrie, Richland, Shelby, Wabash, Wayne

U.S. 50 Expressway Project - 27-mile project will look at US Route 50 from 2.5 miles west of Illinois Route 130 (near Olney) to 3.5 miles east of Illinois Route 1 (near Lawrenceville)


District 8
Counties include: Bond, Calhoun, Clinton, Greene, Jersey, Madison, Marion, Monroe, Randolph, St. Clair, Washington

Alton-Godfrey Transportation Study - New
Interstate 55 Corridor Work Zones
Interstate 70 - Access Highland Project
Interstate 270 Chain of Rocks Canal Bridge Project - New
Illinois 3 - Improvement project in Waterloo
Illinois 159 - Study in Madison and St. Clair Counties.
Illinois 255 / Alton Bypass - Extension of IL 255 from Interstate 270 near Edwardsville to US 67 in Godfrey.
U.S. 67 Corridor
New Mississippi River Bridge Project - Connecting Missouri & Illinois to downtown St. Louis
Gateway Connector Study - Madison, St. Clair, and Monroe counties.
 


District 9
Counties include: Alexander, Franklin, Gallatin, Hamilton, Hardin, Jackson, Jefferson, Johnson, Massac, Perry, Pope, Pulaski, Saline, Union, White, Williamson

I-66 - Alexander, Johnson, Massac, Pulaski, and Union Counties
Interstate 57 / Illinois 13 and Morgan Ave Project - Proposed Traffic and Roadway Network Improvements
Interstate 57 - Proposed Traffic and Roadway Network Improvements  
Illinois 13 - Proposed Traffic and Roadway Network Improvements
Illinois 13 - 127 - Proposed Traffic and Roadway Network Improvements
U.S. 45 - Proposed Traffic and Roadway Network Improvements
 


General Information

Current Road Construction
Fiber - Optic Network Report
Illinois State Rail Plan
Illinois State Transportation Plan
Expressway Lane Closures - Ramp and lane closures for Illinois expressway
 

IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA