FOR IMMEDIATE RELEASE CONTACT: 217/782-6953
TTY: 217/524-4875
FAX: 217/782-8714
SPRINGFIELD, ILL. -- The Illinois Department of Transportation will open bids on January 16, 2004 for various road and bridge improvement projects located throughout the state. Also included are one aeronautics project and three land reclamation projects.

Following is a list of the projects, by county:

1. Will County, Blodgett Road, District 1, Contract No. 62604, 1.96 miles of 20 feet, 22 feet and variable width milling and bituminous concrete surface on Blodgett Road from FAI Route 55 to Kelly Avenue in Wilmington Township. 50 Working Days.

2. Ford County, US 45, District 3, Contract No. 66397, 3.43 miles of 24 feet width of coldmilling and bituminous concrete resurfacing on U.S. Route 45 from Paxton to the Champaign County Line. 20 Working Days.

3. Lake County, Oakwood Road, District 1, Contract No. 83716, Construction consists of 1.57 miles pavement reconstruction, curb and gutter sidewalk and installation of traffic signals on FAU Route 3521, Oakwood Road from 200 ft north of Main Street to 475 ft west of the intersection of Midlothian Road and Lakewood Lane in Lake Zurich. Completion Date September 15, 2004 Plus 10 Working Days.

4. DuPage County, Dunham Road, District 1, Contract No. 83724, 0.57 mile roadway reconstruction and resurfacing of Dunham Road from Lemont Road to 71st Street in Downers Grove including lighting, traffic signal modernization, retaining wall and etc. Completion Date August 20, 2004 Plus 10 Working Days.

5. Stephenson County, Galena Road, District 2, Contract No. 85324, Construction consists of 6.44 miles of 3" resurfacing with aggregate shoulders wedge along FAS Route 65, Galena Road from JoDaviess County line to Lake Road in Lena. 25 Working Days.

6. Whiteside County, Lynn Boulevard, District 2, Contract No. 85331, 0.77 mile earth excavation, borrow excavation, pipe culverts, aggregate base course, aggregate shoulders, seeding and related appurtenances for a 4-lane roadway on Lynn Boulevard between Griswald Avenue and YMCA Way in Sterling. 50 Working Days.

7. Rock Island County, 127th Avenue, District 2, Contract No. 85332, Construction consists of 2.66 miles of 2 3/4 inch resurfacing with aggregate shoulder wedge on FAS Route 1206, 127th Avenue from 13th Street to Knoxville Road 1 mile south of Oak Grove. 15 Working Days.

8. Macon County, Hickory Point Road, District 5, Contract No. 91270, Construction consists of PCC pavement, storm sewer, curb and gutter and sidewalks on FAU Route 7356, Hickory Point Road from the east edge of the bridge over Stevens Creek easterly 3417 feet in the Village of Forsyth. 180 Working Days.

9. Macoupin County, CH 56, District 6, Contract No. 93344, Construction consists of reconstruction of FAS Route 1729, CH 56, Monterey Mine Road with aggregate base and A-3 bituminous surface treatment from IL Route 4 westerly 14,616 lin ft. 70 Working Days.

10. Morgan County, Massey Lane, District 6, Contract No. 93359, Construction consists of bituminous concrete binder and surface, curb and gutter, storm sewer and sidewalk along FAU Route 8179, Massey Lane, from Morton Avenue north to Mound Avenue in the City of Jacksonville. Completion Date November 15, 2004 Working Days.

11. Mason County, Unmarked Route, District 6, Contract No. 93361, This project consists of reconstructing existing pavement, new storm sewers and incidental work in the City of Havana at various locations. 120 Working Days.

12. Richland County, US 50, District 7, Contract No. 94864, 2.88 miles of pavement patching, bituminous surface removal, leveling binder 44 feet and variable width bituminous concrete resurfacing, 3 feet and 7 feet width bituminous shoulders and 7 feet width aggregate shoulders on U.S. Route 50 from 0.1 mile west of IL Route 130 to IL Route 250 east of Olney. 45 Working Days.

13. St Clair County, Old Collinsville Road, District 8, Contract No. 97193, Construction consists of one-half mile of new concrete pavement on Old Collinsville Road from Lincoln Highway to Salem Place in O'Fallon. Completion Date September 15, 2004 Working Days.

14. Kane County, IL 31, District 1, Contract No. 62655, Beam replacement for the existing structure carrying IL Route 31 over U.S. Route 20 in Elgin. 35 Working Days.

15. Livingston County, IL 17, District 3, Contract No. 66288, Removal and replacement of the superstructure carrying Illinois Route 17 over Gooseberry Creek located 4.5 miles east of Illinois Route 47 near Dwight. 75 Working Days.

16. Ford County, IL 9, District 3, Contract No. 66359, Removal and replacing the existing structure carrying IL Route 9 over Dickerson Slough located 1.6 miles east of IL Route 47 near Gibson City. 75 Working Days.

17. Edgar-Douglas Counties, IL 49, District 5, Contract No. 70012, Removal and replacement of the structure carrying IL Route 49 over Pope Branch of Brushy Fork located 1.3 miles north of U.S. Route 36 near McCown. 50 Working Days.

18. Stephenson County, Henderson Road, District 2, Contract No. 85316, Construction consists of removal of the existing single-span bridge and replacement with a 3-span, 2 @ 42'-0" and 1 @ 54'-0", precast prestressed concrete deck beam bridge carrying TR 206 over Cedar Creek, 1.0 mile east of Cedarville. 45 Working Days.

19. Rock Island County, Unmarked Route, District 2, Contract No. 85321, Construction consists of a pedestrian bridge carrying American Discovery Trail from Rock Island to Rock Island Arsenal. 115 Working Days.

20. Marshall County, CH 16, District 3, Contract No. 87257, Removal of the existing structure and replace with a single span precast prestressed deck beam bridge carrying FAS Route 365 over Strawns Run near the east city limits of Lacon. 35 Working Days.

21. Champaign County, Unmarked Route, District 5, Contract No. 91299, Construction consists of a single span, 1 @ 57'-11", precast prestressed concrete deck beam bridge carrying CH 32 over unnamed channel one mile south of Gifford. 60 Working Days.

22. Shelby County, Unmarked Route, District 5, Contract No. 91305, Remove existing structure and replace with a double reinforced concrete box culvert 12' x 8' with aggregate approaches on TR 423A over Wolf Creek 1.5 miles southwest of Stewardson and incidental work required to complete the section. 30 Working Days.

23. Adams County, CH 7, District 6, Contract No. 93362, Project consists of scour repairs, debris removal and riprap replacement on FAS Route 1600 3.5 miles northwest of Ursa over Bear Creek. 25 Working Days.

24. White County, US 45, District 7, Contract No. 94943, Deck overlays and joint repairs on 4 structures on U.S. Route 45 at the following locations: (1) structure number 097-0062 on U.S. Route 45 over Skillet Fork Creek 0.8 mile south of Mill Shoals (2) structure number 097-0019 over an unnamed stream 1.5 miles south of Mill Shoals (3) structure number 097-0021 over an unnamed stream 2.5 miles south of Mill Shoals and (4) structure number 097-0022 over Beaver Creek 1 mile southeast of Springerton. 100 Working Days.

25. Fayette County, CH 10, District 7, Contract No. 95385, Rehabilitate the existing 4-span bridge carrying CH 10 over Hurricane Creek 3 miles southwest of Pittsburg including exterior beam replacement, deck surface replacement, railing, aggregate surface course and other work required to complete the section. 30 Working Days.

26. Jefferson County, Panzier Lane, District 7, Contract No. 95386, Removal of existing structure and replacement with a prestressed precast concrete deck beam bridge (33" depth) and incidental work necessary to complete the section over Novak Creek on CH 15 five miles northwest of Waltonville and three miles south of Illinois Route 15. 30 Working Days.

27. Jersey County, Unmarked Route, District 8, Contract No. 97216, Construction consists of a single span precast prestressed concrete deck beam bridge carrying TR 147 over unnamed creek at Jones Road, 5.5 miles southeast of Jerseyville. 30 Working Days.

28. Winnebago County, IL 251, District 2, Contract No. 64949, Modernization of the traffic signals at the intersection of Illinois Route 75 and Illinois Route 251 in Beloit. 30 Working Days.

29. DuPage-Will Counties, Various, District 1, Contract No. 44828, Removing and replacing damaged raised reflective pavement markers and castings at various locations within the district. Completion Date November 01, 2004 Working Days.

30. Various County, Various, District 1, Contract No. 44830, Repairing various widths and types of pavement marking lines, letters and symbols at various locations in the district. Completion Date November 01, 2004 Working Days.

31. Various County, Various, District 1, Contract No. 44831, Repairing various types and widths of pavement marking lines, letters and symbols at various locations in the district. Completion Date November 01, 2004 Working Days.

32. Various County, Various, District R, Contract No. 44833, The work will consist of repairing various widths of thermoplastic, epoxy, hot spray thermoplastic and polyurea pavement marking lines, letters and symbols and the removal of existing pavement markings on various routes throughout Districts 6&7. Completion Date June 30, 2005 Working Days.

33. Cook County, Various, District 1, Contract No. 62463, Bridge joint repairs on existing structures at 7 locations in Hoffmann Estates, Elk Grove Village, Northbrook, Schaumburg and Des Plaines. 15 Working Days.

34. Cook County, I-90/94 (Dan Ryan Expwy), District 1, Contract No. 62588, Beam and bearing fabrication for 4 structures along FAI Route 90/94 (Dan Ryan Expressway) from FAI Route 90 (WB) to FAI Route 90/94 (NB) express lanes in Chicago. Completion Date August 20, 2004 Working Days.

35. Will County, I-55, District 1, Contract No. 62620, Crack and joint routing and sealing along F.A.I. Route 55 from IL Route 126 west of Braidwood to the Grundy County line north of Plainfield. 20 Working Days.

36. Cook-DuPage Counties, I-290, District 1, Contract No. 62628, Cleaning and painting existing bridges at 4 locations along F.A.I. Route 29 from F.A.I. Route 90 to Devon Avenue in Rolling Meadows, Schaumburg and Itasca. 50 Working Days.

37. Cook-Lake Counties, Various, District 1, Contract No. 62629, Cleaning and painting existing steel structures at 3 locations in Skokie, Morton Grove and Park City. 15 Working Days.

38. Cook County, I-290 & I-55, District 1, Contract No. 62630, Cleaning and painting of existing bridges on F.A.I. Route 290 at the I-88/Roosevelt Road Extension and on F.A.I. Route 55 under State Street in Chicago and Hillside. 15 Working Days.

39. Kane-Will Counties, Various, District 1, Contract No. 62631, Cleaning and painting the existing steel structures at four locations in North Aurora, Channahon and Joliet. 20 Working Days.

40. Cook County, I-80/94/US 6, District 1, Contract No. 62663, Beam, bearing and joint fabrication for the structure carrying IL Route 83 (Torrence Avenue) over FAI Route 80/94/U.S. Route 6 in Lansing. Completion Date April 15, 2005 Working Days.

41. Adams County, US 24, District 6, Contract No. 72858, 0.08 mile of drainage corrections and pipe culvert removal and replacement on U.S. Route 24 in Camp Point at Hampshire Street. 15 Working Days.

42. Madison County, IL 111, District 8, Contract No. 76346, 0.77 mile of pavement patching, bituminous surface removal, 44 ft and variable width bituminous concrete resurfacing, 6 ft width bituminous shoulders and variable width aggregate shoulders on IL Route 111 at Pontoon Beach from 0.7 mile north of IL Route 162 to 0.2 mile south of IL Route 162. 40 Working Days.

43. Morgan County, US 67/IL 104, District 6, Contract No. 72545, 3.71 miles of earth excavation, 2 @ 24 ft width PCC pavements, 6 ft and 10 ft width PCC shoulders, aggregate shoulders, bituminous concrete surface course, pipe drains, pavement removals, pipe culverts, concrete box culvert, and lighting for U.S. Route 67/Illinois Route 104 from 1 mile northwest of Illinois Route 178 in Jacksonville extending northwest to 1 mile east of Chapin. Also included is the removal of the existing structure over Mauvaise Terry Creek and the construction of dual 3 span, 2 @ 115'-7 15/16" and 1 @ 116'-8" precast prestressed concrete bulb T-beam structures with 40 ft width roadways. Completion Date October 05, 2005 Working Days.

44. Will County, US 6, District 1, Contract No. 62615, 0.31 km of roadway reconstruction including variable width widening and resurfacing of the southwest frontage road at U.S. Route 6 and FAI Route 55 at Channahon. Completion Date June 30, 2004 Plus 15 Working Days.

45. Jackson County, IL 149, District 9, Contract No. 98839, 0.24 mile of pavement patching, bituminous surface removal, 38 ft width bituminous concrete resurfacing and striping on Illinois Route 149 in Murphysboro from 6th Street to 11th Street to provide a bi-directional left turn lane. 15 Working Days.

46. Sangamon County, IL 4 (Veteran's Parkway), District 6, Contract No. 72507, Located on the west side of Springfield the improvement will consist of traffic signal upgrade and the construction of right turn lanes at the intersection of IL Route 4 (Veteran's Parkway) and Lawrence Avenue. Also included is pavement patching and shoulder sealing along Veteran's Parkway from Washington Avenue to the F.A.I. Route 72 interchange. Completion Date August 01, 2004 Working Days.

47. Adams County, IL 96, District 6, Contract No. 72240, 4.94 miles of pavement patching, bituminous surface removal, 4 ft. width bituminous concrete base course widening, 26 ft. width bituminous concrete resurfacing, 3 ft. width bituminous shoulders, 3 ft. width aggregate shoulders, box culverts, guardrail and pipe underdrains on Illinois Route 96 from 0.1 mile north of the Pike County Line to 0.3 mile east of Payson. Completion Date November 01, 2004 Working Days.

48. Montgomery County, IL 16, District 6, Contract No. 72768, Intersection improvements at Illinois Route 16, and Ohren Lane in Litchfield consisting of radius improvement, left turn lane storage increase, traffic signal removal and replacement, ditch work and thermoplastic pavement marking placement; 25 Working Days.

49. Warren County, IL 116, District 4, Contract No. 88422, 2.546 km of 7.8m width of bituminous concrete widening and resurfacing on Illinois Route 116 from 50th Street to Main Street in Roseville. Also the removal and replacement of the structure carrying Illinois Route 116 over Negro Creek located 0.9 km west of Main Street. Completion Date November 30, 2004 Plus 05 Working Days.

50. Fayette County, US 51, District 7, Contract No. 94797, On U.S. Route 51 in Vandalia from just north of Main Street extending to the north 0.43 mile to north of Lincoln Street, the improvement will consist of providing a three-lane roadway with a bi-directional turn lane, curb and gutter and traffic signal modernization at the intersection of U.S. Route 5 and Randolph Street. 70 Working Days.

51. Hancock County, IL 96 & US 136, District 6, Contract No. 72863, 450 ft of bituminous surface removal, 27.5 ft width bituminous concrete resurfacing and guardrail repair on Illinois Route 96 approximately 5.5 mile north of Hamilton. Also included is 0.35 mile of bituminous surface removal and 2 @ 35 ft width bituminous concrete resurfacing on U.S. Route 136 in Hamilton beginning at the Mississippi River Bridge and extending to the east. 15 Working Days.

52. Cook County, I-94 (Dan Ryan Expressway), District 1, Contract No. 62594, 0.49 mile of construction of auxiliary lanes with variable width concrete pavement (jointed), additional ramps, retaining wall construction, signing and lighting all along F.A.I. Route 94 (Dan Ryan Expressway) from 79th Street to 83rd Street in Chicago. Completion Date August 15, 2004 Plus 15 Working Days.

53. DeWitt County, US 51 BUS, District 5, Contract No. 90792, 3.02 miles of 28 feet and variable width of bituminous concrete resurfacing on U.S. Business Route 51 from U.S. Route 51 Bypass (N) to U.S. Route 51 Bypass (S) in Clinton. Completion Date August 14, 2004 Working Days.

54. Winnebago County, IL 251 & ALPINE ROAD, District 2, Contract No. 64965, Variable width milling and bituminous concrete surface on IL Route 251 south of Hononegan Road and the turn lanes on Alpine Road at Manchester Drive at Rockford. 20 Working Days.

55. McLean County, Or 66, District 3, Contract No. 66393, 2.7 miles of 24 ft width milling and bituminous concrete surface on Old Route 66 from U.S. Route 136 at McLean to the Logan County Line. 20 Working Days.

56. Kankakee County, IL 1/17, District 3, Contract No. 66414, 0.13 mile of 26 ft to 32 ft width milling and bituminous concrete surface on IL Route 1/17 from Stanley Street to Hamilton Street in Kankakee. 15 Working Days.

57. LaSalle County, US 52, District 3, Contract No. 66404, 10.88 miles of 24 ft and variable width milling and bituminous concrete surface on U.S. Route 52 from FAI Route 39 at Troy Grove to IL Route 23 east of Harding. 30 Working Days.

58. JoDaviess-Stephenson Counties, US 20, District 2, Contract No. 64958, Bituminous resurfacing on U.S. Route 20 (EB) located 3 miles west of Illinois Route 84 (N), on U.S. Route 20, from 2.5 miles west of Illinois Route 78 to the JoDaviess/Stephenson County line and on U.S. Route 20 between the JoDaviess/Stephenson County line to east of Illinois Route 73. 25 Working Days.

59. Carroll County, IL 40 & IL 84, District 2, Contract No. 64966, 1.7 miles of 26 ft width of coldmilling and bituminous concrete resurfacing IL Route 40 from Chadwick to Milledgeville. Includes a section on IL Route north of Savanna. 15 Working Days.

60. Effingham County, I-57/70, District 7, Contract No. 94907, The removal of the existing structures carrying FAI Route 57/70 over U.S. Route 40 and Conrail CSX Railroad on the west side Effingham and the replacement with dual 4 span, 2 @ 70'-0" and 2 @ 51'-6", continuous composite concrete and steel beam bridges with 60 ft width roadways. Completion Date November 22, 2005 Plus 15 Working Days.

61. Fayette County, I-70, District 7, Contract No. 94671, The removal of the existing 3 span structures carrying FAI Route 70 over IL Route 140 and the CSX Railroad located 0.5 mile east of the Bond/Fayette Co Line and the replacement with dual 2 span, 2 @ 159'-2", continuous composite concrete and welded steel plate girder structures with 42 ft width roadways Completion Date November 01, 2005 Working Days.

62. Livingston County, IL 17, District 3, Contract No. 66267, Removal and replacement of the existing structure carrying Illinois Route 1 over Gooseberry Creek located 0.2 miles west of Illinois Route 47 in Dwight. 30 Working Days.

63. Lawrence County, IL 250, District 7, Contract No. 94773, The removal of the existing 2 span precast prestressed concrete deck beam bridge carrying Illinois Route 250 over Shirley Creek in Sumner and the replacement with a 3 span, 2 @ 43'-9" and 1 @ 53'-0", concrete slab bridge with a 36'-6" width roadway. 100 Working Days.

64. Vermilion County, CH 14, District 5, Contract No. 90322, Removal and replacement of the culvert carrying County Highway 14 over Bluegrass Creek located 3.5 miles east of Illinois Route 49 north of Potoma 20 Working Days.

65. Union County, IL 127/146, District 9, Contract No. 98680, The removal of the existing triple 12'-0" x 10'-0" concrete box culvert carrying Illinois Route 127/146 over a Tributary of Green Creek located northwest of Jonesboro and the replacement with a triple 12'-0" x 10'-0" concrete box culvert. 100 Working Days.

66. Iroquois County, IL 54, District 3, Contract No. 66285, Removal and replacement of the existing structure carrying Illinois Route 5 over a tributary of Spring Creek, located 1.12 miles north of Thawville. 90 Working Days.

67. Livingston County, IL 116, District 3, Contract No. 66287, Removal and replacement of the existing structure carrying Illinois Route 116 over Five Mile Creek located 2.2 miles east of Saunemin. 75 Working Days.

68. Franklin County, IL 14, District 9, Contract No. 98644, The removal of the existing single span bridge (structure number 028-0027) carrying Illinois Route 14 over a tributary to the Big Muddy River located approximately 6.6 miles northeast of Benton and the replacement with a single span, 1 @ 68'-0" composite concrete and steel beam bridge. Also included is the removal of the existing double barrel concrete box culvert (structure number 028-2001) carrying Illinois Route 14 over an overflow to Sugar Camp Creek located approximately 7.8 miles northeast of Benton and the replacement with a double 12'x7' concrete box culvert. 115 Working Days.

69. DeKalb County, IL 64, District 2, Contract No. 64420, Removal and replacement of the structure carrying IL Route 64 over a stream located 2.5 miles west of Sycamore. 45 Working Days.

70. Effingham County, US 45, District 7, Contract No. 94750, In Effingham 0.55 mile of pavement patching, bituminous surface removal, combination concrete curb and gutter and variable width widening and resurfacing on US Route 45 from Fayette Avenue to north of Temple Avenue. Also included is the modernization of the traffic signals at the intersection of Route 45 with Fayette Avenue and Temple Avenue. 80 Working Days.

71. Randolph County, Unmarked, District 8, Contract No. 76602, The rehabilitation of the covered bridge over Little Mary's River located in a roadside rest stop approximately 4 miles northeast of Chester along Illinois Route 150. The work will consist of replacing the roof, floor, and siding of the existing structure, as well as repairing the existing timber trusses, providing a steel support frame under the existing bridge and raising the bridge above the 50 year highwater elevation. 105 Working Days.

72. McLean County, I-55, District 3, Contract No. 66376, Cleaning and painting of 3 existing steel bridges along FAI Route 55 all located near Lexington. 60 Working Days.

73. McLean County, I-74, District 3, Contract No. 66394, Centerline repair consisting of milling and resurfacing of the centerline (3 ft width) along FAI Route 74 (EB) from U.S. Route 51 to west of Downs Ro located just southeast of Bloomington. 15 Working Days.

74. Morgan County, Old Us 36 & I-72, District 6, Contract No. 72855, 1.4 miles of PCC pavement patching on Old U.S. Route 36 from 1.8 miles east 0.4 mile east of Jacksonville. Also, included is approach joint replacement at eleven structures on FAI Route 72 from Station 125+11.24 south of Jacksonville to Station 110+30 east of Jacksonville. 20 Working Days.

75. Madison County, IL 140, District 8, Contract No. 76743, 0.42 mile of guardrail installation on IL Route 140 between Paddock Creek and Cahokia Creek located approximately 4 miles west of Hamel. 15 Working Days.

76. Bond-Washington Counties, I-70 & IL 127, District 8, Contract No. 76714, Cleaning and painting of 4 existing bridges at various locations along FAI Route 70 and IL Route 127 in Bond and Washington counties. 80 Working Days.

77. St. Clair County, I-64 & IL 13, District 8, Contract No. 76715, Cleaning and painting of 3 steel bridges on FAI Route 64 and IL Route 13 near Lenzburg and East St. Louis. 100 Working Days.

78. Champaign-Vermilion Counties, Various, District 5, Contract No. 70350, Pavement patching at various locations throughout the district. Completion Date December 31, 2004 Working Days.

79. Various County, Various, District 4, Contract No. 68374, Weed control spraying at various locations throughout the district. Completion Date July 18, 2004 Working Days.

80. Various County, Various, District 4, Contract No. 44829, Removal and replacement of raised reflective pavement markers and castings at various locations throughout the district. Completion Date November 30, 2004 Working Days.

81. Various County, Various, District 2, Contract No. 64976, Restoration of turf right-of-way as a result of motorist caused damage. This involves tilling, fertilizing, seeding and installing soil retention blanket on disturbed areas on all routes in Boone, DeKalb, JoDaviess, Lee, Ogle, Stephenson and Winnebago Counties. Completion Date December 31, 2004 Working Days.

82. Various County, Various, District 2, Contract No. 64977, Restoration of turf right-of-way as a result of motorist caused damage. This involves tilling, fertilizing, seeding and installing soil retention blanket on disturbed areas on all routes in Bureau, Carroll, Henry, Rock Island and Whiteside Counties on a call turf repair. Completion Date December 31, 2004 Working Days.

83. Champaign County, I-72, District 5, Contract No. 70351, Various patching on Interstate 72 from Mattis Avenue to the Piatt County line in Champaign. 15 Working Days.

84. Various County, Various, District 5, Contract No. 70352, Patching on various routes throughout District 5 on a call-out basis. Completion Date December 31, 2004 Working Days.

85. Various County, Various, District 5, Contract No. 70353, Patching on various routes throughout District 5 on a call-out basis. Completion Date December 31, 2004 Working Days.

86. Will County, US 45, District 1, Contract No. 60933, Intersection reconstruction including variable width widening with bituminous concrete base course, milling, bituminous concrete surface, traffic signal installation and storm sewers all at the intersection of U.S. Route 45 at Laraway Road in Frankfort. Completion Date July 30, 2004 Plus 05 Working Days.

87. Kane County, IL 25, District 1, Contract No. 62474, 0.32 mile of intersection reconstruction including variable width concrete pavement, bituminous concrete surface, traffic signal installation and lighting on IL Route 25 at Il Route 56 in North Aurora. Completion Date August 20, 2004 Plus 05 Working Days.

88. Ogle County, IL 64, District 2, Contract No. 64177, 1.36 miles of 26 feet and variable bituminous concrete widening and resurfacing on Illinois Route 64 from Maple Avenue to the Burlington Northern Railroad; includes intersection improvement at McKendrie Street consisting of traffic signals in Mt. Morris. Completion Date November 22, 2004 Plus 35 Working Days.

89. DeKalb County, US 30, District 2, Contract No. 64516, .707 mile of reconstruction consisting of 27 feet and variable width bituminous concrete resurfacing and storm sewers on US Route 30 from the west corporate limits of Waterman to the east corporate limits. Completion Date September 23, 2004 Plus 15 Working Days.

90. Henry County, US 6, District 2, Contract No. 64592, 0.50 mile of variable width widening with bituminous base course, 16.8 ft and variable width bituminous concrete surface and installation of traffic signals along U.S. Route 6 at the Chicago Avenue intersection, located in Geneseo. 40 Working Days.

91. LaSalle-Grundy Counties, I-80, District 3, Contract No. 66122, 11.47 miles of 2 @ 24 feet width of bituminous concrete resurfacing on Interstate 80 from Illinois Route 71 to U.S. Route 6 at Seneca. Completion Date August 01, 2004 Plus 05 Working Days.

92. LaSalle County, US 6, District 3, Contract No. 66373, 10.67 miles of 24 feet width of bituminous concrete resurfacing with aggregate wedge shoulders on U.S. Route 6 from Interstate 39 at LaSalle to just west of Ottawa. 45 Working Days.

93. Hancock County, IL 96, District 6, Contract No. 72421, 7.18 miles of pavement patching, bituminous surface removal, 34 ft and variable width bituminous concrete resurfacing and 3 ft width aggregate shoulders on IL Route 96 between Niota and Nauvoo. Also, included is the removal of the existing single span bridge (structure number 034-0016) over a drainage ditch and the replacement with a triple barrel 12' X 8' concrete box culvert and repairs to the bridge (structure number 034-0018) over Riley Creek Branch a bridge (structure number 034-0054) over Tyson Creek. Completion Date September 17, 2004 Working Days.

94. Madison County, IL 159, District 8, Contract No. 76012, 2.22 km of widening and resurfacing or reconstruction to provide two traffic lanes in each direction and a bi-directional left turn lane on IL Route 159 Maryville from just south of An-Jo-Lo-Drive extending in a northerly direct to just south of IL Route 162. Also included are culvert replacements, storm sewers, traffic signals, sidewalks, existing bridge removal and box culvert 225 Working Days.

95. This item has been withdrawn from the letting.

96. DuPage County, Diehl Road, District 1, Contract No. 83719, 1.46 miles reconstruction of Diehl Road consisting of widening, storm sewer lighting, landscaping, and striping from Eola Road to Country Club Boulevard in Naperville. 185 Working Days.

97. Tazewell County, Centennial Drive, District 4, Contract No. 89319, Pavement removal, earth excavation, full depth bituminous pavement, combination concrete curb and gutter, storm sewer, box culverts, seeding an other collateral work on Centennial Drive from Quail Meadows Golf Course easterly 0.74 KM in East Peoria. 85 Working Days.

98. Vermilion County, West Newell Road, District 5, Contract No. 91271, Project consists of the construction of 2.10 miles of bituminous concrete pavement and shoulders, drainage improvements including storm sewers, entra and cross road pipes, box culvert, and approach work on CH 20 (West Newell Road) from Denmark Road to IL Route 1. 100 Working Days.

99. Madison County, IL 157, District 8, Contract No. 96765, 5.41 kilometers of widening, resurfacing or reconstruction of Illinois Rout 157 in Edwardsville from a two-lane, two-way facility to four traffic lanes with a center bi-directional turn lane in two segments, the first one begin south of the SIUE South Entrance and continues to south of Center Grove Road and the second segment begins north of Lewis Road and continues in a northerly direction to Schwarz Street. 210 Working Days.

100. Madison County, Unmarked Route, District 8, Contract No. 97218, Construction consists of 682 feet of pavement, sidewalk, curb and gutter and lighting improvements along 19th Street and Edison Avenue in Granite City. 30 Working Days.

101. Cook County, I-57, District 1, Contract No. 62121, Bridge deck removal and replacement, substructure repairs, resurfacing and lighting for the existing structures carrying FAI Route 57 over Throop Street and 107th Street in Chicago. Completion Date October 31, 2004 Plus 10 Working Days.

102. Rock Island County, Milan Beltway, District 2, Contract No. 64649, Construction of a structure carrying the Milan Beltway Extension over the West Rock River. Includes 2600 feet of grading for future bridges over Interstate 280 and over Airport Road in Milan. 225 Working Days.

103. Livingston County, IL 23, District 3, Contract No. 66104, Removal and replacement of the structure carrying IL Route 23 over the Vermilion River near Cornell. 125 Working Days.

104. McLean County, I-74, District 3, Contract No. 66382, Cleaning and painting the existing structural steel on 4 structures on Interstate 74 near Downs. 80 Working Days.

105. Grundy County, IL 47, District 3, Contract No. 66405, Removal and replacement of the structure carrying Illinois Route 47 over Brewster Run located north of Interstate 55 at Dwight. 80 Working Days.

106. St. Clair County, I-70/55/64, District 8, Contract No. 76210, Seismic retrofit and redundancy modifications and deck rehabilitation on seven structures of the Illinois Route 3 ramps and roadways at the Poplar Street Complex (FAI Routes 55/70/64) in East St. Louis. Completion Date November 19, 2004 Plus 50 Working Days.

107. Jersey County, IL 109, District 8, Contract No. 76690, On IL Route 109 located approximately 2 miles south of Jerseyville, the improvement will consist of a roadway grade raise and the removal of the existing single span bridge (structure number 042-0020) over a Branch of Otter Creek and the replacement with a double 10' X 7' concrete box culvert 50 Working Days.

108. Will County, Plainfield-Naperville Rd., District 1, Contract No. 83720, Removal of existing structure and replacement with a 3 span @ 70'-0" precast prestressed concrete 48" I-Beam structure carrying Plainfield-Naperville Road over the DuPage River 2.5 miles south of the DuPage County line. Completion Date October 15, 2004 Plus 10 Working Days.

109. Various County, Various, District 1, Contract No. 62665, Annual maintenance of REVLAC, Roosevelt Ramp access control, CCTV Systems and Sonet at various locations in the district. Completion Date March 31, 2005 Working Days.

110. Peoria-Tazewell Counties, Various, District 4, Contract No. 68378, Retrofitting LED modules into all existing incandescent traffic signal head installing new load switches in the existing traffic signal cabinets, and installing battery backup systems with cabinets at various locations on various routes in Peoria. 30 Working Days.

111. Douglas County, I-57, District 5, Contract No. 70316, Highway lighting at the intersection of Interstate 57 and U.S. Route 36 at Tuscola. 35 Working Days.

112. Various County, Various, District R, Contract No. 44832, Replacement of various types, sizes and widths of pavement markings in Districts 4 and 5. Completion Date June 30, 2005 Working Days.

113. Cook County, US 6 (159th Street), District 1, Contract No. 62632, Building demolition consisting of the removal of nine buildings along U.S. Route 6 (159th Street) between F.A.I. Route 294 (Tri-State Tollway) an Illinois Route 1 (Halsted Street) in Harvey. 30 Working Days.

114. Bureau County, US 34, District 2, Contract No. 64617, 0.35 mile of realignment of U.S. Route 34 at Buda Road and the addition of a northbound right turn lane located 3 miles south of U.S. Route 6 near Sheffield. 85 Working Days.

115. Carroll-Whiteside Counties, Various, District 2, Contract No. 64964, Routing, cleaning and sealing pavement surface cracks along with painting centerline and edgeline at various locations. 20 Working Days.

116. Madison-St. Clair Counties, Various, District 8, Contract No. 76694, The planting and maintaining of various tree species at 22 locations along various routes in Madison and St. Clair Counties. Completion Date April 30, 2004 Working Days.

117. Madison County, IL 3, District 8, Contract No. 76744, The demolition of five residential buildings and three detached garages for the proposed relocated IL Route 3 in Venice. 20 Working Days.

118. Various County, Various, District 6, Contract No. 44827, The installation of hand applied polyurea pavement marking lines, letters and symbols, the installation of preformed thermoplastic pavement markings using a hybridized primer and the removal of existing pavement markings on various highways throughout District 6. Completion Date November 01, 2004 Working Days.

119. Peoria County, I-474, District 4, Contract No. 68148, 7.74 miles of erosion control and landscaping on Interstate 474 from Interstate 74 to the Tazewell County line. Completion Date July 31, 2004 Plus 15 Working Days.

120. Christian County, IL 29, District 6, Contract No. 72285, In Taylorville storm sewer improvements southeast of the subway on IL Route (Park Street) at Poplar Street, and riprap improvements at the bridge (Structure Number 011-0011) carrying IL Route 29 over Flat Branch Creek. 30 Working Days.

121. Madison County, IL 3, District 8, Contract No. 76721, The demolition of two commercial buildings and one residential building for the proposed relocated Illinois Route 3 in Venice. 15 Working Days.

1A. Greater Rockford Airport, Rockford, Illinois, Winnebago County, Greater Rockford Runway 25 Safety Area Improvements - Phase 1 (Relocation Of Falcon Road)

1LR. Vermilion County, RECLAMATION OF THE SHARON C & B MINE GROUP, The proposed reclamation project includes work at three abandoned mine sites in southeastern Vermilion County. Work at these sites will include the partial excavation and resealing of two vertical mine shafts, one slope entry and three subsidence sinkholes. The project also includes erosion repair and re-seeding on 10 acres of a previously reclaimed mine site. Work items include approximately 600 cu yds of earth excavation, 1,250 cu yds of special excavation, 70 cu yds of controlled low strength material (CSLM), and see and soil amendments for approximately 12 acres.

2LR. St. Clair County, RECLAMATION OF THE SHILOH NO. 8 MINE GROUP, The proposed reclamation project includes work at two abandoned mine site The Shiloh No. 8 Mine site is located in St. Clair County, one mile south the Village of Shiloh. The Lumaghi Mine site is located in Madison County one mile east of the City of Collinsville. Work on the Lumaghi Mine site involves remedial reclamation of a previously reclaimed site, including erosion repair and placement of stone riprap (175 sq yds). Work at the Shiloh Mine site involves demolition and on-site burial of concrete structures a regrading a small mound and waterway (500 cu yds of earth excavation, 1.1 acres of seeding and soil amendments). A Pre-Bid Meeting will be held at Shiloh Mine site on Monday, January 12, 2004 at 10:30 AM.

3LR., Williamson County, RECLAMATION OF THE MCDONALD STRIP MINE, The proposed reclamation project is located approximately two miles south of the village of Crab Orchard, Illinois, off of Sunnybrook Road. The proposed work will include approximately 57 acres of special clearing, 301,561 cu yds of earth excavation, dewatering impoundments of 6,200,000 installation of 5,233 sq yds of stone riprap A-3 and 554 sq yds of stone riprap A-4 with corresponding filter fabric, installation of two 90 ft - culverts, replacement of 1,240 ft of barbed wire fence, placement of 39,227 sq yds of special excelsior blanket, and seeding and soil amendments for 57 acres. A Pre-Bid Meeting will be held at the project site on Wednesday, January 7, 2004 at 10:30 AM.