SPRINGFIELD, IL -- The Illinois Department of Transportation will
open bids on January 17, 2003 for various road and bridge
improvement projects located throughout the state. Also included are
two land reclamation projects.
Following is a list of the projects by county:
1. Lake County, IL 60/IL 83, District 1, Contract No. 60166, 3.14
miles of milling and bituminous concrete surface on IL 60/IL 83 from
EJ & E Railroad to IL 21 located in Mundelein and Vernon Hills. 40
Working Days.
1P. Madison County, IL 255, District 8, Contract No. 96743, 3.07
km of widening and resurfacing to four lanes along IL 111 from just
south of Jackson Drive to north of Airline Drive in Wood River and
Bethalto. Includes the reconstruction of Airline Drive from two to
four lanes and the construction of a 2 span, continuous composite
concrete and steel welded plate girder structure to carry Airline
Drive over IL 255 in Bethalto. Completion Date July 01, 2004 Plus 20
Working Days.
2. McHenry County, IL 120, District 1, Contract No. 60173, 3.8 km
of variable width widening, milling, resurfacing, intersection
improvements, traffic signal installation and lighting on IL 120
from IL 47 to Fleming Road in Woodstock. Completion Date September
29, 2003 Plus 10 Working Days.
3. Cook County, IL 50, District 1, Contract No. 60444, 5.0 miles
of milling and bituminous concrete surface on IL 50 from Flossmoor
Road to Steger Road and replacement of the IL 50 bridge over
Butterfield Creek, all in Matteson, Richton Park and University
Park. Completion Date October 31, 2003 Plus 05 Working Days.
4. Cook County, US 30, District 1, Contract No. 62363, 2.73 miles
of milling and bituminous concrete surface on US 30 (Lincoln
Highway) from Halsted Street to IL 394 (Bishop Ford Expressway) in
Chicago Heights and Ford Heights. 55 Working Days.
4P. Madison County, IL 255 (Alton Bypass), District 8, Contract
No. 76384, 7.05 kilometers of grading and paving, bituminous
shoulders, five concrete box culverts, and three concrete noise
barrier walls on IL 255 (Alton Bypass) from IL 143 to IL 140.
Completion Date July 31, 2004.
5. Cook County, Stony Island Avenue, District 1, Contract No.
62415, 1.21 miles of milling and bituminous concrete surface on
Stony Island Avenue from 79th Street to 69th Street in Chicago. 50
Working Days.
6. Cook County, US 12/20, District 1, Contract No. 62427, 0.98
mile of milling and bituminous concrete surface on US 12/20 (95th
Street) from Ashland Avenue to Halsted Street in Chicago. 35 Working
Days.
6P. Madison County, IL 159, District 8, Contract No. 76014, The
widening and resurfacing to five lanes 3.64 km of IL 159 from north
of I-270 north to Harvard Drive in Edwardsville, the construction of
728 m of relocated IL 159, the reconstruction of Kettle River Drive
and Cougar Road, the widening and resurfacing of Center Grove Road
to add through and right turn lanes and the extension of pedestrian
box culvert all located in Glen Carbon and Edwardsville. Completion
Date June 15, 2004.
7. Cook County, US 45 (Des Plaines River Rd), District 1,
Contract No. 62433, 0.48 mile of milling and bituminous concrete
surface on US 45 (Des Plaines River Road) from IL 58 (Golf Road) to
US 12 (Rand Road) in Des Plaines. 25 Working Days.
8. Lake County, IL 21, District 1, Contract No. 62442, 2.77 miles
of milling and bituminous concrete surface on IL 21 from IL 176
(East Park Avenue) to IL 60 (Townline Road) in Libertyville.
Completion Date October 31, 2003.
9. Kane-Kendall Counties, IL 31, District 1, Contract No. 62446,
0.92 mile of milling and bituminous concrete surface on IL 31 from
Webster Street to Caterpillar Drive in Montgomery. 30 Working Days.
10. Cook County, IL 43 (Harlem Ave.), District 1, Contract No.
62456, 0.65 mile of milling and bituminous concrete on IL 43 (Harlem
Avenue) from I-55 to 57th Street in Chicago, and Summit. 30 Working
Days.
11. LaSalle County, I-80, District 3, Contract No. 66129, 8.89
miles of bituminous concrete resurfacing, patching and bridge
repairs on I-80 from the Bureau County line to east of IL 178.
Completion Date November 01, 2003 Plus 20 Working Days.
12. Tazewell County, US 150, District 4, Contract No. 68151, 5.06
miles of bituminous concrete resurfacing on US 150 from East Peoria
to east of Detroit Avenue in Morton. Completion Date July 02, 2003.
12P. Madison County, IL 159, District 8, Contract No. 76013, 1.82
kilometers of widening to five lanes and resurfacing of IL 159 from
IL 162 in Maryville to Glen Crossing Road in Glen Carbon Completion
Date November 01, 2004.
13. Adams County, IL 96, District 6, Contract No. 72141, 6.04 km
of pavement patching, bituminous surface removal, bituminous
concrete resurfacing and aggregate wedge shoulders on IL 96 from
south of State Street in Quincy southeast to I-172. Also, included
is the removal of the existing 3 span bridge over Curtis Creek and
the replacement with a single span, precast, prestressed concrete
I-beam bridge with a 12 m width roadway. Completion Date October 01,
2003.
13P. Madison County, IL 3, District 8, Contract No. 76295, 0.68
mile of widening, bituminous surface removal, variable width
bituminous concrete resurfacing and bituminous and aggregate
shoulders on IL 3 to add a center left turn lane from Delmar Avenue
to IL 111 in Godfrey. Completion Date September 15, 2003 Plus 10
Working Days.
14. Sangamon County, IL 124, District 6, Contract No. 72637, 9.14
miles of pavement patching, bituminous surface removal, bituminous
concrete resurfacing and 3 ft aggregate shoulders on IL 124 from
Business Loop 55 in Sherman northwest to IL 29. Completion Date
August 04, 2003.
14P. Clinton County, US 50, District 8, Contract No. 76385, 1.71
miles of pavement patching, bituminous surface removal, bituminous
concrete resurfacing, curb and gutter and storm sewers on US 50 from
11th Street to east of Lake Street in Carlyle. Also included are
repairs to the bridge over the Kaskaskia River. Completion Date
November 30, 2003.
15. Macoupin-Montgomery Counties, IL 108, District 6, Contract
No. 72690, 11.58 miles of pavement patching, bituminous surface
removal, bituminous concrete resurfacing and 3 ft aggregate wedge
shoulders on IL 108 from south of IL 4 in Carlinville east to 0.5
mile west of I-55. Completion Date September 30, 2003.
15P. Madison County, IL 255, District 8, Contract No. 76527, The
reconstruction of Wood Station Road on new vertical and horizontal
alignments and the construction of a two span, composite concrete
and steel web plate girder structure on vaulted abutments to carry
Wood Station Road over proposed IL 255 northeast of Alton.
Completion Date July 01, 2004.
16. Sangamon County, I-55, District 6, Contract No. 92911, 11.74
miles of pavement patching, bituminous surface removal, bituminous
concrete resurfacing, leveling binder, 12 ft, 10 ft and 6 ft
bituminous shoulders, 2 ft aggregate shoulders, and the
rehabilitation of 11 structures along I-55 from south of Springfield
south to the Montgomery County line. Completion Date November 01,
2003.
17. Adams County, 18th Street, District 6, Contract No. 93337,
improvement of the intersection of 18th Street and Locust Street in
Quincy. 130 Working Days.
18. WITHDRAWN
19. Pulaski County, I-57, District 9, Contract No. 98714, On I-57
from north of the Perks Road overpass southerly 7.75 miles to east
of Pulaski: pavement patching, pavement removal and the replacement
with bituminous base course and bituminous concrete resurfacing, 4
ft and 10 ft bituminous shoulders, 4 ft and 2 ft aggregate
shoulders, the resurfacing of the Ullin interchange ramps, and the
rehabilitation of six bridges. Completion Date November 01, 2003.
20. Williamson-Pope Counties, IL 37 & IL 146, District 9,
Contract No. 98762, 1.34 miles of pavement patching, bituminous
surface removal, bituminous concrete resurfacing, bituminous and
aggregate shoulders at the following locations: (1) 1.01 miles on IL
37 at Pulleys Mill and (2) 0.33 mile on IL 146 at Watersburg 30
Working Days.
21. Will County, I-55, District 1, Contract No. 60537, Removal of
the existing structure and replacement with a 2-span bridge carrying
Wilmington Road over I-55, also approach roadway reconstruction and
substructure repairs, located near Lorenzo. Completion Date October
31, 2003 Plus 10 Working Days.
22. Cook County, Madison Street, District 1, Contract No. 62036,
Removal of the existing structure and replacement with a three span
steel girder bridge carrying Madison Street over Des Plaines River
in Maywood, River Forest and Forest Park. Completion Date October
31, 2003 Plus 15 Working Days.
23. Cook County, Shermer Road, District 1, Contract No. 62395,
Bridge repair including removal and replacement of the concrete
surface, joint replacement and detector loop replacement on Shermer
Road over the Middle Fork of the North Branch of the Chicago River
in Northbrook. Completion Date June 30, 2003 Plus 05 Working Days.
24. Cook County, I-57, District 1, Contract No. 62476, Deck
resurfacing on 3 bridges over I-57 at Genoa Avenue, 103rd Street and
125th Street in Chicago and Calumet Park. Completion Date July 31,
2003 Plus 05 Working Days.
25. DuPage County, I-290, District 1, Contract No. 62484,
painting of the 2 structures carrying I-290 (EB) over I-355 and
I-290 (WB) ramp to I-355 in Addison. 50 Working Days.
26. Morgan County, I-72, District 6, Contract No. 72641, Bridge
repairs on the structure carrying Old US 36 over I-72 approximately
2 miles east of Jacksonville. The work will consist of bridge joint
repair, bridge deck patching, mirosilica concrete overlay formed
concrete and shotcrete repair, approach pavement overlay, plugging
existing deck drains and pavement marking. 30 Working Days.
27. Winnebago County, US 20, District 2, Contract No. 84934,
Removal and replacement of the dual bridge decks carrying US 20 over
Cunningham Road and the dual bridge decks over the CC & P Railroad
from Meridian Road to east of Cunningham Road in Rockford. 100
Working Days.
28. Livingston County, Watson Street, District 3, Contract No.
87146, Construction of a precast concrete double box culvert
carrying Watson Street over a branch of Vermilion River in Forrest.
40 Working Days.
29. Iroquois County, CH 10, District 3, Contract No. 87215,
removal and replacement of three structures carrying CH 10 over
tributaries to Pigeon Creek located three miles east of Loda. 100
Working Days.
30. Marshall County, TR 77A, District 3, Contract No. 87225,
Construction of a three span concrete deck beam bridge carrying TR
77A over Senachwine Creek, 5 miles west of Lacon. 40 Working Days.
31. Tazewell County, 3rd Street, District 4, Contract No. 89270,
rehabilitation and restoration of the existing bridge carrying 3rd
Street over ICG RR in Delavan. 55 Working Days.
32. Champaign County, I-57, District 5, Contract No. 90950,
Rehabilitation of the structure carrying Monticello Road over I-57
south of Champaign. Completion Date October 15, 2003 Plus 10 Working
Days.
33. Fayette County, IL 185, District 7, Contract No. 94518,
removal of the existing IL 185 bridge over Hurricane Creek
approximate 8 miles northwest of Vandalia, and replacement with a 3
span concrete and steel beam bridge with a 32 ft width roadway. 90
Working Days.
34. Jefferson County, IL 15, District 7, Contract No. 94726,
removal of the IL 15 bridge over the Big Muddy Overflow located
approximately 2.7 miles west of I-57 in Mt. Vernon, and replacement
with a 3 span concrete and steel wide, flange beam structure with a
36 ft width roadway. 140 Working Days.
35. Lawrence County, IL 1, District 7, Contract No. 94779,
removal of the existing IL 1 bridge over Brushy Fork Creek
approximately 4.7 miles north of Lawrenceville and replacement with
a 2 span concrete and steel beam bridge. 95 Working Days.
36. Hamilton County, TR 369, District 7, Contract No. 95334,
Construction of a three span, precast, prestressed concrete deck
beam bridge, earthwork and drainage, carrying TR 369 over North Fork
Saline River 4 miles north of Broughton. 30 Working Days.
37. Fayette County, TR 315, District 7, Contract No. 95350,
Construction of a single span, precast, prestressed concrete deck
beam bridge carrying TR 315 over Vandalia Drainage Ditch, two miles
east of Vandalia Correctional Center. 35 Working Days.
38. Randolph County, Roseborough Road, District 8, Contract No.
97205, Construction of a single span, precast, prestressed concrete
deck beam bridge carrying TR 159A, Roseborough Road, over Mary's
River 4 miles southeast of Sparta. 20 Working Days.
39. Jackson County, Old IL13, District 9, Contract No. 98650,
removal of the existing Old IL 13 bridge over Mud Creek southeast of
Murphysboro, and replacement with a single span concrete and steel
beam bridge with a 32 ft width roadway. 95 Working Days.
40. Franklin County, IL 37, District 9, Contract No. 98716,
Repairs to the bridge carrying IL 37 over stream approximately 1.80
miles north of Benton. The work will include approach pavement
patching, bridge deck patching, a microsilica concrete overlay and
floor drain extensions. 35 Working Days.
41. Union County, Bald Knob Cross Road, District 9, Contract No.
98792, Repairs to the structure carrying Bald Knob Cross Road over
IL 127 in Alto Pass. The work will include concrete superstructure
repairs, and the placement of riprap. 20 Working Days.
42. Lake County, US 14, District 1, Contract No. 62274, Traffic
signal modernization along US 14 (Northwest Highway) from Hart Road
to Lake-Cook Road in Barrington. 55 Working Days.
43. Peoria-Tazewell Counties, I-74, District 4, Contract No.
68226, Supplying an Intelligent Transportation System (ITS) on I-74
from west of Sterling Avenue to east of Washington Street in Peoria
and East Peoria. Completion Date December 31, 2006.
44. Various Counties, Various Routes, District 8, Contract No.
76606, construction of lighted signs at IL 3 and Stolle Road at
Dupo; IL 161 and Old Lincoln Trail at Belleville; North Belt West
and 37th Street/Royal Heights Road in Belleville. Also, included is
the construction of flashing beacons at Old US 50 and
Frogtown/Little Prairie Road west of Beckemeyer; IL 15 (Broadway)
and 6th Street in East St. Louis; and IL 160/177 and Venedy Station
northwest of Okawville. 60 Working Days.
45. Macon County, US 36, District 5, Contract No. 90835,
Modernization of the traffic signals on US 36 at the intersections
with Van Dyke Street, Edwards Street, Church Street, Water Street,
Franklin Street, and Jackson Street. Also at IL 105 all in Decatur.
175 Working Days.
46. Various Counties, Various Routes, District 1, Contract No.
44800, Placement of various types and widths of paint pavement
markings at various locations throughout the district. Completion
Date November 01, 2003.
47. Cook County, Various Routes, District 1, Contract No. 44802,
Removal and replacement of damaged raised reflector pavement markers
and castings at various locations throughout the county. Completion
Date November 01, 2003.
48. Various Counties, Various Routes, District 1, Contract No.
44803, Replacement of various types and widths of pavement markings
at various locations throughout the district. Completion Date
November 01, 2003.
49. Various Counties, Various Routes, District 1, Contract No.
44804, Repairing various types and widths of pavement markings at
various locations throughout the district. Completion Date November
01, 2003.
50. Cook County, I-90/94, District 1, Contract No. 60284,
Rehabilitation of the pump station located at the southwest quadrant
of Des Plaines Street and Van Buren Street in Chicago. Completion
Date February 01, 2005.
51. Cook County, IL 171, District 1, Contract No. 62460,
Placement of permanent protective shield on the structures carrying
IL 171 (First Avenue) over I-55 (Stevenson Expressway) in Summit. 15
Working Days.
52. DuPage County, I-355 & I-290, District 1, Contract No. 62485,
Bridge painting of the structures carrying I-355 over US 20, over IL
53; and I-290 over Addison Road and Woodale Road in Addison. 65
Working Days.
53. Lake County, IL 53/IL 120, District 1, Contract No. 62491,
Demolition and disposal of 7 buildings on IL 53/IL 120 at Gilmer
Road in Hawthorn Woods. 30 Working Days.
54. McHenry County, US 14, District 1, Contract No. 62493,
Repairs of the Harvard Weigh Station north of Crowley Road at Oak
Grove Estates northeast of Harvard. 20 Working Days.
55. Kane County, IL 31, District 1, Contract No. 62501, Crack and
joint sealing along IL 31 from IL 62 to Strom Drive in Elgin. 15
Working Days.
56. Kane-Cook Counties, IL 25 & IL 19, District 1, Contract No.
62502, Crack and joint sealing along IL 25 from west of Shales
Boulevard to Schaumburg Road in East Dundee, Carpentersville and
Elgin. 15 Working Days.
57. Calhoun County, IL 108, District 8, Contract No. 76443,
Kampsville Ferry harbor improvements at Kampsville include harbor
dredging, sheet pile retaining wall, moorings and stairs. 30 Working
Days.
58. Cook County, Lake Avenue, District 1, Contract No. 83504,
Construction of 7,708 ft of portland cement concrete pedestrian and
bicycle path on West Lake Avenue along the perimeters of Great Park
on West Chestnut Avenue to Lake Road and North South Road in
Glenview. 35 Working Days.
59. WITHDRAWN
60. Madison County, SIU Trail Spur, District 8, Contract No.
97203, Construction consists of 0.56 mile Bike Trail from Madison
County Transit Authority bike trail to the SIU student parking lots
on the Southern Illinois University Campus at Edwardsville. 20
Working Days.
61. Jackson County, US 51, District 9, Contract No. 98784,
Landscaping along the backslopes of a relocated section of US 51
from Pleasant Hill Road to west of Boskydell Road in Carbondale.
Completion Date November 30, 2003.
62. Champaign County, US 150, District 5, Contract No. 90924,
1.17 miles of bituminous concrete resurfacing on US 150 from Union
Street to Francis Drive in Champaign. 30 Working Days.
63. Champaign County, IL 10 & Mattis Ave., District 5, Contract
No. 90734, 2.52 miles of bituminous concrete resurfacing on IL 10
(Springfield Avenue) from Fieldstone Road to Mattis Avenue. Also
Mattis Avenue from Springfield Avenue to Church Street in Champaign.
Includes intersection improvements and traffic signals. Completion
Date September 15, 2003 Plus 10 Working Days.
64. Christian County, McAdam Drive, District 6, Contract No.
72755, 0.55 mile of pavement patching, bituminous concrete
resurfacing and aggregate wedge shoulders on McAdam Drive and
adjacent spur between IL 29 and IL 48 in Taylorville 15 Working
Days.
65. Clay-Richland Counties, US 50, District 7, Contract No.
94398, 7.43 miles of pavement patching, bituminous surface removal,
bituminous concrete resurfacing, bituminous and aggregate shoulders
on US 50 from west of Clay City to west of Noble. Also included is
the rehabilitation of the bridge over the Little Wabash River. 90
Working Days.
66. Coles County, Shiloh Cemetery, District 5, Contract No.
70182, 0.06 mile of resurfacing on Cemetery Drive and construction
of 10 parking space areas at the Shiloh Presbyterian Church Cemetery
7 miles southwest of Charleston. Includes sidewalk removal and
replacement, lighting and landscaping. 20 Working Days.
67. Kane County, IL 72, District 1, Contract No. 82668, 1.09
miles of pavement reconstruction with concrete pavement (jointed)
and traffic signal modernization on IL 72 from IL 68 to IL 25 in
East Dundee. Completion Date October 31, 2003 Plus 10 Working Days.
68. Lake County, IL 131, District 1, Contract No. 60184,
Intersection reconstruction including widening, resurfacing, new
traffic signals, and loop detectors on IL 131 from Wisconsin state
line in Pleasant Prairie, Wis. to IL 173 in Zion, IL. Completion
Date August 29, 2003 Plus 10 Working Days.
69. Lee County, Various Routes, District 2, Contract No. 64838,
1.25 miles of milling and bituminous resurfacing on US 30 east of US
52, two locations are on U.S. 52 between Dixon and U.S. 30, and two
locations are on Illinois 26 south of U.S. 30. 15 Working Days.
70. Macoupin County, IL 4 & Old IL 4, District 6, Contract No.
72292, 5.27 km of pavement patching, bituminous surface removal,
bituminous resurfacing, bituminous concrete base course widening and
aggregate wedge shoulders on IL 4 from the Sangamon County line to
George Street in Virden, and on Old IL 4 from south of Virden to IL
4 in Virden. Completion Date September 01, 2003 Working Days.
71. McDonough County, US 67, District 4, Contract No. 68235, 4.7
miles of bituminous concrete surface on US 67 south of US 67/US 136
to South Street in Industry. 25 Working Days.
72. McHenry County, IL 120, District 1, Contract No. 62007, 7.80
km of widening with concrete base course, milling and bituminous
concrete surface and traffic signal modernization on IL 120 from
Fleming Road to Dot Street in McHenry. Completion Date August 29,
2003 Plus 10 Working Days.
73. McHenry County, IL 120 & IL 31, District 1, Contract No.
82470, 4.56 km on IL 120 and 1.38 km on IL 31--widening, milling,
bituminous concrete surface, pavement reconstruction and traffic
signal modernization from Dot street to IL 31 and High Street to IL
120 all in McHenry. Completion Date October 15, 2004 Plus 15 Working
Days.
74. Menard County, CH 14, District 6, Contract No. 93338, 0.62
mile of new pavement, gutter, storm sewer, culvert, entrance and
side road intersection improvements on South Athens Blacktop 2.0
miles south of Athens to the Menard/Sangamon county line. 110
Working Days.
75. Ogle County, US 52, District 2, Contract No. 64844,
Intermittent bituminous resurfacing on US 52 from IL 26 to IL 64 at
Brookville. 15 Working Days.
76. Peoria County, IL 40, District 4, Contract No. 68112, 0.80
mile of bituminous concrete resurfacing on IL 40 from Ravenswood
Road to Lindberg Road in Peoria. Also, bridge repairs to the
structure carrying IL 40 over IL 6. 40 Working Days.
77. Peoria County, IL 8, District 4, Contract No. 88854, 0.35 km
of bituminous concrete widening and resurfacing on Western Avenue
(IL 8) from Wiswall Street to Butler Street in Peoria. Completion
Date September 15, 2003.
78. Sangamon County, Wabash Ave.& Veteran's Pkwy, District 6,
Contract No. 72654, construction of dual left turn lanes and
widening at the intersection of Wabash Avenue and Veterans Parkway
on the west side of Springfield. Includes milling, resurfacing and
striping of Wabash Avenue from Robbins Road to the West White Oaks
Mall entrance with traffic signal upgrade. Also included is the
patching, shoulder repair and shoulder sealing of Veterans Parkway
from Iles Avenue to the I-72 interchange. Completion Date October
10, 2003.
79. Tazewell County, Morton Community Bikeway, District 4,
Contract No. 89276, construction of a bicycle/pedestrian path
beginning at the terminus of the existing trail near Cypress Road
and ending at the terminus of the existing trail near Happ Lane in
Morton. 60 Working Days.
80. Winnebago County, IL 70, District 2, Contract No. 64841, 3.76
miles of bituminous concrete widening and resurfacing on IL 70 from
Meridian Road to Summerdale Avenue in Rockford. Includes lighting,
traffic signals, or bridge replacement at Kent Creek and 3 bridge
rehabilitations. 145 Working Days.
81. Winnebago County, I-39, District 2, Contract No. 64865, 7.76
miles of concrete patching on Interstate 39 from I-90 south to
Baxter Road. 15 Working Days.
82. Clark County, CH 8, District 5, Contract No. 91276,
Construction of an additional prestressed, concrete deck beam span
to an existing three span concrete deck 2.4 miles from Westfield. 30
Working Days.
83. Cook County, Ridge Road, District 1, Contract No. 62095,
Removal of the existing bridge and replacement with a 12' x 14'
reinforced concrete box culvert carrying Ridge Road over Illinois
Central Railroad and 40 ft width pavement reconstruction, all in
Homewood. Completion Date October 01, 2003 Plus 05 Working Days.
84. Cook County, IL 58 (Dempster St.), District 1, Contract No.
60918, Removal of the existing bridge and replacement with a 3-span
bridge carrying IL 58 (Dempster St.) over North Shore Channel, new
approach pavement, lighting and traffic signal modernization located
in Skokie and Evanston. Completion Date October 31, 2003 Plus 15
Working Days.
85. Kankakee County, IL 17, District 3, Contract No. 66213,
Removal and replacement of the structures carrying IL 17 (Court
Street) over the IC Railroad in Kankakee. Completion Date December
01, 2003 Plus 15 Working Days.
86. Lake County, IL 173, District 1, Contract No. 62034, Removal
of the existing structure and replacement with a single span steel
beam bridge carrying IL 73 (Rosecrans Road) over North Branch of
Mill Creek east of Antioch. Completion Date November 15, 2003 Plus
10 Working Days.
87. Peoria-Tazewell Counties, Various Routes, District 4,
Contract No. 68313, Cleaning and painting of 11 structures on
various routes in Peoria and Tazewell counties. 125 Working Days.
88. St. Clair County, I-55/70, District 8, Contract No. 76619,
Bridge parapet, approach parapet and approach shoulder pavement
repairs to tri-level ramp from I-55/70 westbound to I-64 eastbound
in East St. Louis. Completion Date May 30, 2003.
89. St. Clair County, I-64, District 8, Contract No. 76428,
widening of the structure carrying Ruby Lane over I-64. Work will
consist of concrete deck removal and replacement, substructure
widening, beam placement and pavement widening. Completion Date
August 29, 2003 Plus 15 Working Days.
90. Vermilion County, US 150 & IL 1, District 5, Contract No.
90641, Removal and replacement of the structure carrying IL 1 over
the Norfolk and Southern Railroad, installation of a new bridge on
4th Street crossing over the Norfolk and Southern Railroad and
construction of a retaining wall at IL 1 and Adams Street. Also,
bituminous widening and resurfacing on US 150 and IL 1 and the
surrounding roads from Interstate 74 to Main Street in Danville.
Completion Date December 01, 2004 Plus 10 Working Days.
91. Vermilion County, TR 101, District 5, Contract No. 91187,
Construction of a five span, precast prestressed concrete deck beam
bridge carrying TR 101 over North Fork of Vermilion River 1/4 mile
west of Alvin. 90 Working Days.
92. Cook County, IL 62, District 1, Contract No. 83663, new
roadway lighting on IL 61 (Algonquin Road) from Goebber Road to
Busse Road in Mount Prospect and Arlington Heights. 60 Working Days.
93. Cook County, 111th Street, District 1, Contract No. 62512,
Traffic signal installation on 111th Street at Jodan Drive in Oak
Lawn. 45 Working Days.
94. Carroll-JoDaviess Counties, IL 72 & IL 78, District 2,
Contract No. 64864, 5.25 miles of routing, cleaning and sealing
pavement cracks on IL 72 from IL 73 to Shannon and on IL 78 from
Warren to the Wisconsin state line. 15 Working Days.
95. Cook County, Hicks Road, District 1, Contract No. 62452,
Concrete pavement patching on Hicks Road (SB) from north of US 14
(Northwest Highway) to south of IL 68 (Dundee Rd.) in Palatine. 25
Working Days.
96. DeKalb County, Various Routes, District 2, Contract No.
64817, 13.97 miles of routing and sealing cracks on US 30 from IL 23
to Hinckley; on US 34 from Somanauk to Sandwich; and on IL 72 from
Kirkland to Genoa. 15 Working Days.
97. Henry County, IL 92, District 2, Contract No. 64819,
maintenance (mowing, spraying, tree shelter repairs) at the Joslin
Wetland southeast of IL 92 and the Rock River. Completion Date
October 03, 2003.
98. Iroquois County, I-57, District 3, Contract No. 66314,
Constructing a 4350 ft concrete paved ditch along the east side of
Interstate 57 and IL 54 near Onarga. 30 Working Days.
99. Lee County, I-39, District 2, Contract No. 64866, 5.2 miles
of bituminous shoulder removal and replacement on I-39 from Perry
Road south to US 30. 15 Working Days.
100. Peoria County, I-74, District 4, Contract No. 68316,
Demolition of duplexes at 1511, 1513, 1515 and 1517 North Knoxville
in Peoria. 15 Working Days.
101. Tazewell County, Unmarked Route, District 4, Contract No.
89279, Construction of 0.37 mile of bituminous bikeway, walks,
lighting, irrigation and planting from Riverside Drive to Bob Michel
Bridge in East Peoria. 150 Working Days.
102. Tazewell County, Springfield Road, District 4, Contract No.
89258, 2.028 miles of earth embankment, grading, drainage
improvements, paving and placement of bituminous and aggregate
shoulders on Springfield Road from Toboggan Road to IL 122. 90
Working Days.
103. Various Counties, Various Routes, District 2, Contract No.
64863, "On call" guardrail and fence repairs in the north half of
District Two on all state maintained routes. Completion Date March
15, 2004.
104. Various Counties, Various Routes, District 2, Contract No.
64862, "On call" guardrail and fence repairs in the south half of
District Two on all state maintained routes. Completion Date March
15, 2004.
105. Various Counties, Various Routes, District 4, Contract No.
44801, Installing raised reflective pavement markers, removing
reflectors, placing new reflectors and removing damaged pavement
marker castings on various routes in District 4. Completion Date
November 30, 2003.
106. Various Counties, Various Routes, District 4, Contract No.
68320, District wide weed control spraying on various routes
throughout District Four. Completion Date June 05, 2003.
107. Champaign-Vermilion Counties, Various Routes, District 5,
Contract No. 70281, Patching at various locations in Champaign and
Vermilion counties. Completion Date December 31, 2003.
108. Various Counties, Various Routes, District 5, Contract No.
70282, Patching at various locations in DeWitt, Macon, Moultrie,
Piatt and Shelby counties. Completion Date December 31, 2003.
109. Various Counties, Various Routes, District 5, Contract No.
70283, Patching at various locations in Clark, Coles, Cumberland,
Douglas and Edgar counties. Completion Date December 31, 2003.
110. Various Counties, Various Routes, District 8, Contract No.
76632, Weed control spraying along I-64, I-55/70, I-255, I-270 and
IL 255 in various counties throughout District 8. Completion Date
May 30, 2003.
111. Cook County, Meacham Road, District 1, Contract No. 83634,
1.24 miles of pavement widening, resurfacing, roadway patching,
storm sewers, traffic signals and landscaping on Meacham Road from
IL 72 (Higgins Road) to Tower Road in Schaumburg. 110 Working Days.
112. Cook County, Various Routes, District 1, Contract No. 83666,
bituminous pavement reconstruction with curb and gutter,
landscaping, storm sewer and other items incidental in completing
the improvements to 142nd Street, 143rd Street, Lamon Avenue and
Lavergne Avenue in Crestwood, Cook County. 100 Working Days.
113. DeKalb County, IL 72, District 2, Contract No. 64567, 0.69
mile of pavement removal and replacement, addition of curb and
gutter, storm sewer, widening of intersections and addition of
bi-directional lanes on IL 72 from the west city limits to the east
city limits in Kirkland. Completion Date November 26, 2003.
114. LaSalle County, OR 6, District 3, Contract No. 66280, 0.19
mile of pavement removal, aggregate base course and bituminous
concrete resurfacing at the Oakwood/Rockwell Cemetery entrance
located east of LaSalle. 25 Working Days.
115. McHenry County, West Main Street, District 1, Contract No.
83672, 0.4 mile of bituminous concrete pavement widening and
resurfacing, water main, storm and sanitary sewer placement and
other items incidental to completing the improvements to West Main
Street from Bonnie Brae Road to IL 47 in Huntley. 55 Working Days.
116. McHenry County, McCullom Lake Road, District 1, Contract No.
83608, roadway realignment, box culvert, and resurfacing on McCullom
Lake Road from East Wonder Lake Road to Ringwood Road in McHenry
County. 85 Working Days.
117. Pike County, I-72, District 6, Contract No. 72350, 29.46
miles of pavement patching, bituminous surface removal, bituminous
concrete resurfacing, 10 ft and 8 ft bituminous shoulders, guardrail
replacement, and bridge repairs on I-72 from northwest of Kinderhook
east to the Illinois River bridge. Completion Date November 01,
2003.
118. St Clair County, Old Collinsville Road, District 8, Contract
No. 97193, one-half mile of new concrete pavement on Old
Collinsville Road from Lincoln Highway to Salem Place in O'Fallon.
125 Working Days.
119. St. Clair County, Hartmann/West Highway 50, District 8,
Contract No. 97189, 1,106 feet of widening, milling and resurfacing
on West Highway 50, and 624 feet of pavement reconstruction on
Hartman Lane in O'Fallon. The improvement also involves storm sewer,
installation of traffic signals and building removal. 88 Working
Days.
120. Will County, Caton Farm Road, District 1, Contract No.
83645, 1.07 km bituminous pavement reconstruction, additional turn
lanes, concrete curb and gutter, traffic signals at IL 59, drainage
structures on Caton Farm Road from west of Pebble Beach Drive to
east of Cryden Lane, west of Crest Hill. Completion Date November
30, 2003 Plus 35 Working Days.
121. Will County, Dixie Highway, District 1, Contract No. 83644,
1.7 miles of pavement widening, bituminous resurfacing, storm
sewers, curb and gutter, traffic signals and landscaping Dixie
Highway from Church Road to Indiana Avenue. Project includes work on
Church Road at Dixie Highway and on Miller Street from Trim Creek to
Dixie Highway in Beecher. 120 Working Days.
122. Edgar County, TR 317, District 5, Contract No. 91274,
construction of a 3-span precast, prestressed concrete deck beam
bridge carrying TR 317 over Sugar Creek in Edgar County. 110 Working
Days.
123. Greene County, IL 16/100, District 8, Contract No. 76281,
rehabilitation on the Joe Page Bridge carrying IL 16/100 over the
Illinois River at Hardin. The work will include electrical and
mechanical rehabilitation, deck replacement for the lift span,
painting, installation of a new operator's house, a utility building
and repairs to the fender system. Completion Date December 31, 2003.
124. Lake County, Sheridan Road, District 1, Contract No. 60919,
Superstructure removal and replacement, substructure repair and
pavement resurfacing of the Sheridan Road bridge over Bovington and
Middleton Ravines in Highland Park. Completion Date November 15,
2003 Plus 05 Working Days.
125. Lake County, Deer Path Road, District 1, Contract No. 83665,
bridge rehabilitation including demolition of the existing bridge
superstructure carrying Deer Path Road over Skokie River in Lake
Forest. 60 Working Days.
126. Marshall County, IL 17, District 4, Contract No. 68253, a
12" storm sewer across IL 17 to connect to an existing field tile
west of Sparland. 15 Working Days.
127. Tazewell County, IL 29, District 4, Contract No. 68262,
Placement of a storm sewer, a drop structure, earthwork and various
erosion control items on IL 29 near Creve Coeur. 15 Working Days.
128. Various Counties, I-39, District 3, Contract No. 66289,
Patching at 8 interchanges on Interstate 39 from Oglesby Spur in
LaSalle County to US 24 in Woodford County. 35 Working Days.
129. Jackson County, US 51, District 9, Contract No. 98421, 0.9
kilometer of widening and resurfacing of the existing pavement;
adding turn lanes, relocating Lincoln Drive, storm sewers, adding
three lanes to Grand Avenue, signal upgrade and curb and gutter on
US 51 from Mill Street to the SIU Physical Plant in Carbondale. 220
Working Days.
130. Livingston County, IL 23, District 3, Contract No. 66255,
11.0 miles of bituminous concrete surface removal and resurfacing on
IL 23 from Cornell to Pontiac. Completion Date July 01, 2003 Working
Days.
131. WITHDRAWN
132. Cook County, Unmarked Route, District 1, Contract No. 83662,
Construction of 4,940 feet of bituminous bike trail, stage 2, from
Wheeling Road to Palatine Road and along Wolf Road and the widening
of the West Frontage Bridge over Palatine Road in the Prospect
Heights Park District. 25 Working Days.
133. Grundy County, Various Routes, District 3, Contract No.
66301, Miscellaneous pavement patching at various locations in
Grundy County. Completion Date December 31, 2003.
134. Kane County, IL 47, District 1, Contract No. 62504, Crack
and joint sealing on IL 47 from Plank Road to Plato Road, west of
Elgin. 15 Working Days.
135. Various Counties, Various Routes, District 3, Contract No.
66298, Miscellaneous pavement patching at various locations
throughout various counties on various marked routes. Completion
Date December 31, 2003.
136. Winnebago-Ogle Counties, US 20 & I-39, District 2, Contract
No. 64792, Installation of changeable message signs at four (4)
locations along US 20 and Interstate 39. 40 Working Days.
1LR. LaSalle County, Reclamation of the Bents Mine, The proposed
reclamation project is located on the north edge of Oglesby,
adjacent to the Vermilion River. The work includes approximately
33,300 of earth excavation, 98,100 cu yds of mine refuse excavation,
special excavation and filling of 2 mine shafts, 2,000 sq yds of
stone riprap A-4 600 sq yds stone riprap A-3, 7,700 sq yds of
erosion control blanket, and the seeding, mulch, and soil amendments
for approximately 12 acres. A pre-bid meeting will be held at 10:00
a.m. Monday, January 13, 2003 at the site.
2LR. Menard County, Reclamation of Lincoln Coal Mine Group, The
proposed reclamation project includes four abandoned mine sites
located in Menard County. The proposed work requires the removal of
concrete cap or exploratory excavation (659 C.Y. Special Excavation)
of settled fill materials in previously filled shafts. The project
also provides for the shafts to be filled and resealed with a
combination of soil furnished by the Contractor (406 C.Y. of Borrow
Excavation) and crushed limestone fill materials (1,317 tons). The
project also includes 0.8 acres of seeding,
###
|