Bid Letting Set for August 1


SPRINGFIELD, IL -- The Illinois Department of Transportation will open bids on August 1, 2003 for various road and bridge improvement projects throughout the state. included are 19 aeronautics projects and one land reclamation project.

Following is a list of the projects by county:

1. Lawrence County, US 50, District 7, Contract No. 94961, widening and resurfacing for the construction of left turn lanes on US 50 at the intersection with Sumner Road (IL 2) located 0.50 mile north of Sumner. 55 Working Days.

2. Cook County, Broadway Avenue, District 1, Contract No. 62451, 1.42 miles of milling and bituminous concrete surface on Broadway Avenue from Francisco Avenue to Ashland Avenue in Blue Island. 45 Working Days.

3. Will County, IL 53/US 6 (Ottawa St.), District 1, Contract No. 62578, 0.66 mile of milling and bituminous concrete surface on IL 53/US 6/Ottawa Street from Chicago Street to Washington Street in Joliet. 30 Working Days.

4. Kankakee-Iroquois Counties, I-57, District 3, Contract No. 66330, 4.29 miles of milling and bituminous concrete resurfacing on Interstate 57 from 0.6 mile north of the Kankakee/Iroquois County line to 4.3 miles south of Clifton. Completion Date August 01, 2004.

5. Cook County, I-94/IL 394, District 1, Contract No. 62103, Reconstruction of 170th Street, Prince Drive and Van Dam Road, replacement of the existing structure carrying 170th Street over I-94 and temporary drainage all located along I-94/IL 394 under 170th Street in South Holland. Completion Date October 31, 2004 Plus 15 Working Days.

6. Ford County, IL 115, District 3, Contract No. 66260, 1.08 miles of bituminous concrete widening and resurfacing on IL 115 from west of Pine Street to US 24 in Piper City Completion Date September 01, 2004 Plus 15 Working Days.

7. Kendall County, IL 126, District 3, Contract No. 66348, widening of the intersection of IL 126 and Ridge Road and installation of a flashing beacon, north of Minooka 25 Working Days.

8. Lee County, IL 26/US 52, District 2, Contract No. 64927, 0.42 mile of milling and bituminous concrete surface on IL 26/US 52 (Galena Avenue) from 3rd Street to 7th Street in Dixon. 15 Working Days.

9. Mercer County, IL 17, District 4, Contract No. 68211, 3.35 miles of milling and bituminous concrete surface on IL 17 from east of IL 94 in Aledo to TR 1. 30 Working Days.

10. McHenry County, Mccullom Lake Rd., District 1, Contract No. 83717, 0.82 mile of bituminous resurfacing, pavement patching and shoulder repair on McCullom Lake Road between Hickory Drive and Lake Shore Drive. 15 Working Days.

11. Kankakee County, CH 47, District 3, Contract No. 87250, 2.02 miles of bituminous resurfacing and aggregate shoulders on CH 47 from IL 17 to the Bonfield Village limits. 15 Working Days.

12. Calhoun County, Batchtown Road, District 8, Contract No. 97187, 0.13 mile of surface removal, patching and resurfacing on Batchtown Road, 1 mile west of FAS 754. 15 Working Days.

13. Woodford County, IL 251, District 3, Contract No. 66367, 1.72 miles of milling and bituminous concrete surface on IL 251 from the McLean County line to I-39 at Kappa. 15 Working Days.

14. Livingston County, IL 116, District 3, Contract No. 66264, 7.30 miles of milling and bituminous concrete surface on IL 116 from the east limits of Saunemin to the west limits of Cullom. Completion Date October 15, 2003 Plus 15 Working Days.

15. Sangamon County, I-55 WFR, District 6, Contract No. 72810, At two locations on the I-55 West Frontage Road from 1 mile north of the Sangamon/Montgomery County line north to south of Springfield. The work will consist of 0.84 mile of leveling binder and bituminous concrete surface course and 3 ft aggregate shoulders. 20 Working Days.

16. DuPage County, York/Harger Rd, District 1, Contract No. 83630, 0.49 mile of construction of a bike path, pedestrian bridge and widening the existing York Road Bridge over East-West Tollway, Salt Creek to I-88 tollway ramp. 125 Working Days.

17. Cook County, Central Avenue, District 1, Contract No. 83693, 0.30 mile of reconstruction of existing roadway, signal modification, storm sewers, street lighting and landscaping on Central Avenue from Will Road to Edens Expressway. 85 Working Days.

18. Monroe County, Rogers Street, District 8, Contract No. 97214, 1.92 miles of new street extension with concrete curb and gutter, center turn lane, 10 ft wide bike trail and new bridge structure crossing Gerhardt Creek tributary on Rogers Street north from Hamacher Street with extra reconstruction on Country Club Lane. 125 Working Days.

19. Knox County, Main Street, District 4, Contract No. 89293, 0.84 mile of bituminous surface removal and replacement, sidewalk and combination curb and gutter removal and replacement on Main Street from Grand Avenue to Walnut Street in Galesburg. 50 Working Days.

20. White County, CH 7, District 7, Contract No. 95378, 4.52 miles of bituminous resurfacing with aggregate shoulders on CH 7 from CH 2 to FAS 890 at Emma. 25 Working Days.

21. Tazewell County, Springfield Road, District 4, Contract No. 89299, resurfacing Springfield Road from Tobaggan Avenue south to IL 122 northeast of Delavan. 25 Working Days.

22. Wayne County, CH 13, District 7, Contract No. 95377, relocating a portion of the roadway and constructing a soil cement base course with an A-2 treatment along CH 13 from FAS 795 northerly 6.56 miles to the Clay County Line. 30 Working Days.

23. Macon County, CH30/CH7, District 5, Contract No. 91289, widening and resurfacing the intersection of CH 30 and CH 7, the installation of storm sewer and construction of combination concrete curb and gutter at Mt.Zion. 50 Working Days.

24. Perry County, CH 11, District 9, Contract No. 99185, 4.08 miles of bituminous concrete binder and surface courses with 4 ft aggregate shoulders on County Highway 11 from the intersection with IL 127 and easterly to Shamrock Road, 7 miles northwest of Tamaroa. 25 Working Days.

25. Pope County, Bay City Road, District 9, Contract No. 99158, 5.3 miles of resurfacing, shoulders and pipe culvert on Bay City Road from 800 North to FAS 933 at New Liberty, 1/2 mile south of Hamletsburg. 55 Working Days.

26. Jackson County, 7th St & Industrial Park Dr, District 9, Contract No. 99188, 4,160 ft of earthwork, drainage, widening and bituminous resurfacing of Industrial Park Drive and North 7th Street at the north limits of Murphysboro. 80 Working Days.

27. Franklin County, IL 149, District 9, Contract No. 98822, 0.77 mile of base course widening, bituminous concrete resurfacing and 2 ft aggregate shoulders on IL 149 from the Big Muddy River Bridge east to the Freeman Spur Road located between Zeigler and West Frankfort. 15 Working Days.

28. LaSalle-Kendall Counties, US 52, District 3, Contract No. 66257, 5.73 miles of milling and bituminous concrete resurfacing on US 52 between IL 71 and Townhouse Road south of Newark Completion Date November 01, 2003.

29. Lawrence County, SBI 137, District 7, Contract No. 94718, 2.97 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, 1 ft aggregate shoulders and combination concrete curb and gutter on St. Francisville Spur from IL 1 easterly through St. Francisville to the Wabash River. 110 Working Days.

30. Jersey County, IL 3, District 8, Contract No. 76218, At Grafton, construction of left turn lanes at the intersection of IL 3 with Grafton Hills Road and at the intersection of IL 3 with IL 100 along with the resurfacing of IL 3 and 100. 70 Working Days.

31. Madison County, IL 157, District 8, Contract No. 96765, 5.41 kilometers of widening, resurfacing or reconstruction of IL 157 in Edwardsville from a two-lane, two-way facility to four traffic lanes with a center bi-directional turn lane. The work will be done in two segments: 1) south of the SIUE South Entrance south to Center Grove Road and 2) from north of Lewis Road north to Schwarz Street. 210 Working Days.

32. Fulton County, US 136, District 4, Contract No. 68321, 0.61 mile of milling and bituminous concrete surface on US 136 located west of the bridge over the Illinois River at Havana. 15 Working Days.

33. Macon County, IL 121, District 5, Contract No. 70336, 0.16 mile of patching, milling and bituminous concrete resurfacing on IL 121 from Locust Street to Division Street in Decatur. 20 Working Days.

34. Winnebago County, US 20 Frontage Road, District 2, Contract No. 64920, 1.15 miles of patching and bituminous concrete resurfacing on the south frontage road long US 20 between Falconer Road and Weldon Road. 15 Working Days.

35. Fayette County, I-70, District 7, Contract No. 74008, Beginning at the structure carrying I-70 over IL 140 approximately 1 mile northeast of the Bond/Fayette County Line northeast 0.82 mile toward Vandalia, the work will consist of bituminous surface removal and bituminous concrete binder and surface courses on the eastbound driving lane of I-70 only. 15 Working Days.

36. DeKalb County, IL 23/72, District 2, Contract No. 64585, 2.1 miles of bituminous concrete resurfacing on IL 23 (South) to IL 23 (North) also culvert replacements and the installation of signals and a right turn lane at IL 23 (South)/IL 72 (West) in Genoa. Completion Date November 01, 2004 Plus 05 Working Days.

37. Tazewell County, CH 1, District 4, Contract No. 89286, 1.13 miles of bituminous surfacing, widening, striping, earthwork, milling, storm sewers and sidewalks on CH 1 from south of Queenwood Road to IL 98 at Groveland. 80 Working Days.

38. Effingham County, Unmarked Route, District 7, Contract No. 95351, 0.89 mile of PCC pavement, including earthwork and drainage, on Grove Avenue from Schwerman Street to Raney Street, and on Schwerman Street from US 40 to Grove Avenue, and on US 40 1,687 feet in Effingham. 135 Working Days.

39. Effingham County, I-57, District 7, Contract No. 74007, The installation of new bearings, removal and replacement of the abutment backwalls, wingwall repairs, bridge approach pavement and expansion joints at the bridge carrying northbound I-57 over Green Creek north of Effingham. Completion Date November 21, 2003

40. Kane County, US 20, District 1, Contract No. 62041, Removal of the existing structure and replacement with a triple cell precast concrete box culvert carrying US 20 over Pingree Creek in Plato. Completion Date September 30, 2004 Plus 05 Working Days.

41. McLean County, Bus US 51 (SB), District 3, Contract No. 66060, Bridge deck replacement on the existing 8-span steel beam bridge carrying Business US 51 (SB) over Norfolk Southern Railroad in Bloomington. Completion Date August 31, 2004.

42. Ogle County, Cherry Rd., District 2, Contract No. 85323, replacement of the existing temporary structure with a double barrel box culvert over a branch of the Leaf River southwest of Adeline and approach roadway work. 35 Working Days.

43. Menard County, CH 17, District 6, Contract No. 93356, Remove existing culvert and replace with a single span precast, prestressed concrete deck beam bridge on open reinforced concrete abutments carrying CH 17 (Altig Bridge Road) over a drainage ditch 0.75 mile west of Greenview 30 Working Days.

44. DuPage County, Meyers Road, District 1, Contract No. 83698, bridge removal and replacement of the structure carrying CH 25 (Meyers Road) over the East-West Tollway (I-88) in Oak Brook. Completion Date October 29, 2004 Plus 15 Working Days.

45. Pope County, IL 147, District 9, Contract No. 98382, A 1.5 foot grade raise and deck replacement at the structure carrying IL 147 over the CN/IC Railroad near Robbs. 110 Working Days.

46. Jersey County, TR 69, District 8, Contract No. 97176, Remove existing structure carrying TR 69 over Phils Creek and replace with a two span precast, prestressed concrete deck beam bridge and approach roadway, 5.5 miles northeast of Jerseyville. 40 Working Days.

47. Marion County, Medlin Rd, District 7, Contract No. 95363, Remove existing 4-span bridge and replace with a single span precast, prestressed concrete deck beam bridge on CH 13 (Medlin Road) over Raccoon Creek 2.5 miles north of Walnut Hill. 30 Working Days.

48. McLean County, University St., District 3, Contract No. 87256, Construction of a triple 12' x 8' box culvert carrying University Street over the north branch of Sugar Creek in Normal. 60 Working Days.

49. Jasper County, TR 335, District 7, Contract No. 95374, Construction of a three sided 28' x 9' precast concrete structure carrying TR 335 over Hurricane Creek, six miles southeast of Bogota. 35 Working Days.

50. Shelby County, Unmarked Route, District 5, Contract No. 91236, 0.16 mile of construction of a single span precast, prestressed concrete deck beam bridge with pile abutments, aggregate approaches and earthwork over Sexson Branch four miles east of Strasburg. 45 Working Days.

51. Shelby County, TR 72A, District 5, Contract No. 91252, Remove existing bridge and construct a one span precast, prestressed concrete deck beam bridge with aggregate surface course approaches on TR 72A over Beck's Creek. Also includes new aggregate surface course at the intersection of TR 60 for 0.05 mile, all 2.5 miles southwest of Tower Hill. 35 Working Days.

52. Pike County, TR 512, District 6, Contract No. 93357, Construction of a two span precast, prestressed concrete deck beam bridge carrying TR 512 over Bettell Creek north of Pearl. 40 Working Days.

53. Bond County, CH 20, District 8, Contract No. 97200, Construction of a single span, precast, prestressed concrete deck beam bridge carrying CH 20 over tributary to Shoal Creek south of Pocahontas. 35 Working Days.

54. Hamilton County, TR 129A, District 7, Contract No. 95376, Construction of a single span, precast, prestressed concrete deck beam bridge carrying TR 129A over tributary to Big Creek, 3 miles north of McLeansboro. 30 Working Days.

55. Jackson County, White Lane, District 9, Contract No. 99176, Construction of a single span, precast, prestressed concrete deck beam bridge carrying TR 90 (White Lane) over Worthen Bayou, 3 miles northwest of Gorham. 30 Working Days.

56. Marshall-Peoria-Putnam Counties, IL 29, District 4, Contract No. 68263, Parapet wall sealing on the structures carrying IL 29 over Senachwine Creek and Coon Creek in Peoria County, Thenius Creek and Crow Creek in Marshall County and Senachwine Creek in Putnam County. 15 Working Days.

57. Lawrence County, TR 199, District 7, Contract No. 95375, Construction of a single span precast, prestressed concrete deck beam bridge carrying TR199 over tributary to Indian Creek, 2 miles south of Lawrenceville. 40 Working Days.

58. Will County, US 30, District 1, Contract No. 83591, traffic signal improvements, widening and resurfacing on US 30 and the West Frontage Road for Interstate 55 east of Spangle Road in Joliet. 35 Working Days.

59. Cook County, Various Routes, District 1, Contract No. 62558, Concrete barrier wall removal and replacement at 31 locations along various expressways in Cook County. Completion Date November 25, 2003

60. Cook-Lake Counties, Various Routes, District 1, Contract No. 62596, Substructure repairs to existing structures at various locations. 40 Working Days.

61. Randolph County, Fort Kaskaskia, District 8, Contract No. 76637, correction of a drainage problem along the main site road and construction of an ADA compliant camping facility in the site's campground at the Fort Kaskaskia State Historic Site northwest of Chester. 15 Working Days.

62. Will County, US 30, District 1, Contract No. 62557, Demolition of a building and parking area located at the corner of US 30 and Raynor Avenue in Joliet. 25 Working Days.

63. Hardin County, IL 34, District 9, Contract No. 98832, approach resurfacing, keyway repair, concrete overlays and bridge rail and terminal section adjustments on the bridges carrying IL 34 over Pinhook Creek, 2 miles south of Herod, and over Hobbs Creek 6 miles south of Herod. 45 Working Days.

64. Effingham County, IL 128, District 7, Contract No. 94963, 0.16 mile of slope repair along IL 128 northwest of Altamont. Includes placement of a 48" diameter concrete pipe, construction of a junction box, extending an existing box culvert, placement and grading of embankment to repair a slope failure and the placement of riprap. 50 Working Days.

65. Cook County, Elgin-O'hare Expressway, District 1, Contract No. 62526, 0.04 mile of concrete pavement patching along Elgin-O'Hare Expressway at Gary Ave in Schaumburg. 15 Working Days.

66. Will County, US 52, District 1, Contract No. 62579, Drainage repair, patching, and curb and gutter replacement along US 52 west of Houbolt Road in Joliet. 15 Working Days.

67. Fulton County, US 24, District 4, Contract No. 68189, Construction of pipe underdrain along US 24, 4 miles east of Little America. 30 Working Days.

68. Cook County, Barker Ave., District 1, Contract No. 83707, Construction of .73 mile of bike path, sidewalk and driveway removal on Barker Avenue from Central Road to Linden Lane and on Weber Drive from Oak Lane to White Oak Lane. 20 Working Days.

69. Sangamon County, IL 29, District 6, Contract No. 72836, replacing approximately 24,000 wetland rootstock plants and 155 trees damaged during flooding along the west side of IL 29 north of Springfield. Completion Date May 15, 2004.

70. Peoria County, IL 29, District 4, Contract No. 68108, 0.61 mile of geometric improvement of IL 29 and traffic signal installation at the intersection of IL 29 and Truitt Avenue in Chillicothe. 35 Working Days.

71. Schuyler County, IL 100, District 6, Contract No. 72828, pavement patching, manhole reconstruction, new flap valve, shoulder removal and replacement, and gutter removal and replacement on IL 100 from the north edge of Frederick extending 0.7 mile northeast. 15 Working Days.

72. Hancock County, Warsaw Spur/US 136, District 6, Contract No. 72822, replacement of gutter, removal and replacement of guardrail, grading of the existing shoulder and ditch, and removal and replacement of pipe culvert at the following locations: (1) 0.20 mile on the Warsaw Spur (SBI 96) in Warsaw from Station 46+50 to Station 57+00 (2) 1.52 miles on the Warsaw Spur (SBI 96) in Warsaw from Station 71+39 to Station 151+55 and (3) 0.07 mile on US 136 located 2 miles east of Carthage from Station 234+00 to Station 237+50. 20 Working Days.

73. Various County, Various Routes, District 4, Contract No. 68358, Approximately 36 miles of crack routing and sealing along various routes. 20 Working Days.

74. Effingham County, I-57, District 7, Contract No. 74009, 4 miles of continuously reinforced PCC pavement patching on I-57 beginning at the Shelby/Effingham County line and extending southwest. 20 Working Days.

75. Various County, Various Routes, District 4, Contract No. 68359, 38.3 miles of crack routing and crack filling at various locations. 45 Working Days.

76. Ford County, I-57, District 3, Contract No. 66355, Cleaning and painting of 4 structures on Interstate 57 from 2.0 miles north of Paxton to 3.0 miles south of Paxton. 80 Working Days.

77. Champaign-Vermilion Counties, I-74, District 5, Contract No. 70292, 9.70 miles of patching on Interstate 74 from Saint Joseph to US 150 near Muncie. 25 Working Days.

78. Alexander-Pulaski Counties, I-57, District 9, Contract No. 98819, 9 miles of continuously reinforced PCC pavement patching on I-57 beginning at milepost 0 the Mississippi River Bridge and extending northerly to milepost 9. 15 Working Days.

79. DuPage County, Unmarked Route, District 1, Contract No. 83658, Construction of 7.03 miles of 10' wide bituminous bike trail, two prefabricated pedestrian bridges and construction of wetland site. 75 Working Days.

80. Whiteside County, Unmarked, District 2, Contract No. 64936, .078 mile of patching and bituminous concrete widening and resurfacing on Elston Road from IL 84 to 16th Avenue in Fulton. 15 Working Days.

81. Kankakee County, IL 115, District 3, Contract No. 66268, 1.89 km of bituminous concrete widening and resurfacing and bridge replacement on IL 115 from Township Road to the structure carrying IL 115 over Horse Creek in Herscher. Completion Date August 11, 2004.

82. Kankakee County, IL 113, District 3, Contract No. 66306, 0.68 km of reconstruction on IL 113 with full depth bituminous concrete from IL 17 to Oak Tree Lane in Kankakee. Completion Date June 30, 2005.

83. McLean County, Unmarked Route, District 3, Contract No. 66341, Resurfacing the Park Road and parking lot improvements at Moraine View State Park east of Bloomington. 20 Working Days.

84. Kendall County, US 52, District 3, Contract No. 66349, widening of the intersection of US 52 and Ridge Road and installation of a flashing beacon, north of Minooka. 25 Working Days.

85. Logan County, I-55 Bus. Loop, District 6, Contract No. 72824, construction of a right turn late on I-55 Business loop at the intersection with TR128 (Prison Road) south of Lincoln. Completion Date November 01, 2003.

86. Cook County, Barrington Road, District 1, Contract No. 83670, 1.24 miles of earth excavation, roadway reconstruction, traffic signal installation, roadway lighting, storm sewers, drainage structures and retaining walls on Barrington Road from Old Higgins Road to Interstate 90 in Hoffman Estates. Completion Date November 30, 2004 Plus 15 Working Days.

87. Cook County, St. Charles Rd, District 1, Contract No. 83689, 1.28 miles of reconstruction, resurfacing, widening and highway lighting on St. Charles Road and portions of Wolf Road and Taft Avenue from Interstate 290 to Wolf Road and from St. Charles Road to Proviso Drive in Berkeley. 195 Working Days.

88. Effingham County, Technology Dr. & US 45, District 7, Contract No. 95362, 0.76 mile of PCC pavement, lime modified soil, curb and gutter, and earth work in Effingham consisting of 0.30 mile on Technology Drive from US 45 to Althoff Drive, 0.27 mile on US 45, 0.15 mile on Althoff Drive, and 0.04 mile on Althoff Avenue. 205 Working Days.

89. Gallatin County, Unmarked Route, District 9, Contract No. 98743, aggregate base course and bituminous mixture complete, earth work and culvert extensions on the park road leading to the Old Slave House (Crenshaw House) located 3 miles east of Equality. 50 Working Days.

90. Rock Island County, Milan Beltway, District 2, Contract No. 64649, Construction of a structure carrying the Milan Beltway Extension over the West Rock River. Includes 2600 feet of grading for future bridges over Interstate 280 and over Airport Road in Milan. 225 Working Days.

91. McLean County, IL 9, District 3, Contract No. 66162, Removal and replacement of three structures, two of them with cast in place box culverts and one with a new two-span steel I-beam bridge, all carrying IL 9 over an unnamed stream (two locations) and Kings Mill Creek between IL 122 and US 150 near Bloomington. Completion Date July 31, 2004.

92. Madison County, IL 255, District 8, Contract No. 76525, construction of a new 2 span, continuous composite concrete and steel web plate beam girder structure with a 10.2 m width roadway to carry Vonnahmen Road over proposed IL 255 and the reconstruction of Vonnahmen Road on new alignment, north of Alton. Also included is the construction of dual 5 span, continuous composite concrete and steel plate beam girder structures with 12.6 m width roadways to carry IL 255 over the West Fork of Wood River Creek. 185 Working Days.

93. Whiteside County, Moline Road, District 2, Contract No. 64395, Removal and replacement of the box culvert carrying Moline Road over an unnamed stream located 1.0 mile east of Erie. Completion Date November 10, 2003.

94. JoDaviess County, Unmarked Route, District 2, Contract No. 64802, Road and parking lot improvements at Apple River Fort State Historic Site near Elizabeth. 25 Working Days.

95. Whiteside County, Freeport Road, District 2, Contract No. 64935, culvert extension, reshaping ditches and removing guardrail in the northeast quadrant at the intersection of Freeport Road and Lynn Boulevard in Sterling. 15 Working Days.

96. Knox County, IL 116, District 4, Contract No. 68317, Box culvert extension, gutter, slope and shoulder work along IL 116, east of IL 41 near St. Augustine. 30 Working Days.

97. Cook County.,I-80/94/US 6, District 1, Contract No. 62518, 5.63 km of variable width temporary widening and shoulder reconstruction along I-80 from west of IL 83 to Burnham Avenue and I-94 and I-394 from 159th Street to Thornton-Lansing Road, located in Lansing and South Holland. Completion Date October 31, 2003 Plus 10 Working Days.

98. Bureau County, US 6, District 2, Contract No. 64387, 0.79 miles of bituminous concrete resurfacing, and signal installation on US 6 from IL 26 (N) to IL 26 (S) in Princeton. Includes upgrading the traffic signals at the intersection of Main Street and installing new traffic signals at the intersection of Euclid. Completion Date November 24, 2004 Plus 10 Working Days.

99. Henry County, US 34. District 2, Contract No. 64507, Improvement of the intersection at US 34 and Kentville Road by the addition of an auxiliary lane and left turn lanes located east of Kewanee. Completion Date August 22, 2003.

100. Morgan County, US 67/IL 104, District 6, Contract No. 72262, 1.75 miles of pavement patching, bituminous surface removal, leveling binder, bituminous concrete resurfacing, 4 ft width bituminous shoulders, 3 ft width aggregate shoulders and guardrail improvements on US 67/IL 104 located 1 mile northwest of Bethel. 25 Working Days.

101. Morgan County, IL 104, District 6, Contract No. 72424, Pavement patching, bituminous surface removal, bituminous concrete resurfacing, 4 ft and 8 ft width bituminous shoulders and 3 ft width aggregate shoulders on IL 104 beginning from the Illinois River Bridge in Meredosia extending 1.82 miles to the east. Also included in the project is the construction of a portable scale turnout. 25 Working Days.

102. Logan County, Unmarked Route, District 6, Contract No. 72629, 4.53 miles of widening and resurfacing of the internal park roads and the reconstruction of parking areas at the Edward Madigan State Park located 1 mile south of Lincoln. Also included is the resurfacing of County Road 128. Completion Date October 31, 2003 Working Days

103. DeWitt County, US 51 BUS, District 5, Contract No. 90792, 3.45 miles of bituminous concrete resurfacing, storm sewer upgrade, geometric and safety improvements along Bus. 51 Bypass (N) to Bus. 51 (S) in Clinton. Completion Date October 18, 2003 Plus 10 Working Days.

104. Jackson County, US 51 & IL 13, District 9, Contract No. 98749, 1.48 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing on US 51 from Industrial Park Road north to Airport Road, and on IL 13 (Main Street) from Wall Street to east of Lewis Lane in Carbondale. 25 Working Days.

105. Jackson County, Park Roads, District 9, Contract No. 98770, Located northwest of Murphysboro the work is at the Paul Ice Recreational Area and at Lake Murphysboro State Park and will consist of resurfacing Paul Ice Road, Cook Road, Leon Winn Memorial Drive, interior parking lots and sidewalks to be surfaced, new lighting, aggregate shoulders, pavement patches and guardrail. 55 Working Days.

106. Saline County, US 45, District 9, Contract No. 98789, 1.49 miles of pavement patching, leveling binder, bituminous concrete resurfacing and 2 feet aggregate shoulders on US 45 located 2.5 miles northeast of Eldorado. 15 Working Days.

107. Sangamon County, Old IL 4, District 6, Contract No. 72408, The removal of the existing single span structure carrying Old IL 4 over a tributary to Lick Creek south of Springfield and the replacement with a double barrell 6' X 9' concrete box culvert. Completion Date October 31, 2003.

108. Cook County, US 12, District 1, Contract No. 62562, Storm sewer maintenance along US 12 from IL 33 to Euclid Avenue in Wheeling. 15 Working Days.

109. Cook County, IL 83, District 1, Contract No. 62563, Storm sewer maintenance along IL 83 from US 14 to Palatine Road in Prospect Heights and Wheeling. 15 Working Days.

110. Cook County, IL 1, District 1, Contract No. 62564, Storm sewer maintenance along IL 1 from 16th Street to Union Avenue in Chicago Heights. 30 Working Days.

111. Cook-Kane Counties, IL 19, District 1, Contract No. 62565, Storm sewer maintenance along IL 19 from IL 25 to Schaumburg Road in Elgin. 25 Working Days.

112. Cook-Kane Counties, IL 72, District 1, Contract No. 62567, Storm sewer maintenance along IL 72 from east of IL 25 to west of Beverly Road and at Oakton Street in East Dundee, Hoffman Estate and Elk Grove Village. 15 Working Days.

113. Cook County, US 14, District 1, Contract No. 62568, Storm sewer maintenance along US 14 from Highland Avenue to Des Plaines River Road in Arlington Heights and Mount Prospect. 15 Working Days.

114. Cook County, 95th Street, District 1, Contract No. 62569, Storm sewer maintenance along 95th Street from Melvina Avenue in Oaklawn to Western Avenue in Evergreen Park. 25 Working Days.

115. Cook County, Kedzie Avenue, District 1, Contract No. 62570, Storm sewer maintenance along Kedzie Avenue from 87th Street in Evergreen Park to 115th Street in Chicago. 20 Working Days.

116. Cook County, 111th Street, District 1, Contract No. 62571, Storm sewer maintenance along 111th Street from Harlem Avenue to Ridgeland Avenue in Worth. 15 Working Days.

117. Rock Island County, Friedens Road & IL 5 FR, District 2, Contract No. 64766, 1.4 miles of patching and resurfacing on Friedens Road (a frontage road) and on IL 5 Frontage Road near the interchange of Interstate 80 and Illinois 5. 15 Working Days

118. Warren-Knox Counties, US 34, District 4, Contract No. 68326, 6.2 miles of intermittent patching on US 34 from Cameron Road to Main Street in Galesburg. 25 Working Days.

119. Jackson-Perry Counties, US 51 & IL 149, District 9, Contract No. 98809, inlet replacement on US 51 from IL 152 to High Street and inlet reconstruction on Washington Street in DuQuoin. Also included is storm sewer cleaning on IL 149 from 5th Street to 6th Street in Murphysboro. 30 Working Days.

120. Jersey County, IL 109, District 8, Contract No. 76680, Pavement patching, bituminous surface removal, leveling binder, bituminous concrete resurfacing, 3 ft bituminous shoulders and 3 ft aggregate shoulders on IL 9 from US 67 in Jerseyville south 8.18 miles to IL 3. 50 Working Days.

121. Piatt County, IL 48, District 5, Contract No. 70305, 0.69 mile of bituminous concrete patching and resurfacing on IL 48 over Interstate 72 near Cisco. 25 Working Days.

1A. Waukegan Regional Airport, Waukegan, Lake County, Expanding the Existing Detention Basin in the SW Quad.

2A. U of I – Willard Airport, Savoy, Champaign County, Rehabilitate Northwest Parallel Taxiway (Taxiway C).

3A. Palwaukee Municipal Airport, Prospect Heights, Cook County, Construct, Light and Mark Taxiway Kilo from Runway 6/24 to 34 Pad and Taxiway Echo Extension.

4A. Schaumburg Regional Airport, Schaumburg, Cook County, Install Perimeter Security Fencing.

5A. Mt. Vernon Airport, Mt. Vernon, Jefferson County, Relocate 8" Water Main for Fire Protection.

6A. St. Louis Regional Airport, East Alton, Madison County, Install an Automated Weather Observation System – AWOS III P/T.

7A. Greenville Airport, Greenville, Bond County, T-Hangar Apron Rehabilitation & Expansion.

8A. Williamson County Regional Airport, Marion, Williamson County, 1700 ft. North Extension to Runway 2/20, including Relocation of AWOS, Glide Slope, and MALSR; Grading and Drainage for the extension of Taxiway C.

9A. Metropolis Municipal Airport, Metropolis, Massac County, Construct a Partial Parallel Taxiway to Runway 18/36.

10A. Havana Regional Airport, Havana, Mason County, Construction of an Access Taxiway and Open Channel Improvements.

11A. Rochelle Municipal Airport, Rochelle, Ogle County, Install PAPIs and REILS on Runway 7/25.

12A. Kewanee Municiapl Airport, Kewanee, Henry County, Perimeter Fencing of the Airport Property Line and Frontal Area (Phase II).

13A. Albertus Airport, Freeport, Stephenson County, Construct Hangar Access Taxiways.

14A. Central Illinois Regional Airport, Bloomington, McLean County, Rehabilitate & Widen Taxiway E.

15A. Williamson County Regional Airport, Marion, Williamson County, Pave, Light and Mark the Extension of Taxiway C.

16A. Greater Peoria Regional Airport, Peoria, Peoria County, Rehabilitate Southeast 600’ of Runway 13/31.

17A. Greater Peoria Regional Airport, Peoria, Peoria County, Rehabilitate Airfield Security Gates; Rehabilitate Terminal Video and Access Control.

18A. Greater Rockford Airport, Rockford, Winnebago County, Relocation of Beltline Road.

19A. Central Illinois Regional Airport, Bloomington, McLean County, Construct Paved Shoulders

1W. Cass County, Panther Creek Flood Control, Chandlerville, Project is located in Chanderville along Panther Creek from it's confluence with the Sangamon River to a point approximately 630 meters upstream of IL 78. The project consists of removing trees from channel, some channel widening, levee modification/construction, constructing rock stabilization spurs, stone riffles, longitudinal peak stone protection, and check dams.

###