Illinois Department of Transportation, Erica Borggren, Acting Secretary
Loading
Patrick J. Quinn, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info


FOR IMMEDIATE RELEASE
CONTACT: 217-782-6953
APRIL 25, 2003
TTY: 217-524-4875

SPRINGFIELD, IL -- The Illinois Department of Transportation received bids on April 25, 2003 for various road and bridge improvement projects throughout the state. Also included were 28 aeronautics projects, two land reclamation projects and one water resource project.

Following is a list of the projects by county and the apparent low bidder:

1. Cook County, Ashland Avenue, District 1, Contract No. 62394, 0.11 mile of milling and bituminous concrete surface on Ashland Avenue to lower the pavement under the viaduct at Norfolk Southern Railroad, near 59th Street in Chicago. Completion Date August 15, 2003 Plus 05 Working Days. Bartlett Bituminous Asphalt, LLC, Itasca, $742,750.

2. Cook County, Ashland Avenue, District 1, Contract No. 62440, 1.78 miles of milling and bituminous concrete surface on Ashland Avenue from Archer Avenue to 13th Street in Chicago. Completion Date October 17, 2003 Plus 05 Working Days. E.A. Cox Co., Chicago, $1,484,591.

3. Cook County, Roosevelt Rd. & Union St. District 1, Contract No. 62521, milling and bituminous concrete surface on 0.09 mile of Roosevelt Rd. at I-90/94 and 0.18 mile on Union St. from Roosevelt to Taylor St. in Chicago. Completion Date September 12, 2003, plus 05 Working Days. Arrow Road Construction Co., Mt. Prospect, $248,955.

4. Crawford-Lawrence Counties, IL 1 & US 50, District 7, Contract No. 94957, 3.50 miles of bituminous surface removal, bituminous concrete resurfacing and aggregate wedge shoulders Illinois 1 at three locations between Lawrenceville and IL 33; and on US 50 north of Sumner and at the north edge of Lawrenceville. 40 Working Days. Ambraw Asphalt Materials, Inc., Lawrenceville, $336,575.

4P. Madison County, IL 255 (Alton Bypass), District 8, Contract No. 76384, 7.05 kilometers of grading, paving, bituminous shoulders, five concrete box culverts, and three concrete noise barrier walls on IL 255 (Alton ByPass) from IL 143 to IL 140. Completion Date July 31, 2004. James Cape & Sons Co., Hoffman Estates, $24,883,957.

5. DuPage-Cook Counties, US 34, District 1, Contract No. 62435, 1.78 miles of milling and bituminous concrete surface on US 34 from IL 83 (Kingery Highway) to Cook County line in Hinsdale and Western Springs. 30 Working Days. Central Blacktop Co., Inc., LaGrange, $654,845.

6. Franklin-Union Counties, IL 37 & IL 146, District 9, Contract No. 98793, 0.88 mile of bituminous surface removal, bituminous concrete resurfacing on IL 37 in West Frankfort from south of Illinois 149 to near Chestnut Street; and on IL 146 in Anna from Anna-Jonesboro High School west 0.6 mile, and from Jefferson Street west to near Spring Street. 15 Working Days. E.T. Simonds Construction Co., Carbondale, $101,455.

7. Jackson County, IL 149, District 9, Contract No. 98786, 4.76 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, bituminous and aggregate shoulders on IL 149 from west of Treadwater Drive in Desoto, easterly to the Williamson County line. Also included is the removal and replacement of 1" of bituminous wearing surface on the Six Mile Creek Bridge. 30 Working Days. E.T. Simonds Construction Co., Carbondale, $672,354.

8. Jefferson County, IL 142, District 7, Contract No. 94763, Pavement patching, bituminous surface removal, bituminous concrete resurfacing and aggregate wedge shoulders on IL 142 beginning at Mt. Vernon and extending southeast 11.8 miles. 40 Working Days. Southern Illinois Asphalt Co., Inc., Marion, $1,418,971.

9. Jefferson-Wayne Counties, Old IL 37 & Old IL 15, District 7, Contract No. 94956, 0.45 mile of bituminous concrete resurfacing and aggregate shoulders on Old IL 15 approximately 2 miles north of Wayne City; and 0.84 mile of bituminous surface removal, bituminous concrete resurfacing and aggregate shoulders on Old IL 37 4.5 miles north of Mt. Vernon. 30 Working Days. Southern Illinois Asphalt Co., Inc., Marion, $119,821.

10. Lake County, Unmarked Route, District 1, Contract No. 62406, Pavement and parking lot rehabilitation of the park roads in Illinois Beach State Park - North Unit. Includes resurfacing, parking improvements, culvert replacement and retaining wall installation in Zion and Beach Park. Completion Date November 15, 2003 Plus 10 Working Days. Maneval Construction Co., Inc., Grayslake, $2,555,701.

11. LaSalle County, IL 251, District 3, Contract No. 66313, Modernization of the traffic signals and street lighting at the intersection of IL 251 and Richard Moyle Road. Also the construction of north and westbound right turn lanes. All in Oglesby. Completion Date October 15, 2003. Ladd Construction Co., Ladd, $426,459.

12. Menard County, Unmarked Route, District 6, Contract No. 72642, 5.43 miles of pavement patching, bituminous surface removal, resurfacing, storm sewer installation and crack routing and filling of the internal roads, parking areas and campgrounds at the New Salem State Historic Site west of Petersburg. Completion Date August 01, 2003. Merrill's Contractors, Inc., Springfield, $316,062.

13. Richland County, US 50, District 7, Contract No. 94933, Widening and resurfacing at the intersection of US 50 and Ste. Marie Road east of Olney for the construction of left turn lanes on US 50. 65 Working Days. Ambraw Asphalt Materials, Inc., Lawrenceville, $428,483.

14. Brown-Schuyler Counties, IL 99, District 6, Contract No. 72518, 9.8 miles of bituminous concrete resurfacing and aggregate wedge shoulders on IL 99 between Mount Sterling and Camden. 50 Working Days. W.L. Miller Co., Hamilton, $1,143,682.

15. St. Clair County, IL 161, District 8, Contract No. 76588, The widening and resurfacing of IL 161 at the intersection with Shiloh Station Road south of Shiloh for the construction of a left turn lane 20 Working Days. Mounds Construction Co., Inc., Collinsville, $125,421.

16. St. Clair County, Morrison Road, District 8, Contract No. 76587, 0.37 mile of bituminous surface removal, widening, bituminous concrete resurfacing, concrete curb and gutter, bituminous and aggregate shoulders on Morrison Road in Collinsville for the construction of a bi-directional turn lane from east of Caseyville Road to west of Heatherwood Drive. Completion Date August 10, 2003 Plus 05 Working Days. Mounds Construction Co., Inc., Collinsville, $459,315.

16P. Peoria County, I-74, District 4, Contract No. 68193, Reconstruction of the arterial roadway system on Sterling Avenue, through University Street including widening on Interstate 74 from University Avenue to 0.4 km west of the Union Pacific Railroad, and the removal and reconstruction of the Gale, University, Broadway, Sheridan and Ellis structures over I-74 in Peoria. Completion Date November 19, 2004. Walsh Construction Co. of Illinois, Chicago, $99,787,249. (Combination 16P, 17P, 18P)

17. Wabash-Effingham-Fayette Counties, District 7, District 7, Contract No. 94955, 2.18 miles of bituminous surface removal, bituminous concrete resurfacing at the following locations: (1) 0.48 mile on Old IL 1 north of Mt. Carmel (2) 0.88 mile on IL 33 at Dieterich and (3) 0.82 mile on IL 140 between Mangner Street and West Gallatin Street in Vandalia. 40 Working Days. Howell Asphalt Co. & Howell Paving, Inc., Mattoon, $224,339.

17P. Peoria County, I-74, District 4, Contract No. 68194, Reconstruction of the arterial roadways system in the downtown area of Peoria between Armstrong Avenue and Adams Street, including the construction of the Armstrong Avenue interchange from Ellis Street on Interstate 74 east to Columbia Terrace in Peoria. Completion Date November 19, 2004. Walsh Construction Co. of Illinois, Chicago, $99,787,249. (Combination 16P, 17P, 18P)

18. Will County, US 6, District 1, Contract No. 60963, 4.26 km of roadway reconstruction, widening, drainage improvements and traffic signal modernization on US 6 from east of I & M Canal to Roberts Avenue and from Roberts Avenue to I-55, in Channahon. Completion Date November 15, 2003 Plus 15 Working Days. Sjostrom & Sons, Inc., Rockford, $9,895,402.

18P. Tazewell County, I-74, District 4, Contract No. 68195, Reconstruction of the Eastbound and Westbound lanes of I-74 and ramps, structures, earthwork, lighting, signing and retaining walls located at the I-74/Riverfront Drive Interchange in East Peoria, immediately southeast of Murray Baker Bridge. Completion Date October 01, 2005 Plus 20 Working Days. Walsh Construction Co. of Illinois, Chicago, $99,787,249. (Combination 16P, 17P, 18P)

19. Winnebago County, US Bus 20, District 2, Contract No. 64832, Improvement of the intersection of US Business 20 (East State Street) and Trainer Road in Rockford. Includes addition of left turn lane on U.S. Bus. 20 and widening of Trainer Road return. 20 Working Days. Campos Construction, Inc., Rockford, $110,225.

20. Adams, IL-Marion, MO Counties, US 24, District 6, Contract No. 72431, Improvements to the Bayview Bridge (US 24) over the Mississippi River at Quincy. Includes wrapping the cable sheathing with an elastomeric tape, replacement of the top and bottom neoprene cable boots, replacement of the expansion joints, removal of the existing bituminous wearing surface and the replacement with microsilica concrete overlay and the sealing of cracks on both approaches. Completion Date October 01, 2003. Hillyer, Inc., Macomb, $1,665,447.

21. DeKalb County, IL 23, District 2, Contract No. 64149, Removal and replacement of the structure carrying IL 23 over the east branch of the south branch of the Kishwaukee River located 0.4 mile north of IL 64 in Sycamore. Completion Date November 14, 2003. Ladd Construction Co., Ladd, $1,374,349.

22. Gallatin County, IL 13, District 9, Contract No. 98643, removal of the existing bridge carrying IL 13 over Market Street at Old Shawneetown, and the replacement with a 3 span, precast prestressed concrete I-beam bridge with a 36 ft width roadway. 125 Working Days. E.T. Simonds Construction Co., Carbondale, $770,474.

23. Henry County, IL 78 & US 150, District 2, Contract No. 64900, Replacing the existing bituminous wearing surface on 2 structures with a concrete wearing surface, located on IL 78 over Green River, two miles south of Hooppole, and US 150 over Edwards River, 1.6 mil south of IL 81 near Windsor. Completion Date August 30, 2003. Valley Construction Co., Rock Island, $489,235.

24. Jackson-Perry Counties, US 51, District 9, Contract No. 98763, bituminous resurfacing of approach pavements, bituminous shoulders, concrete repair, bridge deck patching and bridge deck microsilica concrete overlays on the following bridges on US 51: (1) over Collier Creek north of Tamaroa (2) over Half-Mile Creek south of DuQuoin (3) over Six Mile Creek north of Dowell and (4) over a stream in Elkville. 55 Working Days. The Kilian Corp., Mascoutah, $212,601.

25. Madison County, IL 160, District 8, Contract No. 76130, The removal of the existing triple barrel concrete box culvert carrying IL 160 over Buckeye Branch 3.1 miles south of Highland and the replacement with a 41.5 ft long precast concrete structure with a 36 ft width roadway. 70 Working Days. SW-MAC Construction, Ltd., Staunton, $642,194.

26. Morgan County, I-72, District 6, Contract No. 72600, Expansion joint replacement, removal of the bituminous concrete wearing surface and replacement with a microsilica concrete wearing surface on the structure carrying CH 23 over I-72 southwest of Jacksonville. 30 Working Days. SW-MAC Construction, Ltd., Staunton, $165,428.

27. Cook County, US 14, District 1, Contract No. 62004, Modernization of traffic signals along US 14 (Northwest Highway) from Euclid Avenue to Arlington Heights Road in Arlington Heights. 45 Working Days. Home Towne Electric, Inc., Lake Villa, $371,226.

28. DeKalb County, IL 64, District 2, Contract No. 64835, Modernization of the flashing beacons at the intersection of IL 64 and First Street, west of Sycamore. 15 Working Days. Virgil Cook & Son, Inc., DeKalb, $15,601.

29. DeKalb County, IL 72, District 2, Contract No. 64834, Modernization of the flashing beacons at the intersection of IL 72 and Annie Glidden Road near Kingston. 15 Working Days. Virgil Cook & Son, Inc., DeKalb, $14,852.

30. Madison County, Various, District 8, Contract No. 76640, The modernization of the traffic signals at the following intersections: (1) IL 111 with IL 140/ Bellwood at Bethalto (2) IL 3 with IL 143/Madison Ave./Berm Hwy at Wood River (3) IL 143 with Wood River Ave. at Wood River (4) IL 111 with IL 143/Madison Ave. at Wood River (5) IL 111 with Wesley Dr. at Wood River (6) IL 143 with 6th Street at Wood River and (7) IL 3 with Hawthorne Ave. at Hartford. 30 Working Days. Electrico, Inc., Columbia, $98,353.

31. Ogle County, IL 72, District 2, Contract No. 64825, Removal and replacement of the existing flashing beacons above the existing "Stop" signs and the "Crossroad" signs at the intersection of IL 72 a IL 251 near Davis Junction. 15 Working Days. Virgil Cook & Son, Inc., DeKalb, $16,483.

32. St. Clair County, Various Routes, District 8, Contract No. 76639, Modernization of traffic signals at the following intersections: (1) IL 159 at I-64 eastbound and westbound in Fairview Heights (2) IL 159 at Market Place in Fairview Heights (3) IL 159 at Ludwig Drive/Salem Place in Fairview Heights (4) IL 159 at Lincoln Highway in Fairview Heights (5) IL 157 at I-64 eastbound and westbound in Caseyville and (6) IL 111 at St. Clair Avenue in Washington Park. 30 Working Days. Electrico, Inc., Columbia, $74,600.

33. Various Counties, Various Routes, District 6, Contract No. 72771, Traffic signal improvements at nine intersections in various counties at the following locations: (1) Old US 66 and Ferdon Street in Litchfield (2) IL 4 and Mathers Gun Club Road in Springfield (3) Wabash Avenue and Leonard Street in Jerome (4) Madison Street and First Street in Springfield (5) Madison Street and Eleventh Street in Springfield (6) Sangamon Avenue and Peoria Road in Springfield (7) Veterans Parkway and Walnut Street in Springfield (8) Lincoln Parkway and Woodlawn Road in Lincoln and (9) Dearborn Street and Schrader Avenue in Havana. 35 Working Days. Egizii Electric, Inc., Springfield, $312,998.

34. Marion-Jefferson Counties, US 50 & IL 142, District 7, Contract No. 94934, The installation of highway lighting at the intersection of IL 142 and Main Street in Belle Rive, and at the intersection of US 50 and Omega Road at Iuka along with the replacement of the wiring for the existing flashing beacons at that intersection. 30 Working Days. J.H. Moore, Inc., Effingham, $28,116.

35. Adams County, I-172, District 6, Contract No. 72779, Located 1.4 miles north of IL 104 on the east side of Quincy, the improvement will consist of removing and replacing a collapsed manhole and storm sewer and regrading on the south side of TR349 (Columbus Road). 20 Working Days. Sparks & Wiewel Construction Co., Quincy, $27,452.

36. Cook County, US 30, District 1, Contract No. 62494, Rehabilitation and repairs of the weigh station and inspection lane located along US 30 at Torrence Avenue in Sauk Village. 35 Working Days. K-Five Construction Corp., Lemont, $294,977.

37. WITHDRAWN

38. Cook County, Ohio Street, District 1, Contract No. 62464, Bridge painting of the center lock area of the structure carrying Ohio Street over the North Branch of the Chicago River in Chicago. 20 Working Days. Eagle Painting and Maintenance Co., Lansing, $68,500.

39. WITHDRAWN

40. Cook County, I-94 (Edens Expwy), District 1, Contract No. 62487, Bridge painting along I-94 at 6 locations from Skokie River to Skokie Road in Wilmette, Skokie and Chicago. 20 Working Days. Eagle Painting and Maintenance Co., Lansing, $193,340.

41. Cook County, Hicks Road, District 1, Contract No. 62559, Pavement patching along Hicks Road (northbound) from US 14/Northwest Highway to south of IL 68/Dundee Road in Palatine. 25 Working Days. Triggi Construction, Inc., West Chicago, $394,844.

42. Cook County, Various Routes, District 1, Contract No. 44812, Removal and replacement of raised reflective pavement markers at various locations in Cook county. Completion Date June 30, 2004 Working Days. Marking Specialists Corp., Arlington Heights, $764,795.

43. Cumberland County, I-70, District 5, Contract No. 70310, Painting of 2 bridges on I-70 located 2 miles east of Greenup and 1 mile west of Clark County line. 35 Working Days. Three Star Painting, Inc., Lake Station, IN, $125,000.

44. Various Counties, Various Routes, District 1, Contract No. 62444, Scour countermeasures at 8 locations in River Grove, Park Ridge, Hodgkins and Des Plaines. 90 Working Days. Thos. M. Madden Co., Carol Stream, $745,519.

45. Douglas County, IL 130, District 5, Contract No. 70284, Pavement patching on IL 130 from Coles County line to IL 133. 15 Working Days. G.M. Sipes Construction, Inc., Rushville, $93,755.

46. Various Counties, Various Routes, District 9, Contract No. 98805, Replace damaged storm sewer and relocate electrical conduit for signals at intersection of IL 37 and St.Louis Street in West Frankfort; and reconstruct damaged inlets at the intersection of IL 13, with Halfway Road in Marion, and at the intersection of IL 13 with US 45 in Harrisburg. 15 Working Days. E.T. Simonds Construction Co., Carbondale, $38,163.

47. Jefferson County, I-57/64, District 7, Contract No. 94953, pavement patching on I-57/64 between the tri-level interchange at Mt. Vernon and on I-64 south of Mt. Vernon beginning at milepost 85 and extending east to the Wayne County line. 20 Working Days. G.M. Sipes Construction, Inc., Rushville, $144,702.

48. Kane County, IL 72, District 1, Contract No. 62445, Parapet repair on the structure carrying IL 72 over I-90 near Gilberts. 40 Working Days. Sumit Construction Co., Inc., Skokie, $139,064.

49. McHenry-Lake Counties, IL 120, District 1, Contract No. 62525, Concrete pavement patching on IL 120 from Fox River to IL 60 in McHenry and Wauconda. 35 Working Days. Triggi Construction, Inc., West Chicago, $271,859.

50. McHenry County, IL 23, District 1, Contract No. 62524, Concrete pavement patching on IL 23 from north of IL 176 to US 20 in Marengo. 30 Working Days. Triggi Construction, Inc., West Chicago, $175,837.

51. McHenry County, Various Routes, District 1, Contract No. 44811, Removal and replacement of damaged raised reflective pavement markers and castings at various locations in McHenry County. Completion Date November 01, 2003. Superior Road Striping, Inc., Bensenville, $234,237.

52. Saline County, Old IL 13, District 9, Contract No. 98803, bituminous resurfacing, waterproofing, membrane systems and keyway repair on the following bridges on Old IL 13: (1) over Possum Trail Branch 5.2 mile west of Harrisburg (2) over Bankston Creek 3.5 miles west of Harrisburg and (3) a stream 0.4 mile west of Carrier Mills Road. 30 Working Days. E.T. Simonds Construction Co., Carbondale, $80,922.

53. Sangamon County, I-55, District 6, Contract No. 72786, 0.15 mile of landscaping along the west side of I-55 north of the Lake Springfield Bridge. 15 Working Days. Central Landscaping, Princeville, $8,000.

54. Schuyler County, IL 100, District 6, Contract No. 72754, Earth excavation, slope repair and seeding along the west side of IL 100 approximately 1.43 miles north of Frederick. 15 Working Days. Sparks & Wiewel Construction Co., Quincy, $30,833.

55. Scott County, I-72, District 6, Contract No. 72757, The cleaning and painting of the eastbound and westbound bridges carrying I-72 over IL 100 located 1.5 miles southeast of Oxville. 25 Working Days. All States Painting, Inc., Alexander, $64,400.

56. Morgan-Sangamon Counties, Various Routes, District 6, Contract No. 72778, cleaning and painting of the bridges at the following locations: (1) IL 29 over the South Fork of the Sangamon River at the southeast edge of Springfield (2) I-72 over Spring Creek 3.5 miles west of New Berlin (3) IL 4 over an abandoned railroad at the south edge of Springfield and (4) IL 4 over Lick Creek 1 mile south of Springfield. 60 Working Days. ERA-Valdivia Contractors, Inc., Chicago, $304,237.

57. Various Counties, Various Routes, District 6 & 7, Contract No. 44815, The repairing of various widths of thermoplastic, preformed plastic, preformed thermoplastic, epoxy, hot spray thermoplastic and polyurea pavement marking lines, letters and symbols and the removal of existing pavement markings on various routes throughout Districts 6 and 7. Completion Date June 30, 2004. A.C. Pavement Striping Co., Elgin, $510,692.

58. Various Counties, Various Routes, District 1, Contract No. 44816, Replacing reflectorized barrier wall markers and installing reflectorized linear delineation panels. Completion Date December 31, 2003. G.F. Structure, Corp., Chicago, $69,750.

59. Shelby-Moultrie Counties, Various Routes, District 5, Contract No. 70301, Rout and seal cracks on various routes in Shelby and Moultrie Counties. 45 Working Days. Complete Asphalt Service Co., Bluffs, $208,159.

60. Various Counties, Various Routes, District 7, Contract No. 94958, Crack routing, cleaning, and sealing of transverse and longitudinal reflected cracks and joints in the existing pavement along various routes throughout District 7. 60 Working Days. Kinney Contractors, Inc., Raymond, $341,235.

61. Effingham-Fayette-Clay Counties, Various Routes, District 7, Contract No. 94952, Pavement patching on I-57/70 between the tri-level interchanges; US 45 (Banker Street) and West Fayette Avenue in Effingham; IL 128 at Altamont; I-70 west of St. Elmo and west of Vandalia; and I-57 at Farina and Edgewood. 50 Working Days. Kinney Contractors, Inc., Raymond, $284,812.

62. Various Counties, Various Routes, District 7, Contract No. 94954, 8.40 miles of placing a seal coat on various frontage roads in various counties in District 7. 25 Working Days. Mt. Carmel Sand & Gravel Co., Inc., Mt. Carmel, $64,737.

63. Various Counties, I-57, District 7, Contract No. 94965, 1,160 acres of weed control spraying along I-57 in various counties in District 7. Completion Date June 04, 2003 Working Days. The Daltons Inc., Warsaw, IN, $40,082.

64. Various Counties, Various Routes, Statewide, Contract No. 44818, repairing or replacing damaged sign components, furnishing, or furnishing and installing new signs and supports or replacing damaged overhead sign structure components and end supports on various routes throughout the state Completion Date June 30, 2004 Working Days. Western Remac, Inc., Woodridge, $826,561.

65. Vermilion County, Unmarked Route, District 5, Contract No. 70307, Pavement patching along FAS Route 508 from FAS Route 503 to Westville city limits. 15 Working Days. G.M. Sipes Construction, Inc., Rushville, $69,313.

66. Adams County, IL 104, District 6, Contract No. 72312, 1.82 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, bituminous and aggregate shoulders on IL 104 approximately 4.5 miles east of Kingston. Also, included is the removal of existing single span bridge carrying IL 104 over a tributary to Fishhook Creek and the replacement with a precast concrete structure. 100 Working Days. R.L. Brink Corp., Quincy, $624,826.

67. Calhoun County, IL 100, District 8, Contract No. 76660, 7.19 miles of pavement patching, bituminous surface removal and bituminous concrete resurfacing on IL 100 from IL 96 in Kampsville north to the Pike County line. 35 Working Days. Macoupin County Contracting, Inc., Staunton, $576,067.

68. Cook County, 103rd Street, District 1, Contract No. 62472, 0.05 mile of pavement removal, new pavement and pavement marking for lowering the elevation of the roadway on 103rd Street at the Illinois Central Railroad in Chicago. Completion Date August 28, 2003 Plus 05 Working Days. Thos. M. Madden Co., Chicago, $392,337.

69. Cook County, 103rd Street, District 1, Contract No. 62426, 3.21 miles of milling and bituminous concrete surface on 103rd Street from IL 1 (Halsted Street) to Stony Island Avenue in Chicago. Completion Date October 31, 2003 Plus 15 Working Days. K-Five Construction Corp., Lemont, $2,190,000.

70. Cook County, Nerge Road, District 1, Contract No. 83682, 1.06 miles of reconstruction and widening, traffic signals, parking lot and drainage on Nerge Road from west of Rohlwing Road to Devon Avenue in Elk Grove Village. 110 Working Days. R.W. Dunteman Co., Addison, $2,612,551.

71. Cook County, Moon Lake Blvd, District 1, Contract No. 83624, 0.95 mile of reconstruction, traffic signals, and lighting on Moon Lake Blvd in Hoffman Estates. 65 Working Days. Arrow Road Construction Co., Mt. Prospect, $1,573,805.

72. Cook County, Woodside Road, District 1, Contract No. 83681, 2,762 feet of resurfacing, patching, sodding, manhole replacement along Woodside Road from Longcommon to 31st Street in Riverside. 35 Working Days. Central Blacktop Co., Inc., LaGrange, $326,633.

73. Crawford County, CH 19, District 7, Contract No. 95357, 5,373 feet of a bituminous surface on a soil-cement base course with aggregate shoulders on CH 19, from 1 mile east of Jasper County line to CH 1, 4 miles west of Hardinville. 65 Working Days. Allendale Gravel Co., Inc., Allendale, $430,832.

74. DeKalb County, Unmarked Route, District 2, Contract No. 85309, 9.72 miles pavement resurfacing with an aggregate shoulder on Stone Quarry Road from Cherry Valley Road to the Boone County line; on Cherry Valley Road from the Boone County line to Genoa Road; and on Five Points Road from Cherry Valley Road to IL 72. 30 Working Days. Peter Baker & Son Co., Lake Bluff, $723,584.

75. DeKalb County, IL 64, District 2, Contract No. 64337, 4.48 miles of bituminous resurfacing on IL 64 from IL 23 N. to the Kane County line near Sycamore. 30 Working Days. Harry W. Kuhn, Inc., Wheaton, $440,040.

76. DuPage County, 83rd Street, District 1, Contract No. 83677, .74 mile of widening, resurfacing, storm sewers, traffic signals and landscaping along 83rd Street from Jane Avenue to Woodward Avenue in Woodridge. 35 Working Days. Bartlett Bituminous Asphalt, LLC, Itasca, $589,201.

77. Gallatin County, CH 13, District 9, Contract No. 99173, 1.92 miles of widening and resurfacing, aggregate shoulders and drainage structures along CH 13 from FAP Route 782 to Pounds Hollow Recreational Area. 70 Working Days. E.T. Simonds Construction Co., Carbondale, $771,615.

78. Iroquois County, CH 4, District 3, Contract No. 87244, 3.03 miles of bituminous resurfacing and aggregate shoulders from west corporate limits of Clifton to County Highway 23. 15 Working Days. Kankakee Valley Construction, Kankakee, $353,705.

79. Jersey County, IL 100 & IL 16, District 8, Contract No. 76659, 14.74 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, and aggregate shoulders at the following locations: (1) 12.09 miles on IL 16 beginning in Jerseyville west to IL 100 (2) 1.50 miles on IL 16 from the east edge of Jerseyville extending east and (3) 1.15 miles on IL 100 in Grafton from Daggert Hollow Road to west of Sycamore Street 60 Working Days. Charles E. Mahoney Co., Belleville, $1,962,920.

80. Kendall County, Orchard Rd / Galena Rd, District 3, Contract No. 87248, 1.12 miles of widening of Orchard Road, and reconstruction and realignment of Galena Road, and improvement of the Galena Orchard Road intersection. 70 Working Days. Aurora Blacktop, Inc., Montgomery, $1,123,021.

81. Knox County, Prairie Street, District 4, Contract No. 89284, 0.224 mile of bituminous surfacing, milling, reflective crack control and striping along Prairie Street from South Street to Main Street in Galesburg. 20 Working Days. Gunther Construction Co., Galesburg, $105,179.

82. Madison County, Hedge Road, District 8, Contract No. 97207, 1.76 miles of reconstruction and partial relocation of Hedge Road as well as widening Madison Avenue in the vicinity of Hedge Road to accommodate left-turn lanes at the intersection of the two routes, in Roxana. 100 Working Days. RCS Construction, Inc., Wood River, $2,699,246.

83. McHenry County, Lake Avenue, District 1, Contract No. 83668, 4,667 feet of reconstruction of Lake Avenue from Huntley to Riverside in Lakewood. 60 Working Days. Arrow Road Construction Co., Mt. Prospect, $592,864.

84. Pike County, CH 3, District 6, Contract No. 93342, resurfacing 3.56 miles, aggregate shoulders on CH 3 from I-72 interchange to north of New Salem. 50 Working Days. W.L. Miller Co., Hamilton, $844,247.

85. Whiteside County, Spring Hill Road, District 2, Contract No. 85310 3.8 miles of resurfacing and aggregate shoulders Spring Hill to the Henry County line. Completion Date August 29, 2003. Northwest Illinois Construction Co., Rock Falls, $439,492.

86. Will County, I-57, District 1, Contract No. 62413, 12.96 miles of milling and bituminous concrete surface on I-57 from Steger Road to the Kankakee County line in Monee and University Park. Completion Date October 10, 2003 Plus 05 Working Days. D. Construction, Inc., Coal City, $10,471,515.

87. Williamson County, Various Routes, District 9, Contract No. 98767, 9.38 miles of earthwork, guardrail placement, culvert extensions, intersection reconstruction, pavement patching, bituminous surface removal and resurfacing, pavement widening, aggregate shoulders and pavement markings at the following locations: (1) IL 149 from the Jackson County line at Hurst east and north to the Franklin County line (2) Herrin Road from IL 149 at Hurst southeast to east of Division Street at Colp and (3) Division Street at Colp south to south of Bryn Avenue in Carterville. 125 Working Days. Southern Illinois Asphalt Co., Inc., Marion, $2,338,891.

88. Winnebago County, Meridian Road, District 2, Contract No. 85308, 3.25 miles resurfacing of Meridian Road from IL 75 to Knapp Road. 30 Working Days. Rockford Blacktop Construction Co., Loves Park, $398,974.

89. Bureau County, I-80, District 2, Contract No. 64868, Removal and replacement of the wearing surfaces on ten structures on Interstate 80 from IL 26 easterly to the LaSalle County line. Completion Date August 22, 2003. Sjostrom & Sons, Inc., Rockford, $1,189,143.

90. Carroll County, US 52/IL 64, District 2, Contract No. 64873, Replacing the existing wearing surface on 2 structures with a concrete wearing surface located on US 52 and IL 64, 1.7 miles and 3.1 mile east of Mt. Carroll. Completion Date August 30, 2003 Plus 05 Working Days. Civil Constructors, Inc. of Illinois, Freeport, $304,548.

91. Carroll County, Straddle Creek Rd, District 2, Contract No. 85311, realignment of the roadway and replacement of the existing 2 bridges with one, 2-span precast, prestressed concrete deck beam bridge over Straddle Creek 2 miles northeast of Lanark. 60 Working Days. Curnyn Construction Co., Geneseo, $366,682.

92. Champaign County, Unmarked Route, District 5, Contract No. 91278, Construction of a single span precast, prestressed concrete deck beam bridge and aggregate surfaced approaches 5 miles south of Champaign, just west of I-57 over Two Mile Slough. 25 Working Days. Schmidt Construction, Inc., Mt. Zion, $86,121.

93. Clinton County, Russland Road, District 8, Contract No. 97208, Construction of a triple concrete box culvert and approach roadwork carrying Russland Road over tributary to Sugar Creek in Aviston. 40 Working Days. Perry County Construction Co., Herrin, $146,165.

94. DeWitt County, Unmarked Route, District 5, Contract No. 91282, Construction of a single span, precast prestressed concrete deck beam bridge and approaches carrying TR55 over tributary to Point Creek, 3 miles northwest of Wapella. 35 Working Days. Entler Excavating Co., Inc., Decatur, $176,439.

95. Effingham County, Unmarked Route, District 7, Contract No. 95359, Construction of a two span, precast prestressed concrete deck beam bridge carrying TR 4 over Wolf Creek, one mile south of Beecher City. 40 Working Days. Perry County Construction Co., Herrin, $202,098.

96. Hancock County, CH 3, District 6, Contract No. 93343, Construction of a 3-span precast, prestressed concrete deck beam bridge with approach work carrying CH 3 over Grove Creek 2.7 miles north of Burnside. 45 Working Days. Hillyer, Inc., Macomb, $264,152.

97. Hancock County, Unmarked Route, District 6, Contract No. 93333, bridge removal and replacement with a three span precast, prestressed concrete deck beam bridge carrying TR 401 over Slater Creek, 1.5 miles west of Bowen. 55 Working Days. Sparks & Wiewel Construction Co., Quincy, $370,879.

98. Henry County, IL 82, District 2, Contract No. 64718, Rehabilitation of a single span precast, prestressed concrete deck beam structure carrying IL 82 over Spring Creek near Cambridge. 15 Working Days. Brandt Construction Co., Milan, $60,823.

99. Iroquois County, West Street, District 3, Contract No. 87144, removing and replacing the bridge carrying West Street over a tributary to Pigeon Creek in Cissna Park. 40 Working Days. Iroquois Paving Corp., Watseka, $192,701.

100. Macoupin County, Unmarked Route, District 6, Contract No. 93340, Construction of a 3 span, precast prestressed concrete deck beam bridge and approaches carrying TR195 over Macoupin Creek, 1.5 miles west of Atwater. 60 Working Days. SW-MAC Construction, Ltd., Staunton, $423,317.

101. Menard County, CH 10, District 6, Contract No. 93341, Removal and replacement of the single span precast prestressed concrete deck beam bridge carrying County Highway 10 over a Branch of Pike Creek 4.5 mile northeast of Sweetwater. 35 Working Days. Sparks & Wiewel Construction Co., Quincy, $174,869.

102. Monroe County, CH 3, District 8, Contract No. 97210, Construction of a single span, precast prestressed concrete deck beam bridge carrying CH 3 over Morrison Hollow Creek, 1 1/4 miles north of Fults. Completion Date August 31, 2003. Baxmeyer Construction, Inc., Waterloo, $99,222.

103. Pike County, Unmarked Route, District 6, Contract No. 93339, Construction of a 3 span, precast prestressed concrete deck beam bridge carrying TR 386 over Bay Creek 4.5 mile west of Pearl. 55 Working Days. Sparks & Wiewel Construction Co., Quincy, $294,430.

104. Richland County, Unmarked Route, District 7, Contract No. 95356, 0.13 mile of bridge removal and replacement, aggregate surface course and incidental work, 3 miles east of Springtown. 35 Working Days. Allendale Gravel Co., Inc., Allendale, $128,226.

105. Shelby County, Unmarked Route, District 5, Contract No. 91287, Construction of a single span, precast prestressed concrete deck beam bridge with approaches carrying CH 23 over Green Creek, 2 miles west of Sigel. 45 Working Days. Sparks & Wiewel Construction Co., Quincy, $187,180.

106. Shelby County, Unmarked Route, District 5, Contract No. 91261, Construction of a three span precast prestressed concrete deck beam bridge, aggregate surfaced approaches and incidental work 3.5 miles northwest of Wapella. 45 Working Days. Sparks & Wiewel Construction Co., Quincy, $230,749.

107. Stephenson County, Winslow Rd, District 2, Contract No. 85313, removal and replacement of the 3-span structure with related approach work over Honey Creek 1.0 mile east of Winslow. 60 Working Days. Civil Constructors, Inc. of Illinois, Freeport, $572,326.

108. Adams County, IL 96 & US 24, District 6, Contract No. 72776, upgrading of the traffic signal controllers and signal heads at the intersections of IL 96 with Hampshire Street and US 24 with State Street in Quincy. 20 Working Days. Supreme Electric Co., Quincy, $82,397.

109. Cook County, Dempster Street, District 1, Contract No. 62014, Traffic signal installation on Dempster St. at Hamlin Ave. in Skokie and interconnect between Keeler Ave. and St. Louis/Lincolnwood Drive in Skokie. 60 Working Days. H&H Electric Co., Franklin Park, $153,959.

110. Cook County, I-90/94, District 1, Contract No. 62530, Replacing the existing underpass lighting system on I-90/94 at Hubbard's Cave in Chicago. Completion Date November 30, 2003 Plus 05 Working Days. Aldridge Electric, Inc., Libertyville, $2,372,311.

111. Cook County, US 14, District 1, Contract No. 62536, Installation of permanent lighting along US 14 from Lake-Cook Road to west of Baldwin Road and at Hillside Road in Palatine. Completion Date October 03, 2003. J.F. Edwards Construction Co., Geneseo, $165,990.

112. Boone County, IL 76, District 2, Contract No. 64905, Placing pipe underdrains along IL 76 from south of IL 173 for approximately 0.15 mile, north of Belvidere. 15 Working Days. Sjostrom & Sons, Inc., Rockford, $34,759.

113. Champaign County, I-57, District 5, Contract No. 70288, Pavement patching on I-57 from Thomasboro to Rantoul. 15 Working Days. G.M. Sipes Construction, Inc., Rushville, $160,641.

114. Champaign County, US 150, District 5, Contract No. 70304, Pavement patching on US 150 from Duncan Road to west of Mathis Avenue in Champaign. 15 Working Days. G.M. Sipes Construction, Inc., Rushville, $75,206.

115. DuPage County, Bikeway Connectors, District 1, Contract No. 83651, 2 miles of construction of 3 separate bike paths on 83rd Street, 71st Street, Hobson Road and bridge/box culvert/retaining wall in Woodridge. 45 Working Days. Martam Construction, Inc., Elgin, $825,413.

116. Fayette County, St. Elmo Road, District 7, Contract No. 95354, Culvert removal and replacement, pipe culvert liners and other miscellaneous work beginning at St. Elmo then northerly 7.7 miles. 30 Working Days. A.J. Walker Construction Co., Mattoon, $174,066.

117. Cook-Lake Counties, Unmarked Route, District 1, Contract No. 83678, 0.549 mile of roadway enhancement and lighting on Cook Street, Station Street and Park Avenue in Barrington. 85 Working Days. Landmark Contractors, Inc., Huntley, $1,038,265.

118. LaSalle County, IL 170, District 3, Contract No. 66317, Removal and replacement of a failed bridge/box culvert located at the intersection of IL 170 and TR 535 1 mile south of Ransom. 25 Working Days. H.J. Eppel & Co., Pontiac, $102,044.

119. Macon County, IL 105, District 5, Contract No. 70306, Pavement patching on IL 105 east of Bender Road, east of Decatur. 15 Working Days. G.M. Sipes Construction, Inc., Rushville, $69,920.

120. Peoria County, IL 90, District 4, Contract No. 68260, Installation of underdrains on IL 90 at the railroad viaduct north of the west junction of IL 90/IL 91 near Edelstein. 15 Working Days. Otto Baum Co., Inc., Morton, $24,703.

121. Rock Island County, Historic Block Bike Trail, District 2, Contract No. 85303, Construction of 0.203 miles of bike and pedestrian path, lighting and landscaping from 15th Street south to Mill Town Street, then north to 16th in Moline. 50 Working Days. Valley Construction Co., Rock Island, $188,826.

122. Various Counties, Various Routes, District 4, Contract No. 68327, 47.5 miles of routing and sealing on various routes throughout the district 40 Working Days. Freehill Asphalt, Inc., Watseka, $258,440.

123. Various Counties, Various Routes, District 5, Contract No. 70302, Rout and crack seal on various routes in various counties. 35 Working Days. Complete Asphalt Service Co., Bluffs, $119,818.

124. Various Counties, I-57, District 9, Contract No. 98801, Two applications of selective herbicide mixtures to the turf areas along the right-of-way of I-57 beginning at the Dongola interchange and extending south to the Mississippi River Bridge at Cairo. Completion Date August 15, 2003. DeAngelo Brothers, Inc., Decatur, $52,080.

125. Various Counties, Various Routes, Districts 1,2,4,8, Contract No. 44819, The repairing or replacing damaged or deteriorated overhead sign structure components and supports on various routes throughout Districts 1,2,4 & 8. Completion Date July 31, 2004. T.M.F. Construction Co., Springfield, $940,060.

126. Vermilion County, CH 8, District 5, Contract No. 70309, Partial depth patching on CH 8 from west of Jackson Street to Jackson Street in Catlin. 15 Working Days. Champaign Asphalt Co., Champaign, $54,695.

127. Vermilion-Champaign Counties, Various Routes, District 5, Contract No. 70303, Rout and crack sealing along various routes in Vermilion and Champaign Counties. 45 Working Days. Huff Sealing Corp, Albion, $142,243.

128. Peoria County, I-74, District 4, Contract No. 68331, Demolition of a building at 332 N.E. Jefferson Avenue in Peoria. 25 Working Days. Hy-Tech Specialized Services, Inc., Springfield, $144,285.

129. Cook County, McCormick Blvd, District 1, Contract No. 60475, 0.59 km of intersection reconstruction including variable width widening, resurfacing, traffic signal modernization and lighting on McCormick Boulevard from US 41 (Lincoln Avenue) to Devon Avenue and from Devon Avenue to Golf Road in Chicago and Lincolnwood. Completion Date November 30, 2003 Plus 25 Working Days. Capitol Cement co., Inc., Chicago, $2,299,786.

130. Cook-DuPage Counties, US 20, District 1, Contract No. 62280, 1.91 miles of pavement reconstruction, milling, bituminous concrete surface, widening and traffic signal modernization on US 20 from East Bartlett Road to Elgin-O'Hare Expressway in Hanover Park and Streamwood. Completion Date October 31, 2004 Plus 30 Working Days. Martam Construction, Inc., Elgin, $13,213,146.

131. Lee County, IL 26, District 2, Contract No. 64362, 4.3 miles patching and bituminous concrete resurfacing on IL 26 from Bloody Gulch Road in Dixon to US 30. Includes improvements of the intersection at Progress Drive and the removal of the ICRR bridge. Completion Date November 24, 2003. Bob Propheter Construction, LLC, Sterling, $4,902,567.

132. Lee County, IL 38, District 2, Contract No. 64447, 1.75 miles of rubblization, bituminous resurfacing and turn lane improvement on IL 38 from Chicago Avenue to Sink Hollow Road in Dixon. 110 Working Days. Northwest Illinois Construction Co., Rock Falls, $3,181,177.

133. DeKalb County, US 30, District 2, Contract No. 64513, 0.67 mile of new pavement, curb and gutter, storm sewer and lighting on US 30 from the west city limits to Blackhawk Street in Shabbona. Completion Date December 01, 2003 Plus 15 Working Days. Sjostrom & Sons, Inc., Rockford, $3,089,933.

134. Ogle County, IL 38, District 2, Contract No. 64631, 3.61 miles of bituminous resurfacing on IL 38 from Interstate 39 to the Ogle/Dekalb County line. 70 Working Days. Rockford Blacktop Construction Co., Loves Park, $1,996,803.

135. Winnebago County, US BUS 20, District 2, Contract No. 64804, 0.78 mile of bituminous resurfacing on (US Bus 20 ) West State Street between Springfield Avenue and Day Avenue in Rockford. 25 Working Days. Rockford Blacktop Construction Co., Loves Park, $351,358.

136. Bureau County, IL 92, District 2, Contract No. 64830, 4.4 miles of resurfacing on IL 92 from IL 40 to the west city limits of Walnut. 35 Working Days. Advanced Asphalt Co., Princeton, $765,272.

137. Boone-Winnebago Counties, IL 173, District 2, Contract No. 64901, 1.8 miles of intermittent resurfacing on IL 173 from IL 251 east to IL 76 near Caledonia. 15 Working Days. Rockford Blacktop Construction Co., Loves Park, $132,757.

138. Carroll County, IL 84, District 2, Contract No. 64902, 0.98 mile of intermittent bituminous resurfacing on IL 84 located between Savanna and the Carroll/JoDaviess County line. 15 Working Days. Civil Constructors, Inc. of Illinois, Freeport, $163,165.

139. Ogle-Winnebago Counties, IL 2, District 2, Contract No. 64903, 0.39 mile of bituminous resurfacing on IL 2 at the intersection with Meridian Road east of Rockford. 15 Working Days. Bob Propheter Construction, LLC, Sterling, $105,898.

140. Kendall County, Unmarked Route, District 3, Contract No. 66119, Reconfiguring and resurfacing 9 separate areas within Silver Springs State Park includes resurfacing existing roads and parking lots located south of Plano. Completion Date December 01, 2003. Aurora Blacktop, Inc., Montgomery, $788,167.

141. Iroquois County, US 45, District 3, Contract No. 66259, 0.69 mile of bituminous concrete widening and resurfacing, curb and gutter, storm sewer, intersection improvements and water main relocation on US 45 from IL 116 to the south city limits of Ashkum. Completion Date November 01, 2003 Plus 15 Working Days. Iroquois Paving Co., Watseka, $1,542,472.

142. LaSalle County, Old US 34, District 3, Contract No. 66308, 2.28 miles of bituminous pavement patching and resurfacing on Old US 34 from US 34 west of Earlville to US 34 east of Earlville. Completion Date August 16, 2003 Plus 10 Working Days. Bob Propheter Construction, LLC, Sterling, $539,495.

143. LaSalle County, IL 170, District 3, Contract No. 66309, Modernization of the intersection of IL 170 and County Highway 6 (Mazon/Grand Ridge Road) consisting of bituminous concrete widening and resurfacing, installation of islands for channelization and creation of a four way stop, 4 miles south of Seneca. 35 Working Days. D. Construction, Inc., Coal City, $234,753.

144. LaSalle County, IL 351, District 3, Contract No. 66326, Repairing the deck slab on the structure carrying IL 351 over Interstate 80 at the north end of LaSalle. 15 Working Days. Central Illinois Contracting Corp., LaSalle, $139,525.

145. Livingston County, IL 47, District 3, Contract No. 66327, Removal and replacement of the existing bituminous wearing surface on the approach pavement and bridge deck on IL 47 over the Vermilion River 3.6 miles south of IL 116 near Livingston 15 Working Days. Iroquois Paving Corp., Watseka, $29,386.

146. Vermilion County, Unmarked Route, District 5, Contract No. 70241, 2.74 miles of bituminous widening and resurfacing on the park roads in the Middlefork Fish and Wildlife Area 6 miles northwest of Danville. 35 Working Days. Champaign Asphalt Co., Champaign, $577,568.

147. Macon County, US 36, District 5, Contract No. 70287, 0.31 mile of skidproofing/resurfacing on US 36 from College Street to Edwards Street in Decatur. 15 Working Days. Illinois Valley Paving Co., Springfield, $114,694.

148. Coles County, Lerna Road, District 5, Contract No. 70308, 0.27 miles of bituminous resurfacing and shoulders on Lerna Road from DeWitt Avenue to IL 16 near Mattoon. 15 Working Days. Howell Paving, Inc., Mattoon, $92,510.

149. Pike County, IL 107, District 6, Contract No. 72313, 10.70 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing and aggregate wedge shoulders on IL 107 from 0.3 mile north of I-72 northerly to 2 miles north of Perry. Completion Date October 15, 2003. Illinois Valley Paving Co., Springfield, $1,778,903.

150. St. Clair County, IL 159, District 8, Contract No. 76061, 10.76 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing and shoulder widening on IL 159, from IL 13 in Belleville south to Sand Rock Road south of Smithton 125 Working Days. Hank's Excavating & Landscaping, Inc., Belleville, $3,294,346.

151. WITHDRAWN

152. Clinton County, IL 161, District 8, Contract No. 76646, 4.84 miles of pavement patching, bituminous surface removal and bituminous concrete resurfacing on IL 161 from Charles Street in Albers to Hanover Street in Germantown. 30 Working Days. Howell Paving, Inc. & General Contractors, Inc., Mattoon, $395,587.

153. Monroe County, IL 156, District 8, Contract No. 76647, 7.08 miles of bituminous surface removal and bituminous concrete resurfacing on IL 156 between Waterloo and Valmeyer. 30 Working Days. Mounds Construction Co., Inc., Collinsville, $527,835.

154. Madison-St. Clair-Clinton Counties, IL 160 & IL 161, District 8, Contract No. 76658, 8.18 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, bituminous and aggregate shoulders on IL 160/IL161 beginning near New Baden east and north to Highland. 40 Working Days. The Kilian Corp. & Asphalt Sales and Products, Inc., Mascoutah, $1,216,044.

155. Cook County, Wentworth Avenue, District 1, Contract No. 82631, 2.57 miles milling and bituminous concrete surface on Wentworth Ave from 167th Street to State Street in Calumet City. 35 Working Days. Gallagher Asphalt Corp., Thornton, $672,277.

156. Lake County, Wilson Rd / IL 134, District 1, Contract No. 83647, widening, resurfacing, drainage and traffic signals from Big Hollow Road to Long Lake Road. 65 Working Days. Hardin Paving Co., Wheeling, $1,378,616.

157. Will County, Black Road, District 1, Contract No. 83653, 0.54 miles of bituminous concrete surface and binder course, curb and gutter, storm sewers and modification of traffic signals. 60 Working Days. Gallagher Asphalt Corp., Thornton, $731,822.

158. Lake County, Fairway Drive, District 1, Contract No. 83671, 1.23 miles of bituminous concrete pavement, milling, bike path, storm sewers and drainage structures along Fairway Drive, from Huron Street to Greenview Court in Vernon Hills. 130 Working Days. Maneval Construction Co., Inc., Grayslake, $3,962,090.

159. WITHDRAWN

160. McLean County, I-55, District 3, Contract No. 86856, 9.2 km of reconstructing and widening of Interstates 55 and 74 to six lanes from south of IL 9 to Interstate 39. Also the realignment of the ramp connecting eastbound Interstate 74 to southbound 55 and the reconstruction of the interchange of IL 9 with Interstate 55 and 74, all located west and northwest of Bloomington/Normal. Completion Date October 15, 2005 Plus 30 Working Days. Rowe Construction Co., Bloomington, $43,686,774.

161. Douglas County, IL 133, District 5, Contract No. 90729, 8.02 miles of bituminous concrete resurfacing on IL 133 from Bourbon Road in Chesterville to Arcola. Completion Date November 05, 2003 Plus 10 Working Days. Howell Asphalt Co. & Howell Paving, Inc., Mattoon, $3,708,691.

162. Pulaski-Massac Counties, IL 169, District 9, Contract No. 98517, Pavement patching bituminous surface removal, widening, bituminous concrete resurfacing, and aggregate shoulders on IL 169 from IL 37 west of Karnak east 8.93 miles to US 45. Also, included in the improvement is the reconstruction of the intersections with IL 37 and US 45. 175 Working Days. Southern Illinois Asphalt Co., Inc., Marion, $3,684,705.

163. Saline County, US 45, District 9, Contract No. 98629, 1.21 miles at widening and resurfacing, earth excavation and embankment, combination curb and gutter with enclosed drainage and shoulder removal and replacement to provide additional lanes on US 45 from north of IL 15 in Harrisburg extending northeast. Also, included are new traffic signals and new concrete pavement at the intersection of US 45 with IL 13, Seright Street and Small Street. Completion Date December 01, 2004. George E. Jones Excavating, LLC, Marion, $5,743,796.

164. Jackson County, IL 13, District 9, Contract No. 98780, At the intersection of IL 13 and Glenview Drive in Carbondale the improvement will extend 0.2 mile east and west of Glenview Drive on IL 13 and consist of the addition of a third westbound lane and traffic signal modifications. 65 Working Days. E.T. Simonds Construction Co., Carbondale, $861,982.

165. Kankakee County, IL 113, District 3, Contract No. 66100, Removal and replacement of the structure carrying the Norfolk Southern Rail tracks over IL 113 in Kankakee. Completion Date June 30, 2004 Plus 15 Working Days. Kankakee Valley Construction, Kankakee, $2,051,827.

166. Livingston County, IL 116, District 3, Contract No. 66325, Rehabilitation of the structure carrying IL 116 over Rooks Creek near Graymont west of Pontiac. 70 Working Days. H.J. Eppel & Co., Pontiac, $195,699.

167. Champaign County, I-74, District 5, Contract No. 70324, Rehabilitation of the structure carrying Township Road 296 over Interstate 74 east of Saint Joseph. Completion Date September 30, 2003 Plus 10 Working Days. Champaign Asphalt Co., Champaign, $865,085.

168. St. Clair County, I-64, District 8, Contract No. 76629, Repairs to the structure carrying I-64 over the Metro-Link Light Rail near 25th Street in East St. Louis. 100 Working Days. Keeley & Sons, Inc., East St. Louis, $418,761.

169. Kane County, Big Timber Road, District 1, Contract No. 83572, Construction a of single span, precast, prestressed deck beam bridge, architectural railing, guardrail, traffic barrier terminals immediately east of the Union Pacific Railroad and 1 mile west of Randall Road. Completion Date November 15, 2003 Plus 10 Working Days. IHC Construction Co., LLC, Elgin, $935,738.

170. Will County, Francis Road, District 1, Contract No. 83619, removal and replacement of existing bridge carrying Francis Road over Marley Creek 2 miles west of Mokeno. Completion Date November 30, 2003. Lorig Construction Co., Des Plaines, $1,455,771.

171. Bureau County, I-80, District 2, Contract No. 84872, Removal and replacement of the bridge carrying IL 26 over Interstate 80. Constructing concrete pavement on IL 26 and the southwest ramp, installing traffic signals on IL 26 and the south ramps. Also removal the high mast lighting tower and installing lights along IL 26 near Princeton. Completion Date November 26, 2003 Plus 10 Working Days. Ladd Construction Co., Ladd, $4,298,944.

172. McDonough County, IL 61, District 4, Contract No. 88917, Removal and replacement of the bridge deck carrying IL 61 over the BNSF Railroad in Collmar. Completion Date November 01, 2003 Plus 05 Working Days. Sparks & Wiewel Construction Co., Quincy, $901,467.

173. Alexander-Pulaski Counties, Mounds Road, District 9, Contract No. 98565, removal of the existing structure carrying Olive Branch Road over the Cache River and the adjacent structure over the overflow area west of the Cache River located southwest of Mounds City; and replacement with a 5 span, continuous composite concrete and steel beam bridge with a 32 ft width roadway. Completion Date November 01, 2004. E.T. Simonds Construction Co., Carbondale, $3,689,590.

174. Franklin County, IL 34, District 9, Contract No. 98647, The removal of the existing 4 span precast prestressed concrete deck beam structure carrying IL 34 over the Canadian National/Illinois Central Railroad east of Thompsonville; and replacement with a 3 span, continuous composite concrete and steel beam structure with a 36 ft width roadway. 140 Working Days. E.T. Simonds Construction Co., Carbondale, $1,445,218.

175. Winnebago County, IL 251, District 2, Contract No. 64854, Installation of traffic signals at the intersection IL 251 at McCurry Road near Roscoe. 30 Working Days. Rockfrod Electric Power, Inc., Loves Park, $131,511.

176. Peoria County, IL 40 & US 24, District 4, Contract No. 68329, Installation of a vehicle video detection systems along IL 40 (William Kumpf Boulevard) at Adams Street, Jefferson Street, John Gwynn Avenue, Romeo B. Garrett Avenue and Martin Luther King Drive, and along US 24 (Washington Street) at MacArthur Highway and Persimmon Street in Peoria. 25 Working Days. Laser Electric, Inc. Peoria, $123,977.

177. Madison County, IL 140, District 8, Contract No. 76459, Traffic signal installation and restriping for left turn lanes on IL 140 at the intersection with Texas Blvd. in Bethalto. 30 Working Days. Electrico, Inc., Columbia, $173,132.

178. Kankakee County, IL 50, District 3, Contract No. 44813, Removing and replacing raised reflective pavement marker castings complete with reflectors on IL 50 from the Will County line south to Third Street in Manteno. Completion Date November 01, 2003. Marking Specialists Corp., Arlington Heights, $22,753.

179. Various Counties, Various Routes, Districts 4 & 5, Contract No. 44814, Repairing various widths of thermoplastic, preformed, plastic, preformed thermoplastic, epoxy, hot spray thermoplastic and polyurea pavement marking lines, letters and symbols and the removal of existing pavement markings on "call-out" throughout District 4 and 5. Completion Date June 30, 2004. A.C. Pavement Striping Co., Elgin, $476,084.

180. Various Counties, Various Routes, District 5, Contract No. 44817, Replacing reflectorized guardrail markers, bridge rail markers, barrier wall markers and terminal markers in DeWitt, Moultrie, Piatt and Shelby counties Completion Date December 31, 2003. Hodges Fence Erectors, Edgewood, $55,813.

181. Cook County, Various Routes, District 1, Contract No. 60980, Curb and gutter repair at various locations near Midway Airport in Chicago. 15 Working Days. DNB Construction Co., Villa Park, $118,552.

182. Boone County, US 20, District 2, Contract No. 64853, Removal of an abandoned portion of south US 20 frontage road east and west of East Avenue intersection in Belvidere. 15 Working Days. Rockford Blacktop Construction Co., Loves Park, $38,399.

183. Winnebago County, Alpine Road & I-39, District 2, Contract No. 64869, Cleaning and painting structural steel on 5 structures in Rockford. Completion Date October 31, 2003. Three Star Painting, Inc., Lake Station, IN, $353,529.

184. Whiteside County, IL 2, District 2, Contract No. 64887, Intersection improvements at IL 2 and Prairieville Road west of the Whiteside/Lee county line. 15 Working Days. D.R. Gilbert & Sons, Inc., Rochelle, $54,634.

185. Winnebago County, IL 75, District 2, Contract No. 64913, Guardrail installation on IL 75 in Rockton southeast of Russel Street 15 Working Days. Northern Contracting, Inc., Sycamore, $6,131.

186. Iroquois County, I-57, District 3, Contract No. 66311, Replacing field tile with PVC pipe along the west side of I-57 from the Old US 45 and the ICG Railroad bridge to 2800 North Road near Clifton. 35 Working Days. Tobey's Construction & Cartage, Inc., Herscher, $51,980.

187. Grundy County, US 6, District 3, Contract No. 66319, Modernization of the intersection of US 6 with Union Street/Michael Drive includes milling, bituminous concrete widening and resurfacing, left turn lanes and traffic signals in Morris. 45 Working Days. D. Construction, Inc., Coal City, $441,363.

188. Kendall County, IL 47, District 3, Contract No. 66339, Installation of a pipe culvert under IL 47 at Ament Road south of IL 71 and the Yorkville Maintenance Yard near Yorkville. 20 Working Days. D. Construction, Inc., Coal City, $51,909.

189. Livingston County, I-55, District 3, Contract No. 66340, Removal and replacement of the sidewalk at various locations adjacent to the southbound Limestone Rest Area located 2.7 miles south of Pontiac. 20 Working Days. H.J. Eppel & Co., Pontiac, $21,934.

190. LaSalle-Grundy Counties, I-80, District 3, Contract No. 66346, Patching in the westbound lanes of Interstate 80 from mile post marker 98.5 East of Marseilles to mile post marker 105 just east of Seneca. 15 Working Days. G.M. Sipes Construction, Inc., Rushville, $84,562.

191. Knox County, I-74, District 4, Contract No. 68177, Installing scour mitigation countermeasures on the structures carrying Interstate 74 eastbound and westbound over French Creek five miles east of the Spoon River. 20 Working Days. Hillyer, Inc., Macomb, $138,230.

192. Macon County, IL 121, District 5, Contract No. 70285, Grinding a portion of the existing southbound lane along IL 121 just south of the Staley Bridge in Decatur. 15 Working Days. Freesen, Inc., Springfield, $46,754.

193. Coles County, I-57, District 5, Contract No. 70323, Painting of 8 structures on Interstate 57 near Mattoon. 150 Working Days. All States Painting, Inc., Alexander, $423,000.

194. Various Counties, Various Routes, District 6, Contract No. 72758, washing of five bridges at the following locations: (1) US 136 the Mississippi River at Hamilton (2) US 67 over the Illinois River Beardstown (3) IL 100/106 over the Illinois River at Florence and (4) on I-72 the eastbound and westbound Barry Bridges located 1.5 miles west of the Barry Interchange. 25 Working Days. All States Painting, Inc, Alexander, $63,000.

195. Kendall County, Station Drive, District 3, Contract No. 87241, A "Park and Ride" commuter parking lot and access road (Station Drive) will be constructed at the northwest corner of Orchard Road and Mill Road in Oswego. 110 Working Days. Aurora Blacktop, Inc. & H. Linden & Sons Sewer and Water, Inc., Montgomery, $1,498,819.

196. McLean County, Old Rt. 51, District 3, Contract No. 66316, 0.3 feet of bituminous shoulder removal and replacement and guardrail removal and replacement at 7 culvert locations on OR 51 between Heyworth and Randolph. 50 Working Days. Rowe Construction Co., Bloomington, $296,265.

197. Madison County, US 67/IL 111, District 8, Contract No. 76099, 1.90 miles of pavement patching, bituminous surface removal, widening and resurfacing, storm sewers, curb and gutter, and signal work to provide a bi-directional turn lane and bicycle accommodations along US 67/IL 111 in Godfrey from Tolle Lane to the US 267 wye. 95 Working Days. RCS Construction, Inc., Wood River, $3,437,017.

198. DeWitt County, US 51 BUS, District 5, Contract No. 90792, 3.45 miles of bituminous concrete resurfacing storm sewer upgrade, geometric and safety improvements along BUS 51 Bypass (N) to US 51 Bypass (S) in Clinton. Completion Date September 13, 2003. Freesen, Inc., Springfield, $2,415,375.

199. Clay-Richland Counties, US 50, District 7, Contract No. 94398, 7.43 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, bituminous and aggregate shoulders on US 50 from west of Clay City to west of Noble. Also included is the rehabilitation of the bridge over the Little Wabash River. 90 Working Days. Howell Paving, Inc. & Wabash Asphalt Co., Inc., Mattoon, $2,336,762.

200. Williamson-Pope Counties, IL 37 & IL 146, District 9, Contract No. 98762, 1.34 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, bituminous and aggregate shoulders at the following locations: (1) 1.01 miles on IL 37 at Pulleys Mill and (2) 0.33 mile on IL 146 at Watersburg. 30 Working Days. Southern Illinois Asphalt Co., Inc., Marion, $413,288.

201. Hardin County, Bassett Road, District 9, Contract No. 99171, 6.242 km of bituminous resurfacing, culvert extensions and other miscellaneous items on Bassett Road from Elizabethtown northerly. 70 Working Days. E.T. Simonds Construction Co., Carbondale, $1,067,610.

202. Hancock, IL – Lee, IA Counties, US 136, District 6, Contract No. 72640, Repairs to the bridge carrying US 136 over the Mississippi River at Hamilton consisting of bridge joint repair, relocating the inspection catwalks underneath the structure, removal and re-installation of the existing pedestrian handrail to correct loose anchor studs and riprap placement at pier 4. Completion Date: August 1, 2003 Plus 20 Working Days. Hillyer, Inc., Macomb, $895,603.

203. Madison County, IL 255, District 8, Contract No. 76630, planting and caring for 20,900 seedlings as part of the tree mitigation on 49 acres along the west side of IL 255 between the Wagon Wheel Road and the Cahokia Diversion Channel and east of the Union Pacific Railroad at Roxana. 15 Working Days. Lightning Seed Co., Toledo, $39,030.

204. Cumberland-Douglas Counties, Various Routes, District 5, Contract No. 90943, Scour protection at various locations in Cumberland and Douglas counties. 55 Working Days. Klein Excavating, Rosamond, $236,619.

205. Cook County, Dixie Highway, District 1, Contract No. 62429, 2.18 miles of milling and bituminous concrete surface on Dixie Highway from Vollmer Rd. to 183rd St. in Flossmoor and Homewood. Gallagher Asphalt Corp., Thornton, $769,420.

1A. Quad City International Airport, Moline, Rock Island County, Construct South Automobile Parking Lot. Valley Construction Co., Rock Island, $89,790.

2A. WITHDRAWN

3A. Lansing Municipal Airport, Lansing, Cook County, Rehabilitate & Mark Runway 9/27 incl. Porous Friction Course; Install PAPI System & Edge Drains. Gallagher Asphalt Corp., Thornton, $596,591.

4A. Morris Municipal Airport, Morris, Grundy County, Construct T-Hangar Sitework. S.A. Issert Construction, Inc., Wilmington, $820,026.

5A. WITHDRAWN

6A. Greenville Airport, Greenville, Bond County, T-Hangar Apron Rehabilitation & Expansion. Carl Bannister Excavating, Sparta, $570,478.

7A. Vandalia Municipal Airport, Vandalia, Fayette County, Rehabilitate T-Hangar Taxiways. Howell Paving, Inc., Mattoon, $140,986.

8A. Capital Airport, Springfield, Sangamon County, Construct New T-Hangars Sitework. Beyers Construction Co., Inc., Pana, $1,287,250.

9A. Capital Airport, Springfield, Sangamon County, Expand Auto Parking Lot. Western Asphalt, Inc, Jacksonville, $148,211.

10A. WITHDRAWN

11A. Carmi Municipal Airport, Carmi, White County, Rehabilitate & Mark Runway 18/36. Howell Paving, Inc. & Wabash Asphalt Co., Inc., Mattoon, $667,221.

12A. Coles County Memorial Airport, Mattoon, Coles County, Replace Runway 6/24 MIRL & REILS; Replace 36" Beacon with Refurbished Beacon. J.F. Edwards Construction Co., Geneseo, $179,368.

13A. Litchfield Municipal Airport, Litchfield, Montgomery County, Construct Partial Parallel Taxiway to Runway 18/36. Illinois Valley Paving Co., Springfield, $854,194.

14A. Pontiac Municipal Airport, Pontiac, Livingston County, Construct 1,000' X 75' Runway Extension & Turnaround, incl. Grading, Drainage Bituminous Paving, Lighting, Marking & Turfing. Tobey's Construction & Cartage, Inc., Herscher, $694,553.

15A. Pittsfield Penstone Municipal Airport, Pittsfield, Pike County, Apply Porous Friction Course to and Mark Runway 13/31 (4,000' X 60'). W.L. Miler Co., Hamilton, $182,185.

16A. Jacksonville Municipal Airport, Jacksonville, Morgan County, Rehabilitate & Mark Runway 13/31 (5,000' X 75'); Install New Runway Edge Lighting System. K.E. Vas Co., Jacksonville, $677,227.

17A. Macomb Municipal Airport, Macomb, McDonough County, Widen Runway 9/27 from 75' To 100' & apply a porous Friction Course. United Paving & Construction, Inc., Canton, $956,956.

18A. Effingham County Memorial Airport, Effingham, Effingham County, Memorial Phase II Rehabilitation Of The Aircraft Apron. Kieffer Bros. Construction Co., Inc., Mt. Carmel, $229,206.

19A. Vandalia Municipal Airport, Vandalia, Fayette County, Construct Electrical Vault, Install PAPI On Runway End 18. J.F. Edwards Construction Co., Geneseo, $132,963.

20A. WITHDRAWN

21A. Lansing Municipal Airport, Lansing, Cook County, Construct T-Hangar Sitework - Phase 2, incl. Grading & Drainage. Dyer Construction Co., Inc., Dyer, IN, $553,130.

22A. WITHDRAWN

23A. Whiteside County Airport, Sterling, Whiteside County, Rehabilitate N. Terminal Apron & Runway 18/36 Rehab. Bob Propheter Construction, LLC, Sterling, $1,068,587.

24A. Quad City International Airport, Moline, Rock Island County, Relocate Electrical Switchgear Facility, incl. Power Company Force Account Work . Davenport Electric Contract Co., Davenport, IA, $147,148.

25A. Southern Illinois Airport, Carbondale, Jackson County, Rehabilitate Runway 18l/36R. E.T. Simonds Constructon Co., Carbondale, $1,291,493.

26A. U of I – Willard Airport, Savoy, Champaign County, Rehabilitate Southeast Parallel Taxiway (Taxiway A) & General Aviation Roadways. University Constructon, Urbana, $1,599,830.

27A. Quad City International Airport, Moline, Rock Island County, Construct PCC Pavement Extension to Taxiway K, Phase II. Brandt Construction Co., Milan, $764,000.

28A. Benton Municipal Airport, Benton, Franklin County, Apply Porous Friction Course to Runway 18/36. Southern Illinois Asphalt Co., Inc, Marion, $272,615.

1LR. WILLIAMSON County, Reclamation of the Will Scarlet Mine-Clearing, The proposed reclamation project is located approximately 7 miles southwest of Carrier Mills. The proposed work includes the special clearing of approximately 44 acres and the installation of temporary erosion controls. Gibbs Construction, Modesto, $59,625.

2LR. MADISON County, Reclamation of the Worden No. 1 Mine Group, The proposed reclamation project includes five abandoned mine sites in or near Worden. The work includes de-watering and backfilling two ponds, approximately 31,000 cu yds of mine refuse excavation, 24,000 cu yds of earth excavation, exploratory excavation of 10 mine shafts, and seeding and soil amendments for approximately 23 acres. Gibbs Construction, Modesto, $216,000.

1W. COOK County, DesPlaines River-Rand Park Flood Control Phase II, Located in Des Plaines-pump station construction on Farmer Creek near its intersection with Busse Highway and clay blanket construction along the Union Pacific Railroad embankment just north of Joseph Schwab Road/ Campground Road. The work consists of converting the side slope of an existing 10 ft high pervious railroad embankment from a 2:1 slope to a 3:1 slope with a 2' thick impervious cap (3000 ft approx. length), constructing a reinforced concrete floodwall (200 ft. approx. length), a gated closure structure consisting of 7-8'x8' motorized sluice gates across Farmer Creek, a storm pumping station with 3-42" Vertical line shaft pumps (37,400 G.P.M. each pump and a sump pump (80 G.P.M.) to be constructed adjacent to the gated closure structure with appurtenant electrical and communication devices in the motor control center utilizing PLC in combination with a personal computer running SCADA software. Also, construct sheet pile retaining walls with concrete facing and chain link fence adjacent to pump station to contain surrounding embankment a combination log stop/trash rack with non-metallic trash racks between the log stops mounted on the pump station intake structure, concrete paving blocks, and cellular confinement system for erosion control around the pump station together with all appurtenant work required to complete the project. Some of the major items of work and approximate quantities are: 4.83 acre tree removal; 3,101 cu yds earth excavation; 950 cu yds removal and disposal of unsuitable material; 2,571 cu yds topsoil excavation and placement; 297 sq yds articulated block mat; 1,427 cu yds structure excavation; 1,030 cu yds concrete structures; 47,500 lbs furnish and erecting structural steel; 178,900 lbs reinforcement bars; 1,724 ft furnishing creosoted piles 20.1 to 38 ft; 1,350 ft furnishing creosoted piles over 38 ft; 3,074 ft driving timber piles; 8,138 sq ft steel sheet piling; 311 ft storm sewer, type 1, reinforced concrete culvert, class III 15"; mobilization; 14.93 acre seeding mulching and fertilizing; non-metallic trash racks; construction staking; architectural work complete; mechanical. IHC Construction Companies, LLC, Elgin, $3,169,909.


###

IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA