   Features   

diagonal image

FOR IMMEDIATE RELEASE

CONTACT: 217/782-6953

JANUARY 21, 2002

TTY: 217/524-4875

 

FAX: 217/782-8714

SPRINGFIELD, IL -- The Illinois Department of Transportation received bids on January 17, 2003 for various road and bridge improvement projects located throughout the state. Also included were two land reclamation projects.

Following is a list of the projects by county and the apparent low bidder:

1. Lake County, IL 60/IL 83, District 1, Contract No. 60166, 3.14 miles of milling and bituminous concrete surface on IL 60/IL 83 from EJ & E Railroad to IL 21 located in Mundelein and Vernon Hills. 40 Working Days. Peter Baker & Son Co., Lake Bluff, $1,149,790.

1P. Madison County, IL 255, District 8, Contract No. 96743, 3.07 km of widening and resurfacing to four lanes along IL 111 from just south of Jackson Drive to north of Airline Drive in Wood River and Bethalto. Includes the reconstruction of Airline Drive from two to four lanes and the construction of a 2 span, continuous composite concrete and steel welded plate girder structure to carry Airline Drive over IL 255 in Bethalto. Completion Date July 01, 2004 Plus 20 Working Days. Thiems Construction Co., Inc., Edwardsville, $10,184,970.

2. McHenry County, IL 120, District 1, Contract No. 60173, 3.8 km of variable width widening, milling, resurfacing, intersection improvements, traffic signal installation and lighting on IL 120 from IL 47 to Fleming Road in Woodstock. Completion Date September 29, 2003 Plus 10 Working Days. Thelen Sand & Gravel, Inc. and Curran Contracting Co., Antioch, $3,888,888.

3. Cook County, IL 50, District 1, Contract No. 60444, 5.0 miles of milling and bituminous concrete surface on IL 50 from Flossmoor Road to Steger Road and replacement of the IL 50 bridge over Butterfield Creek, all in Matteson, Richton Park and University Park. Completion Date October 31, 2003 Plus 05 Working Days. Gallagher Asphalt Corp., Thornton, $4,248,372.

4. Cook County, US 30, District 1, Contract No. 62363, 2.73 miles of milling and bituminous concrete surface on US 30 (Lincoln Highway) from Halsted Street to IL 394 (Bishop Ford Expressway) in Chicago Heights and Ford Heights. 55 Working Days. Gallagher Asphalt Corp., Thornton, $863,109.

5. Cook County, Stony Island Avenue, District 1, Contract No. 62415, 1.21 miles of milling and bituminous concrete surface on Stony Island Avenue from 79th Street to 69th Street in Chicago. 50 Working Days. E.A. Cox Co., Chicago, $1,161,374.

6. Cook County, US 12/20, District 1, Contract No. 62427, 0.98 mile of milling and bituminous concrete surface on US 12/20 (95th Street) from Ashland Avenue to Halsted Street in Chicago. 35 Working Days. Central Blacktop Co., Inc., LaGrange, $493,730.

7. Cook County, US 45 (Des Plaines River Rd), District 1, Contract No. 62433, 0.48 mile of milling and bituminous concrete surface on US 45 (Des Plaines River Road) from IL 58 (Golf Road) to US 12 (Rand Road) in Des Plaines. 25 Working Days. Peter Baker & Son Co., Lake Bluff, $190,132.

8. WITHDRAWN

9. Kane-Kendall Counties, IL 31, District 1, Contract No. 62446, 0.92 mile of milling and bituminous concrete surface on IL 31 from Webster Street to Caterpillar Drive in Montgomery. 30 Working Days. Aurora Blacktop, Inc., Montgomery, $374,367.

10. Cook County, IL 43 (Harlem Ave.), District 1, Contract No. 62456, 0.65 mile of milling and bituminous concrete on IL 43 (Harlem Avenue) from I-55 to 57th Street in Chicago, and Summit. 30 Working Days. Central Blacktop Co., Inc., LaGrange, $410,360.

11. LaSalle County, I-80, District 3, Contract No. 66129, 8.89 miles of bituminous concrete resurfacing, patching and bridge repairs on I-80 from the Bureau County line to east of IL 178. Completion Date November 01, 2003 Plus 20 Working Days. Advanced Asphalt Co., Princeton, $8,616,396.

12. Tazewell County, US 150, District 4, Contract No. 68151, 5.06 miles of bituminous concrete resurfacing on US 150 from East Peoria to east of Detroit Avenue in Morton. Completion Date July 02, 2003. R.A. Cullinan & Son, Inc., Tremont, $1,219,415.

13. Adams County, IL 96, District 6, Contract No. 72141, 6.04 km of pavement patching, bituminous surface removal, bituminous concrete resurfacing and aggregate wedge shoulders on IL 96 from south of State Street in Quincy southeast to I-172. Also, included is the removal of the existing 3 span bridge over Curtis Creek and the replacement with a single span, precast, prestressed concrete I-beam bridge with a 12 m width roadway. Completion Date October 01, 2003. Diamond Construction Co., Quincy, $1,194,465.

13P. Madison County, IL 3, District 8, Contract No. 76295, 0.68 mile of widening, bituminous surface removal, variable width bituminous concrete resurfacing and bituminous and aggregate shoulders on IL 3 to add a center left turn lane from Delmar Avenue to IL 111 in Godfrey. Completion Date September 15, 2003 Plus 10 Working Days. Charles E. Mahoney Co., Belleville, $1,145,315.

14. Sangamon County, IL 124, District 6, Contract No. 72637, 9.14 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing and 3 ft aggregate shoulders on IL 124 from Business Loop 55 in Sherman northwest to IL 29. Completion Date August 04, 2003. Illinois Valley Paving Co., Springfield, $1,049,753.

14P. Clinton County, US 50, District 8, Contract No. 76385, 1.71 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, curb and gutter and storm sewers on US 50 from 11th Street to east of Lake Street in Carlyle. Also included are repairs to the bridge over the Kaskaskia River. Completion Date November 30, 2003. The Kilian Corp. and Asphalt Sales and Products, Inc., Mascoutah, $1,685,599.

15. Macoupin-Montgomery Counties, IL 108, District 6, Contract No. 72690, 11.58 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing and 3 ft aggregate wedge shoulders on IL 108 from south of IL 4 in Carlinville east to 0.5 mile west of I-55. Completion Date September 30, 2003. The Kilian Corp. and Asphalt Sales and Products, Inc., Mascoutah, $1,443,761.

16. Sangamon County, I-55, District 6, Contract No. 92911, 11.74 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, leveling binder, 12 ft, 10 ft and 6 ft bituminous shoulders, 2 ft aggregate shoulders, and the rehabilitation of 11 structures along I-55 from south of Springfield south to the Montgomery County line. Completion Date November 01, 2003. Chester Bross Construction Co., Hannibal, MO, $16,572,924.

17. Adams County, 18th Street, District 6, Contract No. 93337, improvement of the intersection of 18th Street and Locust Street in Quincy. 130 Working Days. R.L. Brink Corp., Quincy, $670,944.

18. WITHDRAWN

19. Pulaski County, I-57, District 9, Contract No. 98714, On I-57 from north of the Perks Road overpass southerly 7.75 miles to east of Pulaski: pavement patching, pavement removal and the replacement with bituminous base course and bituminous concrete resurfacing, 4 ft and 10 ft bituminous shoulders, 4 ft and 2 ft aggregate shoulders, the resurfacing of the Ullin interchange ramps, and the rehabilitation of six bridges. Completion Date November 01, 2003. E.T. Simonds Construction Co. and Southern Illinois Asphalt Co., Inc., Carbondale, $8,620,789.

20. Williamson-Pope Counties, IL 37 & IL 146, District 9, Contract No. 98762, 1.34 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, bituminous and aggregate shoulders at the following locations: (1) 1.01 miles on IL 37 at Pulleys Mill and (2) 0.33 mile on IL 146 at Watersburg 30 Working Days. Southern Illinois Asphalt Co., Marion, $413,288.

21. Will County, I-55, District 1, Contract No. 60537, Removal of the existing structure and replacement with a 2-span bridge carrying Wilmington Road over I-55, also approach roadway reconstruction and substructure repairs, located near Lorenzo. Completion Date October 31, 2003 Plus 10 Working Days. D. Construction, Inc., Coal City, $3,740,778.

22. Cook County, Madison Street, District 1, Contract No. 62036, Removal of the existing structure and replacement with a three span steel girder bridge carrying Madison Street over Des Plaines River in Maywood, River Forest and Forest Park. Completion Date October 31, 2003 Plus 15 Working Days. Lorig Construction Co., Des Plaines, $2,070,333.

23. Cook County, Shermer Road, District 1, Contract No. 62395, Bridge repair including removal and replacement of the concrete surface, joint replacement and detector loop replacement on Shermer Road over the Middle Fork of the North Branch of the Chicago River in Northbrook. Completion Date June 30, 2003 Plus 05 Working Days. Alliance Contractors, Inc., Woodstock, $140,669.

24. Cook County, I-57, District 1, Contract No. 62476, Deck resurfacing on 3 bridges over I-57 at Genoa Avenue, 103rd Street and 125th Street in Chicago and Calumet Park. Completion Date July 31, 2003 Plus 05 Working Days. Albin Carlson & Co., Melrose Park, $288,060.

25. DuPage County, I-290, District 1, Contract No. 62484, painting of the 2 structures carrying I-290 (EB) over I-355 and I-290 (WB) ramp to I-355 in Addison. 50 Working Days. ERA-Valdivia Contractors, Inc., Chicago, $325,700.

26. Morgan County, I-72, District 6, Contract No. 72641, Bridge repairs on the structure carrying Old US 36 over I-72 approximately 2 miles east of Jacksonville. The work will consist of bridge joint repair, bridge deck patching, mirosilica concrete overlay formed concrete and shotcrete repair, approach pavement overlay, plugging existing deck drains and pavement marking. 30 Working Days. Hillyer, Inc., Macomb, $389,947.

27. Winnebago County, US 20, District 2, Contract No. 84934, Removal and replacement of the dual bridge decks carrying US 20 over Cunningham Road and the dual bridge decks over the CC & P Railroad from Meridian Road to east of Cunningham Road in Rockford. 100 Working Days. Sjostrom & Sons, Inc., Rockford, $2,929,902.

28. Livingston County, Watson Street, District 3, Contract No. 87146, Construction of a precast concrete double box culvert carrying Watson Street over a branch of Vermilion River in Forrest. 40 Working Days. Iroquois Paving Corp., Watseka, $160,456.

29. Iroquois County, CH 10, District 3, Contract No. 87215, removal and replacement of three structures carrying CH 10 over tributaries to Pigeon Creek located three miles east of Loda. 100 Working Days. Iroquois Paving Corp., Watseka, $520,775.

30. Marshall County, TR 77A, District 3, Contract No. 87225, Construction of a three span concrete deck beam bridge carrying TR 77A over Senachwine Creek, 5 miles west of Lacon. 40 Working Days. Curnyn Construction Co., Geneseo, $237,990.

31. Tazewell County, 3rd Street, District 4, Contract No. 89270, rehabilitation and restoration of the existing bridge carrying 3rd Street over ICG RR in Delavan. 55 Working Days. Hillyer, Inc., Macomb, $336,256.

32. Champaign County, I-57, District 5, Contract No. 90950, Rehabilitation of the structure carrying Monticello Road over I-57 south of Champaign. Completion Date October 15, 2003 Plus 10 Working Days. A.J. Walker Construction Co., Mattoon, $1,118,418.

33. Fayette County, IL 185, District 7, Contract No. 94518, removal of the existing IL 185 bridge over Hurricane Creek approximate 8 miles northwest of Vandalia, and replacement with a 3 span concrete and steel beam bridge with a 32 ft width roadway. 90 Working Days. Macoupin County Contracting, Inc., Staunton, $988,453.

34. Jefferson County, IL 15, District 7, Contract No. 94726, removal of the IL 15 bridge over the Big Muddy Overflow located approximately 2.7 miles west of I-57 in Mt. Vernon, and replacement with a 3 span concrete and steel wide, flange beam structure with a 36 ft width roadway. 140 Working Days. Halverson Construction Co., Inc., Ashley, $1,254,596.

35. Lawrence County, IL 1, District 7, Contract No. 94779, removal of the existing IL 1 bridge over Brushy Fork Creek approximately 4.7 miles north of Lawrenceville and replacement with a 2 span concrete and steel beam bridge. 95 Working Days. Wortman-Starwalt, Inc. and Howell Paving, Inc., Effingham, $744,280.

36. Hamilton County, TR 369, District 7, Contract No. 95334, Construction of a three span, precast, prestressed concrete deck beam bridge, earthwork and drainage, carrying TR 369 over North Fork Saline River 4 miles north of Broughton. 30 Working Days. Perry County Construction Co., Herrin, $166,892.

37. Fayette County, TR 315, District 7, Contract No. 95350, Construction of a single span, precast, prestressed concrete deck beam bridge carrying TR 315 over Vandalia Drainage Ditch, two miles east of Vandalia Correctional Center. 35 Working Days. Depew and Owen Builders, Inc., Centralia, $104,981.

38. Randolph County, Roseborough Road, District 8, Contract No. 97205, Construction of a single span, precast, prestressed concrete deck beam bridge carrying TR 159A, Roseborough Road, over Mary's River 4 miles southeast of Sparta. 20 Working Days. Illinois Excavators, Inc., Ruma, $181,558.

39. Jackson County, Old IL13, District 9, Contract No. 98650, removal of the existing Old IL 13 bridge over Mud Creek southeast of Murphysboro, and replacement with a single span concrete and steel beam bridge with a 32 ft width roadway. 95 Working Days. E.T. Simonds Construction Co., Carbondale, $567,482.

40. Franklin County, IL 37, District 9, Contract No. 98716, Repairs to the bridge carrying IL 37 over stream approximately 1.80 miles north of Benton. The work will include approach pavement patching, bridge deck patching, a microsilica concrete overlay and floor drain extensions. 35 Working Days. E.T. Simonds Construction Co., Carbondale, $72,369.

41. Union County, Bald Knob Cross Road, District 9, Contract No. 98792, Repairs to the structure carrying Bald Knob Cross Road over IL 127 in Alto Pass. The work will include concrete superstructure repairs, and the placement of riprap. 20 Working Days. Perry County Construction Co., Herrin, $41,610.

42. Lake County, US 14, District 1, Contract No. 62274, Traffic signal modernization along US 14 (Northwest Highway) from Hart Road to Lake-Cook Road in Barrington. 55 Working Days. Home Towne Electric, Inc., Lake Villa, $249,973.

43. Peoria-Tazewell Counties, I-74, District 4, Contract No. 68226, Supplying an Intelligent Transportation System (ITS) on I-74 from west of Sterling Avenue to east of Washington Street in Peoria and East Peoria. Completion Date December 31, 2006. Divane Bros. Electric Co., Franklin Park, $4,417,000.

44. Various Counties, Various Routes, District 8, Contract No. 76606, construction of lighted signs at IL 3 and Stolle Road at Dupo; IL 161 and Old Lincoln Trail at Belleville; North Belt West and 37th Street/Royal Heights Road in Belleville. Also, included is the construction of flashing beacons at Old US 50 and Frogtown/Little Prairie Road west of Beckemeyer; IL 15 (Broadway) and 6th Street in East St. Louis; and IL 160/177 and Venedy Station northwest of Okawville. 60 Working Days. Bodine Electric of Decatur, Decatur, $69,646.

45. Macon County, US 36, District 5, Contract No. 90835, Modernization of the traffic signals on US 36 at the intersections with Van Dyke Street, Edwards Street, Church Street, Water Street, Franklin Street, and Jackson Street. Also at IL 105 all in Decatur. 175 Working Days. Egizii Electirc, Inc., Springfield, $533,569.

46. Various Counties, Various Routes, District 1, Contract No. 44800, Placement of various types and widths of paint pavement markings at various locations throughout the district. Completion Date November 01, 2003. Maintenance Coatings Co., South Elgin, $466,056.

47. Cook County, Various Routes, District 1, Contract No. 44802, Removal and replacement of damaged raised reflector pavement markers and castings at various locations throughout the county. Completion Date November 01, 2003. Marking Specialists Corp., Arlington Heights, $690,000.

48. Various Counties, Various Routes, District 1, Contract No. 44803, Replacement of various types and widths of pavement markings at various locations throughout the district. Completion Date November 01, 2003. A.C. Pavement Striping Co., Elgin, $458,226.

49. Various Counties, Various Routes, District 1, Contract No. 44804, Repairing various types and widths of pavement markings at various locations throughout the district. Completion Date November 01, 2003. Marking Specialists Corp., Arlington Heights, $641,527.

50. Cook County, I-90/94, District 1, Contract No. 60284, Rehabilitation of the pump station located at the southwest quadrant of Des Plaines Street and Van Buren Street in Chicago. Completion Date February 01, 2005. Meade Electric Co., Inc., McCook, $1,643,838.

51. Cook County, IL 171, District 1, Contract No. 62460, Placement of permanent protective shield on the structures carrying IL 171 (First Avenue) over I-55 (Stevenson Expressway) in Summit. 15 Working Days. Lorrig Construction Co., Des Plaines, $53,000.

52. DuPage County, I-355 & I-290, District 1, Contract No. 62485, Bridge painting of the structures carrying I-355 over US 20, over IL 53; and I-290 over Addison Road and Woodale Road in Addison. 65 Working Days. ERA-Valdivia Contractors, Inc., Chicago, $273,944.

53. Lake County, IL 53/IL 120, District 1, Contract No. 62491, Demolition and disposal of 7 buildings on IL 53/IL 120 at Gilmer Road in Hawthorn Woods. 30 Working Days. Lake County Grading Co., LLC, Libertyville, $66,508.

54. McHenry County, US 14, District 1, Contract No. 62493, Repairs of the Harvard Weigh Station north of Crowley Road at Oak Grove Estates northeast of Harvard. 20 Working Days. Alliance Contractors, Inc., Woodstock, $103,843.

55. Kane County, IL 31, District 1, Contract No. 62501, Crack and joint sealing along IL 31 from IL 62 to Strom Drive in Elgin. 15 Working Days. Behm Pavement Maintenance, Inc., Crystal Lake, $44,820.

56. Kane-Cook Counties, IL 25 & IL 19, District 1, Contract No. 62502, Crack and joint sealing along IL 25 from west of Shales Boulevard to Schaumburg Road in East Dundee, Carpentersville and Elgin. 15 Working Days. Behm pavement Maintenance, Inc., Crystal Lake, $62,747.

57. Calhoun County, IL 108, District 8, Contract No. 76443, Kampsville Ferry harbor improvements at Kampsville include harbor dredging, sheet pile retaining wall, moorings and stairs. 30 Working Days. Keeley & Sons, Inc., East St. Louis, $254,897.

58. Cook County, Lake Avenue, District 1, Contract No. 83504, Construction of 7,708 ft of portland cement concrete pedestrian and bicycle path on West Lake Avenue along the perimeters of Great Park on West Chestnut Avenue to Lake Road and North South Road in Glenview. 35 Working Days. Schroeder and Schroeder, Inc, Skokia, $359,923.

59. WITHDRAWN

60. Madison County, SIU Trail Spur, District 8, Contract No. 97203, Construction consists of 0.56 mile Bike Trail from Madison County Transit Authority bike trail to the SIU student parking lots on the Southern Illinois University Campus at Edwardsville. 20 Working Days. C.D. Peters Construction Co., Granite City, $129,349.

61. Jackson County, US 51, District 9, Contract No. 98784, Landscaping along the backslopes of a relocated section of US 51 from Pleasant Hill Road to west of Boskydell Road in Carbondale. Completion Date November 30, 2003. Vienna Nursery, Vienna, $199,703.

62. Champaign County, US 150, District 5, Contract No. 90924, 1.17 miles of bituminous concrete resurfacing on US 150 from Union Street to Francis Drive in Champaign. 30 Working Days. University Construction, Urbana, $607,000.

63. Champaign County, IL 10 & Mattis Ave., District 5, Contract No. 90734, 2.52 miles of bituminous concrete resurfacing on IL 10 (Springfield Avenue) from Fieldstone Road to Mattis Avenue. Also Mattis Avenue from Springfield Avenue to Church Street in Champaign. Includes intersection improvements and traffic signals. Completion Date September 15, 2003 Plus 10 Working Days. Cross Construction, Inc., Urbana, $2,107,377.

64. Christian County, McAdam Drive, District 6, Contract No. 72755, 0.55 mile of pavement patching, bituminous concrete resurfacing and aggregate wedge shoulders on McAdam Drive and adjacent spur between IL 29 and IL 48 in Taylorville 15 Working Days. Illinois Valley Paving Co., Springfield, $182,779.

65. Clay-Richland Counties, US 50, District 7, Contract No. 94398, 7.43 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, bituminous and aggregate shoulders on US 50 from west of Clay City to west of Noble. Also included is the rehabilitation of the bridge over the Little Wabash River. 90 Working Days. Howell Paving, Inc. and Wabash Asphalt Co., Inc., Mattoon, $2,408,495.

66. Coles County, Shiloh Cemetery, District 5, Contract No. 70182, 0.06 mile of resurfacing on Cemetery Drive and construction of 10 parking space areas at the Shiloh Presbyterian Church Cemetery 7 miles southwest of Charleston. Includes sidewalk removal and replacement, lighting and landscaping. 20 Working Days. Ne-Co Asphalt Co., Inc., Charleston, $101,373.

67. Kane County, IL 72, District 1, Contract No. 82668, 1.09 miles of pavement reconstruction with concrete pavement (jointed) and traffic signal modernization on IL 72 from IL 68 to IL 25 in East Dundee. Completion Date October 31, 2003 Plus 10 Working Days. Plote Construction Inc., Elgin, $7,181,852.

68. Lake County, IL 131, District 1, Contract No. 60184, Intersection reconstruction including widening, resurfacing, new traffic signals, and loop detectors on IL 131 from Wisconsin state line in Pleasant Prairie, Wis. to IL 173 in Zion, IL. Completion Date August 29, 2003 Plus 10 Working Days. Peter Baker & Son Co., Lake Bluff, $2,791,734.

69. Lee County, Various Routes, District 2, Contract No. 64838, 1.25 miles of milling and bituminous resurfacing on US 30 east of US 52, two locations are on U.S. 52 between Dixon and U.S. 30, and two locations are on Illinois 26 south of U.S. 30. 15 Working Days. Johnson Blacktop, Inc., Elburn, $60,167.

70. Macoupin County, IL 4 & Old IL 4, District 6, Contract No. 72292, 5.27 km of pavement patching, bituminous surface removal, bituminous resurfacing, bituminous concrete base course widening and aggregate wedge shoulders on IL 4 from the Sangamon County line to George Street in Virden, and on Old IL 4 from south of Virden to IL 4 in Virden. Completion Date September 01, 2003 Working Days. Macoupin County Contracting, Inc., Staunton, $1,952,212.

71. McDonough County, US 67, District 4, Contract No. 68235, 4.7 miles of bituminous concrete surface on US 67 south of US 67/US 136 to South Street in Industry. 25 Working Days. United Paving & Construction, Inc., Canton, $513,547.

72. McHenry County, IL 120, District 1, Contract No. 62007, 7.80 km of widening with concrete base course, milling and bituminous concrete surface and traffic signal modernization on IL 120 from Fleming Road to Dot Street in McHenry. Completion Date August 29, 2003 Plus 10 Working Days. Curran Contracting Co., Crystal Lake, $2,878,930.

73. McHenry County, IL 120 & IL 31, District 1, Contract No. 82470, 4.56 km on IL 120 and 1.38 km on IL 31--widening, milling, bituminous concrete surface, pavement reconstruction and traffic signal modernization from Dot street to IL 31 and High Street to IL 120 all in McHenry. Completion Date October 15, 2004 Plus 15 Working Days. James Cape & Sons Co., Hoffman Estates, $13,966,083.

74. Menard County, CH 14, District 6, Contract No. 93338, 0.62 mile of new pavement, gutter, storm sewer, culvert, entrance and side road intersection improvements on South Athens Blacktop 2.0 miles south of Athens to the Menard/Sangamon county line. 110 Working Days. McIntire & Co., Contractors, Winchester, $585,512.

75. Ogle County, US 52, District 2, Contract No. 64844, Intermittent bituminous resurfacing on US 52 from IL 26 to IL 64 at Brookville. 15 Working Days. Northwest Illinois Construction Co., Rock Falls, $200,806.

76. Peoria County, IL 40, District 4, Contract No. 68112, 0.80 mile of bituminous concrete resurfacing on IL 40 from Ravenswood Road to Lindberg Road in Peoria. Also, bridge repairs to the structure carrying IL 40 over IL 6. 40 Working Days. R.A. Cullinan & Sons, Inc., Tremont, $1,133,953.

77. Peoria County, IL 8, District 4, Contract No. 88854, 0.35 km of bituminous concrete widening and resurfacing on Western Avenue (IL 8) from Wiswall Street to Butler Street in Peoria. Completion Date September 15, 2003. P.J. Hoerr, Inc., Peoria, $873,950.

78. Sangamon County, Wabash Ave.& Veteran's Pkwy, District 6, Contract No. 72654, construction of dual left turn lanes and widening at the intersection of Wabash Avenue and Veterans Parkway on the west side of Springfield. Includes milling, resurfacing and striping of Wabash Avenue from Robbins Road to the West White Oaks Mall entrance with traffic signal upgrade. Also included is the patching, shoulder repair and shoulder sealing of Veterans Parkway from Iles Avenue to the I-72 interchange. Completion Date October 10, 2003. Merrill's Contractors, Inc., Springfield, $1,974,329.

79. Tazewell County, Morton Community Bikeway, District 4, Contract No. 89276, construction of a bicycle/pedestrian path beginning at the terminus of the existing trail near Cypress Road and ending at the terminus of the existing trail near Happ Lane in Morton. 60 Working Days. Halverson Construction Co., Inc., Springfield, $869,836.

80. Winnebago County, IL 70, District 2, Contract No. 64841, 3.76 miles of bituminous concrete widening and resurfacing on IL 70 from Meridian Road to Summerdale Avenue in Rockford. Includes lighting, traffic signals, or bridge replacement at Kent Creek and 3 bridge rehabilitations. 145 Working Days. Rockford Blacktop Construction Co., Loves Park, $6,365,480.

81. Winnebago County, I-39, District 2, Contract No. 64865, 7.76 miles of concrete patching on Interstate 39 from I-90 south to Baxter Road. 15 Working Days. G.M. Sipes Construction, Inc, Rushville, $154,911.

82. Clark County, CH 8, District 5, Contract No. 91276, Construction of an additional prestressed, concrete deck beam span to an existing three span concrete deck 2.4 miles from Westfield. 30 Working Days. Perry County Construction Co., Herrin, $178,465.

83. Cook County, Ridge Road, District 1, Contract No. 62095, Removal of the existing bridge and replacement with a 12' x 14' reinforced concrete box culvert carrying Ridge Road over Illinois Central Railroad and 40 ft width pavement reconstruction, all in Homewood. Completion Date October 01, 2003 Plus 05 Working Days. Dyer Construction Co., Inc., Dyer, IN, $929,804.

84. Cook County, IL 58 (Dempster St.), District 1, Contract No. 60918, Removal of the existing bridge and replacement with a 3-span bridge carrying IL 58 (Dempster St.) over North Shore Channel, new approach pavement, lighting and traffic signal modernization located in Skokie and Evanston. Completion Date October 31, 2003 Plus 15 Working Days. James Cape & Sons Co., Hoffman Estates, $2,734,734.

85. Kankakee County, IL 17, District 3, Contract No. 66213, Removal and replacement of the structures carrying IL 17 (Court Street) over the IC Railroad in Kankakee. Completion Date December 01, 2003 Plus 15 Working Days. Kankakee Valley Construction, Kankakee, $4,446,491.

86. Lake County, IL 173, District 1, Contract No. 62034, Removal of the existing structure and replacement with a single span steel beam bridge carrying IL 73 (Rosecrans Road) over North Branch of Mill Creek east of Antioch. Completion Date November 15, 2003 Plus 10 Working Days. Belvidere Construction Co., Belvidere, $747,473.

87. Peoria-Tazewell Counties, Various Routes, District 4, Contract No. 68313, Cleaning and painting of 11 structures on various routes in Peoria and Tazewell counties. 125 Working Days. Eagle Painting and Maintenance Co., Lansing, $487,000.

88. St. Clair County, I-55/70, District 8, Contract No. 76619, Bridge parapet, approach parapet and approach shoulder pavement repairs to tri-level ramp from I-55/70 westbound to I-64 eastbound in East St. Louis. Completion Date May 30, 2003. Plocher Construction Co., Inc., Highland, $41,231.

89. St. Clair County, I-64, District 8, Contract No. 76428, widening of the structure carrying Ruby Lane over I-64. Work will consist of concrete deck removal and replacement, substructure widening, beam placement and pavement widening. Completion Date August 29, 2003 Plus 15 Working Days. Keeley & Sons, Inc., East St. Louis, $859,364.

90. Vermilion County, US 150 & IL 1, District 5, Contract No. 90641, Removal and replacement of the structure carrying IL 1 over the Norfolk and Southern Railroad, installation of a new bridge on 4th Street crossing over the Norfolk and Southern Railroad and construction of a retaining wall at IL 1 and Adams Street. Also, bituminous widening and resurfacing on US 150 and IL 1 and the surrounding roads from Interstate 74 to Main Street in Danville. Completion Date December 01, 2004 Plus 10 Working Days. O'Neil Bros, Urbana, $11,356,798.

91. Vermilion County, TR 101, District 5, Contract No. 91187, Construction of a five span, precast prestressed concrete deck beam bridge carrying TR 101 over North Fork of Vermilion River 1/4 mile west of Alvin. 90 Working Days. White Construction, Inc, Clinton, IN, $1,108,160.

92. Cook County, IL 62, District 1, Contract No. 83663, new roadway lighting on IL 61 (Algonquin Road) from Goebber Road to Busse Road in Mount Prospect and Arlington Heights. 60 Working Days. H & H Electric Co., Franklin Park, $531,856.

93. Cook County, 111th Street, District 1, Contract No. 62512, Traffic signal installation on 111th Street at Jodan Drive in Oak Lawn. 45 Working Days. H & H Electric, Inc., Franklin Park, $200,865.

94. Carroll-JoDaviess Counties, IL 72 & IL 78, District 2, Contract No. 64864, 5.25 miles of routing, cleaning and sealing pavement cracks on IL 72 from IL 73 to Shannon and on IL 78 from Warren to the Wisconsin state line. 15 Working Days. Fahrner Asphalt Sealers, Inc., Plover, WI, $24,858.

95. Cook County, Hicks Road, District 1, Contract No. 62452, Concrete pavement patching on Hicks Road (SB) from north of US 14 (Northwest Highway) to south of IL 68 (Dundee Rd.) in Palatine. 25 Working Days. Plote Construction Inc., Elgin, $379,002.

96. DeKalb County, Various Routes, District 2, Contract No. 64817, 13.97 miles of routing and sealing cracks on US 30 from IL 23 to Hinckley; on US 34 from Somanauk to Sandwich; and on IL 72 from Kirkland to Genoa. 15 Working Days. Behm Pavement Maintenance, Inc, Crystal Lake, $60,763.

97. Henry County, IL 92, District 2, Contract No. 64819, maintenance (mowing, spraying, tree shelter repairs) at the Joslin Wetland southeast of IL 92 and the Rock River. Completion Date October 03, 2003. Dalziel Enterprises, Inc., Moline, $104,440.

98. Iroquois County, I-57, District 3, Contract No. 66314, Constructing a 4350 ft concrete paved ditch along the east side of Interstate 57 and IL 54 near Onarga. 30 Working Days. Iroquois Paving Corp., Watseka, $89,080.

99. Lee County, I-39, District 2, Contract No. 64866, 5.2 miles of bituminous shoulder removal and replacement on I-39 from Perry Road south to US 30. 15 Working Days. Curran Contracting Co., Crystal Lake, $142,450.

100. Peoria County, I-74, District 4, Contract No. 68316, Demolition of duplexes at 1511, 1513, 1515 and 1517 North Knoxville in Peoria. 15 Working Days. N.E. Finch Co., Peoria, $39,912.

101. Tazewell County, Unmarked Route, District 4, Contract No. 89279, Construction of 0.37 mile of bituminous bikeway, walks, lighting, irrigation and planting from Riverside Drive to Bob Michel Bridge in East Peoria. 150 Working Days. Otto Baum Co., Inc., Morton, $912,581.

102. Tazewell County, Springfield Road, District 4, Contract No. 89258, 2.028 miles of earth embankment, grading, drainage improvements, paving and placement of bituminous and aggregate shoulders on Springfield Road from Toboggan Road to IL 122. 90 Working Days. R.A. Cullinan & Son, Inc., Tremont, $734,143.

103. WITHDRAWN

104. WITHDRAWN

105. Various Counties, Various Routes, District 4, Contract No. 44801, Installing raised reflective pavement markers, removing reflectors, placing new reflectors and removing damaged pavement marker castings on various routes in District 4. Completion Date November 30, 2003. P&P Construction Co., Riverton, $79,636.

106. Various Counties, Various Routes, District 4, Contract No. 68320, District wide weed control spraying on various routes throughout District Four. Completion Date June 05, 2003. DeAngelo Brothers, Inc., Decatur, $44,893.

107. Champaign-Vermilion Counties, Various Routes, District 5, Contract No. 70281, Patching at various locations in Champaign and Vermilion counties. Completion Date December 31, 2003. Champaign Asphalt Co., Urbana, $145,975.

108. Various Counties, Various Routes, District 5, Contract No. 70282, Patching at various locations in DeWitt, Macon, Moultrie, Piatt and Shelby counties. Completion Date December 31, 2003. G.M. Sipes Construction, Inc., Rushville, $310,285.

109. Various Counties, Various Routes, District 5, Contract No. 70283, Patching at various locations in Clark, Coles, Cumberland, Douglas and Edgar counties. Completion Date December 31, 2003. Howell Paving, Inc., Mattoon, $116,567.

110. Various Counties, Various Routes, District 8, Contract No. 76632, Weed control spraying along I-64, I-55/70, I-255, I-270 and IL 255 in various counties throughout District 8. Completion Date May 30, 2003. DeAngelo Brothers, Inc., Decatur, $77,488.

111. Cook County, Meacham Road, District 1, Contract No. 83634, 1.24 miles of pavement widening, resurfacing, roadway patching, storm sewers, traffic signals and landscaping on Meacham Road from IL 72 (Higgins Road) to Tower Road in Schaumburg. 110 Working Days. Plote Construction, Inc., Elgin, $4,041,419.

112. Cook County, Various Routes, District 1, Contract No. 83666, bituminous pavement reconstruction with curb and gutter, landscaping, storm sewer and other items incidental in completing the improvements to 142nd Street, 143rd Street, Lamon Avenue and Lavergne Avenue in Crestwood, Cook County. 100 Working Days. K-Five Construction Corp., Lemont, $1,481,835.

113. DeKalb County, IL 72, District 2, Contract No. 64567, 0.69 mile of pavement removal and replacement, addition of curb and gutter, storm sewer, widening of intersections and addition of bi-directional lanes on IL 72 from the west city limits to the east city limits in Kirkland. Completion Date November 26, 2003. Rockford Blacktop Construction Co., Loves Park, $2,882,755.

114. LaSalle County, OR 6, District 3, Contract No. 66280, 0.19 mile of pavement removal, aggregate base course and bituminous concrete resurfacing at the Oakwood/Rockwell Cemetery entrance located east of LaSalle. 25 Working Days. Johnson Blacktop, Inc., Elburn, $53,925.

115. McHenry County, West Main Street, District 1, Contract No. 83672, 0.4 mile of bituminous concrete pavement widening and resurfacing, water main, storm and sanitary sewer placement and other items incidental to completing the improvements to West Main Street from Bonnie Brae Road to IL 47 in Huntley. 55 Working Days. Johnson Blacktop, Inc., Elburn, $805,757.

116. McHenry County, McCullom Lake Road, District 1, Contract No. 83608, roadway realignment, box culvert, and resurfacing on McCullom Lake Road from East Wonder Lake Road to Ringwood Road in McHenry County. 85 Working Days. Thelen Sand & Gravel, Inc., Antioch, $875,500.

117. Pike County, I-72, District 6, Contract No. 72350, 29.46 miles of pavement patching, bituminous surface removal, bituminous concrete resurfacing, 10 ft and 8 ft bituminous shoulders, guardrail replacement, and bridge repairs on I-72 from northwest of Kinderhook east to the Illinois River bridge. Completion Date November 01, 2003. Chester Bross Construction Co., Hannibal, MO, $10,462,297.

118. WITHDRAWN

119. St. Clair County, Hartmann/West Highway 50, District 8, Contract No. 97189, 1,106 feet of widening, milling and resurfacing on West Highway 50, and 624 feet of pavement reconstruction on Hartman Lane in O'Fallon. The improvement also involves storm sewer, installation of traffic signals and building removal. 88 Working Days. Hank's Excavating & Landscaping, Inc., Belleville, $955,570.

120. Will County, Caton Farm Road, District 1, Contract No. 83645, 1.07 km bituminous pavement reconstruction, additional turn lanes, concrete curb and gutter, traffic signals at IL 59, drainage structures on Caton Farm Road from west of Pebble Beach Drive to east of Cryden Lane, west of Crest Hill. Completion Date November 30, 2003 Plus 35 Working Days. D. Construction, Inc., Coal City, $2,471,111.

121. Will County, Dixie Highway, District 1, Contract No. 83644, 1.7 miles of pavement widening, bituminous resurfacing, storm sewers, curb and gutter, traffic signals and landscaping Dixie Highway from Church Road to Indiana Avenue. Project includes work on Church Road at Dixie Highway and on Miller Street from Trim Creek to Dixie Highway in Beecher. 120 Working Days. Iroquois Paving Corp., Watseka, $2,576,757.

122. Edgar County, TR 317, District 5, Contract No. 91274, construction of a 3-span precast, prestressed concrete deck beam bridge carrying TR 317 over Sugar Creek in Edgar County. 110 Working Days. Feutz Contractors, Inc., Paris, $414,296.

123. Greene County, IL 16/100, District 8, Contract No. 76281, rehabilitation on the Joe Page Bridge carrying IL 16/100 over the Illinois River at Hardin. The work will include electrical and mechanical rehabilitation, deck replacement for the lift span, painting, installation of a new operator's house, a utility building and repairs to the fender system. Completion Date December 31, 2003. Keeley & Sons, Inc., East St. Louis, $13,698,743.

124. Lake County, Sheridan Road, District 1, Contract No. 60919, Superstructure removal and replacement, substructure repair and pavement resurfacing of the Sheridan Road bridge over Bovington and Middleton Ravines in Highland Park. Completion Date November 15, 2003 Plus 05 Working Days. L.B. Nugent, Inc. and Lindahl Brothers, Inc., St. Charles, $2,719,605.

125. Lake County, Deer Path Road, District 1, Contract No. 83665, bridge rehabilitation including demolition of the existing bridge superstructure carrying Deer Path Road over Skokie River in Lake Forest. 60 Working Days. Belvidere Construction Co., Belevidere, $871,340.

126. Marshall County, IL 17, District 4, Contract No. 68253, a 12" storm sewer across IL 17 to connect to an existing field tile west of Sparland. 15 Working Days. Otto Baum Co., Inc., Morton, $15,128.

127. Tazewell County, IL 29, District 4, Contract No. 68262, Placement of a storm sewer, a drop structure, earthwork and various erosion control items on IL 29 near Creve Coeur. 15 Working Days. Twin Builders Construction, Inc., Colchester, $48,924.

128. WITHDRAWN

129. Jackson County, US 51, District 9, Contract No. 98421, 0.9 kilometer of widening and resurfacing of the existing pavement; adding turn lanes, relocating Lincoln Drive, storm sewers, adding three lanes to Grand Avenue, signal upgrade and curb and gutter on US 51 from Mill Street to the SIU Physical Plant in Carbondale. 220 Working Days. E.T. Simonds Construction Co., Carbondale, $3,034,586.

130. Livingston County, IL 23, District 3, Contract No. 66255, 11.0 miles of bituminous concrete surface removal and resurfacing on IL 23 from Cornell to Pontiac. Completion Date July 01, 2003 Working Days. Trico Paving, Inc., Pontiac, $1,799,486.

131. WITHDRAWN

132. Cook County, Unmarked Route, District 1, Contract No. 83662, Construction of 4,940 feet of bituminous bike trail, stage 2, from Wheeling Road to Palatine Road and along Wolf Road and the widening of the West Frontage Bridge over Palatine Road in the Prospect Heights Park District. 25 Working Days. Thos. M. Madden Co., Carol Stream, $393,488.

133. Grundy County, Various Routes, District 3, Contract No. 66301, Miscellaneous pavement patching at various locations in Grundy County. Completion Date December 31, 2003. D. Construction, Inc., Coal City, $249,673.

134. Kane County, IL 47, District 1, Contract No. 62504, Crack and joint sealing on IL 47 from Plank Road to Plato Road, west of Elgin. 15 Working Days. Behm Pavement Maintenance, Inc., Crystal Lake, $27,770.

135. Various Counties, Various Routes, District 3, Contract No. 66298, Miscellaneous pavement patching at various locations throughout various counties on various marked routes. Completion Date December 31, 2003. No Bids Received.

136. Winnebago-Ogle Counties, US 20 & I-39, District 2, Contract No. 64792, Installation of changeable message signs at four (4) locations along US 20 and Interstate 39. 40 Working Days. Western Remac, Inc., Woodridge, $936,230.

1LR. LaSalle County, Reclamation of the Bents Mine, The proposed reclamation project is located on the north edge of Oglesby, adjacent to the Vermilion River. The work includes approximately 33,300 of earth excavation, 98,100 cu yds of mine refuse excavation, special excavation and filling of 2 mine shafts, 2,000 sq yds of stone riprap A-4 600 sq yds stone riprap A-3, 7,700 sq yds of erosion control blanket, and the seeding, mulch, and soil amendments for approximately 12 acres. A pre-bid meeting will be held at 10:00 a.m. Monday, January 13, 2003 at the site. Miller and Son Construction Co., Mackinaw, $306,965.

2LR. Menard County, Reclamation of Lincoln Coal Mine Group, The proposed reclamation project includes four abandoned mine sites located in Menard County. The proposed work requires the removal of concrete cap or exploratory excavation (659 C.Y. Special Excavation) of settled fill materials in previously filled shafts. The project also provides for the shafts to be filled and resealed with a combination of soil furnished by the Contractor (406 C.Y. of Borrow Excavation) and crushed limestone fill materials (1,317 tons). The project also includes 0.8 acres of seeding, McIntire & Co., Contractors, Winchester, $60,291.

###