Illinois Department of Transportation, Erica Borggren, Acting Secretary
Loading
Patrick J. Quinn, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info


HOME

Frequently Asked Questions

Q: When should I expect traffic backups?
A: Temporary lane closures will occur on an as needed basis from 9:00AM-3:30PM on Monday thru Friday, and none on the weekends. Traffic backups are expected when the contractor switches traffic to start staged construction. Temporary Changeable Message Boards will be installed to alert the motoring public on upcoming work.

Q: Will access to my business remain open during construction?
A: Access to each property will remain open at all times during construction. When we move traffic into staged construction, if a property has two driveways, the contractor will provide access to the property through one of the driveways while the other is being constructed. Every driveway will be wide enough to handle two-way traffic throughout construction. If a property only has one driveway, it will be temporarily widened during construction while the new driveway is constructed. Again, two-way traffic will be maintained at all times.

Q: Will the mailbox's along the roadway be replaced?
A: In coordination with the Post Office, mailboxes that are in conflict with construction will be relocated as close to the original location as possible. Mail service will not be interrupted throughout the entire construction process.

Q: When will this project be complete?
A: The completion date for this project is Fall 2012.

Q: Will there be impacts to the motoring public?
A: Increased traffic volumes, stress and deterioration of IL Route 56 (Butterfield Road) is in need of repair and reconstruction is needed to restore a smooth, safe ride for the motoring public. Major impacts to the motoring public are anticipated. IDOT appreciates your patience and urges the motoring public to begin to take necessary steps like alternate route planning, car pooling, flexible work schedules, and public transportation to avoid traffic.

Q: Will there be sidewalks and bikeways maintained throughout the project?
A: Yes, sidewalks and bikeways will be accessible throughout the project duration.

Q: Will there be impacts to the Forest Preserve Facilities?
A: Yes, the Forest Preserve entrances are scheduled to be reconstructed in conjunction with the IL Route 56 project. However, access will be maintained at all times.

Q: During construction can my Horse cross IL 56?
A: The equestrian trail will be accessible and maintained at all times.

Q: Will residents be notified in advance of when the streets will be closed?
A: Yes. Local Access will be maintained at all times. Information on impacts to the streets will be relayed periodically to the businesses and residents through postings through this website, by distribution of flyers or meetings.

Q: Will the project affect services currently provided by the police, fire, & EMS departments?
A: No. At all times access for emergency related vehicles will be maintained so construction will not affect those services.

Q: Will my trash services be interrupted?
A: No.
 

ILLINOIS 56
RECONSTRUCTION


Home
Project Overview
Site Map
Photo Gallery
Media
FAQ
Contact Us
IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA