The study's traffic projections show that (if a roadway facility is placed in the corridor) 15,000 to 48,000 vehicles could use the corridor each day.  This is not "new" traffic but represents vehicles being "removed" from existing routes, thereby reducing congestion on existing roadways.  These projections also show that most people who would use the corridor would be making local trips rather than motorists traveling straight through the corridor.

close window