ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 03/01/02 10:48:07 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 01/18/2002 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 98728 LETTING ITEM NUMBER: 100 RESPONSIBLE DISTRICT: 09 BIDS LOCKED: Y SECTION: D9 CONT. MAINT. FY2002-2 COUNTY: WILLIAMSON ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 3045 George E. Jones Excavating, L.L.C. NO ALT 227,928.81 227,928.81 227,928.81 5550 E. T. Simonds Construction Company NO ALT 220,511.23 * 220,511.23 220,511.23 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 54 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF X0322902 SAW CUTTING (PD) 13,583.000 FOOT 3045 George E. Jones Excavating, L.L.C. 1.4500 19,695.35 19,695.35 5550 E. T. Simonds Construction Company 1.0000 13,583.00 13,583.00 X0322904 PCC OVERLAY 3 2,322.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 22.0000 51,084.00 51,084.00 5550 E. T. Simonds Construction Company 19.8500 46,091.70 46,091.70 X0323581 REMOVING SAN SEWER 1.000 L SUM 3045 George E. Jones Excavating, L.L.C. 200.0000 200.00 200.00 5550 E. T. Simonds Construction Company 1,340.0700 1,340.07 1,340.07 Z0017202 DOWEL BARS 1 1/2 32.000 EACH 3045 George E. Jones Excavating, L.L.C. 15.0000 480.00 480.00 5550 E. T. Simonds Construction Company 12.5000 400.00 400.00 Z0041500 PLUG EX CULVERTS 1.000 EACH 3045 George E. Jones Excavating, L.L.C. 10,100.0000 10,100.00 10,100.00 5550 E. T. Simonds Construction Company 11,559.0600 11,559.06 11,559.06 Z0075310 TIE BARS 3/4 222.000 EACH 3045 George E. Jones Excavating, L.L.C. 9.0000 1,998.00 1,998.00 5550 E. T. Simonds Construction Company 6.5000 1,443.00 1,443.00 20700110 POROUS GRAN EMBANK 1,144.000 TON 3045 George E. Jones Excavating, L.L.C. 12.5000 14,300.00 14,300.00 5550 E. T. Simonds Construction Company 12.9500 14,814.80 14,814.80 40600990 TEMPORARY RAMP 85.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 45.0000 3,825.00 3,825.00 5550 E. T. Simonds Construction Company 5.0000 425.00 425.00 42001200 PAVEMENT FABRIC 295.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 5.0000 1,475.00 1,475.00 5550 E. T. Simonds Construction Company 7.5000 2,212.50 2,212.50 42001300 PROTECTIVE COAT 31.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 1.0000 31.00 31.00 5550 E. T. Simonds Construction Company 3.0000 93.00 93.00 42300300 PCC DRIVEWAY PAVT 7 43.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 36.2500 1,558.75 1,558.75 5550 E. T. Simonds Construction Company 59.6400 2,564.52 2,564.52 42400100 PC CONC SIDEWALK 4 522.000 SQ FT 3045 George E. Jones Excavating, L.L.C. 5.2500 2,740.50 2,740.50 5550 E. T. Simonds Construction Company 4.7500 2,479.50 2,479.50 44000007 BIT SURF REM 2 2,207.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 4.2500 9,379.75 9,379.75 5550 E. T. Simonds Construction Company 3.4600 7,636.22 7,636.22 44000030 BIT SURF REM VAR DP 315.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 8.0000 2,520.00 2,520.00 5550 E. T. Simonds Construction Company 4.0000 1,260.00 1,260.00 44000200 DRIVE PAVEMENT REM 57.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 10.0000 570.00 570.00 5550 E. T. Simonds Construction Company 5.0000 285.00 285.00 44000500 COMB CURB GUTTER REM 99.000 FOOT 3045 George E. Jones Excavating, L.L.C. 6.0000 594.00 594.00 5550 E. T. Simonds Construction Company 3.0000 297.00 297.00 44000600 SIDEWALK REM 440.000 SQ FT 3045 George E. Jones Excavating, L.L.C. 2.7000 1,188.00 1,188.00 5550 E. T. Simonds Construction Company 1.0000 440.00 440.00 44200976 CL B PATCH T4 10 295.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 51.0000 15,045.00 15,045.00 5550 E. T. Simonds Construction Company 65.0000 19,175.00 19,175.00 44201771 CL D PATCH T4 10 103.000 SQ YD 3045 George E. Jones Excavating, L.L.C. 156.0000 16,068.00 16,068.00 5550 E. T. Simonds Construction Company 105.8000 10,897.40 10,897.40 44213200 SAW CUTS 305.000 FOOT 3045 George E. Jones Excavating, L.L.C. 5.0000 1,525.00 1,525.00 5550 E. T. Simonds Construction Company 3.2500 991.25 991.25 50100300 REM EXIST STRUCT N1 1.000 EACH 3045 George E. Jones Excavating, L.L.C. 2,500.0000 2,500.00 2,500.00 5550 E. T. Simonds Construction Company 7,455.7700 7,455.77 7,455.77 50800205 REINF BARS, EPOXY CTD 1,450.000 POUND 3045 George E. Jones Excavating, L.L.C. 2.0000 2,900.00 2,900.00 5550 E. T. Simonds Construction Company 1.0000 1,450.00 1,450.00 54002020 EXPAN BOLTS 3/4 124.000 EACH 3045 George E. Jones Excavating, L.L.C. 10.0000 1,240.00 1,240.00 5550 E. T. Simonds Construction Company 18.5000 2,294.00 2,294.00 54248510 CONCRETE COLLAR .600 CU YD 3045 George E. Jones Excavating, L.L.C. 400.0000 240.00 240.00 5550 E. T. Simonds Construction Company 750.0000 450.00 450.00 550A0050 STORM SEW CL A 1 12 20.000 FOOT 3045 George E. Jones Excavating, L.L.C. 43.0000 860.00 860.00 5550 E. T. Simonds Construction Company 83.6500 1,673.00 1,673.00 550A0070 STORM SEW CL A 1 15 4.000 FOOT 3045 George E. Jones Excavating, L.L.C. 68.0000 272.00 272.00 5550 E. T. Simonds Construction Company 104.6800 418.72 418.72 550A0120 STORM SEW CL A 1 24 99.000 FOOT 3045 George E. Jones Excavating, L.L.C. 46.0000 4,554.00 4,554.00 5550 E. T. Simonds Construction Company 47.1000 4,662.90 4,662.90 55100700 STORM SEWER REM 15 58.000 FOOT 3045 George E. Jones Excavating, L.L.C. 14.0000 812.00 812.00 5550 E. T. Simonds Construction Company 22.9100 1,328.78 1,328.78 56300200 ADJ SAN SEWER OVER 8 53.000 FOOT 3045 George E. Jones Excavating, L.L.C. 46.2500 2,451.25 2,451.25 5550 E. T. Simonds Construction Company 75.0000 3,975.00 3,975.00 60243300 INLETS SPL T3 5 4.000 EACH 3045 George E. Jones Excavating, L.L.C. 1,560.0000 6,240.00 6,240.00 5550 E. T. Simonds Construction Company 1,595.5600 6,382.24 6,382.24 60255500 MAN ADJUST 6.000 EACH 3045 George E. Jones Excavating, L.L.C. 500.0000 3,000.00 3,000.00 5550 E. T. Simonds Construction Company 350.0000 2,100.00 2,100.00 60265700 VV ADJUST 2.000 EACH 3045 George E. Jones Excavating, L.L.C. 700.0000 1,400.00 1,400.00 5550 E. T. Simonds Construction Company 250.0000 500.00 500.00 60500040 REMOV MANHOLES 3.000 EACH 3045 George E. Jones Excavating, L.L.C. 500.0000 1,500.00 1,500.00 5550 E. T. Simonds Construction Company 450.0000 1,350.00 1,350.00 60500060 REMOV INLETS 4.000 EACH 3045 George E. Jones Excavating, L.L.C. 500.0000 2,000.00 2,000.00 5550 E. T. Simonds Construction Company 450.0000 1,800.00 1,800.00 60605000 COMB CC&G TB6.24 91.000 FOOT 3045 George E. Jones Excavating, L.L.C. 27.0000 2,457.00 2,457.00 5550 E. T. Simonds Construction Company 38.2600 3,481.66 3,481.66 67000400 ENGR FIELD OFFICE A 3.000 CAL MO 3045 George E. Jones Excavating, L.L.C. 1,000.0000 3,000.00 3,000.00 5550 E. T. Simonds Construction Company 1,250.0000 3,750.00 3,750.00 67100100 MOBILIZATION 1.000 L SUM 3045 George E. Jones Excavating, L.L.C. 2,500.0000 2,500.00 2,500.00 5550 E. T. Simonds Construction Company 2,250.0000 2,250.00 2,250.00 70101800 TRAF CONT & PROT SPL 1.000 L SUM 3045 George E. Jones Excavating, L.L.C. 2,900.0000 2,900.00 2,900.00 5550 E. T. Simonds Construction Company 8,750.0000 8,750.00 8,750.00 70102620 TR CONT & PROT 701501 1.000 L SUM 3045 George E. Jones Excavating, L.L.C. 3,200.0000 3,200.00 3,200.00 5550 E. T. Simonds Construction Company 500.0000 500.00 500.00 70102640 TR CONT & PROT 701801 1.000 L SUM 3045 George E. Jones Excavating, L.L.C. 1,200.0000 1,200.00 1,200.00 5550 E. T. Simonds Construction Company 3,624.3600 3,624.36 3,624.36 70300100 SHORT-TERM PAVT MKING 100.000 FOOT 3045 George E. Jones Excavating, L.L.C. 1.5000 150.00 150.00 5550 E. T. Simonds Construction Company 0.6500 65.00 65.00 70300210 TEMP PVT MK LTR & SYM 212.000 SQ FT 3045 George E. Jones Excavating, L.L.C. 4.2000 890.40 890.40 5550 E. T. Simonds Construction Company 0.0000 0.00 0.00 70300220 TEMP PVT MK LINE 4 2,513.000 FOOT 3045 George E. Jones Excavating, L.L.C. 0.6500 1,633.45 1,633.45 5550 E. T. Simonds Construction Company 0.0000 0.00 0.00 70300250 TEMP PVT MK LINE 8 175.000 FOOT 3045 George E. Jones Excavating, L.L.C. 2.1000 367.50 367.50 5550 E. T. Simonds Construction Company 0.0000 0.00 0.00 70300260 TEMP PVT MK LINE 12 210.000 FOOT 3045 George E. Jones Excavating, L.L.C. 4.2000 882.00 882.00 5550 E. T. Simonds Construction Company 0.0000 0.00 0.00 70300280 TEMP PVT MK LINE 24 72.000 FOOT 3045 George E. Jones Excavating, L.L.C. 8.4000 604.80 604.80 5550 E. T. Simonds Construction Company 0.0000 0.00 0.00 70301000 WORK ZONE PAVT MK REM 34.000 SQ FT 3045 George E. Jones Excavating, L.L.C. 10.0000 340.00 340.00 5550 E. T. Simonds Construction Company 0.0000 0.00 0.00 78005100 EPOXY PVT MK LTR-SYM 212.000 SQ FT 3045 George E. Jones Excavating, L.L.C. 10.0000 2,120.00 2,120.00 5550 E. T. Simonds Construction Company 4.9900 1,057.88 1,057.88 78005110 EPOXY PVT MK LINE 4 2,429.000 FOOT 3045 George E. Jones Excavating, L.L.C. 2.5000 6,072.50 6,072.50 5550 E. T. Simonds Construction Company 3.6800 8,938.72 8,938.72 78005140 EPOXY PVT MK LINE 8 175.000 FOOT 3045 George E. Jones Excavating, L.L.C. 5.0000 875.00 875.00 5550 E. T. Simonds Construction Company 3.9400 689.50 689.50 78005150 EPOXY PVT MK LINE 12 210.000 FOOT 3045 George E. Jones Excavating, L.L.C. 7.5000 1,575.00 1,575.00 5550 E. T. Simonds Construction Company 4.2000 882.00 882.00 78005180 EPOXY PVT MK LINE 24 72.000 FOOT 3045 George E. Jones Excavating, L.L.C. 15.0000 1,080.00 1,080.00 5550 E. T. Simonds Construction Company 4.9900 359.28 359.28 78300400 TH-PL PAVT MK REMOV 1,456.000 SQ FT 3045 George E. Jones Excavating, L.L.C. 3.0000 4,368.00 4,368.00 5550 E. T. Simonds Construction Company 3.1500 4,586.40 4,586.40 88600100 DET LOOP T1 596.000 FOOT 3045 George E. Jones Excavating, L.L.C. 12.3600 7,366.56 7,366.56 5550 E. T. Simonds Construction Company 13.0000 7,748.00 7,748.00