Illinois Department of Transportation, Ann L. Schneider, Secretary
Loading
Patrick J. Quinn, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info



BDE Special Provisions
Bureau of Design & Environment  Special Provisions for use
For The April 26 and June 14, 2013 Lettings

HOW TO USE PDF FILES: View a file: click the link with the left mouse button. Download a file: click the link with the right mouse button, then choose "save target as.

Name

Effective
Date
Revised
Date
April 26 and June 14, 2013 Check Sheet    
Above Grade Inlet Protection 07/01/09 01/01/12
Accessible Pedestrian Signals (APS)
04/01/03
01/01/07
Aggregate Subgrade Improvement 04/01/12 01/01/13
Anchor Bolts 01/01/13  
Automated Flagger Assistance Device 01/01/08  
Bituminous Materials Cost Adjustments 11/02/06 01/01/12
Bridge Demolition Debris 07/01/09  
Bridge Relief Joint Sealer 01/01/12 08/01/12
Building Removal – Case I (Non-Friable and Friable Asbestos)
09/01/90
04/01/10
Building Removal – Case II (Non-Friable Asbestos)
09/01/90
04/01/10
Building Removal – Case III (Friable Asbestos) 
09/01/90
04/01/10
Building Removal – Case IV (No Asbestos)
09/01/90
04/01/10
Coarse Aggregate in Bridge Approach Slabs/Footings 04/01/12 04/01/13
Coated Galvanized Steel Conduit 01/01/13  
Completion Date (via calendar days) 04/01/08  
Completion Date (via calendar days) Plus Working Days 04/01/08  
Concrete Box Culverts with Skews > 30 Degrees and Design Fills ≤ 5 Feet 04/01/12  
Concrete Box Culverts with Skews ≤ 30 Degrees Regardless of Design Fill and Skews > 30 Degrees with Design Fills > 5 Feet 04/01/12  
Concrete End Sections for Pipe Culverts 01/01/13  
Concrete Mix Design – Department Provided 01/01/12  
Construction Air Quality – Diesel Retrofit 07/01/10  
Disadvantaged Business Enterprise Participation
09/01/00

08/02/11

Drain Pipe, Tile, Drainage Mat, and Wall Drain 01/01/13  
Fabric Bearing Pads 01/01/13  
Friction Aggregate 01/01/11  
Fuel Cost Adjustment 04/01/09 07/07/09
Granular Materials 11/01/12  
Grooving for Recessed Pavement Markings 11/01/12 01/01/13
High Tension Cable Median Barrier 01/01/07 01/01/13
Hot-Mix Asphalt – Density Testing of Longitudinal Joints 01/01/10 04/01/12
Insertion Lining of Culverts 01/01/13  
Liquidated Damages 04/01/13  
Material Transfer Device
06/15/99
01/01/09
Modified Urethane Pavement Marking 04/01/12  
Moisture Cured Urethane Paint System

11/01/06

01/01/10
Movable Traffic Barrier System 01/01/10 01/01/13
Pavement Marking Removal 04/01/09  
Pavement Marking Tape Type IV 04/01/12  
Pavement Patching 01/01/10  
Pavement Removal 04/01/13  
Payments to Subcontractors
06/01/00

01/01/06

Placing Consolidating Concrete 01/01/13  
Planting Woody Plants 01/01/12 08/01/12
Polyurea Pavement Markings 11/01/12 01/01/13
Portland Cement Concrete 01/01/12 01/01/13
Preformed Plastic Pavement Marking Type D - Inlaid 04/01/12  
Preventive Maintenance – Bituminous Surface Treatment 01/01/09 04/01/12
Preventive Maintenance – Cape Seal 01/01/09 04/01/12
Preventive Maintenance – Micro-Surfacing 01/01/09 04/01/12
Preventive Maintenance – Slurry Seal 01/01/09 04/01/12
Quality Control/Quality Assurance of Concrete Mixtures 01/01/12 01/01/13
Railroad Protective Liability Insurance
12/01/86
01/01/06
Railroad Protective Liability Insurance (5 and 10)

01/01/06

 
Reclaimed Asphalt Pavement (RAP) and Reclaimed Asphalt Shingles (RAS)
(NOTE: The special provisions “Reclaimed Asphalt Pavement (RAP)” and “Reclaimed Asphalt Shingles (RAS)” were combined to create this special provision.
11/01/12 01/01/13
Removal and Disposal of Regulated Substances 01/01/12 11/02/12
Removal and Disposal of Surplus Materials 11/02/12  
Restoring Bridge Approach Pavements Using High-Density Foam 01/01/09 01/01/12
Safety Edge 04/01/11  
Seeding 11/01/12  
Steel Cost Adjustment
04/02/04
04/01/09
Stone Matrix Asphalt 01/01/10 01/01/12
Subcontractor Mobilization Payments

04/02/05

04/01/11
Surface Testing of Hot-Mix Asphalt Overlays (NOTE: This special provision was previously named “Surface Testing of Pavements”.) 01/01/13  
Synthetic Fibers in Concrete Gutter, Curb, Median and Paved Ditch 11/01/12  
Temporary Erosion and Sediment Control 01/01/12  
Temporary Raised Pavement Marker 01/01/09  
Temporary Water Filled Barrier 01/01/10 01/01/13
Tracking the Use of Pesticides 08/01/12  
Traffic Control Deficiency Deduction 08/01/11  
Training Special Provisions
10/15/75
 
Traversable Pipe Grate 01/01/13 04/01/13
Utility Coordination and Conflicts 04/01/11 01/01/12
Warm Mix Asphalt 01/01/12 11/01/12
Weekly DBE Trucking Reports 06/02/12  
Wet Reflective Thermoplastic Pavement Marking 01/01/12  
Working Days
01/01/02
 
Download all Special Provisions (.pdf file)(1.1 mb)

Technical Support: 217-524-1642 null

IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA