Contracts and Plans

Contract #1      April 25, 2003 IDOT Letting

Item 163       Contract No. 98629                       Saline County           District 9

DISTRICT 9 CONSTRUCTION FUNDS  (Contract Includes Wetland Construction)       

1.21 miles at widening and resurfacing, earth excavation and embankment, combination curb and gutter with enclosed drainage and shoulder removal and replacement to provide additional lanes on U.S. Route 45 beginning north of IL Route 15 in Harrisburg and extending northeast. Also, included are new traffic signals and new concrete pavement at the intersection of U.S. Route 45 with IL Route 13, Seright Street and Small Street; includes 6,771 ft storm sewers; 2,181 ft pipe underdrains; 805 ft concrete curb; 14,260 ft combination concrete curb and gutter; 348 ft guardrail removal; 1,723 ft thermoplastic pavement marking line; 7,973 ft paint pavement marking line; 22,968 ft polyurea pavement marking line; 500 raised reflective pavement markers; 1,708 ft conduit in trench; 9,460 ft electric cable in conduit; 3,600 sq yds bituminous shoulders, SUPERPAVE; 4 steel mast arm assemblies and poles; 4 steel combination mast arm assemblies and poles; 134 ft concrete foundations; 24 inductive loop detectors; 2,800 ft detector loop; 200 intermediate trees; 600 shrubs; 1,065 seedling trees; 7,049 tons material transfer device; 2 removal of existing signal systems; 2,650 tons polymerized bituminous concrete surface course, SUPERPAVE, Mix D, N 90; 5,182 tons bituminous concrete binder course, SUPERPAVE, IL-19.0, N 90; 5,087 tons polymerized bituminous concrete binder course, SUPERPAVE, IL-19.0, N 90; 1,573 sq yds bituminous concrete binder course, SUPERPAVE, IL-19.0, N 90, 8 inch; 17,480 sq yds bituminous concrete binder course, SUPERPAVE, IL-19.0, N 90, 13 inch; 5,282 sq yds polymerized bituminous concrete binder course, SUPERPAVE, IL-19.0, N 90, 8 inch; 29 signal heads; 2 building removals; 368 ft sanitary sewers; 42,993 cu yds earth excavation; 85,015 cu yds borrow excavation; 9,485 sq yds bituminous surface removal; 16,950 sq yds pavement removal; 331 sq yds bituminous concrete pavement patches; mobilization; traffic control and protection. (Completion Date: December 01, 2004) (Job No. C-99-049-01) (9-90830-0300)


IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA