ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 12/17/10 13:11:08 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 11/05/2010 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 91430 LETTING ITEM NUMBER: 039 RESPONSIBLE DISTRICT: 05 BIDS LOCKED: Y SECTION: 06-00230-00-BR COUNTY: MCLEAN ESTIMATE: STATE JOB NUMBER: C-95-313-10 MUNICIPALITY: NORMAL PROJECT NUMBER: BRM-5227/055/000 -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0335 Otto Baum Company, Inc. NO ALT 2,032,276.09 2,032,276.09 2,032,276.09 5672 Stark Excavating, Inc. NO ALT 1,849,626.78 * 1,849,626.78 1,849,626.78 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 107 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF XX004812 VIDEO TAPE OF SEWERS 200.000 FOOT 0335 Otto Baum Company, Inc. 4.0000 800.00 800.00 5672 Stark Excavating, Inc. 2.3000 460.00 460.00 XX007452 RELOCATE BOLLARDS 2.000 EACH 0335 Otto Baum Company, Inc. 236.0000 472.00 472.00 5672 Stark Excavating, Inc. 700.0000 1,400.00 1,400.00 XX007524 GATE VALVE & BOX 10" 3.000 EACH 0335 Otto Baum Company, Inc. 2,531.0000 7,593.00 7,593.00 5672 Stark Excavating, Inc. 1,420.0000 4,260.00 4,260.00 XX008405 D I WM 10 RJ 235.000 FOOT 0335 Otto Baum Company, Inc. 174.0000 40,890.00 40,890.00 5672 Stark Excavating, Inc. 146.0000 34,310.00 34,310.00 X0323491 SLOPE WALL CRACK SEAL 400.000 FOOT 0335 Otto Baum Company, Inc. 11.0000 4,400.00 4,400.00 5672 Stark Excavating, Inc. 8.6000 3,440.00 3,440.00 X0325365 RD INLET TYB T8 GRATE 2.000 EACH 0335 Otto Baum Company, Inc. 123.0000 246.00 246.00 5672 Stark Excavating, Inc. 1,228.0000 2,456.00 2,456.00 X0325846 ABAND EX WATER MAIN 1.000 L SUM 0335 Otto Baum Company, Inc. 5,288.0000 5,288.00 5,288.00 5672 Stark Excavating, Inc. 1,364.0000 1,364.00 1,364.00 X0469600 CONN TO EX WATER MAIN 3.000 EACH 0335 Otto Baum Company, Inc. 2,233.0000 6,699.00 6,699.00 5672 Stark Excavating, Inc. 735.0000 2,205.00 2,205.00 X2070304 POROUS GRAN EMB SPEC 114.000 CU YD 0335 Otto Baum Company, Inc. 58.0000 6,612.00 6,612.00 5672 Stark Excavating, Inc. 44.0000 5,016.00 5,016.00 X5020501 UNWAT STR EX PROT L1 1.000 EACH 0335 Otto Baum Company, Inc. 15,000.0000 15,000.00 15,000.00 5672 Stark Excavating, Inc. 9,781.0000 9,781.00 9,781.00 X5020502 UNWAT STR EX PROT L2 1.000 EACH 0335 Otto Baum Company, Inc. 15,000.0000 15,000.00 15,000.00 5672 Stark Excavating, Inc. 9,781.0000 9,781.00 9,781.00 X5030550 PROTECTIVE COAT SPL 1,250.000 SQ YD 0335 Otto Baum Company, Inc. 2.5000 3,125.00 3,125.00 5672 Stark Excavating, Inc. 2.4000 3,000.00 3,000.00 X5091725 BICYCLE RAILING SPL 162.000 FOOT 0335 Otto Baum Company, Inc. 222.0000 35,964.00 35,964.00 5672 Stark Excavating, Inc. 198.0000 32,076.00 32,076.00 X5091755 PARAPET RAILING SPL 133.000 FOOT 0335 Otto Baum Company, Inc. 113.0000 15,029.00 15,029.00 5672 Stark Excavating, Inc. 101.0000 13,433.00 13,433.00 X5640150 FIRE HYDNT ASSY COMP 1.000 EACH 0335 Otto Baum Company, Inc. 4,800.0000 4,800.00 4,800.00 5672 Stark Excavating, Inc. 3,060.0000 3,060.00 3,060.00 X6020127 RD INLET TY B T3V F&G 6.000 EACH 0335 Otto Baum Company, Inc. 1,462.0000 8,772.00 8,772.00 5672 Stark Excavating, Inc. 1,400.0000 8,400.00 8,400.00 Z0001900 ASB BEARING PAD REMOV 4.000 EACH 0335 Otto Baum Company, Inc. 210.0000 840.00 840.00 5672 Stark Excavating, Inc. 44.0000 176.00 176.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0335 Otto Baum Company, Inc. 16,000.0000 16,000.00 16,000.00 5672 Stark Excavating, Inc. 10,044.0000 10,044.00 10,044.00 Z0018002 DRAINAGE SCUPPR DS-11 4.000 EACH 0335 Otto Baum Company, Inc. 756.0000 3,024.00 3,024.00 5672 Stark Excavating, Inc. 844.0000 3,376.00 3,376.00 Z0026407 TEMP SHT PILING 170.000 SQ FT 0335 Otto Baum Company, Inc. 58.0000 9,860.00 9,860.00 5672 Stark Excavating, Inc. 50.0000 8,500.00 8,500.00 Z0030250 IMP ATTN TEMP NRD TL3 2.000 EACH 0335 Otto Baum Company, Inc. 4,000.0000 8,000.00 8,000.00 5672 Stark Excavating, Inc. 3,570.0000 7,140.00 7,140.00 Z0030350 IMP ATTN REL NRD TL3 1.000 EACH 0335 Otto Baum Company, Inc. 400.0000 400.00 400.00 5672 Stark Excavating, Inc. 350.0000 350.00 350.00 Z0056648 SS 1 WAT MN 12 111.000 FOOT 0335 Otto Baum Company, Inc. 112.0000 12,432.00 12,432.00 5672 Stark Excavating, Inc. 57.0000 6,327.00 6,327.00 Z0056650 SS 1 WAT MN 15 15.000 FOOT 0335 Otto Baum Company, Inc. 130.0000 1,950.00 1,950.00 5672 Stark Excavating, Inc. 75.0000 1,125.00 1,125.00 Z0056672 SS 2 WAT MN 24 22.000 FOOT 0335 Otto Baum Company, Inc. 296.0000 6,512.00 6,512.00 5672 Stark Excavating, Inc. 149.0000 3,278.00 3,278.00 Z0077700 WOOD FENCE REM & RE-E 188.000 FOOT 0335 Otto Baum Company, Inc. 28.0000 5,264.00 5,264.00 5672 Stark Excavating, Inc. 5.0000 940.00 940.00 20100110 TREE REMOV 6-15 28.000 UNIT 0335 Otto Baum Company, Inc. 34.0000 952.00 952.00 5672 Stark Excavating, Inc. 23.0000 644.00 644.00 20100210 TREE REMOV OVER 15 42.000 UNIT 0335 Otto Baum Company, Inc. 40.0000 1,680.00 1,680.00 5672 Stark Excavating, Inc. 29.0000 1,218.00 1,218.00 20200100 EARTH EXCAVATION 3,475.000 CU YD 0335 Otto Baum Company, Inc. 25.0000 86,875.00 86,875.00 5672 Stark Excavating, Inc. 16.8000 58,380.00 58,380.00 20201200 REM & DISP UNS MATL 320.000 CU YD 0335 Otto Baum Company, Inc. 15.0000 4,800.00 4,800.00 5672 Stark Excavating, Inc. 17.0000 5,440.00 5,440.00 20300100 CHANNEL EXCAVATION 50.000 CU YD 0335 Otto Baum Company, Inc. 15.0000 750.00 750.00 5672 Stark Excavating, Inc. 23.0000 1,150.00 1,150.00 21000300 GRAN EMBANK SPEC 660.000 TON 0335 Otto Baum Company, Inc. 30.0000 19,800.00 19,800.00 5672 Stark Excavating, Inc. 23.8000 15,708.00 15,708.00 21001000 GEOTECH FAB F/GR STAB 950.000 SQ YD 0335 Otto Baum Company, Inc. 1.8000 1,710.00 1,710.00 5672 Stark Excavating, Inc. 1.7000 1,615.00 1,615.00 21101615 TOPSOIL F & P 4 2,170.000 SQ YD 0335 Otto Baum Company, Inc. 6.5000 14,105.00 14,105.00 5672 Stark Excavating, Inc. 5.6000 12,152.00 12,152.00 25000110 SEEDING CL 1A .700 ACRE 0335 Otto Baum Company, Inc. 2,800.0000 1,960.00 1,960.00 5672 Stark Excavating, Inc. 2,490.0000 1,743.00 1,743.00 25000400 NITROGEN FERT NUTR 63.000 POUND 0335 Otto Baum Company, Inc. 4.8000 302.40 302.40 5672 Stark Excavating, Inc. 4.3000 270.90 270.90 25000500 PHOSPHORUS FERT NUTR 63.000 POUND 0335 Otto Baum Company, Inc. 4.8000 302.40 302.40 5672 Stark Excavating, Inc. 4.3000 270.90 270.90 25000600 POTASSIUM FERT NUTR 63.000 POUND 0335 Otto Baum Company, Inc. 4.8000 302.40 302.40 5672 Stark Excavating, Inc. 4.3000 270.90 270.90 25100115 MULCH METHOD 2 .700 ACRE 0335 Otto Baum Company, Inc. 5,100.0000 3,570.00 3,570.00 5672 Stark Excavating, Inc. 4,596.0000 3,217.20 3,217.20 25200200 SUPPLE WATERING 55.000 UNIT 0335 Otto Baum Company, Inc. 84.0000 4,620.00 4,620.00 5672 Stark Excavating, Inc. 76.0000 4,180.00 4,180.00 28000250 TEMP EROS CONTR SEED 70.000 POUND 0335 Otto Baum Company, Inc. 4.0000 280.00 280.00 5672 Stark Excavating, Inc. 4.0000 280.00 280.00 28000400 PERIMETER EROS BAR 600.000 FOOT 0335 Otto Baum Company, Inc. 4.0000 2,400.00 2,400.00 5672 Stark Excavating, Inc. 5.0000 3,000.00 3,000.00 28000500 INLET & PIPE PROTECT 3.000 EACH 0335 Otto Baum Company, Inc. 112.5000 337.50 337.50 5672 Stark Excavating, Inc. 135.0000 405.00 405.00 28000510 INLET FILTERS 21.000 EACH 0335 Otto Baum Company, Inc. 140.0000 2,940.00 2,940.00 5672 Stark Excavating, Inc. 180.0000 3,780.00 3,780.00 31200100 STAB SUBBASE 4 520.000 SQ YD 0335 Otto Baum Company, Inc. 15.0000 7,800.00 7,800.00 5672 Stark Excavating, Inc. 11.9000 6,188.00 6,188.00 35101100 AGG BASE CSE A 12 4,720.000 SQ YD 0335 Otto Baum Company, Inc. 16.0000 75,520.00 75,520.00 5672 Stark Excavating, Inc. 17.6000 83,072.00 83,072.00 40201000 AGGREGATE-TEMP ACCESS 150.000 TON 0335 Otto Baum Company, Inc. 31.0000 4,650.00 4,650.00 5672 Stark Excavating, Inc. 45.0000 6,750.00 6,750.00 42000301 PCC PVT 8 JOINTED 3,632.000 SQ YD 0335 Otto Baum Company, Inc. 48.0000 174,336.00 174,336.00 5672 Stark Excavating, Inc. 49.0000 177,968.00 177,968.00 42001300 PROTECTIVE COAT 4,538.000 SQ YD 0335 Otto Baum Company, Inc. 1.5000 6,807.00 6,807.00 5672 Stark Excavating, Inc. 0.0100 45.38 45.38 42001420 BR APPR PVT CON (PCC) 448.000 SQ YD 0335 Otto Baum Company, Inc. 140.0000 62,720.00 62,720.00 5672 Stark Excavating, Inc. 99.0000 44,352.00 44,352.00 42300200 PCC DRIVEWAY PAVT 6 43.000 SQ YD 0335 Otto Baum Company, Inc. 86.0000 3,698.00 3,698.00 5672 Stark Excavating, Inc. 71.0000 3,053.00 3,053.00 42400300 PC CONC SIDEWALK 6 6,090.000 SQ FT 0335 Otto Baum Company, Inc. 6.0000 36,540.00 36,540.00 5672 Stark Excavating, Inc. 7.0000 42,630.00 42,630.00 42400800 DETECTABLE WARNINGS 88.000 SQ FT 0335 Otto Baum Company, Inc. 30.0000 2,640.00 2,640.00 5672 Stark Excavating, Inc. 31.0000 2,728.00 2,728.00 44000100 PAVEMENT REM 3,973.000 SQ YD 0335 Otto Baum Company, Inc. 10.0000 39,730.00 39,730.00 5672 Stark Excavating, Inc. 8.3000 32,975.90 32,975.90 44000200 DRIVE PAVEMENT REM 39.000 SQ YD 0335 Otto Baum Company, Inc. 17.0000 663.00 663.00 5672 Stark Excavating, Inc. 9.8000 382.20 382.20 44000500 COMB CURB GUTTER REM 1,737.000 FOOT 0335 Otto Baum Company, Inc. 3.5000 6,079.50 6,079.50 5672 Stark Excavating, Inc. 4.3000 7,469.10 7,469.10 44000600 SIDEWALK REM 5,788.000 SQ FT 0335 Otto Baum Company, Inc. 2.1000 12,154.80 12,154.80 5672 Stark Excavating, Inc. 1.0000 5,788.00 5,788.00 50100100 REM EXIST STRUCT 1.000 EACH 0335 Otto Baum Company, Inc. 100,000.0000 100,000.00 100,000.00 5672 Stark Excavating, Inc. 70,500.0000 70,500.00 70,500.00 50104650 SLOPE WALL REMOV 188.000 SQ YD 0335 Otto Baum Company, Inc. 32.0000 6,016.00 6,016.00 5672 Stark Excavating, Inc. 27.0000 5,076.00 5,076.00 50200100 STRUCTURE EXCAVATION 104.000 CU YD 0335 Otto Baum Company, Inc. 24.0000 2,496.00 2,496.00 5672 Stark Excavating, Inc. 28.0000 2,912.00 2,912.00 50300225 CONC STRUCT 100.800 CU YD 0335 Otto Baum Company, Inc. 1,250.0000 126,000.00 126,000.00 5672 Stark Excavating, Inc. 690.0000 69,552.00 69,552.00 50300255 CONC SUP-STR 597.200 CU YD 0335 Otto Baum Company, Inc. 620.0000 370,264.00 370,264.00 5672 Stark Excavating, Inc. 621.0000 370,861.20 370,861.20 50300260 BR DECK GROOVING 894.000 SQ YD 0335 Otto Baum Company, Inc. 7.0000 6,258.00 6,258.00 5672 Stark Excavating, Inc. 9.4000 8,403.60 8,403.60 50800205 REINF BARS, EPOXY CTD 147,770.000 POUND 0335 Otto Baum Company, Inc. 1.2500 184,712.50 184,712.50 5672 Stark Excavating, Inc. 1.2000 177,324.00 177,324.00 50800515 BAR SPLICERS 598.000 EACH 0335 Otto Baum Company, Inc. 25.0000 14,950.00 14,950.00 5672 Stark Excavating, Inc. 21.0000 12,558.00 12,558.00 51100300 SLOPE WALL 6 370.000 SQ YD 0335 Otto Baum Company, Inc. 120.0000 44,400.00 44,400.00 5672 Stark Excavating, Inc. 136.0000 50,320.00 50,320.00 51200700 FUR PREC CONC PILE 14 301.000 FOOT 0335 Otto Baum Company, Inc. 195.0000 58,695.00 58,695.00 5672 Stark Excavating, Inc. 92.0000 27,692.00 27,692.00 51202305 DRIVING PILES 301.000 FOOT 0335 Otto Baum Company, Inc. 0.0100 3.01 3.01 5672 Stark Excavating, Inc. 0.1000 30.10 30.10 51203000 TEST PILE PREC CONC 2.000 EACH 0335 Otto Baum Company, Inc. 4,000.0000 8,000.00 8,000.00 5672 Stark Excavating, Inc. 3,127.0000 6,254.00 6,254.00 51500100 NAME PLATES 1.000 EACH 0335 Otto Baum Company, Inc. 525.0000 525.00 525.00 5672 Stark Excavating, Inc. 540.0000 540.00 540.00 54248510 CONCRETE COLLAR 4.000 CU YD 0335 Otto Baum Company, Inc. 562.0000 2,248.00 2,248.00 5672 Stark Excavating, Inc. 700.0000 2,800.00 2,800.00 550A0050 STORM SEW CL A 1 12 563.000 FOOT 0335 Otto Baum Company, Inc. 66.0000 37,158.00 37,158.00 5672 Stark Excavating, Inc. 30.0000 16,890.00 16,890.00 550A0070 STORM SEW CL A 1 15 128.000 FOOT 0335 Otto Baum Company, Inc. 70.0000 8,960.00 8,960.00 5672 Stark Excavating, Inc. 33.0000 4,224.00 4,224.00 550A0410 STORM SEW CL A 2 24 10.000 FOOT 0335 Otto Baum Company, Inc. 87.0000 870.00 870.00 5672 Stark Excavating, Inc. 156.0000 1,560.00 1,560.00 55100400 STORM SEWER REM 10 27.000 FOOT 0335 Otto Baum Company, Inc. 17.0000 459.00 459.00 5672 Stark Excavating, Inc. 10.0000 270.00 270.00 55100500 STORM SEWER REM 12 72.000 FOOT 0335 Otto Baum Company, Inc. 17.0000 1,224.00 1,224.00 5672 Stark Excavating, Inc. 11.0000 792.00 792.00 55100900 STORM SEWER REM 18 126.000 FOOT 0335 Otto Baum Company, Inc. 17.0000 2,142.00 2,142.00 5672 Stark Excavating, Inc. 12.0000 1,512.00 1,512.00 55101200 STORM SEWER REM 24 37.000 FOOT 0335 Otto Baum Company, Inc. 17.0000 629.00 629.00 5672 Stark Excavating, Inc. 14.0000 518.00 518.00 59100100 GEOCOMPOSITE WALL DR 87.000 SQ YD 0335 Otto Baum Company, Inc. 15.0000 1,305.00 1,305.00 5672 Stark Excavating, Inc. 18.0000 1,566.00 1,566.00 59300100 CONTR LOW-STRENG MATL 257.000 CU YD 0335 Otto Baum Company, Inc. 70.0000 17,990.00 17,990.00 5672 Stark Excavating, Inc. 129.0000 33,153.00 33,153.00 60109580 P UNDR FOR STRUCT 4 232.000 FOOT 0335 Otto Baum Company, Inc. 15.0000 3,480.00 3,480.00 5672 Stark Excavating, Inc. 20.6000 4,779.20 4,779.20 60224710 RD MAN 4 DIA T3VF&G 1.000 EACH 0335 Otto Baum Company, Inc. 3,100.0000 3,100.00 3,100.00 5672 Stark Excavating, Inc. 2,380.0000 2,380.00 2,380.00 60225400 RD MAN 5 DIA T1F CL 1.000 EACH 0335 Otto Baum Company, Inc. 4,500.0000 4,500.00 4,500.00 5672 Stark Excavating, Inc. 3,276.0000 3,276.00 3,276.00 60236200 INLETS TA T8G 1.000 EACH 0335 Otto Baum Company, Inc. 900.0000 900.00 900.00 5672 Stark Excavating, Inc. 1,219.0000 1,219.00 1,219.00 60242850 INLETS SPL TH 9.000 EACH 0335 Otto Baum Company, Inc. 1,500.0000 13,500.00 13,500.00 5672 Stark Excavating, Inc. 1,630.0000 14,670.00 14,670.00 60255500 MAN ADJUST 2.000 EACH 0335 Otto Baum Company, Inc. 1,700.0000 3,400.00 3,400.00 5672 Stark Excavating, Inc. 459.0000 918.00 918.00 60258000 MAN RECONST SPL 2.000 EACH 0335 Otto Baum Company, Inc. 770.0000 1,540.00 1,540.00 5672 Stark Excavating, Inc. 1,185.0000 2,370.00 2,370.00 60500060 REMOV INLETS 4.000 EACH 0335 Otto Baum Company, Inc. 400.0000 1,600.00 1,600.00 5672 Stark Excavating, Inc. 212.0000 848.00 848.00 60604800 COMB CC&G TB6.18 SPL 1,594.000 FOOT 0335 Otto Baum Company, Inc. 35.0000 55,790.00 55,790.00 5672 Stark Excavating, Inc. 27.7000 44,153.80 44,153.80 63000130 SPBGR TY A SPL 75.000 FOOT 0335 Otto Baum Company, Inc. 58.0000 4,350.00 4,350.00 5672 Stark Excavating, Inc. 52.0000 3,900.00 3,900.00 63100085 TRAF BAR TERM T6 1.000 EACH 0335 Otto Baum Company, Inc. 3,318.0000 3,318.00 3,318.00 5672 Stark Excavating, Inc. 2,950.0000 2,950.00 2,950.00 63100167 TR BAR TRM T1 SPL TAN 2.000 EACH 0335 Otto Baum Company, Inc. 2,500.0000 5,000.00 5,000.00 5672 Stark Excavating, Inc. 2,300.0000 4,600.00 4,600.00 63100215 TRAF BAR TERM T6 SPL 1.000 EACH 0335 Otto Baum Company, Inc. 5,300.0000 5,300.00 5,300.00 5672 Stark Excavating, Inc. 4,700.0000 4,700.00 4,700.00 63200310 GUARDRAIL REMOV 246.000 FOOT 0335 Otto Baum Company, Inc. 7.0000 1,722.00 1,722.00 5672 Stark Excavating, Inc. 6.5000 1,599.00 1,599.00 66410300 CH LK FENCE REMOV 149.000 FOOT 0335 Otto Baum Company, Inc. 15.0000 2,235.00 2,235.00 5672 Stark Excavating, Inc. 5.0000 745.00 745.00 66410400 CH LK FENCE REM & RE 146.000 FOOT 0335 Otto Baum Company, Inc. 36.0000 5,256.00 5,256.00 5672 Stark Excavating, Inc. 17.0000 2,482.00 2,482.00 67100100 MOBILIZATION 1.000 L SUM 0335 Otto Baum Company, Inc. 25,000.0000 25,000.00 25,000.00 5672 Stark Excavating, Inc. 109,000.0000 109,000.00 109,000.00 70103700 TRAF CONT COMPL 1.000 L SUM 0335 Otto Baum Company, Inc. 40,000.0000 40,000.00 40,000.00 5672 Stark Excavating, Inc. 36,750.0000 36,750.00 36,750.00 70300520 PAVT MARK TAPE T3 4 5,445.000 FOOT 0335 Otto Baum Company, Inc. 1.2500 6,806.25 6,806.25 5672 Stark Excavating, Inc. 1.2000 6,534.00 6,534.00 70301000 WORK ZONE PAVT MK REM 1,815.000 SQ FT 0335 Otto Baum Company, Inc. 1.5300 2,776.95 2,776.95 5672 Stark Excavating, Inc. 1.9000 3,448.50 3,448.50 70400100 TEMP CONC BARRIER 687.500 FOOT 0335 Otto Baum Company, Inc. 32.0000 22,000.00 22,000.00 5672 Stark Excavating, Inc. 31.0000 21,312.50 21,312.50 70400200 REL TEMP CONC BARRIER 287.500 FOOT 0335 Otto Baum Company, Inc. 6.2500 1,796.88 1,796.88 5672 Stark Excavating, Inc. 6.0000 1,725.00 1,725.00 78005130 EPOXY PVT MK LINE 6 2,490.000 FOOT 0335 Otto Baum Company, Inc. 2.7500 6,847.50 6,847.50 5672 Stark Excavating, Inc. 2.6000 6,474.00 6,474.00 78005180 EPOXY PVT MK LINE 24 26.000 FOOT 0335 Otto Baum Company, Inc. 17.0000 442.00 442.00 5672 Stark Excavating, Inc. 15.8000 410.80 410.80 78200410 GUARDRAIL MKR TYPE A 8.000 EACH 0335 Otto Baum Company, Inc. 11.0000 88.00 88.00 5672 Stark Excavating, Inc. 10.6000 84.80 84.80 78200520 BAR WALL MKR TYPE B 8.000 EACH 0335 Otto Baum Company, Inc. 17.0000 136.00 136.00 5672 Stark Excavating, Inc. 10.6000 84.80 84.80 78201000 TERMINAL MARKER - DA 2.000 EACH 0335 Otto Baum Company, Inc. 45.0000 90.00 90.00 5672 Stark Excavating, Inc. 40.0000 80.00 80.00