ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 11/06/09 08:31:49 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 09/18/2009 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 83827 LETTING ITEM NUMBER: 129 RESPONSIBLE DISTRICT: 01 BIDS LOCKED: Y SECTION: 00-00116-00-BR COUNTY: DUPAGE ESTIMATE: STATE JOB NUMBER: C-91-138-01 MUNICIPALITY: NAPERVILLE PROJECT NUMBER: BRM-8003/032/000 -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0820 Albin Carlson & Co. NO ALT 3,721,884.92 3,721,884.92 3,721,884.92 1320 D. Construction, Inc. NO ALT 3,552,990.06 3,552,990.06 3,552,990.06 1552 Dunnet Bay Construction Company NO ALT 3,949,746.36 3,949,746.36 3,949,746.36 2520 Herlihy Mid-Continent Company NO ALT 3,491,210.04 * 3,491,210.04 3,491,210.04 * 2779 Illinois Constructors Corporation NO ALT 3,801,685.21 3,801,685.21 3,801,685.21 3243 Kovilic Construction Company, Inc. NO ALT 4,814,110.50 4,814,110.50 4,814,110.50 3505 Lorig Construction Company NO ALT 3,505,752.47 3,505,752.47 3,505,752.47 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 211 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF A2008140 T-TILIA CORD GS 5 1.000 EACH 0820 Albin Carlson & Co. 350.0000 350.00 350.00 1320 D. Construction, Inc. 385.0000 385.00 385.00 1552 Dunnet Bay Construction Company 350.0000 350.00 350.00 2520 Herlihy Mid-Continent Company 350.0000 350.00 350.00 2779 Illinois Constructors Corporation 350.0000 350.00 350.00 3243 Kovilic Construction Company, Inc. 1,500.0000 1,500.00 1,500.00 3505 Lorig Construction Company 375.0000 375.00 375.00 C2C03424 S-HYDRA ARBOR AN 2'C 42.000 EACH 0820 Albin Carlson & Co. 26.0000 1,092.00 1,092.00 1320 D. Construction, Inc. 28.6000 1,201.20 1,201.20 1552 Dunnet Bay Construction Company 26.0000 1,092.00 1,092.00 2520 Herlihy Mid-Continent Company 26.0000 1,092.00 1,092.00 2779 Illinois Constructors Corporation 26.0000 1,092.00 1,092.00 3243 Kovilic Construction Company, Inc. 42.0000 1,764.00 1,764.00 3505 Lorig Construction Company 28.0000 1,176.00 1,176.00 C2C05824 S-RHUS AROMA GRO 2'C 45.000 EACH 0820 Albin Carlson & Co. 30.0000 1,350.00 1,350.00 1320 D. Construction, Inc. 33.0000 1,485.00 1,485.00 1552 Dunnet Bay Construction Company 30.0000 1,350.00 1,350.00 2520 Herlihy Mid-Continent Company 30.0000 1,350.00 1,350.00 2779 Illinois Constructors Corporation 30.0000 1,350.00 1,350.00 3243 Kovilic Construction Company, Inc. 63.0000 2,835.00 2,835.00 3505 Lorig Construction Company 32.0000 1,440.00 1,440.00 C2006148 S-RHUS TYPH LAC 4' 12.000 EACH 0820 Albin Carlson & Co. 45.0000 540.00 540.00 1320 D. Construction, Inc. 49.5000 594.00 594.00 1552 Dunnet Bay Construction Company 45.0000 540.00 540.00 2520 Herlihy Mid-Continent Company 45.0000 540.00 540.00 2779 Illinois Constructors Corporation 45.0000 540.00 540.00 3243 Kovilic Construction Company, Inc. 42.0000 504.00 504.00 3505 Lorig Construction Company 47.0000 564.00 564.00 C2007218 S-ROSA KNOCKOUT 18 27.000 EACH 0820 Albin Carlson & Co. 28.0000 756.00 756.00 1320 D. Construction, Inc. 30.8000 831.60 831.60 1552 Dunnet Bay Construction Company 28.0000 756.00 756.00 2520 Herlihy Mid-Continent Company 28.0000 756.00 756.00 2779 Illinois Constructors Corporation 28.0000 756.00 756.00 3243 Kovilic Construction Company, Inc. 43.0000 1,161.00 1,161.00 3505 Lorig Construction Company 30.0000 810.00 810.00 C2012136 S-VIBURN X JUD 3' 3.000 EACH 0820 Albin Carlson & Co. 55.0000 165.00 165.00 1320 D. Construction, Inc. 60.5000 181.50 181.50 1552 Dunnet Bay Construction Company 55.0000 165.00 165.00 2520 Herlihy Mid-Continent Company 55.0000 165.00 165.00 2779 Illinois Constructors Corporation 55.0000 165.00 165.00 3243 Kovilic Construction Company, Inc. 90.0000 270.00 270.00 3505 Lorig Construction Company 57.0000 171.00 171.00 C2012760 S-VIBURN PRUN 5' 3.000 EACH 0820 Albin Carlson & Co. 140.0000 420.00 420.00 1320 D. Construction, Inc. 154.0000 462.00 462.00 1552 Dunnet Bay Construction Company 140.0000 420.00 420.00 2520 Herlihy Mid-Continent Company 140.0000 420.00 420.00 2779 Illinois Constructors Corporation 140.0000 420.00 420.00 3243 Kovilic Construction Company, Inc. 90.0000 270.00 270.00 3505 Lorig Construction Company 142.0000 426.00 426.00 D2002788 E-PINUS NIGRA 8' 5.000 EACH 0820 Albin Carlson & Co. 375.0000 1,875.00 1,875.00 1320 D. Construction, Inc. 412.5000 2,062.50 2,062.50 1552 Dunnet Bay Construction Company 375.0000 1,875.00 1,875.00 2520 Herlihy Mid-Continent Company 375.0000 1,875.00 1,875.00 2779 Illinois Constructors Corporation 375.0000 1,875.00 1,875.00 3243 Kovilic Construction Company, Inc. 650.0000 3,250.00 3,250.00 3505 Lorig Construction Company 390.0000 1,950.00 1,950.00 D2003524 E-TAXUS X MD DN 2' 5.000 EACH 0820 Albin Carlson & Co. 60.0000 300.00 300.00 1320 D. Construction, Inc. 66.0000 330.00 330.00 1552 Dunnet Bay Construction Company 60.0000 300.00 300.00 2520 Herlihy Mid-Continent Company 60.0000 300.00 300.00 2779 Illinois Constructors Corporation 60.0000 300.00 300.00 3243 Kovilic Construction Company, Inc. 130.0000 650.00 650.00 3505 Lorig Construction Company 62.0000 310.00 310.00 K0026830 SHRUB REMOVAL 28.000 EACH 0820 Albin Carlson & Co. 30.0000 840.00 840.00 1320 D. Construction, Inc. 33.0000 924.00 924.00 1552 Dunnet Bay Construction Company 30.0000 840.00 840.00 2520 Herlihy Mid-Continent Company 30.0000 840.00 840.00 2779 Illinois Constructors Corporation 150.0000 4,200.00 4,200.00 3243 Kovilic Construction Company, Inc. 25.0000 700.00 700.00 3505 Lorig Construction Company 32.0000 896.00 896.00 K0039117 SHRUB CHAEN SPEC 18C 40.000 EACH 0820 Albin Carlson & Co. 40.0000 1,600.00 1,600.00 1320 D. Construction, Inc. 44.0000 1,760.00 1,760.00 1552 Dunnet Bay Construction Company 40.0000 1,600.00 1,600.00 2520 Herlihy Mid-Continent Company 40.0000 1,600.00 1,600.00 2779 Illinois Constructors Corporation 40.0000 1,600.00 1,600.00 3243 Kovilic Construction Company, Inc. 75.0000 3,000.00 3,000.00 3505 Lorig Construction Company 42.0000 1,680.00 1,680.00 K0040350 GC WALDSTENIA FRAG 3" 480.000 EACH 0820 Albin Carlson & Co. 2.5000 1,200.00 1,200.00 1320 D. Construction, Inc. 2.7500 1,320.00 1,320.00 1552 Dunnet Bay Construction Company 2.5000 1,200.00 1,200.00 2520 Herlihy Mid-Continent Company 2.5000 1,200.00 1,200.00 2779 Illinois Constructors Corporation 2.5000 1,200.00 1,200.00 3243 Kovilic Construction Company, Inc. 2.6000 1,248.00 1,248.00 3505 Lorig Construction Company 2.7500 1,320.00 1,320.00 K1004490 PINEBARK FINES MULCH 3.000 CU YD 0820 Albin Carlson & Co. 80.0000 240.00 240.00 1320 D. Construction, Inc. 88.0000 264.00 264.00 1552 Dunnet Bay Construction Company 80.0000 240.00 240.00 2520 Herlihy Mid-Continent Company 80.0000 240.00 240.00 2779 Illinois Constructors Corporation 80.0000 240.00 240.00 3243 Kovilic Construction Company, Inc. 65.0000 195.00 195.00 3505 Lorig Construction Company 82.0000 246.00 246.00 K1004600 REMOVE PERENNIALS 40.000 EACH 0820 Albin Carlson & Co. 10.0000 400.00 400.00 1320 D. Construction, Inc. 11.0000 440.00 440.00 1552 Dunnet Bay Construction Company 10.0000 400.00 400.00 2520 Herlihy Mid-Continent Company 10.0000 400.00 400.00 2779 Illinois Constructors Corporation 10.0000 400.00 400.00 3243 Kovilic Construction Company, Inc. 2.6000 104.00 104.00 3505 Lorig Construction Company 12.0000 480.00 480.00 K1004610 SEASONAL ANNUALS 67.000 SQ FT 0820 Albin Carlson & Co. 10.0000 670.00 670.00 1320 D. Construction, Inc. 11.0000 737.00 737.00 1552 Dunnet Bay Construction Company 10.0000 670.00 670.00 2520 Herlihy Mid-Continent Company 10.0000 670.00 670.00 2779 Illinois Constructors Corporation 10.0000 670.00 670.00 3243 Kovilic Construction Company, Inc. 4.0000 268.00 268.00 3505 Lorig Construction Company 12.0000 804.00 804.00 K1004700 ACCENT BOULDER 30" 2.000 EACH 0820 Albin Carlson & Co. 1,500.0000 3,000.00 3,000.00 1320 D. Construction, Inc. 1,650.0000 3,300.00 3,300.00 1552 Dunnet Bay Construction Company 1,500.0000 3,000.00 3,000.00 2520 Herlihy Mid-Continent Company 1,500.0000 3,000.00 3,000.00 2779 Illinois Constructors Corporation 1,500.0000 3,000.00 3,000.00 3243 Kovilic Construction Company, Inc. 260.0000 520.00 520.00 3505 Lorig Construction Company 1,550.0000 3,100.00 3,100.00 K1005481 SHRED BARK MULCH 3 240.000 SQ YD 0820 Albin Carlson & Co. 4.5000 1,080.00 1,080.00 1320 D. Construction, Inc. 4.9500 1,188.00 1,188.00 1552 Dunnet Bay Construction Company 4.5000 1,080.00 1,080.00 2520 Herlihy Mid-Continent Company 4.5000 1,080.00 1,080.00 2779 Illinois Constructors Corporation 4.5000 1,080.00 1,080.00 3243 Kovilic Construction Company, Inc. 8.0000 1,920.00 1,920.00 3505 Lorig Construction Company 5.7500 1,380.00 1,380.00 K1005875 TREE TRANSPLANT 4.000 EACH 0820 Albin Carlson & Co. 150.0000 600.00 600.00 1320 D. Construction, Inc. 165.0000 660.00 660.00 1552 Dunnet Bay Construction Company 450.0000 1,800.00 1,800.00 2520 Herlihy Mid-Continent Company 150.0000 600.00 600.00 2779 Illinois Constructors Corporation 150.0000 600.00 600.00 3243 Kovilic Construction Company, Inc. 600.0000 2,400.00 2,400.00 3505 Lorig Construction Company 155.0000 620.00 620.00 XX000406 BRICK PAVER REM & REP 480.000 SQ FT 0820 Albin Carlson & Co. 24.0000 11,520.00 11,520.00 1320 D. Construction, Inc. 10.3400 4,963.20 4,963.20 1552 Dunnet Bay Construction Company 15.0000 7,200.00 7,200.00 2520 Herlihy Mid-Continent Company 7.0000 3,360.00 3,360.00 2779 Illinois Constructors Corporation 9.4000 4,512.00 4,512.00 3243 Kovilic Construction Company, Inc. 12.0000 5,760.00 5,760.00 3505 Lorig Construction Company 12.0000 5,760.00 5,760.00 XX000504 RESTORATION WORK 1.000 L SUM 0820 Albin Carlson & Co. 9,999.0000 9,999.00 9,999.00 1320 D. Construction, Inc. 1.0000 1.00 1.00 1552 Dunnet Bay Construction Company 20,000.0000 20,000.00 20,000.00 2520 Herlihy Mid-Continent Company 500.0000 500.00 500.00 2779 Illinois Constructors Corporation 40,000.0000 40,000.00 40,000.00 3243 Kovilic Construction Company, Inc. 50,000.0000 50,000.00 50,000.00 3505 Lorig Construction Company 5,000.0000 5,000.00 5,000.00 XX003435 PCC DRIVE REM & REPL 102.000 SQ YD 0820 Albin Carlson & Co. 84.4000 8,608.80 8,608.80 1320 D. Construction, Inc. 55.0000 5,610.00 5,610.00 1552 Dunnet Bay Construction Company 49.5900 5,058.18 5,058.18 2520 Herlihy Mid-Continent Company 55.0000 5,610.00 5,610.00 2779 Illinois Constructors Corporation 85.0000 8,670.00 8,670.00 3243 Kovilic Construction Company, Inc. 90.0000 9,180.00 9,180.00 3505 Lorig Construction Company 75.0000 7,650.00 7,650.00 XX004809 UNDR BRIDGE COND SYS 1.000 L SUM 0820 Albin Carlson & Co. 85,000.0000 85,000.00 85,000.00 1320 D. Construction, Inc. 96,800.0000 96,800.00 96,800.00 1552 Dunnet Bay Construction Company 55,000.0000 55,000.00 55,000.00 2520 Herlihy Mid-Continent Company 55,000.0000 55,000.00 55,000.00 2779 Illinois Constructors Corporation 55,000.0000 55,000.00 55,000.00 3243 Kovilic Construction Company, Inc. 68,000.0000 68,000.00 68,000.00 3505 Lorig Construction Company 50,000.0000 50,000.00 50,000.00 XX005581 VIDEO TAPE 1.000 UNIT 0820 Albin Carlson & Co. 9,999.0000 9,999.00 9,999.00 1320 D. Construction, Inc. 1,650.0000 1,650.00 1,650.00 1552 Dunnet Bay Construction Company 3,000.0000 3,000.00 3,000.00 2520 Herlihy Mid-Continent Company 1,500.0000 1,500.00 1,500.00 2779 Illinois Constructors Corporation 1,800.0000 1,800.00 1,800.00 3243 Kovilic Construction Company, Inc. 1,500.0000 1,500.00 1,500.00 3505 Lorig Construction Company 800.0000 800.00 800.00 XX005593 N SWITCHGEAR VAULT 1.000 EACH 0820 Albin Carlson & Co. 5,500.0000 5,500.00 5,500.00 1320 D. Construction, Inc. 3,410.0000 3,410.00 3,410.00 1552 Dunnet Bay Construction Company 2,200.0000 2,200.00 2,200.00 2520 Herlihy Mid-Continent Company 2,200.0000 2,200.00 2,200.00 2779 Illinois Constructors Corporation 2,200.0000 2,200.00 2,200.00 3243 Kovilic Construction Company, Inc. 2,700.0000 2,700.00 2,700.00 3505 Lorig Construction Company 2,200.0000 2,200.00 2,200.00 XX005594 FA-2 ENCASEMENT 45.000 CU YD 0820 Albin Carlson & Co. 102.0000 4,590.00 4,590.00 1320 D. Construction, Inc. 23.1000 1,039.50 1,039.50 1552 Dunnet Bay Construction Company 110.0000 4,950.00 4,950.00 2520 Herlihy Mid-Continent Company 110.0000 4,950.00 4,950.00 2779 Illinois Constructors Corporation 110.0000 4,950.00 4,950.00 3243 Kovilic Construction Company, Inc. 138.0000 6,210.00 6,210.00 3505 Lorig Construction Company 110.0000 4,950.00 4,950.00 XX005595 TRENCH BACKFILL CA-6 165.000 CU YD 0820 Albin Carlson & Co. 78.0000 12,870.00 12,870.00 1320 D. Construction, Inc. 35.2000 5,808.00 5,808.00 1552 Dunnet Bay Construction Company 60.0000 9,900.00 9,900.00 2520 Herlihy Mid-Continent Company 60.0000 9,900.00 9,900.00 2779 Illinois Constructors Corporation 60.0000 9,900.00 9,900.00 3243 Kovilic Construction Company, Inc. 75.0000 12,375.00 12,375.00 3505 Lorig Construction Company 30.0000 4,950.00 4,950.00 XX005597 ROD AND MANDREL 8,000.000 FOOT 0820 Albin Carlson & Co. 1.5000 12,000.00 12,000.00 1320 D. Construction, Inc. 0.9400 7,520.00 7,520.00 1552 Dunnet Bay Construction Company 1.0000 8,000.00 8,000.00 2520 Herlihy Mid-Continent Company 1.0000 8,000.00 8,000.00 2779 Illinois Constructors Corporation 1.0000 8,000.00 8,000.00 3243 Kovilic Construction Company, Inc. 1.2500 10,000.00 10,000.00 3505 Lorig Construction Company 1.0000 8,000.00 8,000.00 XX005598 ADD GROUND ROD INSTL 6.000 EACH 0820 Albin Carlson & Co. 275.0000 1,650.00 1,650.00 1320 D. Construction, Inc. 49.5000 297.00 297.00 1552 Dunnet Bay Construction Company 150.0000 900.00 900.00 2520 Herlihy Mid-Continent Company 150.0000 900.00 900.00 2779 Illinois Constructors Corporation 150.0000 900.00 900.00 3243 Kovilic Construction Company, Inc. 187.0000 1,122.00 1,122.00 3505 Lorig Construction Company 150.0000 900.00 900.00 XX005600 COUNTERPOISE, UNPAVED 400.000 FOOT 0820 Albin Carlson & Co. 8.5000 3,400.00 3,400.00 1320 D. Construction, Inc. 11.0000 4,400.00 4,400.00 1552 Dunnet Bay Construction Company 3.0000 1,200.00 1,200.00 2520 Herlihy Mid-Continent Company 3.0000 1,200.00 1,200.00 2779 Illinois Constructors Corporation 3.0000 1,200.00 1,200.00 3243 Kovilic Construction Company, Inc. 3.7500 1,500.00 1,500.00 3505 Lorig Construction Company 3.0000 1,200.00 1,200.00 XX005601 COUNTERPOISE, PAVED 800.000 FOOT 0820 Albin Carlson & Co. 17.0000 13,600.00 13,600.00 1320 D. Construction, Inc. 0.0100 8.00 8.00 1552 Dunnet Bay Construction Company 3.0000 2,400.00 2,400.00 2520 Herlihy Mid-Continent Company 3.0000 2,400.00 2,400.00 2779 Illinois Constructors Corporation 3.0000 2,400.00 2,400.00 3243 Kovilic Construction Company, Inc. 3.7500 3,000.00 3,000.00 3505 Lorig Construction Company 3.0000 2,400.00 2,400.00 XX005602 HAND DIG 0'-5' PAV'T 40.000 CU YD 0820 Albin Carlson & Co. 420.0000 16,800.00 16,800.00 1320 D. Construction, Inc. 385.0000 15,400.00 15,400.00 1552 Dunnet Bay Construction Company 200.0000 8,000.00 8,000.00 2520 Herlihy Mid-Continent Company 200.0000 8,000.00 8,000.00 2779 Illinois Constructors Corporation 200.0000 8,000.00 8,000.00 3243 Kovilic Construction Company, Inc. 250.0000 10,000.00 10,000.00 3505 Lorig Construction Company 200.0000 8,000.00 8,000.00 XX005603 HAND DIG 5'-20' PAV'T 30.000 CU YD 0820 Albin Carlson & Co. 420.0000 12,600.00 12,600.00 1320 D. Construction, Inc. 385.0000 11,550.00 11,550.00 1552 Dunnet Bay Construction Company 300.0000 9,000.00 9,000.00 2520 Herlihy Mid-Continent Company 300.0000 9,000.00 9,000.00 2779 Illinois Constructors Corporation 300.0000 9,000.00 9,000.00 3243 Kovilic Construction Company, Inc. 375.0000 11,250.00 11,250.00 3505 Lorig Construction Company 300.0000 9,000.00 9,000.00 XX005604 HAND DIG 0'-5' UNPAVD 40.000 CU YD 0820 Albin Carlson & Co. 380.0000 15,200.00 15,200.00 1320 D. Construction, Inc. 330.0000 13,200.00 13,200.00 1552 Dunnet Bay Construction Company 200.0000 8,000.00 8,000.00 2520 Herlihy Mid-Continent Company 200.0000 8,000.00 8,000.00 2779 Illinois Constructors Corporation 200.0000 8,000.00 8,000.00 3243 Kovilic Construction Company, Inc. 250.0000 10,000.00 10,000.00 3505 Lorig Construction Company 200.0000 8,000.00 8,000.00 XX005605 HAND DIG 5'-20' UNPAV 30.000 CU YD 0820 Albin Carlson & Co. 380.0000 11,400.00 11,400.00 1320 D. Construction, Inc. 330.0000 9,900.00 9,900.00 1552 Dunnet Bay Construction Company 300.0000 9,000.00 9,000.00 2520 Herlihy Mid-Continent Company 300.0000 9,000.00 9,000.00 2779 Illinois Constructors Corporation 300.0000 9,000.00 9,000.00 3243 Kovilic Construction Company, Inc. 375.0000 11,250.00 11,250.00 3505 Lorig Construction Company 300.0000 9,000.00 9,000.00 XX005606 MACH AID DIG 0-5 PAVE 60.000 CU YD 0820 Albin Carlson & Co. 80.0000 4,800.00 4,800.00 1320 D. Construction, Inc. 165.0000 9,900.00 9,900.00 1552 Dunnet Bay Construction Company 80.0000 4,800.00 4,800.00 2520 Herlihy Mid-Continent Company 80.0000 4,800.00 4,800.00 2779 Illinois Constructors Corporation 80.0000 4,800.00 4,800.00 3243 Kovilic Construction Company, Inc. 100.0000 6,000.00 6,000.00 3505 Lorig Construction Company 80.0000 4,800.00 4,800.00 XX005608 MAC AID DIG 0-5 UNPAV 60.000 CU YD 0820 Albin Carlson & Co. 60.0000 3,600.00 3,600.00 1320 D. Construction, Inc. 137.5000 8,250.00 8,250.00 1552 Dunnet Bay Construction Company 45.0000 2,700.00 2,700.00 2520 Herlihy Mid-Continent Company 45.0000 2,700.00 2,700.00 2779 Illinois Constructors Corporation 45.0000 2,700.00 2,700.00 3243 Kovilic Construction Company, Inc. 60.0000 3,600.00 3,600.00 3505 Lorig Construction Company 45.0000 2,700.00 2,700.00 XX005896 CONCRETE PAD REMOVAL 36.000 SQ FT 0820 Albin Carlson & Co. 4.9800 179.28 179.28 1320 D. Construction, Inc. 10.0000 360.00 360.00 1552 Dunnet Bay Construction Company 12.6900 456.84 456.84 2520 Herlihy Mid-Continent Company 11.6000 417.60 417.60 2779 Illinois Constructors Corporation 10.0000 360.00 360.00 3243 Kovilic Construction Company, Inc. 15.0000 540.00 540.00 3505 Lorig Construction Company 6.0000 216.00 216.00 XX005987 MACH AID DIG 5-20 PVT 30.000 CU YD 0820 Albin Carlson & Co. 120.0000 3,600.00 3,600.00 1320 D. Construction, Inc. 137.5000 4,125.00 4,125.00 1552 Dunnet Bay Construction Company 130.0000 3,900.00 3,900.00 2520 Herlihy Mid-Continent Company 130.0000 3,900.00 3,900.00 2779 Illinois Constructors Corporation 130.0000 3,900.00 3,900.00 3243 Kovilic Construction Company, Inc. 163.0000 4,890.00 4,890.00 3505 Lorig Construction Company 130.0000 3,900.00 3,900.00 XX005989 MACH AID DIG 5-20 UPA 60.000 CU YD 0820 Albin Carlson & Co. 95.0000 5,700.00 5,700.00 1320 D. Construction, Inc. 121.0000 7,260.00 7,260.00 1552 Dunnet Bay Construction Company 85.0000 5,100.00 5,100.00 2520 Herlihy Mid-Continent Company 85.0000 5,100.00 5,100.00 2779 Illinois Constructors Corporation 85.0000 5,100.00 5,100.00 3243 Kovilic Construction Company, Inc. 106.0000 6,360.00 6,360.00 3505 Lorig Construction Company 85.0000 5,100.00 5,100.00 XX006947 HMA DRIVE REM & REP 102.000 SQ YD 0820 Albin Carlson & Co. 42.5000 4,335.00 4,335.00 1320 D. Construction, Inc. 36.0000 3,672.00 3,672.00 1552 Dunnet Bay Construction Company 55.0000 5,610.00 5,610.00 2520 Herlihy Mid-Continent Company 41.5000 4,233.00 4,233.00 2779 Illinois Constructors Corporation 78.6200 8,019.24 8,019.24 3243 Kovilic Construction Company, Inc. 36.0000 3,672.00 3,672.00 3505 Lorig Construction Company 55.0000 5,610.00 5,610.00 XX007055 HANDHOLE, DEH6 1.000 EACH 0820 Albin Carlson & Co. 3,000.0000 3,000.00 3,000.00 1320 D. Construction, Inc. 3,960.0000 3,960.00 3,960.00 1552 Dunnet Bay Construction Company 2,600.0000 2,600.00 2,600.00 2520 Herlihy Mid-Continent Company 2,800.0000 2,800.00 2,800.00 2779 Illinois Constructors Corporation 2,800.0000 2,800.00 2,800.00 3243 Kovilic Construction Company, Inc. 3,500.0000 3,500.00 3,500.00 3505 Lorig Construction Company 2,800.0000 2,800.00 2,800.00 XX007138 2W 3 PVCDB 1 X 2 30.000 FOOT 0820 Albin Carlson & Co. 30.0000 900.00 900.00 1320 D. Construction, Inc. 19.8000 594.00 594.00 1552 Dunnet Bay Construction Company 30.0000 900.00 900.00 2520 Herlihy Mid-Continent Company 30.0000 900.00 900.00 2779 Illinois Constructors Corporation 30.0000 900.00 900.00 3243 Kovilic Construction Company, Inc. 38.0000 1,140.00 1,140.00 3505 Lorig Construction Company 30.0000 900.00 900.00 XX007141 2W 6 PVCDB 1 X 2 90.000 FOOT 0820 Albin Carlson & Co. 35.0000 3,150.00 3,150.00 1320 D. Construction, Inc. 24.2000 2,178.00 2,178.00 1552 Dunnet Bay Construction Company 30.0000 2,700.00 2,700.00 2520 Herlihy Mid-Continent Company 30.0000 2,700.00 2,700.00 2779 Illinois Constructors Corporation 30.0000 2,700.00 2,700.00 3243 Kovilic Construction Company, Inc. 38.0000 3,420.00 3,420.00 3505 Lorig Construction Company 30.0000 2,700.00 2,700.00 XX007594 MAN INSTALL TYPE G 2.000 EACH 0820 Albin Carlson & Co. 18,900.0000 37,800.00 37,800.00 1320 D. Construction, Inc. 12,265.0000 24,530.00 24,530.00 1552 Dunnet Bay Construction Company 23,000.0000 46,000.00 46,000.00 2520 Herlihy Mid-Continent Company 23,000.0000 46,000.00 46,000.00 2779 Illinois Constructors Corporation 23,000.0000 46,000.00 46,000.00 3243 Kovilic Construction Company, Inc. 28,800.0000 57,600.00 57,600.00 3505 Lorig Construction Company 23,000.0000 46,000.00 46,000.00 XX007595 MAN INSTALL TYPE E 1.000 EACH 0820 Albin Carlson & Co. 20,400.0000 20,400.00 20,400.00 1320 D. Construction, Inc. 12,078.0000 12,078.00 12,078.00 1552 Dunnet Bay Construction Company 15,000.0000 15,000.00 15,000.00 2520 Herlihy Mid-Continent Company 15,000.0000 15,000.00 15,000.00 2779 Illinois Constructors Corporation 15,000.0000 15,000.00 15,000.00 3243 Kovilic Construction Company, Inc. 18,750.0000 18,750.00 18,750.00 3505 Lorig Construction Company 15,000.0000 15,000.00 15,000.00 XX007596 CON T TRANS & TRANSP 2.000 EACH 0820 Albin Carlson & Co. 3,000.0000 6,000.00 6,000.00 1320 D. Construction, Inc. 8,591.0000 17,182.00 17,182.00 1552 Dunnet Bay Construction Company 7,500.0000 15,000.00 15,000.00 2520 Herlihy Mid-Continent Company 7,500.0000 15,000.00 15,000.00 2779 Illinois Constructors Corporation 7,500.0000 15,000.00 15,000.00 3243 Kovilic Construction Company, Inc. 9,400.0000 18,800.00 18,800.00 3505 Lorig Construction Company 7,500.0000 15,000.00 15,000.00 XX007625 6W 6-6 PVC DB 2X3 400.000 FOOT 0820 Albin Carlson & Co. 65.0000 26,000.00 26,000.00 1320 D. Construction, Inc. 67.1000 26,840.00 26,840.00 1552 Dunnet Bay Construction Company 50.0000 20,000.00 20,000.00 2520 Herlihy Mid-Continent Company 50.0000 20,000.00 20,000.00 2779 Illinois Constructors Corporation 50.0000 20,000.00 20,000.00 3243 Kovilic Construction Company, Inc. 62.0000 24,800.00 24,800.00 3505 Lorig Construction Company 50.0000 20,000.00 20,000.00 XX007627 8W 6-6 2-3 PVCDB 3X3 150.000 FOOT 0820 Albin Carlson & Co. 80.0000 12,000.00 12,000.00 1320 D. Construction, Inc. 70.4000 10,560.00 10,560.00 1552 Dunnet Bay Construction Company 60.0000 9,000.00 9,000.00 2520 Herlihy Mid-Continent Company 60.0000 9,000.00 9,000.00 2779 Illinois Constructors Corporation 60.0000 9,000.00 9,000.00 3243 Kovilic Construction Company, Inc. 75.0000 11,250.00 11,250.00 3505 Lorig Construction Company 60.0000 9,000.00 9,000.00 XX007628 8W 8-6 PVC DB 3X3 10.000 FOOT 0820 Albin Carlson & Co. 100.0000 1,000.00 1,000.00 1320 D. Construction, Inc. 92.4000 924.00 924.00 1552 Dunnet Bay Construction Company 74.0000 740.00 740.00 2520 Herlihy Mid-Continent Company 74.0000 740.00 740.00 2779 Illinois Constructors Corporation 74.0000 740.00 740.00 3243 Kovilic Construction Company, Inc. 93.0000 930.00 930.00 3505 Lorig Construction Company 74.0000 740.00 740.00 XX007629 9W 9-6 PVC DB 3X3 60.000 FOOT 0820 Albin Carlson & Co. 100.0000 6,000.00 6,000.00 1320 D. Construction, Inc. 68.2000 4,092.00 4,092.00 1552 Dunnet Bay Construction Company 75.0000 4,500.00 4,500.00 2520 Herlihy Mid-Continent Company 75.0000 4,500.00 4,500.00 2779 Illinois Constructors Corporation 75.0000 4,500.00 4,500.00 3243 Kovilic Construction Company, Inc. 94.0000 5,640.00 5,640.00 3505 Lorig Construction Company 75.0000 4,500.00 4,500.00 XX007747 PARK BENCH REM & REL 2.000 EACH 0820 Albin Carlson & Co. 473.8000 947.60 947.60 1320 D. Construction, Inc. 520.0000 1,040.00 1,040.00 1552 Dunnet Bay Construction Company 1,761.5700 3,523.14 3,523.14 2520 Herlihy Mid-Continent Company 900.0000 1,800.00 1,800.00 2779 Illinois Constructors Corporation 473.8000 947.60 947.60 3243 Kovilic Construction Company, Inc. 500.0000 1,000.00 1,000.00 3505 Lorig Construction Company 650.0000 1,300.00 1,300.00 XX008136 HDPE S SEW BEND 45 3" 2.000 EACH 0820 Albin Carlson & Co. 204.2100 408.42 408.42 1320 D. Construction, Inc. 420.0000 840.00 840.00 1552 Dunnet Bay Construction Company 429.0000 858.00 858.00 2520 Herlihy Mid-Continent Company 150.0000 300.00 300.00 2779 Illinois Constructors Corporation 417.0000 834.00 834.00 3243 Kovilic Construction Company, Inc. 300.0000 600.00 600.00 3505 Lorig Construction Company 450.0000 900.00 900.00 XX008137 P & INST D BANNER POL 1.000 EACH 0820 Albin Carlson & Co. 9,999.0000 9,999.00 9,999.00 1320 D. Construction, Inc. 6,839.0000 6,839.00 6,839.00 1552 Dunnet Bay Construction Company 6,000.0000 6,000.00 6,000.00 2520 Herlihy Mid-Continent Company 6,000.0000 6,000.00 6,000.00 2779 Illinois Constructors Corporation 6,000.0000 6,000.00 6,000.00 3243 Kovilic Construction Company, Inc. 8,000.0000 8,000.00 8,000.00 3505 Lorig Construction Company 2,700.0000 2,700.00 2,700.00 XX008138 REL MET LT POLE FND 4.000 EACH 0820 Albin Carlson & Co. 510.0000 2,040.00 2,040.00 1320 D. Construction, Inc. 561.0000 2,244.00 2,244.00 1552 Dunnet Bay Construction Company 850.0000 3,400.00 3,400.00 2520 Herlihy Mid-Continent Company 850.0000 3,400.00 3,400.00 2779 Illinois Constructors Corporation 850.0000 3,400.00 3,400.00 3243 Kovilic Construction Company, Inc. 1,100.0000 4,400.00 4,400.00 3505 Lorig Construction Company 850.0000 3,400.00 3,400.00 XX008139 REM & REL MEMORIAL ST 1.000 L SUM 0820 Albin Carlson & Co. 2,146.4000 2,146.40 2,146.40 1320 D. Construction, Inc. 550.0000 550.00 550.00 1552 Dunnet Bay Construction Company 6,825.5000 6,825.50 6,825.50 2520 Herlihy Mid-Continent Company 1,000.0000 1,000.00 1,000.00 2779 Illinois Constructors Corporation 10,000.0000 10,000.00 10,000.00 3243 Kovilic Construction Company, Inc. 5,000.0000 5,000.00 5,000.00 3505 Lorig Construction Company 1,700.0000 1,700.00 1,700.00 XX008140 REM & REL EXIST PLAQ 1.000 EACH 0820 Albin Carlson & Co. 579.4500 579.45 579.45 1320 D. Construction, Inc. 550.0000 550.00 550.00 1552 Dunnet Bay Construction Company 780.0000 780.00 780.00 2520 Herlihy Mid-Continent Company 500.0000 500.00 500.00 2779 Illinois Constructors Corporation 10,000.0000 10,000.00 10,000.00 3243 Kovilic Construction Company, Inc. 2,000.0000 2,000.00 2,000.00 3505 Lorig Construction Company 500.0000 500.00 500.00 XX008141 STANDOFF RISER ASS 6" 1.000 EACH 0820 Albin Carlson & Co. 999.0000 999.00 999.00 1320 D. Construction, Inc. 1,000.0000 1,000.00 1,000.00 1552 Dunnet Bay Construction Company 800.0000 800.00 800.00 2520 Herlihy Mid-Continent Company 800.0000 800.00 800.00 2779 Illinois Constructors Corporation 800.0000 800.00 800.00 3243 Kovilic Construction Company, Inc. 1,000.0000 1,000.00 1,000.00 3505 Lorig Construction Company 900.0000 900.00 900.00 XX008142 10 W 8-6 2-3 PVC DB 170.000 FOOT 0820 Albin Carlson & Co. 100.0000 17,000.00 17,000.00 1320 D. Construction, Inc. 110.0000 18,700.00 18,700.00 1552 Dunnet Bay Construction Company 85.0000 14,450.00 14,450.00 2520 Herlihy Mid-Continent Company 85.0000 14,450.00 14,450.00 2779 Illinois Constructors Corporation 85.0000 14,450.00 14,450.00 3243 Kovilic Construction Company, Inc. 106.0000 18,020.00 18,020.00 3505 Lorig Construction Company 85.0000 14,450.00 14,450.00 XX008143 9 W 7-6 & 2-3 PVC DB 10.000 FOOT 0820 Albin Carlson & Co. 100.0000 1,000.00 1,000.00 1320 D. Construction, Inc. 110.0000 1,100.00 1,100.00 1552 Dunnet Bay Construction Company 85.0000 850.00 850.00 2520 Herlihy Mid-Continent Company 85.0000 850.00 850.00 2779 Illinois Constructors Corporation 85.0000 850.00 850.00 3243 Kovilic Construction Company, Inc. 106.0000 1,060.00 1,060.00 3505 Lorig Construction Company 85.0000 850.00 850.00 XX008144 4 W 2-3 & 2-6 PVC DB 20.000 FOOT 0820 Albin Carlson & Co. 100.0000 2,000.00 2,000.00 1320 D. Construction, Inc. 110.0000 2,200.00 2,200.00 1552 Dunnet Bay Construction Company 45.0000 900.00 900.00 2520 Herlihy Mid-Continent Company 45.0000 900.00 900.00 2779 Illinois Constructors Corporation 45.0000 900.00 900.00 3243 Kovilic Construction Company, Inc. 57.0000 1,140.00 1,140.00 3505 Lorig Construction Company 45.0000 900.00 900.00 XX008145 SAN FORCEMAIN REM 3" 214.000 FOOT 0820 Albin Carlson & Co. 20.4200 4,369.88 4,369.88 1320 D. Construction, Inc. 20.0000 4,280.00 4,280.00 1552 Dunnet Bay Construction Company 17.0000 3,638.00 3,638.00 2520 Herlihy Mid-Continent Company 15.0000 3,210.00 3,210.00 2779 Illinois Constructors Corporation 45.7000 9,779.80 9,779.80 3243 Kovilic Construction Company, Inc. 5.0000 1,070.00 1,070.00 3505 Lorig Construction Company 40.0000 8,560.00 8,560.00 XX008146 SAN SEW HDPE FRCMN 3" 105.000 FOOT 0820 Albin Carlson & Co. 70.7900 7,432.95 7,432.95 1320 D. Construction, Inc. 50.0000 5,250.00 5,250.00 1552 Dunnet Bay Construction Company 99.0000 10,395.00 10,395.00 2520 Herlihy Mid-Continent Company 52.0000 5,460.00 5,460.00 2779 Illinois Constructors Corporation 46.4000 4,872.00 4,872.00 3243 Kovilic Construction Company, Inc. 20.0000 2,100.00 2,100.00 3505 Lorig Construction Company 100.0000 10,500.00 10,500.00 XX008147 SAN SEW PVC SDR 21 8 137.000 FOOT 0820 Albin Carlson & Co. 88.4900 12,123.13 12,123.13 1320 D. Construction, Inc. 120.0000 16,440.00 16,440.00 1552 Dunnet Bay Construction Company 89.0000 12,193.00 12,193.00 2520 Herlihy Mid-Continent Company 65.0000 8,905.00 8,905.00 2779 Illinois Constructors Corporation 50.6000 6,932.20 6,932.20 3243 Kovilic Construction Company, Inc. 50.0000 6,850.00 6,850.00 3505 Lorig Construction Company 70.0000 9,590.00 9,590.00 XX008148 U D 4/C 6 XLP DIR BOR 863.000 FOOT 0820 Albin Carlson & Co. 18.4000 15,879.20 15,879.20 1320 D. Construction, Inc. 20.2400 17,467.12 17,467.12 1552 Dunnet Bay Construction Company 11.0000 9,493.00 9,493.00 2520 Herlihy Mid-Continent Company 11.0000 9,493.00 9,493.00 2779 Illinois Constructors Corporation 11.0000 9,493.00 9,493.00 3243 Kovilic Construction Company, Inc. 14.0000 12,082.00 12,082.00 3505 Lorig Construction Company 11.0000 9,493.00 9,493.00 XX008149 ROUGH GRADING 100.000 SQ YD 0820 Albin Carlson & Co. 9.0000 900.00 900.00 1320 D. Construction, Inc. 10.0000 1,000.00 1,000.00 1552 Dunnet Bay Construction Company 75.0000 7,500.00 7,500.00 2520 Herlihy Mid-Continent Company 6.0000 600.00 600.00 2779 Illinois Constructors Corporation 43.5400 4,354.00 4,354.00 3243 Kovilic Construction Company, Inc. 3.0000 300.00 300.00 3505 Lorig Construction Company 4.0000 400.00 400.00 XX008159 PCC BAND PAVER BRICKS 56.000 FOOT 0820 Albin Carlson & Co. 24.3000 1,360.80 1,360.80 1320 D. Construction, Inc. 20.0000 1,120.00 1,120.00 1552 Dunnet Bay Construction Company 25.0000 1,400.00 1,400.00 2520 Herlihy Mid-Continent Company 22.0000 1,232.00 1,232.00 2779 Illinois Constructors Corporation 40.0000 2,240.00 2,240.00 3243 Kovilic Construction Company, Inc. 15.0000 840.00 840.00 3505 Lorig Construction Company 65.0000 3,640.00 3,640.00 XX008160 DEC LT SYS COMPLETE 1.000 L SUM 0820 Albin Carlson & Co. 30,000.0000 30,000.00 30,000.00 1320 D. Construction, Inc. 33,000.0000 33,000.00 33,000.00 1552 Dunnet Bay Construction Company 14,000.0000 14,000.00 14,000.00 2520 Herlihy Mid-Continent Company 14,000.0000 14,000.00 14,000.00 2779 Illinois Constructors Corporation 14,000.0000 14,000.00 14,000.00 3243 Kovilic Construction Company, Inc. 17,500.0000 17,500.00 17,500.00 3505 Lorig Construction Company 14,000.0000 14,000.00 14,000.00 XX008161 REM REINST MOD C PAVR 208.000 SQ FT 0820 Albin Carlson & Co. 17.6300 3,667.04 3,667.04 1320 D. Construction, Inc. 10.3400 2,150.72 2,150.72 1552 Dunnet Bay Construction Company 15.0000 3,120.00 3,120.00 2520 Herlihy Mid-Continent Company 8.0000 1,664.00 1,664.00 2779 Illinois Constructors Corporation 9.4000 1,955.20 1,955.20 3243 Kovilic Construction Company, Inc. 12.0000 2,496.00 2,496.00 3505 Lorig Construction Company 15.0000 3,120.00 3,120.00 XX008162 MAINTAIN LIGHTING SYS 1.000 L SUM 0820 Albin Carlson & Co. 5,000.0000 5,000.00 5,000.00 1320 D. Construction, Inc. 5,500.0000 5,500.00 5,500.00 1552 Dunnet Bay Construction Company 2,100.0000 2,100.00 2,100.00 2520 Herlihy Mid-Continent Company 2,100.0000 2,100.00 2,100.00 2779 Illinois Constructors Corporation 2,100.0000 2,100.00 2,100.00 3243 Kovilic Construction Company, Inc. 2,600.0000 2,600.00 2,600.00 3505 Lorig Construction Company 2,100.0000 2,100.00 2,100.00 X0320591 SAN MAN REMOVED 1.000 EACH 0820 Albin Carlson & Co. 816.8100 816.81 816.81 1320 D. Construction, Inc. 800.0000 800.00 800.00 1552 Dunnet Bay Construction Company 500.0000 500.00 500.00 2520 Herlihy Mid-Continent Company 600.0000 600.00 600.00 2779 Illinois Constructors Corporation 2,903.0000 2,903.00 2,903.00 3243 Kovilic Construction Company, Inc. 1,500.0000 1,500.00 1,500.00 3505 Lorig Construction Company 600.0000 600.00 600.00 X0321158 PARK BENCHES 1.000 EACH 0820 Albin Carlson & Co. 2,260.4500 2,260.45 2,260.45 1320 D. Construction, Inc. 2,486.0000 2,486.00 2,486.00 1552 Dunnet Bay Construction Company 1,500.0000 1,500.00 1,500.00 2520 Herlihy Mid-Continent Company 2,000.0000 2,000.00 2,000.00 2779 Illinois Constructors Corporation 2,836.8900 2,836.89 2,836.89 3243 Kovilic Construction Company, Inc. 2,200.0000 2,200.00 2,200.00 3505 Lorig Construction Company 1,500.0000 1,500.00 1,500.00 X0321297 REM EX SIGN POST 1.000 EACH 0820 Albin Carlson & Co. 100.0000 100.00 100.00 1320 D. Construction, Inc. 160.0000 160.00 160.00 1552 Dunnet Bay Construction Company 100.0000 100.00 100.00 2520 Herlihy Mid-Continent Company 100.0000 100.00 100.00 2779 Illinois Constructors Corporation 500.0000 500.00 500.00 3243 Kovilic Construction Company, Inc. 100.0000 100.00 100.00 3505 Lorig Construction Company 100.0000 100.00 100.00 X0321309 CONCRETE PAD 4.000 SQ YD 0820 Albin Carlson & Co. 521.6200 2,086.48 2,086.48 1320 D. Construction, Inc. 150.0000 600.00 600.00 1552 Dunnet Bay Construction Company 5.1000 20.40 20.40 2520 Herlihy Mid-Continent Company 245.0000 980.00 980.00 2779 Illinois Constructors Corporation 50.0000 200.00 200.00 3243 Kovilic Construction Company, Inc. 90.0000 360.00 360.00 3505 Lorig Construction Company 100.0000 400.00 400.00 X0322033 STORM SEW WM REQ 12 41.000 FOOT 0820 Albin Carlson & Co. 92.5700 3,795.37 3,795.37 1320 D. Construction, Inc. 65.0000 2,665.00 2,665.00 1552 Dunnet Bay Construction Company 79.0000 3,239.00 3,239.00 2520 Herlihy Mid-Continent Company 68.0000 2,788.00 2,788.00 2779 Illinois Constructors Corporation 61.7000 2,529.70 2,529.70 3243 Kovilic Construction Company, Inc. 100.0000 4,100.00 4,100.00 3505 Lorig Construction Company 50.0000 2,050.00 2,050.00 X0322256 TEMP INFO SIGNING 103.000 SQ FT 0820 Albin Carlson & Co. 10.0000 1,030.00 1,030.00 1320 D. Construction, Inc. 25.0000 2,575.00 2,575.00 1552 Dunnet Bay Construction Company 10.0000 1,030.00 1,030.00 2520 Herlihy Mid-Continent Company 15.0000 1,545.00 1,545.00 2779 Illinois Constructors Corporation 10.0000 1,030.00 1,030.00 3243 Kovilic Construction Company, Inc. 50.0000 5,150.00 5,150.00 3505 Lorig Construction Company 17.0000 1,751.00 1,751.00 X0322671 STAB CONSTR ENTRANCE 450.000 SQ YD 0820 Albin Carlson & Co. 20.1900 9,085.50 9,085.50 1320 D. Construction, Inc. 1.0000 450.00 450.00 1552 Dunnet Bay Construction Company 30.0000 13,500.00 13,500.00 2520 Herlihy Mid-Continent Company 8.0000 3,600.00 3,600.00 2779 Illinois Constructors Corporation 73.6200 33,129.00 33,129.00 3243 Kovilic Construction Company, Inc. 18.0000 8,100.00 8,100.00 3505 Lorig Construction Company 57.9600 26,082.00 26,082.00 X0322795 REM RELOC EX MONUMENT 1.000 EACH 0820 Albin Carlson & Co. 999.0000 999.00 999.00 1320 D. Construction, Inc. 1,000.0000 1,000.00 1,000.00 1552 Dunnet Bay Construction Company 5,000.0000 5,000.00 5,000.00 2520 Herlihy Mid-Continent Company 900.0000 900.00 900.00 2779 Illinois Constructors Corporation 10,000.0000 10,000.00 10,000.00 3243 Kovilic Construction Company, Inc. 10,000.0000 10,000.00 10,000.00 3505 Lorig Construction Company 1,500.0000 1,500.00 1,500.00 X0322917 PRO SS CONN TO EX MAN 3.000 EACH 0820 Albin Carlson & Co. 1,089.0800 3,267.24 3,267.24 1320 D. Construction, Inc. 1,000.0000 3,000.00 3,000.00 1552 Dunnet Bay Construction Company 820.0000 2,460.00 2,460.00 2520 Herlihy Mid-Continent Company 800.0000 2,400.00 2,400.00 2779 Illinois Constructors Corporation 1,174.0000 3,522.00 3,522.00 3243 Kovilic Construction Company, Inc. 1,000.0000 3,000.00 3,000.00 3505 Lorig Construction Company 800.0000 2,400.00 2,400.00 X0323080 DRAINAGE SCUPPR DS-12 6.000 EACH 0820 Albin Carlson & Co. 1,446.6600 8,679.96 8,679.96 1320 D. Construction, Inc. 1,200.0000 7,200.00 7,200.00 1552 Dunnet Bay Construction Company 1,200.0000 7,200.00 7,200.00 2520 Herlihy Mid-Continent Company 1,200.0000 7,200.00 7,200.00 2779 Illinois Constructors Corporation 1,400.0000 8,400.00 8,400.00 3243 Kovilic Construction Company, Inc. 1,000.0000 6,000.00 6,000.00 3505 Lorig Construction Company 1,000.0000 6,000.00 6,000.00 X0323350 FUR & SET BRICK PAVER 550.000 SQ FT 0820 Albin Carlson & Co. 16.0000 8,800.00 8,800.00 1320 D. Construction, Inc. 10.3400 5,687.00 5,687.00 1552 Dunnet Bay Construction Company 12.0000 6,600.00 6,600.00 2520 Herlihy Mid-Continent Company 9.5000 5,225.00 5,225.00 2779 Illinois Constructors Corporation 9.4000 5,170.00 5,170.00 3243 Kovilic Construction Company, Inc. 12.0000 6,600.00 6,600.00 3505 Lorig Construction Company 12.0000 6,600.00 6,600.00 X0323706 TRASH RECEPTACLE REL 1.000 EACH 0820 Albin Carlson & Co. 483.5000 483.50 483.50 1320 D. Construction, Inc. 531.0000 531.00 531.00 1552 Dunnet Bay Construction Company 450.0000 450.00 450.00 2520 Herlihy Mid-Continent Company 900.0000 900.00 900.00 2779 Illinois Constructors Corporation 600.0000 600.00 600.00 3243 Kovilic Construction Company, Inc. 250.0000 250.00 250.00 3505 Lorig Construction Company 350.0000 350.00 350.00 X0840000 SAN SEW REMOV 8 127.000 FOOT 0820 Albin Carlson & Co. 100.7400 12,793.98 12,793.98 1320 D. Construction, Inc. 35.0000 4,445.00 4,445.00 1552 Dunnet Bay Construction Company 12.0000 1,524.00 1,524.00 2520 Herlihy Mid-Continent Company 74.0000 9,398.00 9,398.00 2779 Illinois Constructors Corporation 32.3000 4,102.10 4,102.10 3243 Kovilic Construction Company, Inc. 15.0000 1,905.00 1,905.00 3505 Lorig Construction Company 30.0000 3,810.00 3,810.00 X0974300 SIGN REMOVAL 1.000 EACH 0820 Albin Carlson & Co. 75.0000 75.00 75.00 1320 D. Construction, Inc. 160.0000 160.00 160.00 1552 Dunnet Bay Construction Company 75.0000 75.00 75.00 2520 Herlihy Mid-Continent Company 100.0000 100.00 100.00 2779 Illinois Constructors Corporation 500.0000 500.00 500.00 3243 Kovilic Construction Company, Inc. 150.0000 150.00 150.00 3505 Lorig Construction Company 100.0000 100.00 100.00 X4021000 TEMP ACCESS- PRIV ENT 4.000 EACH 0820 Albin Carlson & Co. 1,446.3000 5,785.20 5,785.20 1320 D. Construction, Inc. 800.0000 3,200.00 3,200.00 1552 Dunnet Bay Construction Company 760.0000 3,040.00 3,040.00 2520 Herlihy Mid-Continent Company 4,000.0000 16,000.00 16,000.00 2779 Illinois Constructors Corporation 2,000.0000 8,000.00 8,000.00 3243 Kovilic Construction Company, Inc. 500.0000 2,000.00 2,000.00 3505 Lorig Construction Company 600.0000 2,400.00 2,400.00 X4022000 TEMP ACCESS- COM ENT 1.000 EACH 0820 Albin Carlson & Co. 2,348.2800 2,348.28 2,348.28 1320 D. Construction, Inc. 1,100.0000 1,100.00 1,100.00 1552 Dunnet Bay Construction Company 965.0000 965.00 965.00 2520 Herlihy Mid-Continent Company 4,500.0000 4,500.00 4,500.00 2779 Illinois Constructors Corporation 6,000.0000 6,000.00 6,000.00 3243 Kovilic Construction Company, Inc. 1,000.0000 1,000.00 1,000.00 3505 Lorig Construction Company 1,500.0000 1,500.00 1,500.00 X4023000 TEMP ACCESS- ROAD 2.000 EACH 0820 Albin Carlson & Co. 19,222.5200 38,445.04 38,445.04 1320 D. Construction, Inc. 1,400.0000 2,800.00 2,800.00 1552 Dunnet Bay Construction Company 2,030.0000 4,060.00 4,060.00 2520 Herlihy Mid-Continent Company 7,800.0000 15,600.00 15,600.00 2779 Illinois Constructors Corporation 42,000.0000 84,000.00 84,000.00 3243 Kovilic Construction Company, Inc. 1,500.0000 3,000.00 3,000.00 3505 Lorig Construction Company 1,500.0000 3,000.00 3,000.00 X5020501 UNWAT STR EX PROT L1 1.000 EACH 0820 Albin Carlson & Co. 9,999.0000 9,999.00 9,999.00 1320 D. Construction, Inc. 40,000.0000 40,000.00 40,000.00 1552 Dunnet Bay Construction Company 20,000.0000 20,000.00 20,000.00 2520 Herlihy Mid-Continent Company 2,000.0000 2,000.00 2,000.00 2779 Illinois Constructors Corporation 45,000.0000 45,000.00 45,000.00 3243 Kovilic Construction Company, Inc. 50,000.0000 50,000.00 50,000.00 3505 Lorig Construction Company 1,000.0000 1,000.00 1,000.00 X5020502 UNWAT STR EX PROT L2 1.000 EACH 0820 Albin Carlson & Co. 9,999.0000 9,999.00 9,999.00 1320 D. Construction, Inc. 40,000.0000 40,000.00 40,000.00 1552 Dunnet Bay Construction Company 10,000.0000 10,000.00 10,000.00 2520 Herlihy Mid-Continent Company 33,000.0000 33,000.00 33,000.00 2779 Illinois Constructors Corporation 25,000.0000 25,000.00 25,000.00 3243 Kovilic Construction Company, Inc. 50,000.0000 50,000.00 50,000.00 3505 Lorig Construction Company 1,000.0000 1,000.00 1,000.00 X5020503 UNWAT STR EX PROT L3 1.000 EACH 0820 Albin Carlson & Co. 9,999.0000 9,999.00 9,999.00 1320 D. Construction, Inc. 35,000.0000 35,000.00 35,000.00 1552 Dunnet Bay Construction Company 10,000.0000 10,000.00 10,000.00 2520 Herlihy Mid-Continent Company 33,000.0000 33,000.00 33,000.00 2779 Illinois Constructors Corporation 25,311.0100 25,311.01 25,311.01 3243 Kovilic Construction Company, Inc. 50,000.0000 50,000.00 50,000.00 3505 Lorig Construction Company 1,000.0000 1,000.00 1,000.00 X5020504 UNWAT STR EX PROT L4 1.000 EACH 0820 Albin Carlson & Co. 9,999.0000 9,999.00 9,999.00 1320 D. Construction, Inc. 35,000.0000 35,000.00 35,000.00 1552 Dunnet Bay Construction Company 20,000.0000 20,000.00 20,000.00 2520 Herlihy Mid-Continent Company 2,000.0000 2,000.00 2,000.00 2779 Illinois Constructors Corporation 35,000.0000 35,000.00 35,000.00 3243 Kovilic Construction Company, Inc. 50,000.0000 50,000.00 50,000.00 3505 Lorig Construction Company 1,000.0000 1,000.00 1,000.00 X5428878 CIP RC END SEC 78 SPL 1.000 EACH 0820 Albin Carlson & Co. 17,134.5600 17,134.56 17,134.56 1320 D. Construction, Inc. 11,000.0000 11,000.00 11,000.00 1552 Dunnet Bay Construction Company 18,000.0000 18,000.00 18,000.00 2520 Herlihy Mid-Continent Company 15,000.0000 15,000.00 15,000.00 2779 Illinois Constructors Corporation 35,000.0000 35,000.00 35,000.00 3243 Kovilic Construction Company, Inc. 30,000.0000 30,000.00 30,000.00 3505 Lorig Construction Company 8,000.0000 8,000.00 8,000.00 X6060150 CONC CURB 6 REINF 206.000 FOOT 0820 Albin Carlson & Co. 25.3500 5,222.10 5,222.10 1320 D. Construction, Inc. 18.0000 3,708.00 3,708.00 1552 Dunnet Bay Construction Company 13.4000 2,760.40 2,760.40 2520 Herlihy Mid-Continent Company 21.0000 4,326.00 4,326.00 2779 Illinois Constructors Corporation 30.0000 6,180.00 6,180.00 3243 Kovilic Construction Company, Inc. 36.0000 7,416.00 7,416.00 3505 Lorig Construction Company 25.0000 5,150.00 5,150.00 X7240600 REM RE-ERECT EX SIGN 3.000 EACH 0820 Albin Carlson & Co. 150.0000 450.00 450.00 1320 D. Construction, Inc. 500.0000 1,500.00 1,500.00 1552 Dunnet Bay Construction Company 150.0000 450.00 450.00 2520 Herlihy Mid-Continent Company 100.0000 300.00 300.00 2779 Illinois Constructors Corporation 1,000.0000 3,000.00 3,000.00 3243 Kovilic Construction Company, Inc. 1,000.0000 3,000.00 3,000.00 3505 Lorig Construction Company 175.0000 525.00 525.00 X8161000 EXP & REL EX UNIT DCT 10.000 FOOT 0820 Albin Carlson & Co. 80.0000 800.00 800.00 1320 D. Construction, Inc. 88.0000 880.00 880.00 1552 Dunnet Bay Construction Company 60.0000 600.00 600.00 2520 Herlihy Mid-Continent Company 60.0000 600.00 600.00 2779 Illinois Constructors Corporation 60.0000 600.00 600.00 3243 Kovilic Construction Company, Inc. 100.0000 1,000.00 1,000.00 3505 Lorig Construction Company 60.0000 600.00 600.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0820 Albin Carlson & Co. 12,500.0000 12,500.00 12,500.00 1320 D. Construction, Inc. 12,500.0000 12,500.00 12,500.00 1552 Dunnet Bay Construction Company 20,000.0000 20,000.00 20,000.00 2520 Herlihy Mid-Continent Company 35,000.0000 35,000.00 35,000.00 2779 Illinois Constructors Corporation 18,950.0000 18,950.00 18,950.00 3243 Kovilic Construction Company, Inc. 10,000.0000 10,000.00 10,000.00 3505 Lorig Construction Company 100,000.0000 100,000.00 100,000.00 Z0015500 DEBRIS REMOVAL 1.000 L SUM 0820 Albin Carlson & Co. 3,313.2100 3,313.21 3,313.21 1320 D. Construction, Inc. 3,000.0000 3,000.00 3,000.00 1552 Dunnet Bay Construction Company 5,519.8400 5,519.84 5,519.84 2520 Herlihy Mid-Continent Company 1,200.0000 1,200.00 1,200.00 2779 Illinois Constructors Corporation 10,000.0000 10,000.00 10,000.00 3243 Kovilic Construction Company, Inc. 10,000.0000 10,000.00 10,000.00 3505 Lorig Construction Company 3,000.0000 3,000.00 3,000.00 Z0018500 DRAINAGE STR CLEANED 3.000 EACH 0820 Albin Carlson & Co. 1,437.2100 4,311.63 4,311.63 1320 D. Construction, Inc. 225.0000 675.00 675.00 1552 Dunnet Bay Construction Company 310.0000 930.00 930.00 2520 Herlihy Mid-Continent Company 450.0000 1,350.00 1,350.00 2779 Illinois Constructors Corporation 450.0000 1,350.00 1,350.00 3243 Kovilic Construction Company, Inc. 300.0000 900.00 900.00 3505 Lorig Construction Company 1,300.0000 3,900.00 3,900.00 Z0022800 FENCE REMOVAL 25.000 FOOT 0820 Albin Carlson & Co. 16.0000 400.00 400.00 1320 D. Construction, Inc. 10.0000 250.00 250.00 1552 Dunnet Bay Construction Company 16.0000 400.00 400.00 2520 Herlihy Mid-Continent Company 13.0900 327.25 327.25 2779 Illinois Constructors Corporation 13.0900 327.25 327.25 3243 Kovilic Construction Company, Inc. 5.0000 125.00 125.00 3505 Lorig Construction Company 15.0000 375.00 375.00 Z0054400 ROCK FILL 262.000 CU YD 0820 Albin Carlson & Co. 39.2600 10,286.12 10,286.12 1320 D. Construction, Inc. 35.0000 9,170.00 9,170.00 1552 Dunnet Bay Construction Company 45.0000 11,790.00 11,790.00 2520 Herlihy Mid-Continent Company 40.0000 10,480.00 10,480.00 2779 Illinois Constructors Corporation 56.5000 14,803.00 14,803.00 3243 Kovilic Construction Company, Inc. 100.0000 26,200.00 26,200.00 3505 Lorig Construction Company 50.0000 13,100.00 13,100.00 Z0062000 SAW CUTTING 8.000 FOOT 0820 Albin Carlson & Co. 87.8900 703.12 703.12 1320 D. Construction, Inc. 50.0000 400.00 400.00 1552 Dunnet Bay Construction Company 2.7000 21.60 21.60 2520 Herlihy Mid-Continent Company 24.0000 192.00 192.00 2779 Illinois Constructors Corporation 18.0000 144.00 144.00 3243 Kovilic Construction Company, Inc. 25.0000 200.00 200.00 3505 Lorig Construction Company 12.0000 96.00 96.00 20100110 TREE REMOV 6-15 556.000 UNIT 0820 Albin Carlson & Co. 9.0000 5,004.00 5,004.00 1320 D. Construction, Inc. 9.9000 5,504.40 5,504.40 1552 Dunnet Bay Construction Company 11.0000 6,116.00 6,116.00 2520 Herlihy Mid-Continent Company 9.0000 5,004.00 5,004.00 2779 Illinois Constructors Corporation 9.0000 5,004.00 5,004.00 3243 Kovilic Construction Company, Inc. 20.0000 11,120.00 11,120.00 3505 Lorig Construction Company 10.0000 5,560.00 5,560.00 20100210 TREE REMOV OVER 15 197.000 UNIT 0820 Albin Carlson & Co. 12.0000 2,364.00 2,364.00 1320 D. Construction, Inc. 13.2000 2,600.40 2,600.40 1552 Dunnet Bay Construction Company 15.0000 2,955.00 2,955.00 2520 Herlihy Mid-Continent Company 12.0000 2,364.00 2,364.00 2779 Illinois Constructors Corporation 12.0000 2,364.00 2,364.00 3243 Kovilic Construction Company, Inc. 25.0000 4,925.00 4,925.00 3505 Lorig Construction Company 13.0000 2,561.00 2,561.00 20101000 TEMPORARY FENCE 730.000 FOOT 0820 Albin Carlson & Co. 6.2500 4,562.50 4,562.50 1320 D. Construction, Inc. 3.8500 2,810.50 2,810.50 1552 Dunnet Bay Construction Company 6.2500 4,562.50 4,562.50 2520 Herlihy Mid-Continent Company 4.1100 3,000.30 3,000.30 2779 Illinois Constructors Corporation 3.5000 2,555.00 2,555.00 3243 Kovilic Construction Company, Inc. 6.0000 4,380.00 4,380.00 3505 Lorig Construction Company 5.0000 3,650.00 3,650.00 20101100 TREE TRUNK PROTECTION 43.000 EACH 0820 Albin Carlson & Co. 45.0000 1,935.00 1,935.00 1320 D. Construction, Inc. 110.0000 4,730.00 4,730.00 1552 Dunnet Bay Construction Company 45.0000 1,935.00 1,935.00 2520 Herlihy Mid-Continent Company 100.0000 4,300.00 4,300.00 2779 Illinois Constructors Corporation 125.0000 5,375.00 5,375.00 3243 Kovilic Construction Company, Inc. 100.0000 4,300.00 4,300.00 3505 Lorig Construction Company 80.0000 3,440.00 3,440.00 20200100 EARTH EXCAVATION 1,750.000 CU YD 0820 Albin Carlson & Co. 20.9800 36,715.00 36,715.00 1320 D. Construction, Inc. 25.0000 43,750.00 43,750.00 1552 Dunnet Bay Construction Company 23.0000 40,250.00 40,250.00 2520 Herlihy Mid-Continent Company 25.0000 43,750.00 43,750.00 2779 Illinois Constructors Corporation 37.0000 64,750.00 64,750.00 3243 Kovilic Construction Company, Inc. 50.0000 87,500.00 87,500.00 3505 Lorig Construction Company 40.0000 70,000.00 70,000.00 20200205 ROCK EXCAVATION SPL 50.000 CU YD 0820 Albin Carlson & Co. 225.0000 11,250.00 11,250.00 1320 D. Construction, Inc. 49.5000 2,475.00 2,475.00 1552 Dunnet Bay Construction Company 200.0000 10,000.00 10,000.00 2520 Herlihy Mid-Continent Company 10.0000 500.00 500.00 2779 Illinois Constructors Corporation 195.0000 9,750.00 9,750.00 3243 Kovilic Construction Company, Inc. 300.0000 15,000.00 15,000.00 3505 Lorig Construction Company 700.0000 35,000.00 35,000.00 20200410 EARTH EXCAVATION SPL 70.000 CU YD 0820 Albin Carlson & Co. 50.0000 3,500.00 3,500.00 1320 D. Construction, Inc. 50.0000 3,500.00 3,500.00 1552 Dunnet Bay Construction Company 85.0000 5,950.00 5,950.00 2520 Herlihy Mid-Continent Company 40.0000 2,800.00 2,800.00 2779 Illinois Constructors Corporation 49.0000 3,430.00 3,430.00 3243 Kovilic Construction Company, Inc. 100.0000 7,000.00 7,000.00 3505 Lorig Construction Company 75.0000 5,250.00 5,250.00 20700400 POROUS GRAN EMB SPEC 750.000 CU YD 0820 Albin Carlson & Co. 33.0500 24,787.50 24,787.50 1320 D. Construction, Inc. 40.0000 30,000.00 30,000.00 1552 Dunnet Bay Construction Company 60.0000 45,000.00 45,000.00 2520 Herlihy Mid-Continent Company 50.0000 37,500.00 37,500.00 2779 Illinois Constructors Corporation 37.0000 27,750.00 27,750.00 3243 Kovilic Construction Company, Inc. 50.0000 37,500.00 37,500.00 3505 Lorig Construction Company 50.0000 37,500.00 37,500.00 20700420 POROUS GRAN EMB SUBGR 50.000 CU YD 0820 Albin Carlson & Co. 57.2600 2,863.00 2,863.00 1320 D. Construction, Inc. 50.0000 2,500.00 2,500.00 1552 Dunnet Bay Construction Company 40.0000 2,000.00 2,000.00 2520 Herlihy Mid-Continent Company 50.0000 2,500.00 2,500.00 2779 Illinois Constructors Corporation 54.0000 2,700.00 2,700.00 3243 Kovilic Construction Company, Inc. 50.0000 2,500.00 2,500.00 3505 Lorig Construction Company 50.0000 2,500.00 2,500.00 20800150 TRENCH BACKFILL 713.300 CU YD 0820 Albin Carlson & Co. 51.7300 36,899.01 36,899.01 1320 D. Construction, Inc. 40.0000 28,532.00 28,532.00 1552 Dunnet Bay Construction Company 34.0000 24,252.20 24,252.20 2520 Herlihy Mid-Continent Company 38.0000 27,105.40 27,105.40 2779 Illinois Constructors Corporation 45.0000 32,098.50 32,098.50 3243 Kovilic Construction Company, Inc. 50.0000 35,665.00 35,665.00 3505 Lorig Construction Company 30.0000 21,399.00 21,399.00 21101615 TOPSOIL F & P 4 2,640.000 SQ YD 0820 Albin Carlson & Co. 3.0000 7,920.00 7,920.00 1320 D. Construction, Inc. 3.3000 8,712.00 8,712.00 1552 Dunnet Bay Construction Company 3.0000 7,920.00 7,920.00 2520 Herlihy Mid-Continent Company 3.0000 7,920.00 7,920.00 2779 Illinois Constructors Corporation 3.0000 7,920.00 7,920.00 3243 Kovilic Construction Company, Inc. 5.0000 13,200.00 13,200.00 3505 Lorig Construction Company 3.0000 7,920.00 7,920.00 21101815 COMPOST F & P 4 54.000 SQ YD 0820 Albin Carlson & Co. 10.0000 540.00 540.00 1320 D. Construction, Inc. 11.0000 594.00 594.00 1552 Dunnet Bay Construction Company 10.0000 540.00 540.00 2520 Herlihy Mid-Continent Company 10.0000 540.00 540.00 2779 Illinois Constructors Corporation 10.0000 540.00 540.00 3243 Kovilic Construction Company, Inc. 7.0000 378.00 378.00 3505 Lorig Construction Company 10.0000 540.00 540.00 25000200 SEEDING CL 2 .010 ACRE 0820 Albin Carlson & Co. 1,200.0000 12.00 12.00 1320 D. Construction, Inc. 1,320.0000 13.20 13.20 1552 Dunnet Bay Construction Company 1,200.0000 12.00 12.00 2520 Herlihy Mid-Continent Company 1,200.0000 12.00 12.00 2779 Illinois Constructors Corporation 1,200.0000 12.00 12.00 3243 Kovilic Construction Company, Inc. 30,000.0000 300.00 300.00 3505 Lorig Construction Company 1,200.0000 12.00 12.00 25000400 NITROGEN FERT NUTR 65.000 POUND 0820 Albin Carlson & Co. 1.5000 97.50 97.50 1320 D. Construction, Inc. 1.6500 107.25 107.25 1552 Dunnet Bay Construction Company 1.5000 97.50 97.50 2520 Herlihy Mid-Continent Company 1.5000 97.50 97.50 2779 Illinois Constructors Corporation 1.5000 97.50 97.50 3243 Kovilic Construction Company, Inc. 10.0000 650.00 650.00 3505 Lorig Construction Company 1.5000 97.50 97.50 25000500 PHOSPHORUS FERT NUTR 65.000 POUND 0820 Albin Carlson & Co. 1.5000 97.50 97.50 1320 D. Construction, Inc. 1.6500 107.25 107.25 1552 Dunnet Bay Construction Company 1.5000 97.50 97.50 2520 Herlihy Mid-Continent Company 1.5000 97.50 97.50 2779 Illinois Constructors Corporation 1.5000 97.50 97.50 3243 Kovilic Construction Company, Inc. 10.0000 650.00 650.00 3505 Lorig Construction Company 1.5000 97.50 97.50 25000600 POTASSIUM FERT NUTR 65.000 POUND 0820 Albin Carlson & Co. 1.5000 97.50 97.50 1320 D. Construction, Inc. 1.6500 107.25 107.25 1552 Dunnet Bay Construction Company 1.5000 97.50 97.50 2520 Herlihy Mid-Continent Company 1.5000 97.50 97.50 2779 Illinois Constructors Corporation 1.5000 97.50 97.50 3243 Kovilic Construction Company, Inc. 10.0000 650.00 650.00 3505 Lorig Construction Company 1.5000 97.50 97.50 25000920 SEEDING CL 1A SPL .250 ACRE 0820 Albin Carlson & Co. 5,000.0000 1,250.00 1,250.00 1320 D. Construction, Inc. 5,500.0000 1,375.00 1,375.00 1552 Dunnet Bay Construction Company 5,000.0000 1,250.00 1,250.00 2520 Herlihy Mid-Continent Company 5,000.0000 1,250.00 1,250.00 2779 Illinois Constructors Corporation 5,000.0000 1,250.00 1,250.00 3243 Kovilic Construction Company, Inc. 20,000.0000 5,000.00 5,000.00 3505 Lorig Construction Company 5,000.0000 1,250.00 1,250.00 25100630 EROSION CONTR BLANKET 14.700 SQ YD 0820 Albin Carlson & Co. 1.0000 14.70 14.70 1320 D. Construction, Inc. 1.1000 16.17 16.17 1552 Dunnet Bay Construction Company 1.0000 14.70 14.70 2520 Herlihy Mid-Continent Company 1.0000 14.70 14.70 2779 Illinois Constructors Corporation 1.0000 14.70 14.70 3243 Kovilic Construction Company, Inc. 14.0000 205.80 205.80 3505 Lorig Construction Company 1.0000 14.70 14.70 25200110 SODDING SALT TOLERANT 2,640.000 SQ YD 0820 Albin Carlson & Co. 4.5000 11,880.00 11,880.00 1320 D. Construction, Inc. 4.9500 13,068.00 13,068.00 1552 Dunnet Bay Construction Company 4.5000 11,880.00 11,880.00 2520 Herlihy Mid-Continent Company 4.5000 11,880.00 11,880.00 2779 Illinois Constructors Corporation 4.5000 11,880.00 11,880.00 3243 Kovilic Construction Company, Inc. 6.0000 15,840.00 15,840.00 3505 Lorig Construction Company 4.5000 11,880.00 11,880.00 25200200 SUPPLE WATERING 27.000 UNIT 0820 Albin Carlson & Co. 0.0100 0.27 0.27 1320 D. Construction, Inc. 0.0100 0.27 0.27 1552 Dunnet Bay Construction Company 0.0100 0.27 0.27 2520 Herlihy Mid-Continent Company 0.0100 0.27 0.27 2779 Illinois Constructors Corporation 0.0100 0.27 0.27 3243 Kovilic Construction Company, Inc. 75.0000 2,025.00 2,025.00 3505 Lorig Construction Company 0.0100 0.27 0.27 25200700 SODDING SPL 200.000 SQ YD 0820 Albin Carlson & Co. 12.0000 2,400.00 2,400.00 1320 D. Construction, Inc. 13.2000 2,640.00 2,640.00 1552 Dunnet Bay Construction Company 12.0000 2,400.00 2,400.00 2520 Herlihy Mid-Continent Company 12.0000 2,400.00 2,400.00 2779 Illinois Constructors Corporation 12.0000 2,400.00 2,400.00 3243 Kovilic Construction Company, Inc. 14.0000 2,800.00 2,800.00 3505 Lorig Construction Company 12.0000 2,400.00 2,400.00 25400105 PERENNIAL PLANTS 366.000 EACH 0820 Albin Carlson & Co. 10.0000 3,660.00 3,660.00 1320 D. Construction, Inc. 11.0000 4,026.00 4,026.00 1552 Dunnet Bay Construction Company 10.0000 3,660.00 3,660.00 2520 Herlihy Mid-Continent Company 10.0000 3,660.00 3,660.00 2779 Illinois Constructors Corporation 10.0000 3,660.00 3,660.00 3243 Kovilic Construction Company, Inc. 16.0000 5,856.00 5,856.00 3505 Lorig Construction Company 10.0000 3,660.00 3,660.00 28000250 TEMP EROS CONTR SEED 12.000 POUND 0820 Albin Carlson & Co. 4.0000 48.00 48.00 1320 D. Construction, Inc. 4.4000 52.80 52.80 1552 Dunnet Bay Construction Company 4.0000 48.00 48.00 2520 Herlihy Mid-Continent Company 4.0000 48.00 48.00 2779 Illinois Constructors Corporation 4.0000 48.00 48.00 3243 Kovilic Construction Company, Inc. 14.0000 168.00 168.00 3505 Lorig Construction Company 4.0000 48.00 48.00 28000400 PERIMETER EROS BAR 727.000 FOOT 0820 Albin Carlson & Co. 2.5000 1,817.50 1,817.50 1320 D. Construction, Inc. 2.7500 1,999.25 1,999.25 1552 Dunnet Bay Construction Company 2.5000 1,817.50 1,817.50 2520 Herlihy Mid-Continent Company 2.5000 1,817.50 1,817.50 2779 Illinois Constructors Corporation 2.5000 1,817.50 1,817.50 3243 Kovilic Construction Company, Inc. 4.1000 2,980.70 2,980.70 3505 Lorig Construction Company 2.5000 1,817.50 1,817.50 28000510 INLET FILTERS 5.000 EACH 0820 Albin Carlson & Co. 250.0000 1,250.00 1,250.00 1320 D. Construction, Inc. 125.0000 625.00 625.00 1552 Dunnet Bay Construction Company 250.0000 1,250.00 1,250.00 2520 Herlihy Mid-Continent Company 250.0000 1,250.00 1,250.00 2779 Illinois Constructors Corporation 225.0000 1,125.00 1,125.00 3243 Kovilic Construction Company, Inc. 150.0000 750.00 750.00 3505 Lorig Construction Company 250.0000 1,250.00 1,250.00 28100107 STONE RIPRAP CL A4 23.000 SQ YD 0820 Albin Carlson & Co. 65.4900 1,506.27 1,506.27 1320 D. Construction, Inc. 55.0000 1,265.00 1,265.00 1552 Dunnet Bay Construction Company 72.0000 1,656.00 1,656.00 2520 Herlihy Mid-Continent Company 84.0000 1,932.00 1,932.00 2779 Illinois Constructors Corporation 95.0000 2,185.00 2,185.00 3243 Kovilic Construction Company, Inc. 150.0000 3,450.00 3,450.00 3505 Lorig Construction Company 90.0000 2,070.00 2,070.00 28100111 STONE RIPRAP CL A6 184.000 SQ YD 0820 Albin Carlson & Co. 137.2400 25,252.16 25,252.16 1320 D. Construction, Inc. 60.0000 11,040.00 11,040.00 1552 Dunnet Bay Construction Company 140.0000 25,760.00 25,760.00 2520 Herlihy Mid-Continent Company 55.0000 10,120.00 10,120.00 2779 Illinois Constructors Corporation 115.0000 21,160.00 21,160.00 3243 Kovilic Construction Company, Inc. 175.0000 32,200.00 32,200.00 3505 Lorig Construction Company 120.0000 22,080.00 22,080.00 28200200 FILTER FABRIC 207.000 SQ YD 0820 Albin Carlson & Co. 8.3300 1,724.31 1,724.31 1320 D. Construction, Inc. 3.0000 621.00 621.00 1552 Dunnet Bay Construction Company 6.0000 1,242.00 1,242.00 2520 Herlihy Mid-Continent Company 1.0000 207.00 207.00 2779 Illinois Constructors Corporation 4.0000 828.00 828.00 3243 Kovilic Construction Company, Inc. 10.0000 2,070.00 2,070.00 3505 Lorig Construction Company 3.0000 621.00 621.00 31101100 SUB GRAN MAT B 385.000 CU YD 0820 Albin Carlson & Co. 44.7800 17,240.30 17,240.30 1320 D. Construction, Inc. 40.0000 15,400.00 15,400.00 1552 Dunnet Bay Construction Company 48.0000 18,480.00 18,480.00 2520 Herlihy Mid-Continent Company 30.0000 11,550.00 11,550.00 2779 Illinois Constructors Corporation 33.0000 12,705.00 12,705.00 3243 Kovilic Construction Company, Inc. 30.0000 11,550.00 11,550.00 3505 Lorig Construction Company 55.0000 21,175.00 21,175.00 40600100 BIT MATLS PR CT 292.000 GALLON 0820 Albin Carlson & Co. 2.0000 584.00 584.00 1320 D. Construction, Inc. 0.0100 2.92 2.92 1552 Dunnet Bay Construction Company 2.0000 584.00 584.00 2520 Herlihy Mid-Continent Company 3.5000 1,022.00 1,022.00 2779 Illinois Constructors Corporation 3.5000 1,022.00 1,022.00 3243 Kovilic Construction Company, Inc. 3.0000 876.00 876.00 3505 Lorig Construction Company 3.5000 1,022.00 1,022.00 40600300 AGG PR CT 6.000 TON 0820 Albin Carlson & Co. 65.0000 390.00 390.00 1320 D. Construction, Inc. 40.0000 240.00 240.00 1552 Dunnet Bay Construction Company 65.0000 390.00 390.00 2520 Herlihy Mid-Continent Company 60.0000 360.00 360.00 2779 Illinois Constructors Corporation 60.0000 360.00 360.00 3243 Kovilic Construction Company, Inc. 200.0000 1,200.00 1,200.00 3505 Lorig Construction Company 60.0000 360.00 360.00 40600895 CONSTRUC TEST STRIP 1.000 EACH 0820 Albin Carlson & Co. 2,500.0000 2,500.00 2,500.00 1320 D. Construction, Inc. 0.0100 0.01 0.01 1552 Dunnet Bay Construction Company 2,500.0000 2,500.00 2,500.00 2520 Herlihy Mid-Continent Company 3,000.0000 3,000.00 3,000.00 2779 Illinois Constructors Corporation 3,000.0000 3,000.00 3,000.00 3243 Kovilic Construction Company, Inc. 3,000.0000 3,000.00 3,000.00 3505 Lorig Construction Company 3,000.0000 3,000.00 3,000.00 40701851 HMA PAVT FD 8 1/2 2,900.000 SQ YD 0820 Albin Carlson & Co. 41.1000 119,190.00 119,190.00 1320 D. Construction, Inc. 30.0000 87,000.00 87,000.00 1552 Dunnet Bay Construction Company 41.1000 119,190.00 119,190.00 2520 Herlihy Mid-Continent Company 34.0000 98,600.00 98,600.00 2779 Illinois Constructors Corporation 34.0000 98,600.00 98,600.00 3243 Kovilic Construction Company, Inc. 40.0000 116,000.00 116,000.00 3505 Lorig Construction Company 35.0000 101,500.00 101,500.00 42001400 BR APPROACH PAVT SPL 348.000 SQ YD 0820 Albin Carlson & Co. 207.6100 72,248.28 72,248.28 1320 D. Construction, Inc. 250.0000 87,000.00 87,000.00 1552 Dunnet Bay Construction Company 305.0000 106,140.00 106,140.00 2520 Herlihy Mid-Continent Company 330.0000 114,840.00 114,840.00 2779 Illinois Constructors Corporation 300.0000 104,400.00 104,400.00 3243 Kovilic Construction Company, Inc. 225.0000 78,300.00 78,300.00 3505 Lorig Construction Company 300.0000 104,400.00 104,400.00 42300400 PCC DRIVEWAY PAVT 8 270.000 SQ YD 0820 Albin Carlson & Co. 51.2100 13,826.70 13,826.70 1320 D. Construction, Inc. 55.0000 14,850.00 14,850.00 1552 Dunnet Bay Construction Company 46.1000 12,447.00 12,447.00 2520 Herlihy Mid-Continent Company 51.0000 13,770.00 13,770.00 2779 Illinois Constructors Corporation 50.0000 13,500.00 13,500.00 3243 Kovilic Construction Company, Inc. 70.0000 18,900.00 18,900.00 3505 Lorig Construction Company 48.0000 12,960.00 12,960.00 42400200 PC CONC SIDEWALK 5 4,055.000 SQ FT 0820 Albin Carlson & Co. 4.9800 20,193.90 20,193.90 1320 D. Construction, Inc. 5.0000 20,275.00 20,275.00 1552 Dunnet Bay Construction Company 4.1500 16,828.25 16,828.25 2520 Herlihy Mid-Continent Company 3.5000 14,192.50 14,192.50 2779 Illinois Constructors Corporation 4.0000 16,220.00 16,220.00 3243 Kovilic Construction Company, Inc. 6.0000 24,330.00 24,330.00 3505 Lorig Construction Company 4.2500 17,233.75 17,233.75 42400410 PC CONC SIDEWALK 8 297.000 SQ FT 0820 Albin Carlson & Co. 6.7500 2,004.75 2,004.75 1320 D. Construction, Inc. 6.5000 1,930.50 1,930.50 1552 Dunnet Bay Construction Company 5.1000 1,514.70 1,514.70 2520 Herlihy Mid-Continent Company 4.7000 1,395.90 1,395.90 2779 Illinois Constructors Corporation 5.0000 1,485.00 1,485.00 3243 Kovilic Construction Company, Inc. 7.0000 2,079.00 2,079.00 3505 Lorig Construction Company 6.2500 1,856.25 1,856.25 42400800 DETECTABLE WARNINGS 136.000 SQ FT 0820 Albin Carlson & Co. 25.0000 3,400.00 3,400.00 1320 D. Construction, Inc. 22.5000 3,060.00 3,060.00 1552 Dunnet Bay Construction Company 20.0000 2,720.00 2,720.00 2520 Herlihy Mid-Continent Company 22.0000 2,992.00 2,992.00 2779 Illinois Constructors Corporation 30.0000 4,080.00 4,080.00 3243 Kovilic Construction Company, Inc. 40.0000 5,440.00 5,440.00 3505 Lorig Construction Company 26.0000 3,536.00 3,536.00 44000100 PAVEMENT REM 3,768.000 SQ YD 0820 Albin Carlson & Co. 11.3900 42,917.52 42,917.52 1320 D. Construction, Inc. 10.0000 37,680.00 37,680.00 1552 Dunnet Bay Construction Company 12.0000 45,216.00 45,216.00 2520 Herlihy Mid-Continent Company 8.1000 30,520.80 30,520.80 2779 Illinois Constructors Corporation 6.5000 24,492.00 24,492.00 3243 Kovilic Construction Company, Inc. 15.0000 56,520.00 56,520.00 3505 Lorig Construction Company 6.5000 24,492.00 24,492.00 44000200 DRIVE PAVEMENT REM 134.000 SQ YD 0820 Albin Carlson & Co. 10.2100 1,368.14 1,368.14 1320 D. Construction, Inc. 10.0000 1,340.00 1,340.00 1552 Dunnet Bay Construction Company 13.8000 1,849.20 1,849.20 2520 Herlihy Mid-Continent Company 8.1000 1,085.40 1,085.40 2779 Illinois Constructors Corporation 10.0000 1,340.00 1,340.00 3243 Kovilic Construction Company, Inc. 18.0000 2,412.00 2,412.00 3505 Lorig Construction Company 18.0000 2,412.00 2,412.00 44000500 COMB CURB GUTTER REM 1,560.000 FOOT 0820 Albin Carlson & Co. 2.7500 4,290.00 4,290.00 1320 D. Construction, Inc. 5.0000 7,800.00 7,800.00 1552 Dunnet Bay Construction Company 5.2500 8,190.00 8,190.00 2520 Herlihy Mid-Continent Company 2.1000 3,276.00 3,276.00 2779 Illinois Constructors Corporation 6.5000 10,140.00 10,140.00 3243 Kovilic Construction Company, Inc. 9.0000 14,040.00 14,040.00 3505 Lorig Construction Company 5.0000 7,800.00 7,800.00 44000600 SIDEWALK REM 4,765.000 SQ FT 0820 Albin Carlson & Co. 0.6500 3,097.25 3,097.25 1320 D. Construction, Inc. 1.0000 4,765.00 4,765.00 1552 Dunnet Bay Construction Company 1.5000 7,147.50 7,147.50 2520 Herlihy Mid-Continent Company 1.9000 9,053.50 9,053.50 2779 Illinois Constructors Corporation 2.0000 9,530.00 9,530.00 3243 Kovilic Construction Company, Inc. 2.0000 9,530.00 9,530.00 3505 Lorig Construction Company 1.0000 4,765.00 4,765.00 44001700 COMB C C&G REM & REPL 32.000 FOOT 0820 Albin Carlson & Co. 28.0700 898.24 898.24 1320 D. Construction, Inc. 35.0000 1,120.00 1,120.00 1552 Dunnet Bay Construction Company 40.0000 1,280.00 1,280.00 2520 Herlihy Mid-Continent Company 21.0000 672.00 672.00 2779 Illinois Constructors Corporation 40.0000 1,280.00 1,280.00 3243 Kovilic Construction Company, Inc. 50.0000 1,600.00 1,600.00 3505 Lorig Construction Company 33.0000 1,056.00 1,056.00 44002000 CONC CURB REMOV 186.000 FOOT 0820 Albin Carlson & Co. 2.7300 507.78 507.78 1320 D. Construction, Inc. 7.0000 1,302.00 1,302.00 1552 Dunnet Bay Construction Company 3.5000 651.00 651.00 2520 Herlihy Mid-Continent Company 2.1000 390.60 390.60 2779 Illinois Constructors Corporation 5.0000 930.00 930.00 3243 Kovilic Construction Company, Inc. 7.0000 1,302.00 1,302.00 3505 Lorig Construction Company 5.0000 930.00 930.00 44004610 SIDEWLK REM & REPL SP 300.000 SQ FT 0820 Albin Carlson & Co. 18.6500 5,595.00 5,595.00 1320 D. Construction, Inc. 10.0000 3,000.00 3,000.00 1552 Dunnet Bay Construction Company 6.2500 1,875.00 1,875.00 2520 Herlihy Mid-Continent Company 7.3500 2,205.00 2,205.00 2779 Illinois Constructors Corporation 16.0000 4,800.00 4,800.00 3243 Kovilic Construction Company, Inc. 13.0000 3,900.00 3,900.00 3505 Lorig Construction Company 7.0000 2,100.00 2,100.00 44201000 CL B PATCH T4 12 100.000 SQ YD 0820 Albin Carlson & Co. 165.0000 16,500.00 16,500.00 1320 D. Construction, Inc. 150.0000 15,000.00 15,000.00 1552 Dunnet Bay Construction Company 110.0000 11,000.00 11,000.00 2520 Herlihy Mid-Continent Company 57.6000 5,760.00 5,760.00 2779 Illinois Constructors Corporation 125.0000 12,500.00 12,500.00 3243 Kovilic Construction Company, Inc. 72.0000 7,200.00 7,200.00 3505 Lorig Construction Company 50.0000 5,000.00 5,000.00 44201796 CL D PATCH T4 12 100.000 SQ YD 0820 Albin Carlson & Co. 175.8000 17,580.00 17,580.00 1320 D. Construction, Inc. 150.0000 15,000.00 15,000.00 1552 Dunnet Bay Construction Company 100.0000 10,000.00 10,000.00 2520 Herlihy Mid-Continent Company 100.0000 10,000.00 10,000.00 2779 Illinois Constructors Corporation 100.0000 10,000.00 10,000.00 3243 Kovilic Construction Company, Inc. 72.0000 7,200.00 7,200.00 3505 Lorig Construction Company 50.0000 5,000.00 5,000.00 50100100 REM EXIST STRUCT 1.000 EACH 0820 Albin Carlson & Co. 225,000.0000 225,000.00 225,000.00 1320 D. Construction, Inc. 75,000.0000 75,000.00 75,000.00 1552 Dunnet Bay Construction Company 408,000.0000 408,000.00 408,000.00 2520 Herlihy Mid-Continent Company 345,000.0000 345,000.00 345,000.00 2779 Illinois Constructors Corporation 304,105.6400 304,105.64 304,105.64 3243 Kovilic Construction Company, Inc. 225,000.0000 225,000.00 225,000.00 3505 Lorig Construction Company 500,000.0000 500,000.00 500,000.00 50200100 STRUCTURE EXCAVATION 1,694.000 CU YD 0820 Albin Carlson & Co. 50.0000 84,700.00 84,700.00 1320 D. Construction, Inc. 28.0000 47,432.00 47,432.00 1552 Dunnet Bay Construction Company 62.6600 106,146.04 106,146.04 2520 Herlihy Mid-Continent Company 60.0000 101,640.00 101,640.00 2779 Illinois Constructors Corporation 42.0000 71,148.00 71,148.00 3243 Kovilic Construction Company, Inc. 50.0000 84,700.00 84,700.00 3505 Lorig Construction Company 23.0000 38,962.00 38,962.00 50300225 CONC STRUCT 561.500 CU YD 0820 Albin Carlson & Co. 500.0000 280,750.00 280,750.00 1320 D. Construction, Inc. 650.0000 364,975.00 364,975.00 1552 Dunnet Bay Construction Company 801.5300 450,059.10 450,059.10 2520 Herlihy Mid-Continent Company 500.0000 280,750.00 280,750.00 2779 Illinois Constructors Corporation 600.0000 336,900.00 336,900.00 3243 Kovilic Construction Company, Inc. 1,000.0000 561,500.00 561,500.00 3505 Lorig Construction Company 600.0000 336,900.00 336,900.00 50300255 CONC SUP-STR 301.600 CU YD 0820 Albin Carlson & Co. 850.0000 256,360.00 256,360.00 1320 D. Construction, Inc. 800.0000 241,280.00 241,280.00 1552 Dunnet Bay Construction Company 950.0000 286,520.00 286,520.00 2520 Herlihy Mid-Continent Company 800.0000 241,280.00 241,280.00 2779 Illinois Constructors Corporation 900.0000 271,440.00 271,440.00 3243 Kovilic Construction Company, Inc. 1,250.0000 377,000.00 377,000.00 3505 Lorig Construction Company 750.0000 226,200.00 226,200.00 50300260 BR DECK GROOVING 581.000 SQ YD 0820 Albin Carlson & Co. 6.1400 3,567.34 3,567.34 1320 D. Construction, Inc. 6.7500 3,921.75 3,921.75 1552 Dunnet Bay Construction Company 6.5000 3,776.50 3,776.50 2520 Herlihy Mid-Continent Company 5.0000 2,905.00 2,905.00 2779 Illinois Constructors Corporation 6.1100 3,549.91 3,549.91 3243 Kovilic Construction Company, Inc. 10.0000 5,810.00 5,810.00 3505 Lorig Construction Company 8.0000 4,648.00 4,648.00 50300280 CONCRETE ENCASEMENT 88.000 CU YD 0820 Albin Carlson & Co. 199.0000 17,512.00 17,512.00 1320 D. Construction, Inc. 230.0000 20,240.00 20,240.00 1552 Dunnet Bay Construction Company 210.0000 18,480.00 18,480.00 2520 Herlihy Mid-Continent Company 210.0000 18,480.00 18,480.00 2779 Illinois Constructors Corporation 210.0000 18,480.00 18,480.00 3243 Kovilic Construction Company, Inc. 270.0000 23,760.00 23,760.00 3505 Lorig Construction Company 225.0000 19,800.00 19,800.00 50300300 PROTECTIVE COAT 1,300.000 SQ YD 0820 Albin Carlson & Co. 3.7900 4,927.00 4,927.00 1320 D. Construction, Inc. 2.5000 3,250.00 3,250.00 1552 Dunnet Bay Construction Company 1.0000 1,300.00 1,300.00 2520 Herlihy Mid-Continent Company 1.0000 1,300.00 1,300.00 2779 Illinois Constructors Corporation 2.0000 2,600.00 2,600.00 3243 Kovilic Construction Company, Inc. 4.0000 5,200.00 5,200.00 3505 Lorig Construction Company 1.0000 1,300.00 1,300.00 50500105 F & E STRUCT STEEL 1.000 L SUM 0820 Albin Carlson & Co. 294,000.0000 294,000.00 294,000.00 1320 D. Construction, Inc. 285,000.0000 285,000.00 285,000.00 1552 Dunnet Bay Construction Company 288,000.0000 288,000.00 288,000.00 2520 Herlihy Mid-Continent Company 230,000.0000 230,000.00 230,000.00 2779 Illinois Constructors Corporation 360,474.8600 360,474.86 360,474.86 3243 Kovilic Construction Company, Inc. 400,000.0000 400,000.00 400,000.00 3505 Lorig Construction Company 300,000.0000 300,000.00 300,000.00 50500505 STUD SHEAR CONNECTORS 4,536.000 EACH 0820 Albin Carlson & Co. 7.5700 34,337.52 34,337.52 1320 D. Construction, Inc. 2.5000 11,340.00 11,340.00 1552 Dunnet Bay Construction Company 3.5000 15,876.00 15,876.00 2520 Herlihy Mid-Continent Company 2.6500 12,020.40 12,020.40 2779 Illinois Constructors Corporation 3.2000 14,515.20 14,515.20 3243 Kovilic Construction Company, Inc. 5.0000 22,680.00 22,680.00 3505 Lorig Construction Company 3.5000 15,876.00 15,876.00 50800105 REINFORCEMENT BARS 11,500.000 POUND 0820 Albin Carlson & Co. 0.9900 11,385.00 11,385.00 1320 D. Construction, Inc. 1.4000 16,100.00 16,100.00 1552 Dunnet Bay Construction Company 1.0000 11,500.00 11,500.00 2520 Herlihy Mid-Continent Company 1.0000 11,500.00 11,500.00 2779 Illinois Constructors Corporation 1.1600 13,340.00 13,340.00 3243 Kovilic Construction Company, Inc. 1.5000 17,250.00 17,250.00 3505 Lorig Construction Company 1.0500 12,075.00 12,075.00 50800205 REINF BARS, EPOXY CTD 181,300.000 POUND 0820 Albin Carlson & Co. 1.0700 193,991.00 193,991.00 1320 D. Construction, Inc. 1.5000 271,950.00 271,950.00 1552 Dunnet Bay Construction Company 1.0500 190,365.00 190,365.00 2520 Herlihy Mid-Continent Company 1.0000 181,300.00 181,300.00 2779 Illinois Constructors Corporation 1.1500 208,495.00 208,495.00 3243 Kovilic Construction Company, Inc. 2.0000 362,600.00 362,600.00 3505 Lorig Construction Company 1.2000 217,560.00 217,560.00 50800515 BAR SPLICERS 318.000 EACH 0820 Albin Carlson & Co. 23.6900 7,533.42 7,533.42 1320 D. Construction, Inc. 20.0000 6,360.00 6,360.00 1552 Dunnet Bay Construction Company 24.0000 7,632.00 7,632.00 2520 Herlihy Mid-Continent Company 20.0000 6,360.00 6,360.00 2779 Illinois Constructors Corporation 35.0000 11,130.00 11,130.00 3243 Kovilic Construction Company, Inc. 50.0000 15,900.00 15,900.00 3505 Lorig Construction Company 5.0000 1,590.00 1,590.00 50900810 PEDESTRIAN RAIL SPL 421.000 FOOT 0820 Albin Carlson & Co. 215.0000 90,515.00 90,515.00 1320 D. Construction, Inc. 165.7500 69,780.75 69,780.75 1552 Dunnet Bay Construction Company 230.0000 96,830.00 96,830.00 2520 Herlihy Mid-Continent Company 151.0000 63,571.00 63,571.00 2779 Illinois Constructors Corporation 150.6800 63,436.28 63,436.28 3243 Kovilic Construction Company, Inc. 280.0000 117,880.00 117,880.00 3505 Lorig Construction Company 166.0000 69,886.00 69,886.00 50901755 PARAPET RAILING SPL 85.000 FOOT 0820 Albin Carlson & Co. 102.0000 8,670.00 8,670.00 1320 D. Construction, Inc. 150.6600 12,806.10 12,806.10 1552 Dunnet Bay Construction Company 118.0000 10,030.00 10,030.00 2520 Herlihy Mid-Continent Company 137.0000 11,645.00 11,645.00 2779 Illinois Constructors Corporation 136.9600 11,641.60 11,641.60 3243 Kovilic Construction Company, Inc. 133.0000 11,305.00 11,305.00 3505 Lorig Construction Company 155.0000 13,175.00 13,175.00 51500100 NAME PLATES 1.000 EACH 0820 Albin Carlson & Co. 597.0100 597.01 597.01 1320 D. Construction, Inc. 350.0000 350.00 350.00 1552 Dunnet Bay Construction Company 450.0000 450.00 450.00 2520 Herlihy Mid-Continent Company 400.0000 400.00 400.00 2779 Illinois Constructors Corporation 435.0000 435.00 435.00 3243 Kovilic Construction Company, Inc. 1,500.0000 1,500.00 1,500.00 3505 Lorig Construction Company 300.0000 300.00 300.00 51602000 PERMANENT CASING 416.000 FOOT 0820 Albin Carlson & Co. 205.0000 85,280.00 85,280.00 1320 D. Construction, Inc. 176.0000 73,216.00 73,216.00 1552 Dunnet Bay Construction Company 320.0000 133,120.00 133,120.00 2520 Herlihy Mid-Continent Company 350.8000 145,932.80 145,932.80 2779 Illinois Constructors Corporation 97.2500 40,456.00 40,456.00 3243 Kovilic Construction Company, Inc. 200.0000 83,200.00 83,200.00 3505 Lorig Construction Company 98.0000 40,768.00 40,768.00 51603000 DRILLED SHAFT IN SOIL 131.100 CU YD 0820 Albin Carlson & Co. 1,400.0000 183,540.00 183,540.00 1320 D. Construction, Inc. 950.0000 124,545.00 124,545.00 1552 Dunnet Bay Construction Company 480.0000 62,928.00 62,928.00 2520 Herlihy Mid-Continent Company 575.0000 75,382.50 75,382.50 2779 Illinois Constructors Corporation 800.0000 104,880.00 104,880.00 3243 Kovilic Construction Company, Inc. 1,000.0000 131,100.00 131,100.00 3505 Lorig Construction Company 825.0000 108,157.50 108,157.50 51604000 DRILLED SHAFT IN ROCK 94.100 CU YD 0820 Albin Carlson & Co. 2,000.0000 188,200.00 188,200.00 1320 D. Construction, Inc. 3,145.0000 295,944.50 295,944.50 1552 Dunnet Bay Construction Company 2,400.0000 225,840.00 225,840.00 2520 Herlihy Mid-Continent Company 2,680.0000 252,188.00 252,188.00 2779 Illinois Constructors Corporation 1,300.0000 122,330.00 122,330.00 3243 Kovilic Construction Company, Inc. 4,375.0000 411,687.50 411,687.50 3505 Lorig Construction Company 1,275.0000 119,977.50 119,977.50 52100010 ELAST BEARING ASSY T1 18.000 EACH 0820 Albin Carlson & Co. 1,718.7500 30,937.50 30,937.50 1320 D. Construction, Inc. 865.0000 15,570.00 15,570.00 1552 Dunnet Bay Construction Company 870.0000 15,660.00 15,660.00 2520 Herlihy Mid-Continent Company 900.0000 16,200.00 16,200.00 2779 Illinois Constructors Corporation 500.0000 9,000.00 9,000.00 3243 Kovilic Construction Company, Inc. 750.0000 13,500.00 13,500.00 3505 Lorig Construction Company 600.0000 10,800.00 10,800.00 52100520 ANCHOR BOLTS 1 36.000 EACH 0820 Albin Carlson & Co. 169.2300 6,092.28 6,092.28 1320 D. Construction, Inc. 55.0000 1,980.00 1,980.00 1552 Dunnet Bay Construction Company 156.0000 5,616.00 5,616.00 2520 Herlihy Mid-Continent Company 160.0000 5,760.00 5,760.00 2779 Illinois Constructors Corporation 125.0000 4,500.00 4,500.00 3243 Kovilic Construction Company, Inc. 150.0000 5,400.00 5,400.00 3505 Lorig Construction Company 175.0000 6,300.00 6,300.00 52100540 ANCHOR BOLTS 1 1/2 36.000 EACH 0820 Albin Carlson & Co. 203.4600 7,324.56 7,324.56 1320 D. Construction, Inc. 55.0000 1,980.00 1,980.00 1552 Dunnet Bay Construction Company 191.0000 6,876.00 6,876.00 2520 Herlihy Mid-Continent Company 200.0000 7,200.00 7,200.00 2779 Illinois Constructors Corporation 152.0000 5,472.00 5,472.00 3243 Kovilic Construction Company, Inc. 200.0000 7,200.00 7,200.00 3505 Lorig Construction Company 225.0000 8,100.00 8,100.00 54213669 PRC FLAR END SEC 24 1.000 EACH 0820 Albin Carlson & Co. 2,450.4400 2,450.44 2,450.44 1320 D. Construction, Inc. 600.0000 600.00 600.00 1552 Dunnet Bay Construction Company 865.0000 865.00 865.00 2520 Herlihy Mid-Continent Company 2,365.0000 2,365.00 2,365.00 2779 Illinois Constructors Corporation 2,365.0000 2,365.00 2,365.00 3243 Kovilic Construction Company, Inc. 1,000.0000 1,000.00 1,000.00 3505 Lorig Construction Company 325.0000 325.00 325.00 54216220 R C PIPE TEE 36P 12R 1.000 EACH 0820 Albin Carlson & Co. 1,225.2200 1,225.22 1,225.22 1320 D. Construction, Inc. 800.0000 800.00 800.00 1552 Dunnet Bay Construction Company 650.0000 650.00 650.00 2520 Herlihy Mid-Continent Company 900.0000 900.00 900.00 2779 Illinois Constructors Corporation 4,462.0000 4,462.00 4,462.00 3243 Kovilic Construction Company, Inc. 3,500.0000 3,500.00 3,500.00 3505 Lorig Construction Company 850.0000 850.00 850.00 54247130 GRATING-C FL END S 24 1.000 EACH 0820 Albin Carlson & Co. 884.8800 884.88 884.88 1320 D. Construction, Inc. 400.0000 400.00 400.00 1552 Dunnet Bay Construction Company 865.0000 865.00 865.00 2520 Herlihy Mid-Continent Company 650.0000 650.00 650.00 2779 Illinois Constructors Corporation 417.0000 417.00 417.00 3243 Kovilic Construction Company, Inc. 750.0000 750.00 750.00 3505 Lorig Construction Company 350.0000 350.00 350.00 550A0050 STORM SEW CL A 1 12 19.000 FOOT 0820 Albin Carlson & Co. 81.6800 1,551.92 1,551.92 1320 D. Construction, Inc. 60.0000 1,140.00 1,140.00 1552 Dunnet Bay Construction Company 53.0000 1,007.00 1,007.00 2520 Herlihy Mid-Continent Company 60.0000 1,140.00 1,140.00 2779 Illinois Constructors Corporation 47.8000 908.20 908.20 3243 Kovilic Construction Company, Inc. 75.0000 1,425.00 1,425.00 3505 Lorig Construction Company 40.0000 760.00 760.00 550A0240 STORM SEW CL A 1 78 32.000 FOOT 0820 Albin Carlson & Co. 510.5100 16,336.32 16,336.32 1320 D. Construction, Inc. 250.0000 8,000.00 8,000.00 1552 Dunnet Bay Construction Company 487.0000 15,584.00 15,584.00 2520 Herlihy Mid-Continent Company 375.0000 12,000.00 12,000.00 2779 Illinois Constructors Corporation 219.8000 7,033.60 7,033.60 3243 Kovilic Construction Company, Inc. 1,500.0000 48,000.00 48,000.00 3505 Lorig Construction Company 300.0000 9,600.00 9,600.00 550A0410 STORM SEW CL A 2 24 192.000 FOOT 0820 Albin Carlson & Co. 106.1900 20,388.48 20,388.48 1320 D. Construction, Inc. 123.0000 23,616.00 23,616.00 1552 Dunnet Bay Construction Company 68.0000 13,056.00 13,056.00 2520 Herlihy Mid-Continent Company 78.0000 14,976.00 14,976.00 2779 Illinois Constructors Corporation 51.4000 9,868.80 9,868.80 3243 Kovilic Construction Company, Inc. 125.0000 24,000.00 24,000.00 3505 Lorig Construction Company 48.0000 9,216.00 9,216.00 55039700 SS CLEANED 575.000 FOOT 0820 Albin Carlson & Co. 20.4200 11,741.50 11,741.50 1320 D. Construction, Inc. 8.0000 4,600.00 4,600.00 1552 Dunnet Bay Construction Company 2.6000 1,495.00 1,495.00 2520 Herlihy Mid-Continent Company 2.0000 1,150.00 1,150.00 2779 Illinois Constructors Corporation 2.0000 1,150.00 1,150.00 3243 Kovilic Construction Company, Inc. 10.0000 5,750.00 5,750.00 3505 Lorig Construction Company 7.0000 4,025.00 4,025.00 55100500 STORM SEWER REM 12 83.000 FOOT 0820 Albin Carlson & Co. 10.8900 903.87 903.87 1320 D. Construction, Inc. 12.0000 996.00 996.00 1552 Dunnet Bay Construction Company 15.0000 1,245.00 1,245.00 2520 Herlihy Mid-Continent Company 8.0000 664.00 664.00 2779 Illinois Constructors Corporation 16.8000 1,394.40 1,394.40 3243 Kovilic Construction Company, Inc. 10.0000 830.00 830.00 3505 Lorig Construction Company 10.0000 830.00 830.00 55101200 STORM SEWER REM 24 179.000 FOOT 0820 Albin Carlson & Co. 16.3400 2,924.86 2,924.86 1320 D. Construction, Inc. 24.0000 4,296.00 4,296.00 1552 Dunnet Bay Construction Company 17.0000 3,043.00 3,043.00 2520 Herlihy Mid-Continent Company 12.0000 2,148.00 2,148.00 2779 Illinois Constructors Corporation 18.6000 3,329.40 3,329.40 3243 Kovilic Construction Company, Inc. 20.0000 3,580.00 3,580.00 3505 Lorig Construction Company 10.0000 1,790.00 1,790.00 55102400 STORM SEWER REM 78 75.000 FOOT 0820 Albin Carlson & Co. 88.4900 6,636.75 6,636.75 1320 D. Construction, Inc. 100.0000 7,500.00 7,500.00 1552 Dunnet Bay Construction Company 100.0000 7,500.00 7,500.00 2520 Herlihy Mid-Continent Company 65.0000 4,875.00 4,875.00 2779 Illinois Constructors Corporation 48.1000 3,607.50 3,607.50 3243 Kovilic Construction Company, Inc. 250.0000 18,750.00 18,750.00 3505 Lorig Construction Company 50.0000 3,750.00 3,750.00 59100100 GEOCOMPOSITE WALL DR 243.000 SQ YD 0820 Albin Carlson & Co. 55.1100 13,391.73 13,391.73 1320 D. Construction, Inc. 15.0000 3,645.00 3,645.00 1552 Dunnet Bay Construction Company 41.5000 10,084.50 10,084.50 2520 Herlihy Mid-Continent Company 20.0000 4,860.00 4,860.00 2779 Illinois Constructors Corporation 35.0000 8,505.00 8,505.00 3243 Kovilic Construction Company, Inc. 10.0000 2,430.00 2,430.00 3505 Lorig Construction Company 35.0000 8,505.00 8,505.00 59300100 CONTR LOW-STRENG MATL 26.000 CU YD 0820 Albin Carlson & Co. 496.9700 12,921.22 12,921.22 1320 D. Construction, Inc. 110.0000 2,860.00 2,860.00 1552 Dunnet Bay Construction Company 180.0000 4,680.00 4,680.00 2520 Herlihy Mid-Continent Company 110.0000 2,860.00 2,860.00 2779 Illinois Constructors Corporation 200.0000 5,200.00 5,200.00 3243 Kovilic Construction Company, Inc. 250.0000 6,500.00 6,500.00 3505 Lorig Construction Company 150.0000 3,900.00 3,900.00 60100060 CONC HDWL FOR P DRAIN 2.000 EACH 0820 Albin Carlson & Co. 816.8200 1,633.64 1,633.64 1320 D. Construction, Inc. 200.0000 400.00 400.00 1552 Dunnet Bay Construction Company 340.0000 680.00 680.00 2520 Herlihy Mid-Continent Company 600.0000 1,200.00 1,200.00 2779 Illinois Constructors Corporation 500.0000 1,000.00 1,000.00 3243 Kovilic Construction Company, Inc. 500.0000 1,000.00 1,000.00 3505 Lorig Construction Company 500.0000 1,000.00 1,000.00 60100905 PIPE DRAINS 4 20.000 FOOT 0820 Albin Carlson & Co. 106.6100 2,132.20 2,132.20 1320 D. Construction, Inc. 40.0000 800.00 800.00 1552 Dunnet Bay Construction Company 38.0000 760.00 760.00 2520 Herlihy Mid-Continent Company 45.0000 900.00 900.00 2779 Illinois Constructors Corporation 16.5000 330.00 330.00 3243 Kovilic Construction Company, Inc. 20.0000 400.00 400.00 3505 Lorig Construction Company 20.0000 400.00 400.00 60221100 MAN TA 5 DIA T1F CL 1.000 EACH 0820 Albin Carlson & Co. 5,717.6900 5,717.69 5,717.69 1320 D. Construction, Inc. 3,000.0000 3,000.00 3,000.00 1552 Dunnet Bay Construction Company 5,430.0000 5,430.00 5,430.00 2520 Herlihy Mid-Continent Company 4,200.0000 4,200.00 4,200.00 2779 Illinois Constructors Corporation 6,047.0000 6,047.00 6,047.00 3243 Kovilic Construction Company, Inc. 5,000.0000 5,000.00 5,000.00 3505 Lorig Construction Company 2,800.0000 2,800.00 2,800.00 60226800 DR MAN TA1-1 5D T1FCL 1.000 EACH 0820 Albin Carlson & Co. 13,341.2800 13,341.28 13,341.28 1320 D. Construction, Inc. 6,000.0000 6,000.00 6,000.00 1552 Dunnet Bay Construction Company 9,296.0000 9,296.00 9,296.00 2520 Herlihy Mid-Continent Company 9,800.0000 9,800.00 9,800.00 2779 Illinois Constructors Corporation 9,253.0000 9,253.00 9,253.00 3243 Kovilic Construction Company, Inc. 7,500.0000 7,500.00 7,500.00 3505 Lorig Construction Company 3,000.0000 3,000.00 3,000.00 60228200 MAN SAN SPL FR & CL 3.000 EACH 0820 Albin Carlson & Co. 4,356.3400 13,069.02 13,069.02 1320 D. Construction, Inc. 5,000.0000 15,000.00 15,000.00 1552 Dunnet Bay Construction Company 4,949.0000 14,847.00 14,847.00 2520 Herlihy Mid-Continent Company 3,200.0000 9,600.00 9,600.00 2779 Illinois Constructors Corporation 5,055.0000 15,165.00 15,165.00 3243 Kovilic Construction Company, Inc. 5,000.0000 15,000.00 15,000.00 3505 Lorig Construction Company 3,600.0000 10,800.00 10,800.00 60235700 INLETS TA T3F&G 3.000 EACH 0820 Albin Carlson & Co. 1,633.6300 4,900.89 4,900.89 1320 D. Construction, Inc. 1,000.0000 3,000.00 3,000.00 1552 Dunnet Bay Construction Company 1,437.0000 4,311.00 4,311.00 2520 Herlihy Mid-Continent Company 1,200.0000 3,600.00 3,600.00 2779 Illinois Constructors Corporation 1,031.0000 3,093.00 3,093.00 3243 Kovilic Construction Company, Inc. 1,500.0000 4,500.00 4,500.00 3505 Lorig Construction Company 1,100.0000 3,300.00 3,300.00 60240220 INLETS TB T3F&G 2.000 EACH 0820 Albin Carlson & Co. 2,450.4400 4,900.88 4,900.88 1320 D. Construction, Inc. 1,500.0000 3,000.00 3,000.00 1552 Dunnet Bay Construction Company 1,814.0000 3,628.00 3,628.00 2520 Herlihy Mid-Continent Company 1,800.0000 3,600.00 3,600.00 2779 Illinois Constructors Corporation 1,238.0000 2,476.00 2,476.00 3243 Kovilic Construction Company, Inc. 1,500.0000 3,000.00 3,000.00 3505 Lorig Construction Company 1,300.0000 2,600.00 2,600.00 60247800 JUNCTION CHAMBER 1.000 EACH 0820 Albin Carlson & Co. 23,687.5800 23,687.58 23,687.58 1320 D. Construction, Inc. 16,000.0000 16,000.00 16,000.00 1552 Dunnet Bay Construction Company 50,750.0000 50,750.00 50,750.00 2520 Herlihy Mid-Continent Company 17,400.0000 17,400.00 17,400.00 2779 Illinois Constructors Corporation 19,221.0000 19,221.00 19,221.00 3243 Kovilic Construction Company, Inc. 20,000.0000 20,000.00 20,000.00 3505 Lorig Construction Company 17,000.0000 17,000.00 17,000.00 60255500 MAN ADJUST 3.000 EACH 0820 Albin Carlson & Co. 680.6800 2,042.04 2,042.04 1320 D. Construction, Inc. 350.0000 1,050.00 1,050.00 1552 Dunnet Bay Construction Company 322.0000 966.00 966.00 2520 Herlihy Mid-Continent Company 500.0000 1,500.00 1,500.00 2779 Illinois Constructors Corporation 585.0000 1,755.00 1,755.00 3243 Kovilic Construction Company, Inc. 350.0000 1,050.00 1,050.00 3505 Lorig Construction Company 300.0000 900.00 900.00 60265700 VV ADJUST 2.000 EACH 0820 Albin Carlson & Co. 612.6100 1,225.22 1,225.22 1320 D. Construction, Inc. 300.0000 600.00 600.00 1552 Dunnet Bay Construction Company 322.0000 644.00 644.00 2520 Herlihy Mid-Continent Company 450.0000 900.00 900.00 2779 Illinois Constructors Corporation 585.0000 1,170.00 1,170.00 3243 Kovilic Construction Company, Inc. 350.0000 700.00 700.00 3505 Lorig Construction Company 300.0000 600.00 600.00 60266600 VALVE BOX ADJ 1.000 EACH 0820 Albin Carlson & Co. 340.3400 340.34 340.34 1320 D. Construction, Inc. 200.0000 200.00 200.00 1552 Dunnet Bay Construction Company 200.0000 200.00 200.00 2520 Herlihy Mid-Continent Company 250.0000 250.00 250.00 2779 Illinois Constructors Corporation 223.0000 223.00 223.00 3243 Kovilic Construction Company, Inc. 100.0000 100.00 100.00 3505 Lorig Construction Company 300.0000 300.00 300.00 60500040 REMOV MANHOLES 1.000 EACH 0820 Albin Carlson & Co. 544.5400 544.54 544.54 1320 D. Construction, Inc. 500.0000 500.00 500.00 1552 Dunnet Bay Construction Company 300.0000 300.00 300.00 2520 Herlihy Mid-Continent Company 400.0000 400.00 400.00 2779 Illinois Constructors Corporation 1,548.0000 1,548.00 1,548.00 3243 Kovilic Construction Company, Inc. 1,000.0000 1,000.00 1,000.00 3505 Lorig Construction Company 300.0000 300.00 300.00 60500060 REMOV INLETS 5.000 EACH 0820 Albin Carlson & Co. 136.1400 680.70 680.70 1320 D. Construction, Inc. 300.0000 1,500.00 1,500.00 1552 Dunnet Bay Construction Company 150.0000 750.00 750.00 2520 Herlihy Mid-Continent Company 100.0000 500.00 500.00 2779 Illinois Constructors Corporation 734.0000 3,670.00 3,670.00 3243 Kovilic Construction Company, Inc. 300.0000 1,500.00 1,500.00 3505 Lorig Construction Company 200.0000 1,000.00 1,000.00 60603800 COMB CC&G TB6.12 1,410.000 FOOT 0820 Albin Carlson & Co. 22.9500 32,359.50 32,359.50 1320 D. Construction, Inc. 13.5000 19,035.00 19,035.00 1552 Dunnet Bay Construction Company 16.2500 22,912.50 22,912.50 2520 Herlihy Mid-Continent Company 18.0000 25,380.00 25,380.00 2779 Illinois Constructors Corporation 20.0000 28,200.00 28,200.00 3243 Kovilic Construction Company, Inc. 25.0000 35,250.00 35,250.00 3505 Lorig Construction Company 20.0000 28,200.00 28,200.00 63200310 GUARDRAIL REMOV 168.000 FOOT 0820 Albin Carlson & Co. 6.0000 1,008.00 1,008.00 1320 D. Construction, Inc. 11.0000 1,848.00 1,848.00 1552 Dunnet Bay Construction Company 6.0000 1,008.00 1,008.00 2520 Herlihy Mid-Continent Company 10.0500 1,688.40 1,688.40 2779 Illinois Constructors Corporation 10.0500 1,688.40 1,688.40 3243 Kovilic Construction Company, Inc. 15.0000 2,520.00 2,520.00 3505 Lorig Construction Company 10.5000 1,764.00 1,764.00 66410300 CH LK FENCE REMOV 28.000 FOOT 0820 Albin Carlson & Co. 14.0000 392.00 392.00 1320 D. Construction, Inc. 9.2000 257.60 257.60 1552 Dunnet Bay Construction Company 14.0000 392.00 392.00 2520 Herlihy Mid-Continent Company 8.3900 234.92 234.92 2779 Illinois Constructors Corporation 8.3900 234.92 234.92 3243 Kovilic Construction Company, Inc. 10.0000 280.00 280.00 3505 Lorig Construction Company 9.0000 252.00 252.00 67000400 ENGR FIELD OFFICE A 8.000 CAL MO 0820 Albin Carlson & Co. 3,000.0000 24,000.00 24,000.00 1320 D. Construction, Inc. 3,500.0000 28,000.00 28,000.00 1552 Dunnet Bay Construction Company 3,000.0000 24,000.00 24,000.00 2520 Herlihy Mid-Continent Company 1,000.0000 8,000.00 8,000.00 2779 Illinois Constructors Corporation 3,000.0000 24,000.00 24,000.00 3243 Kovilic Construction Company, Inc. 3,000.0000 24,000.00 24,000.00 3505 Lorig Construction Company 3,500.0000 28,000.00 28,000.00 67100100 MOBILIZATION 1.000 L SUM 0820 Albin Carlson & Co. 220,000.0000 220,000.00 220,000.00 1320 D. Construction, Inc. 210,000.0000 210,000.00 210,000.00 1552 Dunnet Bay Construction Company 222,000.0000 222,000.00 222,000.00 2520 Herlihy Mid-Continent Company 210,000.0000 210,000.00 210,000.00 2779 Illinois Constructors Corporation 230,460.0000 230,460.00 230,460.00 3243 Kovilic Construction Company, Inc. 100,000.0000 100,000.00 100,000.00 3505 Lorig Construction Company 150,000.0000 150,000.00 150,000.00 70101800 TRAF CONT & PROT SPL 1.000 L SUM 0820 Albin Carlson & Co. 1.0000 1.00 1.00 1320 D. Construction, Inc. 1.0000 1.00 1.00 1552 Dunnet Bay Construction Company 1.0000 1.00 1.00 2520 Herlihy Mid-Continent Company 1.0000 1.00 1.00 2779 Illinois Constructors Corporation 1.0000 1.00 1.00 3243 Kovilic Construction Company, Inc. 20,000.0000 20,000.00 20,000.00 3505 Lorig Construction Company 1.0000 1.00 1.00 70102550 TR CONT-PROT TEMP DET 1.000 EACH 0820 Albin Carlson & Co. 10,100.0000 10,100.00 10,100.00 1320 D. Construction, Inc. 45,000.0000 45,000.00 45,000.00 1552 Dunnet Bay Construction Company 10,100.0000 10,100.00 10,100.00 2520 Herlihy Mid-Continent Company 50,000.0000 50,000.00 50,000.00 2779 Illinois Constructors Corporation 10,100.0000 10,100.00 10,100.00 3243 Kovilic Construction Company, Inc. 30,000.0000 30,000.00 30,000.00 3505 Lorig Construction Company 8,750.0000 8,750.00 8,750.00 70102635 TR CONT & PROT 701701 1.000 L SUM 0820 Albin Carlson & Co. 1.0000 1.00 1.00 1320 D. Construction, Inc. 1.0000 1.00 1.00 1552 Dunnet Bay Construction Company 1.0000 1.00 1.00 2520 Herlihy Mid-Continent Company 1.0000 1.00 1.00 2779 Illinois Constructors Corporation 28,566.2400 28,566.24 28,566.24 3243 Kovilic Construction Company, Inc. 10,000.0000 10,000.00 10,000.00 3505 Lorig Construction Company 1.0000 1.00 1.00 70102640 TR CONT & PROT 701801 1.000 L SUM 0820 Albin Carlson & Co. 1.0000 1.00 1.00 1320 D. Construction, Inc. 1.0000 1.00 1.00 1552 Dunnet Bay Construction Company 1.0000 1.00 1.00 2520 Herlihy Mid-Continent Company 1.0000 1.00 1.00 2779 Illinois Constructors Corporation 1.0000 1.00 1.00 3243 Kovilic Construction Company, Inc. 10,000.0000 10,000.00 10,000.00 3505 Lorig Construction Company 1.0000 1.00 1.00 78000200 THPL PVT MK LINE 4 1,210.000 FOOT 0820 Albin Carlson & Co. 1.3000 1,573.00 1,573.00 1320 D. Construction, Inc. 1.6300 1,972.30 1,972.30 1552 Dunnet Bay Construction Company 1.3000 1,573.00 1,573.00 2520 Herlihy Mid-Continent Company 1.4800 1,790.80 1,790.80 2779 Illinois Constructors Corporation 1.4800 1,790.80 1,790.80 3243 Kovilic Construction Company, Inc. 2.0000 2,420.00 2,420.00 3505 Lorig Construction Company 1.5000 1,815.00 1,815.00 78000400 THPL PVT MK LINE 6 290.000 FOOT 0820 Albin Carlson & Co. 2.1000 609.00 609.00 1320 D. Construction, Inc. 2.4000 696.00 696.00 1552 Dunnet Bay Construction Company 2.1000 609.00 609.00 2520 Herlihy Mid-Continent Company 2.2200 643.80 643.80 2779 Illinois Constructors Corporation 2.2200 643.80 643.80 3243 Kovilic Construction Company, Inc. 3.0000 870.00 870.00 3505 Lorig Construction Company 2.2500 652.50 652.50 78000600 THPL PVT MK LINE 12 150.000 FOOT 0820 Albin Carlson & Co. 4.2000 630.00 630.00 1320 D. Construction, Inc. 4.8800 732.00 732.00 1552 Dunnet Bay Construction Company 4.2000 630.00 630.00 2520 Herlihy Mid-Continent Company 4.4400 666.00 666.00 2779 Illinois Constructors Corporation 4.4400 666.00 666.00 3243 Kovilic Construction Company, Inc. 6.0000 900.00 900.00 3505 Lorig Construction Company 4.5000 675.00 675.00 78000650 THPL PVT MK LINE 24 15.000 FOOT 0820 Albin Carlson & Co. 8.5000 127.50 127.50 1320 D. Construction, Inc. 9.7700 146.55 146.55 1552 Dunnet Bay Construction Company 8.5000 127.50 127.50 2520 Herlihy Mid-Continent Company 8.8800 133.20 133.20 2779 Illinois Constructors Corporation 8.8800 133.20 133.20 3243 Kovilic Construction Company, Inc. 14.0000 210.00 210.00 3505 Lorig Construction Company 9.0000 135.00 135.00 78008210 POLYUREA PM T1 LN 4 430.000 FOOT 0820 Albin Carlson & Co. 10.0000 4,300.00 4,300.00 1320 D. Construction, Inc. 9.9000 4,257.00 4,257.00 1552 Dunnet Bay Construction Company 10.0000 4,300.00 4,300.00 2520 Herlihy Mid-Continent Company 9.0000 3,870.00 3,870.00 2779 Illinois Constructors Corporation 9.0000 3,870.00 3,870.00 3243 Kovilic Construction Company, Inc. 11.0000 4,730.00 4,730.00 3505 Lorig Construction Company 9.0000 3,870.00 3,870.00 81702500 EC C XLP USE 4C 6 52.000 FOOT 0820 Albin Carlson & Co. 5.0000 260.00 260.00 1320 D. Construction, Inc. 5.5000 286.00 286.00 1552 Dunnet Bay Construction Company 10.0000 520.00 520.00 2520 Herlihy Mid-Continent Company 10.0000 520.00 520.00 2779 Illinois Constructors Corporation 10.0000 520.00 520.00 3243 Kovilic Construction Company, Inc. 13.0000 676.00 676.00 3505 Lorig Construction Company 10.0000 520.00 520.00 81900205 TR & BKFIL ELEC W SPL 10.000 FOOT 0820 Albin Carlson & Co. 40.0000 400.00 400.00 1320 D. Construction, Inc. 44.0000 440.00 440.00 1552 Dunnet Bay Construction Company 26.0000 260.00 260.00 2520 Herlihy Mid-Continent Company 26.0000 260.00 260.00 2779 Illinois Constructors Corporation 26.0000 260.00 260.00 3243 Kovilic Construction Company, Inc. 50.0000 500.00 500.00 3505 Lorig Construction Company 26.0000 260.00 260.00 84400105 RELOC EX LT UNIT 4.000 EACH 0820 Albin Carlson & Co. 1,800.0000 7,200.00 7,200.00 1320 D. Construction, Inc. 1,980.0000 7,920.00 7,920.00 1552 Dunnet Bay Construction Company 1,900.0000 7,600.00 7,600.00 2520 Herlihy Mid-Continent Company 1,000.0000 4,000.00 4,000.00 2779 Illinois Constructors Corporation 1,000.0000 4,000.00 4,000.00 3243 Kovilic Construction Company, Inc. 1,300.0000 5,200.00 5,200.00 3505 Lorig Construction Company 1,000.0000 4,000.00 4,000.00 89502300 REM ELCBL FR CON 850.000 FOOT 0820 Albin Carlson & Co. 1.0000 850.00 850.00 1320 D. Construction, Inc. 1.1000 935.00 935.00 1552 Dunnet Bay Construction Company 1.0000 850.00 850.00 2520 Herlihy Mid-Continent Company 1.0000 850.00 850.00 2779 Illinois Constructors Corporation 1.0000 850.00 850.00 3243 Kovilic Construction Company, Inc. 1.2500 1,062.50 1,062.50 3505 Lorig Construction Company 1.0000 850.00 850.00