ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 06/22/10 11:24:39 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 05/14/2010 LETTING TYPE: SPECIAL CONTRACT NUMBER: 60J30 LETTING ITEM NUMBER: 096 RESPONSIBLE DISTRICT: 01 BIDS LOCKED: Y SECTION: 1010.1-I-2 COUNTY: COOK ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0204 Areatha Construction Co., Inc. NO ALT 1,040,410.90 1,040,410.90 1,040,410.90 0820 Albin Carlson & Co. NO ALT 917,803.14 * 917,803.14 917,803.14 * 1002 Chicago Structures LLC NO ALT 985,175.80 985,175.79 985,175.79 1552 Dunnet Bay Construction Company NO ALT 919,700.99 919,700.99 919,700.99 2520 Herlihy Mid-Continent Company NO ALT 1,032,607.42 1,032,607.42 1,032,607.42 3505 Lorig Construction Company NO ALT 922,710.00 922,710.00 922,710.00 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 65 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF X0322185 BR DK LTX C OLY 2 1/4 1,911.000 SQ YD 0820 Albin Carlson & Co. 68.5000 130,903.50 130,903.50 0204 Areatha Construction Co., Inc. 115.0000 219,765.00 219,765.00 1002 Chicago Structures LLC 78.3300 149,688.63 149,688.63 1552 Dunnet Bay Construction Company 90.0000 171,990.00 171,990.00 2520 Herlihy Mid-Continent Company 106.5000 203,521.50 203,521.50 3505 Lorig Construction Company 70.0000 133,770.00 133,770.00 X0322256 TEMP INFO SIGNING 103.000 SQ FT 0820 Albin Carlson & Co. 10.0000 1,030.00 1,030.00 0204 Areatha Construction Co., Inc. 15.0000 1,545.00 1,545.00 1002 Chicago Structures LLC 15.0000 1,545.00 1,545.00 1552 Dunnet Bay Construction Company 15.0000 1,545.00 1,545.00 2520 Herlihy Mid-Continent Company 15.0000 1,545.00 1,545.00 3505 Lorig Construction Company 17.0000 1,751.00 1,751.00 X0323574 MAINTAIN LIGHTING SYS 3.000 CAL MO 0820 Albin Carlson & Co. 2,500.0000 7,500.00 7,500.00 0204 Areatha Construction Co., Inc. 2,100.0000 6,300.00 6,300.00 1002 Chicago Structures LLC 1,470.0000 4,410.00 4,410.00 1552 Dunnet Bay Construction Company 1,470.0000 4,410.00 4,410.00 2520 Herlihy Mid-Continent Company 1,470.0000 4,410.00 4,410.00 3505 Lorig Construction Company 1,500.0000 4,500.00 4,500.00 X0325303 STR REP CON DP OVER 5 18.000 SQ FT 0820 Albin Carlson & Co. 98.0000 1,764.00 1,764.00 0204 Areatha Construction Co., Inc. 98.0000 1,764.00 1,764.00 1002 Chicago Structures LLC 93.0000 1,674.00 1,674.00 1552 Dunnet Bay Construction Company 200.0000 3,600.00 3,600.00 2520 Herlihy Mid-Continent Company 155.0000 2,790.00 2,790.00 3505 Lorig Construction Company 225.0000 4,050.00 4,050.00 X0325305 STR REP CON DP = < 5 1,101.000 SQ FT 0820 Albin Carlson & Co. 106.0000 116,706.00 116,706.00 0204 Areatha Construction Co., Inc. 93.0000 102,393.00 102,393.00 1002 Chicago Structures LLC 98.0000 107,898.00 107,898.00 1552 Dunnet Bay Construction Company 80.0000 88,080.00 88,080.00 2520 Herlihy Mid-Continent Company 75.5400 83,169.54 83,169.54 3505 Lorig Construction Company 96.0000 105,696.00 105,696.00 X0325775 WET RF TEM TAPE T3 4 9,000.000 FOOT 0820 Albin Carlson & Co. 0.2000 1,800.00 1,800.00 0204 Areatha Construction Co., Inc. 1.4000 12,600.00 12,600.00 1002 Chicago Structures LLC 1.3600 12,240.00 12,240.00 1552 Dunnet Bay Construction Company 1.0000 9,000.00 9,000.00 2520 Herlihy Mid-Continent Company 1.0000 9,000.00 9,000.00 3505 Lorig Construction Company 1.0000 9,000.00 9,000.00 X0326765 CLN & PT EXP REBAR SP 50.000 SQ FT 0820 Albin Carlson & Co. 129.0000 6,450.00 6,450.00 0204 Areatha Construction Co., Inc. 63.0000 3,150.00 3,150.00 1002 Chicago Structures LLC 50.0000 2,500.00 2,500.00 1552 Dunnet Bay Construction Company 129.0000 6,450.00 6,450.00 2520 Herlihy Mid-Continent Company 30.0000 1,500.00 1,500.00 3505 Lorig Construction Company 50.0000 2,500.00 2,500.00 X0326766 CLEAN RESEAL RLF JNT 129.000 FOOT 0820 Albin Carlson & Co. 29.0000 3,741.00 3,741.00 0204 Areatha Construction Co., Inc. 67.5000 8,707.50 8,707.50 1002 Chicago Structures LLC 56.2600 7,257.54 7,257.54 1552 Dunnet Bay Construction Company 19.4000 2,502.60 2,502.60 2520 Herlihy Mid-Continent Company 6.0000 774.00 774.00 3505 Lorig Construction Company 14.0000 1,806.00 1,806.00 X7011015 TR C-PROT EXPRESSWAYS 1.000 L SUM 0820 Albin Carlson & Co. 18,500.0000 18,500.00 18,500.00 0204 Areatha Construction Co., Inc. 46,200.0000 46,200.00 46,200.00 1002 Chicago Structures LLC 23,500.0000 23,500.00 23,500.00 1552 Dunnet Bay Construction Company 58,000.0000 58,000.00 58,000.00 2520 Herlihy Mid-Continent Company 19,250.0000 19,250.00 19,250.00 3505 Lorig Construction Company 100.0000 100.00 100.00 X7013820 TR CONT SURVEIL EXPWY 30.000 CAL DA 0820 Albin Carlson & Co. 225.0000 6,750.00 6,750.00 0204 Areatha Construction Co., Inc. 1.0000 30.00 30.00 1002 Chicago Structures LLC 450.0000 13,500.00 13,500.00 1552 Dunnet Bay Construction Company 450.0000 13,500.00 13,500.00 2520 Herlihy Mid-Continent Company 450.0000 13,500.00 13,500.00 3505 Lorig Construction Company 450.0000 13,500.00 13,500.00 X8210305 PROT-MAIN UNPASS LTG 1.000 L SUM 0820 Albin Carlson & Co. 7,500.0000 7,500.00 7,500.00 0204 Areatha Construction Co., Inc. 5,000.0000 5,000.00 5,000.00 1002 Chicago Structures LLC 11,670.0000 11,670.00 11,670.00 1552 Dunnet Bay Construction Company 11,670.0000 11,670.00 11,670.00 2520 Herlihy Mid-Continent Company 12,000.0000 12,000.00 12,000.00 3505 Lorig Construction Company 12,000.0000 12,000.00 12,000.00 Z0001700 APPROACH SL REP (FD) 33.200 SQ YD 0820 Albin Carlson & Co. 630.0000 20,916.00 20,916.00 0204 Areatha Construction Co., Inc. 518.0000 17,197.60 17,197.60 1002 Chicago Structures LLC 566.8100 18,818.09 18,818.09 1552 Dunnet Bay Construction Company 730.0000 24,236.00 24,236.00 2520 Herlihy Mid-Continent Company 1,231.5000 40,885.80 40,885.80 3505 Lorig Construction Company 500.0000 16,600.00 16,600.00 Z0006204 BR DECK HY-SCAR 1/2 1,911.000 SQ YD 0820 Albin Carlson & Co. 37.0000 70,707.00 70,707.00 0204 Areatha Construction Co., Inc. 35.0000 66,885.00 66,885.00 1002 Chicago Structures LLC 39.3000 75,102.30 75,102.30 1552 Dunnet Bay Construction Company 32.5000 62,107.50 62,107.50 2520 Herlihy Mid-Continent Company 31.0000 59,241.00 59,241.00 3505 Lorig Construction Company 32.0000 61,152.00 61,152.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0820 Albin Carlson & Co. 2,500.0000 2,500.00 2,500.00 0204 Areatha Construction Co., Inc. 1,500.0000 1,500.00 1,500.00 1002 Chicago Structures LLC 2,500.0000 2,500.00 2,500.00 1552 Dunnet Bay Construction Company 10,000.0000 10,000.00 10,000.00 2520 Herlihy Mid-Continent Company 15,000.0000 15,000.00 15,000.00 3505 Lorig Construction Company 8,000.0000 8,000.00 8,000.00 Z0016001 DECK SLAB REP (FD-T1) 5.000 SQ YD 0820 Albin Carlson & Co. 820.0000 4,100.00 4,100.00 0204 Areatha Construction Co., Inc. 601.0000 3,005.00 3,005.00 1002 Chicago Structures LLC 1,005.7600 5,028.80 5,028.80 1552 Dunnet Bay Construction Company 1,180.0000 5,900.00 5,900.00 2520 Herlihy Mid-Continent Company 1,400.0000 7,000.00 7,000.00 3505 Lorig Construction Company 900.0000 4,500.00 4,500.00 Z0016002 DECK SLAB REP (FD-T2) 5.500 SQ YD 0820 Albin Carlson & Co. 755.0000 4,152.50 4,152.50 0204 Areatha Construction Co., Inc. 601.0000 3,305.50 3,305.50 1002 Chicago Structures LLC 979.8600 5,389.23 5,389.23 1552 Dunnet Bay Construction Company 780.0000 4,290.00 4,290.00 2520 Herlihy Mid-Continent Company 1,800.0000 9,900.00 9,900.00 3505 Lorig Construction Company 900.0000 4,950.00 4,950.00 Z0017100 DOWEL BARS 70.000 EACH 0820 Albin Carlson & Co. 27.0000 1,890.00 1,890.00 0204 Areatha Construction Co., Inc. 17.0000 1,190.00 1,190.00 1002 Chicago Structures LLC 22.0000 1,540.00 1,540.00 1552 Dunnet Bay Construction Company 15.0000 1,050.00 1,050.00 2520 Herlihy Mid-Continent Company 20.0000 1,400.00 1,400.00 3505 Lorig Construction Company 15.0000 1,050.00 1,050.00 Z0030255 IMP ATTN TEMP FRN TL2 2.000 EACH 0820 Albin Carlson & Co. 5,100.0000 10,200.00 10,200.00 0204 Areatha Construction Co., Inc. 5,100.0000 10,200.00 10,200.00 1002 Chicago Structures LLC 5,100.0000 10,200.00 10,200.00 1552 Dunnet Bay Construction Company 4,500.0000 9,000.00 9,000.00 2520 Herlihy Mid-Continent Company 5,100.0000 10,200.00 10,200.00 3505 Lorig Construction Company 5,200.0000 10,400.00 10,400.00 Z0030260 IMP ATTN TEMP FRN TL3 2.000 EACH 0820 Albin Carlson & Co. 2,200.0000 4,400.00 4,400.00 0204 Areatha Construction Co., Inc. 5,900.0000 11,800.00 11,800.00 1002 Chicago Structures LLC 2,200.0000 4,400.00 4,400.00 1552 Dunnet Bay Construction Company 4,500.0000 9,000.00 9,000.00 2520 Herlihy Mid-Continent Company 5,900.0000 11,800.00 11,800.00 3505 Lorig Construction Company 2,200.0000 4,400.00 4,400.00 Z0030320 IMP ATTN REL FRD TL2 2.000 EACH 0820 Albin Carlson & Co. 5,900.0000 11,800.00 11,800.00 0204 Areatha Construction Co., Inc. 2,200.0000 4,400.00 4,400.00 1002 Chicago Structures LLC 5,900.0000 11,800.00 11,800.00 1552 Dunnet Bay Construction Company 2,500.0000 5,000.00 5,000.00 2520 Herlihy Mid-Continent Company 2,200.0000 4,400.00 4,400.00 3505 Lorig Construction Company 6,000.0000 12,000.00 12,000.00 Z0030330 IMP ATTN REL FRD TL3 2.000 EACH 0820 Albin Carlson & Co. 2,200.0000 4,400.00 4,400.00 0204 Areatha Construction Co., Inc. 2,200.0000 4,400.00 4,400.00 1002 Chicago Structures LLC 2,200.0000 4,400.00 4,400.00 1552 Dunnet Bay Construction Company 2,500.0000 5,000.00 5,000.00 2520 Herlihy Mid-Continent Company 2,200.0000 4,400.00 4,400.00 3505 Lorig Construction Company 2,300.0000 4,600.00 4,600.00 35501317 HMA BASE CSE 8 1/4 187.000 SQ YD 0820 Albin Carlson & Co. 66.0000 12,342.00 12,342.00 0204 Areatha Construction Co., Inc. 66.0000 12,342.00 12,342.00 1002 Chicago Structures LLC 66.0000 12,342.00 12,342.00 1552 Dunnet Bay Construction Company 35.0000 6,545.00 6,545.00 2520 Herlihy Mid-Continent Company 66.0000 12,342.00 12,342.00 3505 Lorig Construction Company 67.0000 12,529.00 12,529.00 40600100 BIT MATLS PR CT 19.000 GALLON 0820 Albin Carlson & Co. 10.0000 190.00 190.00 0204 Areatha Construction Co., Inc. 10.0000 190.00 190.00 1002 Chicago Structures LLC 10.0000 190.00 190.00 1552 Dunnet Bay Construction Company 10.0000 190.00 190.00 2520 Herlihy Mid-Continent Company 10.0000 190.00 190.00 3505 Lorig Construction Company 10.0000 190.00 190.00 44000100 PAVEMENT REM 187.000 SQ YD 0820 Albin Carlson & Co. 26.0000 4,862.00 4,862.00 0204 Areatha Construction Co., Inc. 30.6000 5,722.20 5,722.20 1002 Chicago Structures LLC 20.0000 3,740.00 3,740.00 1552 Dunnet Bay Construction Company 10.7500 2,010.25 2,010.25 2520 Herlihy Mid-Continent Company 33.0000 6,171.00 6,171.00 3505 Lorig Construction Company 15.0000 2,805.00 2,805.00 44001700 COMB C C&G REM & REPL 80.000 FOOT 0820 Albin Carlson & Co. 75.0000 6,000.00 6,000.00 0204 Areatha Construction Co., Inc. 75.0000 6,000.00 6,000.00 1002 Chicago Structures LLC 35.0000 2,800.00 2,800.00 1552 Dunnet Bay Construction Company 37.0000 2,960.00 2,960.00 2520 Herlihy Mid-Continent Company 60.0000 4,800.00 4,800.00 3505 Lorig Construction Company 50.0000 4,000.00 4,000.00 44002010 CONC MEDIAN REMOV 422.000 FOOT 0820 Albin Carlson & Co. 20.5000 8,651.00 8,651.00 0204 Areatha Construction Co., Inc. 9.2000 3,882.40 3,882.40 1002 Chicago Structures LLC 4.0000 1,688.00 1,688.00 1552 Dunnet Bay Construction Company 4.7500 2,004.50 2,004.50 2520 Herlihy Mid-Continent Company 35.0000 14,770.00 14,770.00 3505 Lorig Construction Company 9.0000 3,798.00 3,798.00 44200944 CL B PATCH T4 8 60.000 SQ YD 0820 Albin Carlson & Co. 207.0000 12,420.00 12,420.00 0204 Areatha Construction Co., Inc. 137.0000 8,220.00 8,220.00 1002 Chicago Structures LLC 75.0000 4,500.00 4,500.00 1552 Dunnet Bay Construction Company 60.0000 3,600.00 3,600.00 2520 Herlihy Mid-Continent Company 250.0000 15,000.00 15,000.00 3505 Lorig Construction Company 90.0000 5,400.00 5,400.00 44201000 CL B PATCH T4 12 47.000 SQ YD 0820 Albin Carlson & Co. 274.0000 12,878.00 12,878.00 0204 Areatha Construction Co., Inc. 154.0000 7,238.00 7,238.00 1002 Chicago Structures LLC 85.0000 3,995.00 3,995.00 1552 Dunnet Bay Construction Company 180.0000 8,460.00 8,460.00 2520 Herlihy Mid-Continent Company 350.0000 16,450.00 16,450.00 3505 Lorig Construction Company 125.0000 5,875.00 5,875.00 44213100 PAVEMENT FABRIC 107.000 SQ YD 0820 Albin Carlson & Co. 8.7500 936.25 936.25 0204 Areatha Construction Co., Inc. 6.7000 716.90 716.90 1002 Chicago Structures LLC 12.0000 1,284.00 1,284.00 1552 Dunnet Bay Construction Company 15.0000 1,605.00 1,605.00 2520 Herlihy Mid-Continent Company 30.0000 3,210.00 3,210.00 3505 Lorig Construction Company 9.0000 963.00 963.00 44213200 SAW CUTS 1,022.000 FOOT 0820 Albin Carlson & Co. 3.0000 3,066.00 3,066.00 0204 Areatha Construction Co., Inc. 3.0000 3,066.00 3,066.00 1002 Chicago Structures LLC 2.5000 2,555.00 2,555.00 1552 Dunnet Bay Construction Company 2.2500 2,299.50 2,299.50 2520 Herlihy Mid-Continent Company 5.0000 5,110.00 5,110.00 3505 Lorig Construction Company 3.0000 3,066.00 3,066.00 50102400 CONC REM 21.200 CU YD 0820 Albin Carlson & Co. 1,130.0000 23,956.00 23,956.00 0204 Areatha Construction Co., Inc. 1,500.0000 31,800.00 31,800.00 1002 Chicago Structures LLC 1,594.9500 33,812.94 33,812.94 1552 Dunnet Bay Construction Company 900.0000 19,080.00 19,080.00 2520 Herlihy Mid-Continent Company 2,900.0000 61,480.00 61,480.00 3505 Lorig Construction Company 1,100.0000 23,320.00 23,320.00 50157300 PROTECTIVE SHIELD 1,284.000 SQ YD 0820 Albin Carlson & Co. 28.5000 36,594.00 36,594.00 0204 Areatha Construction Co., Inc. 5.0000 6,420.00 6,420.00 1002 Chicago Structures LLC 57.7300 74,125.32 74,125.32 1552 Dunnet Bay Construction Company 0.0100 12.84 12.84 2520 Herlihy Mid-Continent Company 5.0000 6,420.00 6,420.00 3505 Lorig Construction Company 1.0000 1,284.00 1,284.00 50300255 CONC SUP-STR 23.400 CU YD 0820 Albin Carlson & Co. 1,500.0000 35,100.00 35,100.00 0204 Areatha Construction Co., Inc. 2,500.0000 58,500.00 58,500.00 1002 Chicago Structures LLC 1,618.7100 37,877.81 37,877.81 1552 Dunnet Bay Construction Company 1,800.0000 42,120.00 42,120.00 2520 Herlihy Mid-Continent Company 3,500.0000 81,900.00 81,900.00 3505 Lorig Construction Company 1,300.0000 30,420.00 30,420.00 50300260 BR DECK GROOVING 1,832.000 SQ YD 0820 Albin Carlson & Co. 2.9000 5,312.80 5,312.80 0204 Areatha Construction Co., Inc. 5.7000 10,442.40 10,442.40 1002 Chicago Structures LLC 4.8500 8,885.20 8,885.20 1552 Dunnet Bay Construction Company 3.8500 7,053.20 7,053.20 2520 Herlihy Mid-Continent Company 6.0000 10,992.00 10,992.00 3505 Lorig Construction Company 6.0000 10,992.00 10,992.00 50300300 PROTECTIVE COAT 2,655.000 SQ YD 0820 Albin Carlson & Co. 0.9000 2,389.50 2,389.50 0204 Areatha Construction Co., Inc. 1.5000 3,982.50 3,982.50 1002 Chicago Structures LLC 1.0000 2,655.00 2,655.00 1552 Dunnet Bay Construction Company 1.0000 2,655.00 2,655.00 2520 Herlihy Mid-Continent Company 1.0000 2,655.00 2,655.00 3505 Lorig Construction Company 1.0000 2,655.00 2,655.00 50500405 F & E STRUCT STEEL 5,430.000 POUND 0820 Albin Carlson & Co. 5.9500 32,308.50 32,308.50 0204 Areatha Construction Co., Inc. 6.0000 32,580.00 32,580.00 1002 Chicago Structures LLC 5.3800 29,213.40 29,213.40 1552 Dunnet Bay Construction Company 6.0000 32,580.00 32,580.00 2520 Herlihy Mid-Continent Company 5.2000 28,236.00 28,236.00 3505 Lorig Construction Company 6.0000 32,580.00 32,580.00 50500715 JACK & REM EX BEARING 28.000 EACH 0820 Albin Carlson & Co. 1,100.0000 30,800.00 30,800.00 0204 Areatha Construction Co., Inc. 1,785.0000 49,980.00 49,980.00 1002 Chicago Structures LLC 2,400.0000 67,200.00 67,200.00 1552 Dunnet Bay Construction Company 1,100.0000 30,800.00 30,800.00 2520 Herlihy Mid-Continent Company 1,100.0000 30,800.00 30,800.00 3505 Lorig Construction Company 2,100.0000 58,800.00 58,800.00 50800205 REINF BARS, EPOXY CTD 3,350.000 POUND 0820 Albin Carlson & Co. 1.6000 5,360.00 5,360.00 0204 Areatha Construction Co., Inc. 2.0000 6,700.00 6,700.00 1002 Chicago Structures LLC 2.6300 8,810.50 8,810.50 1552 Dunnet Bay Construction Company 2.4000 8,040.00 8,040.00 2520 Herlihy Mid-Continent Company 1.8500 6,197.50 6,197.50 3505 Lorig Construction Company 2.2500 7,537.50 7,537.50 50800515 BAR SPLICERS 30.000 EACH 0820 Albin Carlson & Co. 33.0000 990.00 990.00 0204 Areatha Construction Co., Inc. 36.0000 1,080.00 1,080.00 1002 Chicago Structures LLC 14.4400 433.20 433.20 1552 Dunnet Bay Construction Company 15.0000 450.00 450.00 2520 Herlihy Mid-Continent Company 19.0000 570.00 570.00 3505 Lorig Construction Company 27.0000 810.00 810.00 52000110 PREF JT STRIP SEAL 182.000 FOOT 0820 Albin Carlson & Co. 175.0000 31,850.00 31,850.00 0204 Areatha Construction Co., Inc. 190.0000 34,580.00 34,580.00 1002 Chicago Structures LLC 104.9200 19,095.44 19,095.44 1552 Dunnet Bay Construction Company 175.0000 31,850.00 31,850.00 2520 Herlihy Mid-Continent Company 150.0000 27,300.00 27,300.00 3505 Lorig Construction Company 200.0000 36,400.00 36,400.00 52100010 ELAST BEARING ASSY T1 28.000 EACH 0820 Albin Carlson & Co. 840.0000 23,520.00 23,520.00 0204 Areatha Construction Co., Inc. 1,256.0000 35,168.00 35,168.00 1002 Chicago Structures LLC 775.3300 21,709.24 21,709.24 1552 Dunnet Bay Construction Company 700.0000 19,600.00 19,600.00 2520 Herlihy Mid-Continent Company 710.0000 19,880.00 19,880.00 3505 Lorig Construction Company 1,200.0000 33,600.00 33,600.00 52100520 ANCHOR BOLTS 1 52.000 EACH 0820 Albin Carlson & Co. 150.0000 7,800.00 7,800.00 0204 Areatha Construction Co., Inc. 211.0000 10,972.00 10,972.00 1002 Chicago Structures LLC 144.6100 7,519.72 7,519.72 1552 Dunnet Bay Construction Company 147.0000 7,644.00 7,644.00 2520 Herlihy Mid-Continent Company 147.0000 7,644.00 7,644.00 3505 Lorig Construction Company 170.0000 8,840.00 8,840.00 58700300 CONCRETE SEALER 5,695.000 SQ FT 0820 Albin Carlson & Co. 0.8900 5,068.55 5,068.55 0204 Areatha Construction Co., Inc. 1.4000 7,973.00 7,973.00 1002 Chicago Structures LLC 0.5000 2,847.50 2,847.50 1552 Dunnet Bay Construction Company 0.8800 5,011.60 5,011.60 2520 Herlihy Mid-Continent Company 0.8000 4,556.00 4,556.00 3505 Lorig Construction Company 1.0000 5,695.00 5,695.00 60619200 CONC MED TSB6.06 1,687.000 SQ FT 0820 Albin Carlson & Co. 21.0000 35,427.00 35,427.00 0204 Areatha Construction Co., Inc. 13.6500 23,027.55 23,027.55 1002 Chicago Structures LLC 8.5000 14,339.50 14,339.50 1552 Dunnet Bay Construction Company 10.0000 16,870.00 16,870.00 2520 Herlihy Mid-Continent Company 14.0000 23,618.00 23,618.00 3505 Lorig Construction Company 12.0000 20,244.00 20,244.00 67000400 ENGR FIELD OFFICE A 4.000 CAL MO 0820 Albin Carlson & Co. 2,700.0000 10,800.00 10,800.00 0204 Areatha Construction Co., Inc. 2,000.0000 8,000.00 8,000.00 1002 Chicago Structures LLC 2,537.0500 10,148.20 10,148.20 1552 Dunnet Bay Construction Company 2,350.0000 9,400.00 9,400.00 2520 Herlihy Mid-Continent Company 4,700.0000 18,800.00 18,800.00 3505 Lorig Construction Company 2,100.0000 8,400.00 8,400.00 67100100 MOBILIZATION 1.000 L SUM 0820 Albin Carlson & Co. 55,000.0000 55,000.00 55,000.00 0204 Areatha Construction Co., Inc. 62,500.0000 62,500.00 62,500.00 1002 Chicago Structures LLC 59,000.0000 59,000.00 59,000.00 1552 Dunnet Bay Construction Company 55,000.0000 55,000.00 55,000.00 2520 Herlihy Mid-Continent Company 32,400.0000 32,400.00 32,400.00 3505 Lorig Construction Company 45,000.0000 45,000.00 45,000.00 70101700 TRAF CONT & PROT 1.000 L SUM 0820 Albin Carlson & Co. 19,900.0000 19,900.00 19,900.00 0204 Areatha Construction Co., Inc. 9,800.0000 9,800.00 9,800.00 1002 Chicago Structures LLC 9,800.0000 9,800.00 9,800.00 1552 Dunnet Bay Construction Company 23,500.0000 23,500.00 23,500.00 2520 Herlihy Mid-Continent Company 8,000.0000 8,000.00 8,000.00 3505 Lorig Construction Company 75,000.0000 75,000.00 75,000.00 70102550 TR CONT-PROT TEMP DET 1.000 EACH 0820 Albin Carlson & Co. 1,500.0000 1,500.00 1,500.00 0204 Areatha Construction Co., Inc. 4,400.0000 4,400.00 4,400.00 1002 Chicago Structures LLC 4,400.0000 4,400.00 4,400.00 1552 Dunnet Bay Construction Company 15,000.0000 15,000.00 15,000.00 2520 Herlihy Mid-Continent Company 2,500.0000 2,500.00 2,500.00 3505 Lorig Construction Company 2,500.0000 2,500.00 2,500.00 70106800 CHANGEABLE MESSAGE SN 6.000 CAL MO 0820 Albin Carlson & Co. 1,100.0000 6,600.00 6,600.00 0204 Areatha Construction Co., Inc. 1,100.0000 6,600.00 6,600.00 1002 Chicago Structures LLC 1,100.0000 6,600.00 6,600.00 1552 Dunnet Bay Construction Company 1,200.0000 7,200.00 7,200.00 2520 Herlihy Mid-Continent Company 1,200.0000 7,200.00 7,200.00 3505 Lorig Construction Company 1,500.0000 9,000.00 9,000.00 70300240 TEMP PVT MK LINE 6 1,996.000 FOOT 0820 Albin Carlson & Co. 0.2400 479.04 479.04 0204 Areatha Construction Co., Inc. 1.0000 1,996.00 1,996.00 1002 Chicago Structures LLC 0.4500 898.20 898.20 1552 Dunnet Bay Construction Company 0.2500 499.00 499.00 2520 Herlihy Mid-Continent Company 0.2300 459.08 459.08 3505 Lorig Construction Company 0.2500 499.00 499.00 70301000 WORK ZONE PAVT MK REM 1,590.000 SQ FT 0820 Albin Carlson & Co. 0.3000 477.00 477.00 0204 Areatha Construction Co., Inc. 0.1000 159.00 159.00 1002 Chicago Structures LLC 0.1000 159.00 159.00 1552 Dunnet Bay Construction Company 0.9500 1,510.50 1,510.50 2520 Herlihy Mid-Continent Company 0.9500 1,510.50 1,510.50 3505 Lorig Construction Company 1.0000 1,590.00 1,590.00 70400100 TEMP CONC BARRIER 1,140.000 FOOT 0820 Albin Carlson & Co. 14.0000 15,960.00 15,960.00 0204 Areatha Construction Co., Inc. 29.8000 33,972.00 33,972.00 1002 Chicago Structures LLC 30.0900 34,302.60 34,302.60 1552 Dunnet Bay Construction Company 12.0000 13,680.00 13,680.00 2520 Herlihy Mid-Continent Company 20.0000 22,800.00 22,800.00 3505 Lorig Construction Company 18.0000 20,520.00 20,520.00 70400200 REL TEMP CONC BARRIER 1,092.000 FOOT 0820 Albin Carlson & Co. 7.2500 7,917.00 7,917.00 0204 Areatha Construction Co., Inc. 3.4000 3,712.80 3,712.80 1002 Chicago Structures LLC 4.8900 5,339.88 5,339.88 1552 Dunnet Bay Construction Company 5.0000 5,460.00 5,460.00 2520 Herlihy Mid-Continent Company 3.0000 3,276.00 3,276.00 3505 Lorig Construction Company 3.0000 3,276.00 3,276.00 78000200 THPL PVT MK LINE 4 3,520.000 FOOT 0820 Albin Carlson & Co. 1.2000 4,224.00 4,224.00 0204 Areatha Construction Co., Inc. 0.4500 1,584.00 1,584.00 1002 Chicago Structures LLC 0.4500 1,584.00 1,584.00 1552 Dunnet Bay Construction Company 1.2000 4,224.00 4,224.00 2520 Herlihy Mid-Continent Company 1.2000 4,224.00 4,224.00 3505 Lorig Construction Company 1.2500 4,400.00 4,400.00 78000300 THPL PVT MK LINE 5 880.000 FOOT 0820 Albin Carlson & Co. 1.5000 1,320.00 1,320.00 0204 Areatha Construction Co., Inc. 0.5500 484.00 484.00 1002 Chicago Structures LLC 0.5500 484.00 484.00 1552 Dunnet Bay Construction Company 1.5000 1,320.00 1,320.00 2520 Herlihy Mid-Continent Company 1.5000 1,320.00 1,320.00 3505 Lorig Construction Company 1.5000 1,320.00 1,320.00 78008210 POLYUREA PM T1 LN 4 2,327.000 FOOT 0820 Albin Carlson & Co. 1.5000 3,490.50 3,490.50 0204 Areatha Construction Co., Inc. 0.7000 1,628.90 1,628.90 1002 Chicago Structures LLC 0.7000 1,628.90 1,628.90 1552 Dunnet Bay Construction Company 1.5000 3,490.50 3,490.50 2520 Herlihy Mid-Continent Company 1.5000 3,490.50 3,490.50 3505 Lorig Construction Company 1.5000 3,490.50 3,490.50 78008240 POLYUREA PM T1 LN 8 1,086.000 FOOT 0820 Albin Carlson & Co. 3.5000 3,801.00 3,801.00 0204 Areatha Construction Co., Inc. 1.4000 1,520.40 1,520.40 1002 Chicago Structures LLC 1.4000 1,520.40 1,520.40 1552 Dunnet Bay Construction Company 3.5000 3,801.00 3,801.00 2520 Herlihy Mid-Continent Company 3.5000 3,801.00 3,801.00 3505 Lorig Construction Company 3.5000 3,801.00 3,801.00 78100100 RAISED REFL PAVT MKR 20.000 EACH 0820 Albin Carlson & Co. 115.0000 2,300.00 2,300.00 0204 Areatha Construction Co., Inc. 50.0000 1,000.00 1,000.00 1002 Chicago Structures LLC 50.0000 1,000.00 1,000.00 1552 Dunnet Bay Construction Company 115.0000 2,300.00 2,300.00 2520 Herlihy Mid-Continent Company 115.0000 2,300.00 2,300.00 3505 Lorig Construction Company 125.0000 2,500.00 2,500.00 78100105 RAISED REF PVT MKR BR 12.000 EACH 0820 Albin Carlson & Co. 125.0000 1,500.00 1,500.00 0204 Areatha Construction Co., Inc. 50.0000 600.00 600.00 1002 Chicago Structures LLC 50.0000 600.00 600.00 1552 Dunnet Bay Construction Company 125.0000 1,500.00 1,500.00 2520 Herlihy Mid-Continent Company 125.0000 1,500.00 1,500.00 3505 Lorig Construction Company 135.0000 1,620.00 1,620.00 78200530 BAR WALL MKR TYPE C 92.000 EACH 0820 Albin Carlson & Co. 6.0000 552.00 552.00 0204 Areatha Construction Co., Inc. 5.0000 460.00 460.00 1002 Chicago Structures LLC 5.0000 460.00 460.00 1552 Dunnet Bay Construction Company 8.0000 736.00 736.00 2520 Herlihy Mid-Continent Company 5.0000 460.00 460.00 3505 Lorig Construction Company 6.0000 552.00 552.00 78300100 PAVT MARKING REMOVAL 2,951.000 SQ FT 0820 Albin Carlson & Co. 1.0000 2,951.00 2,951.00 0204 Areatha Construction Co., Inc. 0.7500 2,213.25 2,213.25 1002 Chicago Structures LLC 0.7500 2,213.25 2,213.25 1552 Dunnet Bay Construction Company 1.0000 2,951.00 2,951.00 2520 Herlihy Mid-Continent Company 1.0000 2,951.00 2,951.00 3505 Lorig Construction Company 1.0000 2,951.00 2,951.00 78300200 RAISED REF PVT MK REM 32.000 EACH 0820 Albin Carlson & Co. 15.0000 480.00 480.00 0204 Areatha Construction Co., Inc. 15.0000 480.00 480.00 1002 Chicago Structures LLC 25.0000 800.00 800.00 1552 Dunnet Bay Construction Company 25.0000 800.00 800.00 2520 Herlihy Mid-Continent Company 65.0000 2,080.00 2,080.00 3505 Lorig Construction Company 6.0000 192.00 192.00 81100300 CON AT ST 1 GALVS 30.000 FOOT 0820 Albin Carlson & Co. 35.0000 1,050.00 1,050.00 0204 Areatha Construction Co., Inc. 110.0000 3,300.00 3,300.00 1002 Chicago Structures LLC 43.3000 1,299.00 1,299.00 1552 Dunnet Bay Construction Company 43.3000 1,299.00 1,299.00 2520 Herlihy Mid-Continent Company 43.3000 1,299.00 1,299.00 3505 Lorig Construction Company 45.0000 1,350.00 1,350.00 81300730 JUN BX SS AS 16X14X6 1.000 EACH 0820 Albin Carlson & Co. 1,250.0000 1,250.00 1,250.00 0204 Areatha Construction Co., Inc. 2,400.0000 2,400.00 2,400.00 1002 Chicago Structures LLC 2,202.0000 2,202.00 2,202.00 1552 Dunnet Bay Construction Company 2,202.0000 2,202.00 2,202.00 2520 Herlihy Mid-Continent Company 2,202.0000 2,202.00 2,202.00 3505 Lorig Construction Company 2,300.0000 2,300.00 2,300.00 81702110 EC C XLP USE 1C 10 240.000 FOOT 0820 Albin Carlson & Co. 3.0000 720.00 720.00 0204 Areatha Construction Co., Inc. 7.0000 1,680.00 1,680.00 1002 Chicago Structures LLC 16.9000 4,056.00 4,056.00 1552 Dunnet Bay Construction Company 16.9000 4,056.00 4,056.00 2520 Herlihy Mid-Continent Company 16.9000 4,056.00 4,056.00 3505 Lorig Construction Company 18.0000 4,320.00 4,320.00