ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 04/13/11 15:55:10 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 03/11/2011 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 68506 LETTING ITEM NUMBER: 128 RESPONSIBLE DISTRICT: 04 BIDS LOCKED: Y SECTION: (48-27)R,RS-4 COUNTY: KNOX ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 2270 Gunther Construction Co. NO ALT 6,180,321.59 * 6,180,321.59 6,180,321.59 * 3810 McCarthy Improvement Company NO ALT 7,160,444.20 7,160,444.20 7,160,444.20 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 127 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF X0326344 GROUT SLURRY SPECIAL 8.000 CU YD 2270 Gunther Construction Co. 280.0000 2,240.00 2,240.00 3810 McCarthy Improvement Company 400.0000 3,200.00 3,200.00 X0326899 SOLAR-POWER FB AS CMP 1.000 EACH 2270 Gunther Construction Co. 2,000.0000 2,000.00 2,000.00 3810 McCarthy Improvement Company 2,100.0000 2,100.00 2,100.00 X0556100 PART DEPTH PATCH SPL 2,053.000 SQ YD 2270 Gunther Construction Co. 55.0000 112,915.00 112,915.00 3810 McCarthy Improvement Company 55.0000 112,915.00 112,915.00 X2503100 MOWING 578.000 UNIT 2270 Gunther Construction Co. 7.2500 4,190.50 4,190.50 3810 McCarthy Improvement Company 7.0000 4,046.00 4,046.00 X2800520 ABOVE GRADE INLT FLTR 1.000 EACH 2270 Gunther Construction Co. 115.0000 115.00 115.00 3810 McCarthy Improvement Company 500.0000 500.00 500.00 X4060826 P LB MM IL-4.75 N50 5,389.800 TON 2270 Gunther Construction Co. 87.0000 468,912.60 468,912.60 3810 McCarthy Improvement Company 92.0000 495,861.60 495,861.60 X4401198 HMA SURF REM VAR DP 3,387.000 SQ YD 2270 Gunther Construction Co. 2.2500 7,620.75 7,620.75 3810 McCarthy Improvement Company 2.0000 6,774.00 6,774.00 X4810100 TEMP SHOULDERS 1,252.000 SQ YD 2270 Gunther Construction Co. 39.0000 48,828.00 48,828.00 3810 McCarthy Improvement Company 63.0000 78,876.00 78,876.00 X7800610 URETH PAVT MK LINE 4 94,730.000 FOOT 2270 Gunther Construction Co. 0.4100 38,839.30 38,839.30 3810 McCarthy Improvement Company 0.4000 37,892.00 37,892.00 X7800640 URETH PAVT MK LINE 8 3,860.000 FOOT 2270 Gunther Construction Co. 1.0500 4,053.00 4,053.00 3810 McCarthy Improvement Company 1.0000 3,860.00 3,860.00 X7800650 URETH PAVT MK LINE 12 387.000 FOOT 2270 Gunther Construction Co. 2.1500 832.05 832.05 3810 McCarthy Improvement Company 2.0000 774.00 774.00 X7800680 URETH PAVT MK LINE 24 34.000 FOOT 2270 Gunther Construction Co. 3.2500 110.50 110.50 3810 McCarthy Improvement Company 3.0000 102.00 102.00 X7830070 GRV RCSD PVT MRKG 5 94,730.000 FOOT 2270 Gunther Construction Co. 0.3600 34,102.80 34,102.80 3810 McCarthy Improvement Company 0.3500 33,155.50 33,155.50 X7830076 GRV RCSD PVT MRKG 9 3,860.000 FOOT 2270 Gunther Construction Co. 0.6900 2,663.40 2,663.40 3810 McCarthy Improvement Company 0.7000 2,702.00 2,702.00 X7830078 GRV RCSD PVT MRKG 13 387.000 FOOT 2270 Gunther Construction Co. 2.1500 832.05 832.05 3810 McCarthy Improvement Company 2.0000 774.00 774.00 X7830090 GRV RCSD PVT MRKG 25 34.000 FOOT 2270 Gunther Construction Co. 3.2500 110.50 110.50 3810 McCarthy Improvement Company 3.0000 102.00 102.00 X8440116 RELOC EX LT UNIT SPL 2.000 EACH 2270 Gunther Construction Co. 1,300.0000 2,600.00 2,600.00 3810 McCarthy Improvement Company 1,400.0000 2,800.00 2,800.00 X8730027 ELCBL C GROUND 6 1C 165.000 FOOT 2270 Gunther Construction Co. 2.2500 371.25 371.25 3810 McCarthy Improvement Company 2.2000 363.00 363.00 Z0001002 GDRL AGG EROS CONT 2,579.000 TON 2270 Gunther Construction Co. 26.0000 67,054.00 67,054.00 3810 McCarthy Improvement Company 36.0000 92,844.00 92,844.00 Z0004556 HMA SURFACE RM (DECK) 1,383.000 SQ YD 2270 Gunther Construction Co. 4.7000 6,500.10 6,500.10 3810 McCarthy Improvement Company 7.0000 9,681.00 9,681.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 2270 Gunther Construction Co. 6,600.0000 6,600.00 6,600.00 3810 McCarthy Improvement Company 5,000.0000 5,000.00 5,000.00 Z0016702 DETOUR SIGNING 1.000 L SUM 2270 Gunther Construction Co. 2,050.0000 2,050.00 2,050.00 3810 McCarthy Improvement Company 2,100.0000 2,100.00 2,100.00 Z0030250 IMP ATTN TEMP NRD TL3 4.000 EACH 2270 Gunther Construction Co. 3,800.0000 15,200.00 15,200.00 3810 McCarthy Improvement Company 3,600.0000 14,400.00 14,400.00 Z0030350 IMP ATTN REL NRD TL3 4.000 EACH 2270 Gunther Construction Co. 700.0000 2,800.00 2,800.00 3810 McCarthy Improvement Company 600.0000 2,400.00 2,400.00 Z0034105 MATL TRANSFER DEVICE 31,101.000 TON 2270 Gunther Construction Co. 1.5500 48,206.55 48,206.55 3810 McCarthy Improvement Company 2.0000 62,202.00 62,202.00 Z0040530 PIPE UNDERDRAIN REMOV 8,014.000 FOOT 2270 Gunther Construction Co. 0.2500 2,003.50 2,003.50 3810 McCarthy Improvement Company 1.0000 8,014.00 8,014.00 20100110 TREE REMOV 6-15 150.000 UNIT 2270 Gunther Construction Co. 22.0000 3,300.00 3,300.00 3810 McCarthy Improvement Company 23.0000 3,450.00 3,450.00 20100210 TREE REMOV OVER 15 474.000 UNIT 2270 Gunther Construction Co. 25.0000 11,850.00 11,850.00 3810 McCarthy Improvement Company 26.0000 12,324.00 12,324.00 20100500 TREE REMOV ACRES 1.000 ACRE 2270 Gunther Construction Co. 6,700.0000 6,700.00 6,700.00 3810 McCarthy Improvement Company 6,000.0000 6,000.00 6,000.00 20200100 EARTH EXCAVATION 3,275.000 CU YD 2270 Gunther Construction Co. 8.8500 28,983.75 28,983.75 3810 McCarthy Improvement Company 10.0000 32,750.00 32,750.00 20201200 REM & DISP UNS MATL 2,538.300 CU YD 2270 Gunther Construction Co. 14.5000 36,805.35 36,805.35 3810 McCarthy Improvement Company 10.0000 25,383.00 25,383.00 20400800 FURNISHED EXCAVATION 7,195.000 CU YD 2270 Gunther Construction Co. 16.2500 116,918.75 116,918.75 3810 McCarthy Improvement Company 10.0000 71,950.00 71,950.00 20800150 TRENCH BACKFILL 8.200 CU YD 2270 Gunther Construction Co. 29.0000 237.80 237.80 3810 McCarthy Improvement Company 80.0000 656.00 656.00 21001000 GEOTECH FAB F/GR STAB 7,719.000 SQ YD 2270 Gunther Construction Co. 1.2000 9,262.80 9,262.80 3810 McCarthy Improvement Company 1.0000 7,719.00 7,719.00 21101615 TOPSOIL F & P 4 16,109.000 SQ YD 2270 Gunther Construction Co. 2.3000 37,050.70 37,050.70 3810 McCarthy Improvement Company 1.0000 16,109.00 16,109.00 21400100 GRADING & SHAP DITCH 4,205.000 FOOT 2270 Gunther Construction Co. 7.5000 31,537.50 31,537.50 3810 McCarthy Improvement Company 4.0000 16,820.00 16,820.00 25000210 SEEDING CL 2A 6.400 ACRE 2270 Gunther Construction Co. 800.0000 5,120.00 5,120.00 3810 McCarthy Improvement Company 800.0000 5,120.00 5,120.00 25000400 NITROGEN FERT NUTR 580.000 POUND 2270 Gunther Construction Co. 2.0000 1,160.00 1,160.00 3810 McCarthy Improvement Company 2.0000 1,160.00 1,160.00 25000500 PHOSPHORUS FERT NUTR 580.000 POUND 2270 Gunther Construction Co. 2.0000 1,160.00 1,160.00 3810 McCarthy Improvement Company 2.0000 1,160.00 1,160.00 25000600 POTASSIUM FERT NUTR 580.000 POUND 2270 Gunther Construction Co. 2.0000 1,160.00 1,160.00 3810 McCarthy Improvement Company 2.0000 1,160.00 1,160.00 25100115 MULCH METHOD 2 6.400 ACRE 2270 Gunther Construction Co. 800.0000 5,120.00 5,120.00 3810 McCarthy Improvement Company 800.0000 5,120.00 5,120.00 25100635 HD EROS CONTR BLANKET 688.000 SQ YD 2270 Gunther Construction Co. 2.0000 1,376.00 1,376.00 3810 McCarthy Improvement Company 2.0000 1,376.00 1,376.00 28000250 TEMP EROS CONTR SEED 8,379.000 POUND 2270 Gunther Construction Co. 0.0100 83.79 83.79 3810 McCarthy Improvement Company 1.0000 8,379.00 8,379.00 28000305 TEMP DITCH CHECKS 810.000 FOOT 2270 Gunther Construction Co. 6.0000 4,860.00 4,860.00 3810 McCarthy Improvement Company 8.0000 6,480.00 6,480.00 28000400 PERIMETER EROS BAR 346.000 FOOT 2270 Gunther Construction Co. 4.0000 1,384.00 1,384.00 3810 McCarthy Improvement Company 8.0000 2,768.00 2,768.00 28000500 INLET & PIPE PROTECT 3.000 EACH 2270 Gunther Construction Co. 105.0000 315.00 315.00 3810 McCarthy Improvement Company 120.0000 360.00 360.00 28000510 INLET FILTERS 3.000 EACH 2270 Gunther Construction Co. 350.0000 1,050.00 1,050.00 3810 McCarthy Improvement Company 200.0000 600.00 600.00 28100107 STONE RIPRAP CL A4 208.000 SQ YD 2270 Gunther Construction Co. 36.0000 7,488.00 7,488.00 3810 McCarthy Improvement Company 60.0000 12,480.00 12,480.00 28100125 STONE RIPRAP CL B3 1,054.000 SQ YD 2270 Gunther Construction Co. 17.1500 18,076.10 18,076.10 3810 McCarthy Improvement Company 15.0000 15,810.00 15,810.00 28200200 FILTER FABRIC 1,261.000 SQ YD 2270 Gunther Construction Co. 1.8500 2,332.85 2,332.85 3810 McCarthy Improvement Company 1.0000 1,261.00 1,261.00 31100910 SUB GRAN MAT A 12 11,564.000 SQ YD 2270 Gunther Construction Co. 13.9000 160,739.60 160,739.60 3810 McCarthy Improvement Company 15.0000 173,460.00 173,460.00 31101900 SUB GRAN MAT C 2,176.200 TON 2270 Gunther Construction Co. 20.1000 43,741.62 43,741.62 3810 McCarthy Improvement Company 28.0000 60,933.60 60,933.60 35300700 PCC BSE CSE 12 4,776.000 SQ YD 2270 Gunther Construction Co. 46.0000 219,696.00 219,696.00 3810 McCarthy Improvement Company 60.0000 286,560.00 286,560.00 40600215 P BIT MATLS PR CT 112.200 TON 2270 Gunther Construction Co. 550.0000 61,710.00 61,710.00 3810 McCarthy Improvement Company 800.0000 89,760.00 89,760.00 40600895 CONSTRUC TEST STRIP 2.000 EACH 2270 Gunther Construction Co. 2,800.0000 5,600.00 5,600.00 3810 McCarthy Improvement Company 4,000.0000 8,000.00 8,000.00 40600982 HMA SURF REM BUTT JT 9,923.000 SQ YD 2270 Gunther Construction Co. 0.5500 5,457.65 5,457.65 3810 McCarthy Improvement Company 7.0000 69,461.00 69,461.00 40600990 TEMPORARY RAMP 3,262.000 SQ YD 2270 Gunther Construction Co. 3.5000 11,417.00 11,417.00 3810 McCarthy Improvement Company 15.0000 48,930.00 48,930.00 40603216 P HMA BC IL12.5 N90 15,034.000 TON 2270 Gunther Construction Co. 66.5000 999,761.00 999,761.00 3810 McCarthy Improvement Company 80.0000 1,202,720.00 1,202,720.00 40603310 HMA SC "C" N50 12,207.700 TON 2270 Gunther Construction Co. 58.0000 708,046.60 708,046.60 3810 McCarthy Improvement Company 66.0000 805,708.20 805,708.20 40603535 P HMA SC "D" N50 131.900 TON 2270 Gunther Construction Co. 111.5000 14,706.85 14,706.85 3810 McCarthy Improvement Company 120.0000 15,828.00 15,828.00 40603545 P HMA SC "D" N90 10,677.700 TON 2270 Gunther Construction Co. 69.4000 741,032.38 741,032.38 3810 McCarthy Improvement Company 84.0000 896,926.80 896,926.80 40701946 HMA PAVT FD 13 1/4 3,617.000 SQ YD 2270 Gunther Construction Co. 54.7500 198,030.75 198,030.75 3810 McCarthy Improvement Company 67.0000 242,339.00 242,339.00 42001200 PAVEMENT FABRIC 4,776.000 SQ YD 2270 Gunther Construction Co. 7.0500 33,670.80 33,670.80 3810 McCarthy Improvement Company 8.0000 38,208.00 38,208.00 44000100 PAVEMENT REM 7,730.000 SQ YD 2270 Gunther Construction Co. 10.0000 77,300.00 77,300.00 3810 McCarthy Improvement Company 15.0000 115,950.00 115,950.00 44000155 HMA SURF REM 1 1/2 111,712.000 SQ YD 2270 Gunther Construction Co. 1.2500 139,640.00 139,640.00 3810 McCarthy Improvement Company 1.7000 189,910.40 189,910.40 44000161 HMA SURF REM 3 763.000 SQ YD 2270 Gunther Construction Co. 3.5000 2,670.50 2,670.50 3810 McCarthy Improvement Company 4.0000 3,052.00 3,052.00 44000500 COMB CURB GUTTER REM 146.000 FOOT 2270 Gunther Construction Co. 7.2500 1,058.50 1,058.50 3810 McCarthy Improvement Company 9.0000 1,314.00 1,314.00 44004000 PAVED DITCH REMOVAL 706.000 FOOT 2270 Gunther Construction Co. 7.0000 4,942.00 4,942.00 3810 McCarthy Improvement Company 6.0000 4,236.00 4,236.00 44004250 PAVED SHLD REMOVAL 8,124.000 SQ YD 2270 Gunther Construction Co. 6.5000 52,806.00 52,806.00 3810 McCarthy Improvement Company 9.0000 73,116.00 73,116.00 44201297 DOWEL BARS 1 144.000 EACH 2270 Gunther Construction Co. 17.0000 2,448.00 2,448.00 3810 McCarthy Improvement Company 19.0000 2,736.00 2,736.00 44213204 TIE BARS 3/4 700.000 EACH 2270 Gunther Construction Co. 8.2500 5,775.00 5,775.00 3810 McCarthy Improvement Company 12.0000 8,400.00 8,400.00 48101200 AGGREGATE SHLDS B 5,565.300 TON 2270 Gunther Construction Co. 12.0000 66,783.60 66,783.60 3810 McCarthy Improvement Company 24.0000 133,567.20 133,567.20 48203029 HMA SHOULDERS 8 3,944.000 SQ YD 2270 Gunther Construction Co. 32.5000 128,180.00 128,180.00 3810 McCarthy Improvement Company 38.0000 149,872.00 149,872.00 48203039 HMA SHOULDERS 10 1/2 3,086.000 SQ YD 2270 Gunther Construction Co. 37.0000 114,182.00 114,182.00 3810 McCarthy Improvement Company 50.0000 154,300.00 154,300.00 50104400 CONC HDWL REM 1.000 EACH 2270 Gunther Construction Co. 1,500.0000 1,500.00 1,500.00 3810 McCarthy Improvement Company 800.0000 800.00 800.00 50104650 SLOPE WALL REMOV 679.000 SQ YD 2270 Gunther Construction Co. 14.5000 9,845.50 9,845.50 3810 McCarthy Improvement Company 15.0000 10,185.00 10,185.00 50300225 CONC STRUCT 20.800 CU YD 2270 Gunther Construction Co. 1,275.0000 26,520.00 26,520.00 3810 McCarthy Improvement Company 900.0000 18,720.00 18,720.00 50800205 REINF BARS, EPOXY CTD 2,825.000 POUND 2270 Gunther Construction Co. 3.0000 8,475.00 8,475.00 3810 McCarthy Improvement Company 2.0000 5,650.00 5,650.00 51100100 SLOPE WALL 4 679.000 SQ YD 2270 Gunther Construction Co. 94.7500 64,335.25 64,335.25 3810 McCarthy Improvement Company 72.0000 48,888.00 48,888.00 542A1081 P CUL CL A 2 36 21.000 FOOT 2270 Gunther Construction Co. 82.0000 1,722.00 1,722.00 3810 McCarthy Improvement Company 100.0000 2,100.00 2,100.00 54205053 P CUL SPEC 18 63.000 FOOT 2270 Gunther Construction Co. 33.0000 2,079.00 2,079.00 3810 McCarthy Improvement Company 49.0000 3,087.00 3,087.00 54210186 PIPE ELBOW 18 2.000 EACH 2270 Gunther Construction Co. 390.0000 780.00 780.00 3810 McCarthy Improvement Company 300.0000 600.00 600.00 54213681 PRC FLAR END SEC 36 1.000 EACH 2270 Gunther Construction Co. 1,125.0000 1,125.00 1,125.00 3810 McCarthy Improvement Company 1,500.0000 1,500.00 1,500.00 54215553 MET END SEC 18 1.000 EACH 2270 Gunther Construction Co. 325.0000 325.00 325.00 3810 McCarthy Improvement Company 180.0000 180.00 180.00 54248510 CONCRETE COLLAR .900 CU YD 2270 Gunther Construction Co. 1,750.0000 1,575.00 1,575.00 3810 McCarthy Improvement Company 2,000.0000 1,800.00 1,800.00 54390210 INSERT CUL LIN 30 198.000 FOOT 2270 Gunther Construction Co. 150.0000 29,700.00 29,700.00 3810 McCarthy Improvement Company 100.0000 19,800.00 19,800.00 60100060 CONC HDWL FOR P DRAIN 24.000 EACH 2270 Gunther Construction Co. 275.0000 6,600.00 6,600.00 3810 McCarthy Improvement Company 250.0000 6,000.00 6,000.00 60107600 PIPE UNDERDRAINS 4 5,332.000 FOOT 2270 Gunther Construction Co. 8.5000 45,322.00 45,322.00 3810 McCarthy Improvement Company 10.0000 53,320.00 53,320.00 60108100 PIPE UNDERDRAIN 4 SP 348.000 FOOT 2270 Gunther Construction Co. 31.0000 10,788.00 10,788.00 3810 McCarthy Improvement Company 15.0000 5,220.00 5,220.00 60218300 MAN TA 4 DIA T1F OL 1.000 EACH 2270 Gunther Construction Co. 1,500.0000 1,500.00 1,500.00 3810 McCarthy Improvement Company 2,000.0000 2,000.00 2,000.00 60600095 CLASS SI CONC OUTLET 16.200 CU YD 2270 Gunther Construction Co. 500.0000 8,100.00 8,100.00 3810 McCarthy Improvement Company 300.0000 4,860.00 4,860.00 60603800 COMB CC&G TB6.12 31.000 FOOT 2270 Gunther Construction Co. 83.0000 2,573.00 2,573.00 3810 McCarthy Improvement Company 38.0000 1,178.00 1,178.00 60900515 CONC THRUST BLOCKS 3.000 EACH 2270 Gunther Construction Co. 245.0000 735.00 735.00 3810 McCarthy Improvement Company 500.0000 1,500.00 1,500.00 63000001 SPBGR TY A 6FT POSTS 7,836.000 FOOT 2270 Gunther Construction Co. 18.0000 141,048.00 141,048.00 3810 McCarthy Improvement Company 18.0000 141,048.00 141,048.00 63000005 SPBGR TY B 100.000 FOOT 2270 Gunther Construction Co. 32.0000 3,200.00 3,200.00 3810 McCarthy Improvement Company 33.0000 3,300.00 3,300.00 63100045 TRAF BAR TERM T2 9.000 EACH 2270 Gunther Construction Co. 925.0000 8,325.00 8,325.00 3810 McCarthy Improvement Company 1,000.0000 9,000.00 9,000.00 63100089 TRAF BAR TERM T6B 15.000 EACH 2270 Gunther Construction Co. 3,150.0000 47,250.00 47,250.00 3810 McCarthy Improvement Company 3,000.0000 45,000.00 45,000.00 63100167 TR BAR TRM T1 SPL TAN 22.000 EACH 2270 Gunther Construction Co. 2,150.0000 47,300.00 47,300.00 3810 McCarthy Improvement Company 2,100.0000 46,200.00 46,200.00 63200310 GUARDRAIL REMOV 9,838.000 FOOT 2270 Gunther Construction Co. 2.6000 25,578.80 25,578.80 3810 McCarthy Improvement Company 2.5000 24,595.00 24,595.00 63500105 DELINEATORS 93.000 EACH 2270 Gunther Construction Co. 48.0000 4,464.00 4,464.00 3810 McCarthy Improvement Company 45.0000 4,185.00 4,185.00 64200105 SHOULDER RUMBLE STRIP 37,380.000 FOOT 2270 Gunther Construction Co. 0.2700 10,092.60 10,092.60 3810 McCarthy Improvement Company 0.4000 14,952.00 14,952.00 67000400 ENGR FIELD OFFICE A 8.000 CAL MO 2270 Gunther Construction Co. 1,000.0000 8,000.00 8,000.00 3810 McCarthy Improvement Company 2,500.0000 20,000.00 20,000.00 67000600 ENGR FIELD LAB 8.000 CAL MO 2270 Gunther Construction Co. 900.0000 7,200.00 7,200.00 3810 McCarthy Improvement Company 1,500.0000 12,000.00 12,000.00 67100100 MOBILIZATION 1.000 L SUM 2270 Gunther Construction Co. 384,000.0000 384,000.00 384,000.00 3810 McCarthy Improvement Company 350,000.0000 350,000.00 350,000.00 70100205 TRAF CONT-PROT 701401 2.000 EACH 2270 Gunther Construction Co. 40,250.0000 80,500.00 80,500.00 3810 McCarthy Improvement Company 40,000.0000 80,000.00 80,000.00 70100207 TRAF CONT-PROT 701402 2.000 EACH 2270 Gunther Construction Co. 50.0000 100.00 100.00 3810 McCarthy Improvement Company 50.0000 100.00 100.00 70100420 TRAF CONT-PROT 701411 8.000 EACH 2270 Gunther Construction Co. 1,150.0000 9,200.00 9,200.00 3810 McCarthy Improvement Company 1,200.0000 9,600.00 9,600.00 70100700 TRAF CONT-PROT 701406 1.000 L SUM 2270 Gunther Construction Co. 100.0000 100.00 100.00 3810 McCarthy Improvement Company 100.0000 100.00 100.00 70100820 TRAF CONT-PROT 701451 1.000 L SUM 2270 Gunther Construction Co. 16,000.0000 16,000.00 16,000.00 3810 McCarthy Improvement Company 8,000.0000 8,000.00 8,000.00 70100825 TRAF CONT-PROT 701456 1.000 L SUM 2270 Gunther Construction Co. 100.0000 100.00 100.00 3810 McCarthy Improvement Company 100.0000 100.00 100.00 70102630 TR CONT & PROT 701601 1.000 L SUM 2270 Gunther Construction Co. 5,200.0000 5,200.00 5,200.00 3810 McCarthy Improvement Company 4,300.0000 4,300.00 4,300.00 70103815 TR CONT SURVEILLANCE 100.000 CAL DA 2270 Gunther Construction Co. 0.0100 1.00 1.00 3810 McCarthy Improvement Company 150.0000 15,000.00 15,000.00 70106800 CHANGEABLE MESSAGE SN 16.000 CAL MO 2270 Gunther Construction Co. 970.0000 15,520.00 15,520.00 3810 McCarthy Improvement Company 1,000.0000 16,000.00 16,000.00 70300100 SHORT TERM PAVT MKING 14,759.000 FOOT 2270 Gunther Construction Co. 0.2500 3,689.75 3,689.75 3810 McCarthy Improvement Company 0.4000 5,903.60 5,903.60 70301000 WORK ZONE PAVT MK REM 4,871.000 SQ FT 2270 Gunther Construction Co. 0.6000 2,922.60 2,922.60 3810 McCarthy Improvement Company 1.3000 6,332.30 6,332.30 70400100 TEMP CONC BARRIER 3,175.000 FOOT 2270 Gunther Construction Co. 17.5000 55,562.50 55,562.50 3810 McCarthy Improvement Company 22.0000 69,850.00 69,850.00 70400200 REL TEMP CONC BARRIER 3,175.000 FOOT 2270 Gunther Construction Co. 2.5000 7,937.50 7,937.50 3810 McCarthy Improvement Company 2.0000 6,350.00 6,350.00 78003130 PREF PL PM TB LINE 6 9,710.000 FOOT 2270 Gunther Construction Co. 3.4000 33,014.00 33,014.00 3810 McCarthy Improvement Company 3.5000 33,985.00 33,985.00 78100100 RAISED REFL PAVT MKR 628.000 EACH 2270 Gunther Construction Co. 24.0000 15,072.00 15,072.00 3810 McCarthy Improvement Company 23.0000 14,444.00 14,444.00 78200410 GUARDRAIL MKR TYPE A 118.000 EACH 2270 Gunther Construction Co. 9.0000 1,062.00 1,062.00 3810 McCarthy Improvement Company 8.0000 944.00 944.00 78201000 TERMINAL MARKER - DA 30.000 EACH 2270 Gunther Construction Co. 26.0000 780.00 780.00 3810 McCarthy Improvement Company 26.0000 780.00 780.00 78300200 RAISED REF PVT MK REM 628.000 EACH 2270 Gunther Construction Co. 4.0000 2,512.00 2,512.00 3810 McCarthy Improvement Company 15.0000 9,420.00 9,420.00 81603035 UD 2#6 #6G XLPUSE 1 232.000 FOOT 2270 Gunther Construction Co. 10.1500 2,354.80 2,354.80 3810 McCarthy Improvement Company 10.0000 2,320.00 2,320.00 81702130 EC C XLP USE 1C 6 330.000 FOOT 2270 Gunther Construction Co. 2.1800 719.40 719.40 3810 McCarthy Improvement Company 2.0000 660.00 660.00 81900200 TR & BKFIL F ELECT WK 232.000 FOOT 2270 Gunther Construction Co. 7.4000 1,716.80 1,716.80 3810 McCarthy Improvement Company 7.0000 1,624.00 1,624.00 83800650 BKWY DEV COU SS SCRN 8.000 EACH 2270 Gunther Construction Co. 90.0000 720.00 720.00 3810 McCarthy Improvement Company 99.0000 792.00 792.00 89502375 REMOV EX TS EQUIP 1.000 EACH 2270 Gunther Construction Co. 1,000.0000 1,000.00 1,000.00 3810 McCarthy Improvement Company 1,050.0000 1,050.00 1,050.00