ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 06/05/08 11:38:01 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 03/07/2008 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 62032 LETTING ITEM NUMBER: 078 RESPONSIBLE DISTRICT: 01 BIDS LOCKED: Y SECTION: 1Y-B-R-1 COUNTY: LAKE ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0204 Areatha Construction Co., Inc. NO ALT 3,997,445.52 3,997,445.53 3,997,445.53 0801 Capitol Cement Co., Inc. NO ALT 3,751,386.43 3,751,386.43 3,751,386.43 1552 Dunnet Bay Construction Company NO ALT 3,823,693.51 3,799,194.51 3,799,194.51 15 2520 Herlihy Mid-Continent Company NO ALT 3,829,027.16 3,829,027.16 3,829,027.16 3127 Kenny Construction Company NO ALT 4,181,488.21 4,181,488.21 4,181,488.21 3505 Lorig Construction Company NO ALT 4,279,761.88 4,279,761.88 4,279,761.88 3702 Martam Construction Incorporated NO ALT 3,745,327.01 * 3,745,427.01 3,744,927.01 * 500.00- 5570 Sjostrom & Sons, Inc. NO ALT 5,385,397.56 5,392,023.32 5,392,023.32 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 169 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF MX032178 TEMP INFO SIGNING 6.900 SQ M 0204 Areatha Construction Co., Inc. 195.0000 1,345.50 1,345.50 0801 Capitol Cement Co., Inc. 175.0000 1,207.50 1,207.50 1552 Dunnet Bay Construction Company 130.0000 897.00 897.00 2520 Herlihy Mid-Continent Company 130.0000 897.00 897.00 3127 Kenny Construction Company 130.0000 897.00 897.00 3505 Lorig Construction Company 135.0000 931.50 931.50 3702 Martam Construction Incorporated 160.0000 1,104.00 1,104.00 5570 Sjostrom & Sons, Inc. 130.0000 897.00 897.00 MX032200 ENGINEERED BARRIER 1,510.000 SQ M 0204 Areatha Construction Co., Inc. 20.0000 30,200.00 30,200.00 0801 Capitol Cement Co., Inc. 30.0000 45,300.00 45,300.00 1552 Dunnet Bay Construction Company 24.0000 36,240.00 36,240.00 2520 Herlihy Mid-Continent Company 8.7000 13,137.00 13,137.00 3127 Kenny Construction Company 20.0000 30,200.00 30,200.00 3505 Lorig Construction Company 26.0000 39,260.00 39,260.00 3702 Martam Construction Incorporated 18.0000 27,180.00 27,180.00 5570 Sjostrom & Sons, Inc. 24.0000 36,240.00 36,240.00 MX032529 SEGMENT CONC BLK WALL 268.000 SQ M 0204 Areatha Construction Co., Inc. 300.0000 80,400.00 80,400.00 0801 Capitol Cement Co., Inc. 285.2500 76,447.00 76,447.00 1552 Dunnet Bay Construction Company 285.2500 76,447.00 76,447.00 2520 Herlihy Mid-Continent Company 200.0000 53,600.00 53,600.00 3127 Kenny Construction Company 285.2500 76,447.00 76,447.00 3505 Lorig Construction Company 415.0000 111,220.00 111,220.00 3702 Martam Construction Incorporated 320.0000 85,760.00 85,760.00 5570 Sjostrom & Sons, Inc. 285.2500 76,447.00 76,447.00 MX032922 ELCBL C GND 6 1C 37.000 METER 0204 Areatha Construction Co., Inc. 6.2000 229.40 229.40 0801 Capitol Cement Co., Inc. 6.2000 229.40 229.40 1552 Dunnet Bay Construction Company 6.2000 229.40 229.40 2520 Herlihy Mid-Continent Company 7.5000 277.50 277.50 3127 Kenny Construction Company 7.5000 277.50 277.50 3505 Lorig Construction Company 8.0000 296.00 296.00 3702 Martam Construction Incorporated 8.0000 296.00 296.00 5570 Sjostrom & Sons, Inc. 6.2000 229.40 229.40 MX033290 SED CONT SILT FENCE 50.000 METER 0204 Areatha Construction Co., Inc. 26.0000 1,300.00 1,300.00 0801 Capitol Cement Co., Inc. 26.0000 1,300.00 1,300.00 1552 Dunnet Bay Construction Company 26.0000 1,300.00 1,300.00 2520 Herlihy Mid-Continent Company 26.0000 1,300.00 1,300.00 3127 Kenny Construction Company 26.0000 1,300.00 1,300.00 3505 Lorig Construction Company 27.0000 1,350.00 1,350.00 3702 Martam Construction Incorporated 30.0000 1,500.00 1,500.00 5570 Sjostrom & Sons, Inc. 26.0000 1,300.00 1,300.00 MX033704 MAN A 1.2D W/FR & LID 10.000 EACH 0204 Areatha Construction Co., Inc. 2,000.0000 20,000.00 20,000.00 0801 Capitol Cement Co., Inc. 1,100.0000 11,000.00 11,000.00 1552 Dunnet Bay Construction Company 2,200.0000 22,000.00 22,000.00 2520 Herlihy Mid-Continent Company 2,235.0000 22,350.00 22,350.00 3127 Kenny Construction Company 2,000.0000 20,000.00 20,000.00 3505 Lorig Construction Company 2,300.0000 23,000.00 23,000.00 3702 Martam Construction Incorporated 2,600.0000 26,000.00 26,000.00 5570 Sjostrom & Sons, Inc. 2,200.0000 22,000.00 22,000.00 MX703200 WET TEMP PM TAPE T3 4,000.000 METER 0204 Areatha Construction Co., Inc. 4.3500 17,400.00 17,400.00 0801 Capitol Cement Co., Inc. 4.4500 17,800.00 17,800.00 1552 Dunnet Bay Construction Company 4.4300 17,720.00 17,720.00 2520 Herlihy Mid-Continent Company 4.6000 18,400.00 18,400.00 3127 Kenny Construction Company 4.4300 17,720.00 17,720.00 3505 Lorig Construction Company 4.7500 19,000.00 19,000.00 3702 Martam Construction Incorporated 5.0000 20,000.00 20,000.00 5570 Sjostrom & Sons, Inc. 4.4300 17,720.00 17,720.00 MX871055 FOCC62.5/125 MM12SM12 823.000 METER 0204 Areatha Construction Co., Inc. 9.8000 8,065.40 8,065.40 0801 Capitol Cement Co., Inc. 9.8000 8,065.40 8,065.40 1552 Dunnet Bay Construction Company 9.8000 8,065.40 8,065.40 2520 Herlihy Mid-Continent Company 10.2500 8,435.75 8,435.75 3127 Kenny Construction Company 10.2500 8,435.75 8,435.75 3505 Lorig Construction Company 10.5000 8,641.50 8,641.50 3702 Martam Construction Incorporated 12.0000 9,876.00 9,876.00 5570 Sjostrom & Sons, Inc. 9.8000 8,065.40 8,065.40 M2020010 EARTH EXCAVATION 3,937.000 CU M 0204 Areatha Construction Co., Inc. 25.0000 98,425.00 98,425.00 0801 Capitol Cement Co., Inc. 22.0000 86,614.00 86,614.00 1552 Dunnet Bay Construction Company 42.0000 165,354.00 165,354.00 2520 Herlihy Mid-Continent Company 25.0000 98,425.00 98,425.00 3127 Kenny Construction Company 46.0000 181,102.00 181,102.00 3505 Lorig Construction Company 33.5000 131,889.50 131,889.50 3702 Martam Construction Incorporated 39.0000 153,543.00 153,543.00 5570 Sjostrom & Sons, Inc. 40.5700 159,724.09 159,724.09 M2021200 REM & DISP UNS MATL 300.000 CU M 0204 Areatha Construction Co., Inc. 45.0000 13,500.00 13,500.00 0801 Capitol Cement Co., Inc. 50.0000 15,000.00 15,000.00 1552 Dunnet Bay Construction Company 55.0000 16,500.00 16,500.00 2520 Herlihy Mid-Continent Company 45.0000 13,500.00 13,500.00 3127 Kenny Construction Company 120.0000 36,000.00 36,000.00 3505 Lorig Construction Company 50.0000 15,000.00 15,000.00 3702 Martam Construction Incorporated 39.0000 11,700.00 11,700.00 5570 Sjostrom & Sons, Inc. 75.0000 22,500.00 22,500.00 M2040800 FURNISHED EXCAV 2,744.000 CU M 0204 Areatha Construction Co., Inc. 25.0000 68,600.00 68,600.00 0801 Capitol Cement Co., Inc. 15.0000 41,160.00 41,160.00 1552 Dunnet Bay Construction Company 8.0000 21,952.00 21,952.00 2520 Herlihy Mid-Continent Company 25.0000 68,600.00 68,600.00 3127 Kenny Construction Company 40.0000 109,760.00 109,760.00 3505 Lorig Construction Company 50.5000 138,572.00 138,572.00 3702 Martam Construction Incorporated 18.0000 49,392.00 49,392.00 5570 Sjostrom & Sons, Inc. 31.0300 85,146.32 85,146.32 M2070220 POROUS GRAN EMBANK 123.000 CU M 0204 Areatha Construction Co., Inc. 25.0000 3,075.00 3,075.00 0801 Capitol Cement Co., Inc. 25.0000 3,075.00 3,075.00 1552 Dunnet Bay Construction Company 65.0000 7,995.00 7,995.00 2520 Herlihy Mid-Continent Company 25.0000 3,075.00 3,075.00 3127 Kenny Construction Company 69.0000 8,487.00 8,487.00 3505 Lorig Construction Company 72.0000 8,856.00 8,856.00 3702 Martam Construction Incorporated 52.0000 6,396.00 6,396.00 5570 Sjostrom & Sons, Inc. 66.8300 8,220.09 8,220.09 M2070400 POROUS GRAN EMB SPEC 57.000 CU M 0204 Areatha Construction Co., Inc. 147.0000 8,379.00 8,379.00 0801 Capitol Cement Co., Inc. 55.0000 3,135.00 3,135.00 1552 Dunnet Bay Construction Company 82.0000 4,674.00 4,674.00 2520 Herlihy Mid-Continent Company 53.0000 3,021.00 3,021.00 3127 Kenny Construction Company 69.0000 3,933.00 3,933.00 3505 Lorig Construction Company 70.0000 3,990.00 3,990.00 3702 Martam Construction Incorporated 52.0000 2,964.00 2,964.00 5570 Sjostrom & Sons, Inc. 73.9900 4,217.43 4,217.43 M2070420 POROUS GRAN EMB SUBGR 123.000 CU M 0204 Areatha Construction Co., Inc. 25.0000 3,075.00 3,075.00 0801 Capitol Cement Co., Inc. 25.0000 3,075.00 3,075.00 1552 Dunnet Bay Construction Company 65.0000 7,995.00 7,995.00 2520 Herlihy Mid-Continent Company 25.0000 3,075.00 3,075.00 3127 Kenny Construction Company 69.0000 8,487.00 8,487.00 3505 Lorig Construction Company 57.0000 7,011.00 7,011.00 3702 Martam Construction Incorporated 52.0000 6,396.00 6,396.00 5570 Sjostrom & Sons, Inc. 66.8300 8,220.09 8,220.09 M2080150 TRENCH BACKFILL 250.000 CU M 0204 Areatha Construction Co., Inc. 50.0000 12,500.00 12,500.00 0801 Capitol Cement Co., Inc. 90.0000 22,500.00 22,500.00 1552 Dunnet Bay Construction Company 82.0000 20,500.00 20,500.00 2520 Herlihy Mid-Continent Company 80.0000 20,000.00 20,000.00 3127 Kenny Construction Company 50.0000 12,500.00 12,500.00 3505 Lorig Construction Company 81.0000 20,250.00 20,250.00 3702 Martam Construction Incorporated 56.0000 14,000.00 14,000.00 5570 Sjostrom & Sons, Inc. 82.0000 20,500.00 20,500.00 M2101000 GEOTECH FAB F/GR STAB 1,000.000 SQ M 0204 Areatha Construction Co., Inc. 5.0000 5,000.00 5,000.00 0801 Capitol Cement Co., Inc. 5.0000 5,000.00 5,000.00 1552 Dunnet Bay Construction Company 3.0000 3,000.00 3,000.00 2520 Herlihy Mid-Continent Company 5.0000 5,000.00 5,000.00 3127 Kenny Construction Company 4.0000 4,000.00 4,000.00 3505 Lorig Construction Company 4.0000 4,000.00 4,000.00 3702 Martam Construction Incorporated 1.5000 1,500.00 1,500.00 5570 Sjostrom & Sons, Inc. 4.7700 4,770.00 4,770.00 M2113100 TOPSOIL F & P 100 3,894.000 SQ M 0204 Areatha Construction Co., Inc. 3.3500 13,044.90 13,044.90 0801 Capitol Cement Co., Inc. 3.3500 13,044.90 13,044.90 1552 Dunnet Bay Construction Company 3.3500 13,044.90 13,044.90 2520 Herlihy Mid-Continent Company 3.3500 13,044.90 13,044.90 3127 Kenny Construction Company 3.3500 13,044.90 13,044.90 3505 Lorig Construction Company 3.5000 13,629.00 13,629.00 3702 Martam Construction Incorporated 4.0000 15,576.00 15,576.00 5570 Sjostrom & Sons, Inc. 3.3500 13,044.90 13,044.90 M2140100 GRADING & SHAP DITCH 190.000 METER 0204 Areatha Construction Co., Inc. 30.0000 5,700.00 5,700.00 0801 Capitol Cement Co., Inc. 30.0000 5,700.00 5,700.00 1552 Dunnet Bay Construction Company 20.0000 3,800.00 3,800.00 2520 Herlihy Mid-Continent Company 30.0000 5,700.00 5,700.00 3127 Kenny Construction Company 60.6000 11,514.00 11,514.00 3505 Lorig Construction Company 100.0000 19,000.00 19,000.00 3702 Martam Construction Incorporated 35.0000 6,650.00 6,650.00 5570 Sjostrom & Sons, Inc. 150.0000 28,500.00 28,500.00 M2500314 SEEDING CL 4B .400 HA 0204 Areatha Construction Co., Inc. 9,000.0000 3,600.00 3,600.00 0801 Capitol Cement Co., Inc. 9,000.0000 3,600.00 3,600.00 1552 Dunnet Bay Construction Company 9,000.0000 3,600.00 3,600.00 2520 Herlihy Mid-Continent Company 9,000.0000 3,600.00 3,600.00 3127 Kenny Construction Company 9,000.0000 3,600.00 3,600.00 3505 Lorig Construction Company 10,000.0000 4,000.00 4,000.00 3702 Martam Construction Incorporated 10,000.0000 4,000.00 4,000.00 5570 Sjostrom & Sons, Inc. 9,000.0000 3,600.00 3,600.00 M2500400 NITROGEN FERT NUTR 28.000 KG 0204 Areatha Construction Co., Inc. 2.0000 56.00 56.00 0801 Capitol Cement Co., Inc. 2.0000 56.00 56.00 1552 Dunnet Bay Construction Company 2.0000 56.00 56.00 2520 Herlihy Mid-Continent Company 2.0000 56.00 56.00 3127 Kenny Construction Company 2.0000 56.00 56.00 3505 Lorig Construction Company 2.0000 56.00 56.00 3702 Martam Construction Incorporated 3.0000 84.00 84.00 5570 Sjostrom & Sons, Inc. 2.0000 56.00 56.00 M2500500 PHOSPHORUS FERT NUTR 28.000 KG 0204 Areatha Construction Co., Inc. 2.0000 56.00 56.00 0801 Capitol Cement Co., Inc. 2.0000 56.00 56.00 1552 Dunnet Bay Construction Company 2.0000 56.00 56.00 2520 Herlihy Mid-Continent Company 2.0000 56.00 56.00 3127 Kenny Construction Company 2.0000 56.00 56.00 3505 Lorig Construction Company 2.0000 56.00 56.00 3702 Martam Construction Incorporated 3.0000 84.00 84.00 5570 Sjostrom & Sons, Inc. 2.0000 56.00 56.00 M2500600 POTASSIUM FERT NUTR 28.000 KG 0204 Areatha Construction Co., Inc. 2.0000 56.00 56.00 0801 Capitol Cement Co., Inc. 2.0000 56.00 56.00 1552 Dunnet Bay Construction Company 2.0000 56.00 56.00 2520 Herlihy Mid-Continent Company 2.0000 56.00 56.00 3127 Kenny Construction Company 2.0000 56.00 56.00 3505 Lorig Construction Company 2.0000 56.00 56.00 3702 Martam Construction Incorporated 3.0000 84.00 84.00 5570 Sjostrom & Sons, Inc. 2.0000 56.00 56.00 M2510630 EROSION CONTR BLANKET 3,111.000 SQ M 0204 Areatha Construction Co., Inc. 1.2500 3,888.75 3,888.75 0801 Capitol Cement Co., Inc. 1.2500 3,888.75 3,888.75 1552 Dunnet Bay Construction Company 1.2500 3,888.75 3,888.75 2520 Herlihy Mid-Continent Company 1.2500 3,888.75 3,888.75 3127 Kenny Construction Company 1.5000 4,666.50 4,666.50 3505 Lorig Construction Company 1.3500 4,199.85 4,199.85 3702 Martam Construction Incorporated 1.5000 4,666.50 4,666.50 5570 Sjostrom & Sons, Inc. 1.2500 3,888.75 3,888.75 M2520110 SODDING SALT TOLERANT 783.000 SQ M 0204 Areatha Construction Co., Inc. 11.5000 9,004.50 9,004.50 0801 Capitol Cement Co., Inc. 11.5000 9,004.50 9,004.50 1552 Dunnet Bay Construction Company 11.5000 9,004.50 9,004.50 2520 Herlihy Mid-Continent Company 11.5000 9,004.50 9,004.50 3127 Kenny Construction Company 11.5000 9,004.50 9,004.50 3505 Lorig Construction Company 12.0000 9,396.00 9,396.00 3702 Martam Construction Incorporated 13.0000 10,179.00 10,179.00 5570 Sjostrom & Sons, Inc. 11.5000 9,004.50 9,004.50 M2520200 SUPPLE WATERING 46.600 UNIT 0204 Areatha Construction Co., Inc. 0.1000 4.66 4.66 0801 Capitol Cement Co., Inc. 0.1000 4.66 4.66 1552 Dunnet Bay Construction Company 0.1000 4.66 4.66 2520 Herlihy Mid-Continent Company 0.1000 4.66 4.66 3127 Kenny Construction Company 0.1000 4.66 4.66 3505 Lorig Construction Company 1.0000 46.60 46.60 3702 Martam Construction Incorporated 0.1000 4.66 4.66 5570 Sjostrom & Sons, Inc. 0.1000 4.66 4.66 M2800250 TEMP EROS CONTR SEED 35.000 KG 0204 Areatha Construction Co., Inc. 33.0000 1,155.00 1,155.00 0801 Capitol Cement Co., Inc. 33.0000 1,155.00 1,155.00 1552 Dunnet Bay Construction Company 33.0000 1,155.00 1,155.00 2520 Herlihy Mid-Continent Company 33.0000 1,155.00 1,155.00 3127 Kenny Construction Company 33.0000 1,155.00 1,155.00 3505 Lorig Construction Company 35.0000 1,225.00 1,225.00 3702 Martam Construction Incorporated 36.0000 1,260.00 1,260.00 5570 Sjostrom & Sons, Inc. 33.0000 1,155.00 1,155.00 M2800400 PERIMETER EROS BAR 628.000 METER 0204 Areatha Construction Co., Inc. 10.5000 6,594.00 6,594.00 0801 Capitol Cement Co., Inc. 25.5000 16,014.00 16,014.00 1552 Dunnet Bay Construction Company 10.5000 6,594.00 6,594.00 2520 Herlihy Mid-Continent Company 10.5000 6,594.00 6,594.00 3127 Kenny Construction Company 10.5000 6,594.00 6,594.00 3505 Lorig Construction Company 11.0000 6,908.00 6,908.00 3702 Martam Construction Incorporated 12.0000 7,536.00 7,536.00 5570 Sjostrom & Sons, Inc. 10.5000 6,594.00 6,594.00 M2810107 STONE RIPRAP CL A4 853.000 SQ M 0204 Areatha Construction Co., Inc. 96.0000 81,888.00 81,888.00 0801 Capitol Cement Co., Inc. 80.0000 68,240.00 68,240.00 1552 Dunnet Bay Construction Company 90.0000 76,770.00 76,770.00 2520 Herlihy Mid-Continent Company 72.0000 61,416.00 61,416.00 3127 Kenny Construction Company 135.0000 115,155.00 115,155.00 3505 Lorig Construction Company 99.0000 84,447.00 84,447.00 3702 Martam Construction Incorporated 66.0000 56,298.00 56,298.00 5570 Sjostrom & Sons, Inc. 95.4700 81,435.91 81,435.91 M2820200 FILTER FABRIC 846.000 SQ M 0204 Areatha Construction Co., Inc. 3.0000 2,538.00 2,538.00 0801 Capitol Cement Co., Inc. 3.0000 2,538.00 2,538.00 1552 Dunnet Bay Construction Company 4.5000 3,807.00 3,807.00 2520 Herlihy Mid-Continent Company 5.0000 4,230.00 4,230.00 3127 Kenny Construction Company 7.5000 6,345.00 6,345.00 3505 Lorig Construction Company 4.0000 3,384.00 3,384.00 3702 Martam Construction Incorporated 10.0000 8,460.00 8,460.00 5570 Sjostrom & Sons, Inc. 5.6700 4,796.82 4,796.82 M3111100 SUB GRAN MAT B 100 1,022.000 SQ M 0204 Areatha Construction Co., Inc. 7.0000 7,154.00 7,154.00 0801 Capitol Cement Co., Inc. 7.0000 7,154.00 7,154.00 1552 Dunnet Bay Construction Company 9.2500 9,453.50 9,453.50 2520 Herlihy Mid-Continent Company 7.0000 7,154.00 7,154.00 3127 Kenny Construction Company 15.0000 15,330.00 15,330.00 3505 Lorig Construction Company 16.0000 16,352.00 16,352.00 3702 Martam Construction Incorporated 6.0000 6,132.00 6,132.00 5570 Sjostrom & Sons, Inc. 14.5600 14,880.32 14,880.32 M3111150 SUB GRAN MAT B 150 1,914.000 SQ M 0204 Areatha Construction Co., Inc. 9.0000 17,226.00 17,226.00 0801 Capitol Cement Co., Inc. 9.0000 17,226.00 17,226.00 1552 Dunnet Bay Construction Company 11.0000 21,054.00 21,054.00 2520 Herlihy Mid-Continent Company 9.0000 17,226.00 17,226.00 3127 Kenny Construction Company 17.0000 32,538.00 32,538.00 3505 Lorig Construction Company 21.0000 40,194.00 40,194.00 3702 Martam Construction Incorporated 8.0000 15,312.00 15,312.00 5570 Sjostrom & Sons, Inc. 17.9000 34,260.60 34,260.60 M3111300 SUB GRAN MAT B 300 5,885.000 SQ M 0204 Areatha Construction Co., Inc. 15.0000 88,275.00 88,275.00 0801 Capitol Cement Co., Inc. 15.0000 88,275.00 88,275.00 1552 Dunnet Bay Construction Company 18.0000 105,930.00 105,930.00 2520 Herlihy Mid-Continent Company 15.0000 88,275.00 88,275.00 3127 Kenny Construction Company 23.5000 138,297.50 138,297.50 3505 Lorig Construction Company 51.0000 300,135.00 300,135.00 3702 Martam Construction Incorporated 13.0000 76,505.00 76,505.00 5570 Sjostrom & Sons, Inc. 27.4500 161,543.25 161,543.25 M3530330 PCC BSE CSE 330 1,022.000 SQ M 0204 Areatha Construction Co., Inc. 40.0000 40,880.00 40,880.00 0801 Capitol Cement Co., Inc. 85.0000 86,870.00 86,870.00 1552 Dunnet Bay Construction Company 67.0000 68,474.00 68,474.00 2520 Herlihy Mid-Continent Company 60.0000 61,320.00 61,320.00 3127 Kenny Construction Company 79.9000 81,657.80 81,657.80 3505 Lorig Construction Company 65.0000 66,430.00 66,430.00 3702 Martam Construction Incorporated 62.0000 63,364.00 63,364.00 5570 Sjostrom & Sons, Inc. 77.5700 79,276.54 79,276.54 M4060200 BIT MATLS PR CT 4.700 M TON 0204 Areatha Construction Co., Inc. 1.0000 4.70 4.70 0801 Capitol Cement Co., Inc. 1.0000 4.70 4.70 1552 Dunnet Bay Construction Company 1.0000 4.70 4.70 2520 Herlihy Mid-Continent Company 1.0000 4.70 4.70 3127 Kenny Construction Company 1.0000 4.70 4.70 3505 Lorig Construction Company 1.0000 4.70 4.70 3702 Martam Construction Incorporated 500.0000 2,350.00 2,350.00 5570 Sjostrom & Sons, Inc. 1.0000 4.70 4.70 M4060300 AGG PR CT 24.000 M TON 0204 Areatha Construction Co., Inc. 1.0000 24.00 24.00 0801 Capitol Cement Co., Inc. 1.0000 24.00 24.00 1552 Dunnet Bay Construction Company 1.0000 24.00 24.00 2520 Herlihy Mid-Continent Company 1.0000 24.00 24.00 3127 Kenny Construction Company 1.0000 24.00 24.00 3505 Lorig Construction Company 1.0000 24.00 24.00 3702 Martam Construction Incorporated 50.0000 1,200.00 1,200.00 5570 Sjostrom & Sons, Inc. 1.0000 24.00 24.00 M4060895 CONSTRUC TEST STRIP 1.000 EACH 0204 Areatha Construction Co., Inc. 1.0000 1.00 1.00 0801 Capitol Cement Co., Inc. 1.0000 1.00 1.00 1552 Dunnet Bay Construction Company 1.0000 1.00 1.00 2520 Herlihy Mid-Continent Company 1.0000 1.00 1.00 3127 Kenny Construction Company 1.0000 1.00 1.00 3505 Lorig Construction Company 1.0000 1.00 1.00 3702 Martam Construction Incorporated 3,000.0000 3,000.00 3,000.00 5570 Sjostrom & Sons, Inc. 1.0000 1.00 1.00 M4060982 HMA SURF REM BUTT JT 74.300 SQ M 0204 Areatha Construction Co., Inc. 14.5000 1,077.35 1,077.35 0801 Capitol Cement Co., Inc. 14.5000 1,077.35 1,077.35 1552 Dunnet Bay Construction Company 14.5000 1,077.35 1,077.35 2520 Herlihy Mid-Continent Company 14.5000 1,077.35 1,077.35 3127 Kenny Construction Company 14.5000 1,077.35 1,077.35 3505 Lorig Construction Company 15.0000 1,114.50 1,114.50 3702 Martam Construction Incorporated 28.0000 2,080.40 2,080.40 5570 Sjostrom & Sons, Inc. 14.5000 1,077.35 1,077.35 M4063310 HMA SC "C" N50 240.000 M TON 0204 Areatha Construction Co., Inc. 85.0000 20,400.00 20,400.00 0801 Capitol Cement Co., Inc. 85.0000 20,400.00 20,400.00 1552 Dunnet Bay Construction Company 85.0000 20,400.00 20,400.00 2520 Herlihy Mid-Continent Company 85.0000 20,400.00 20,400.00 3127 Kenny Construction Company 85.0000 20,400.00 20,400.00 3505 Lorig Construction Company 86.0000 20,640.00 20,640.00 3702 Martam Construction Incorporated 96.0000 23,040.00 23,040.00 5570 Sjostrom & Sons, Inc. 85.0000 20,400.00 20,400.00 M4063595 P HMA SC "F" N90 720.000 M TON 0204 Areatha Construction Co., Inc. 97.0000 69,840.00 69,840.00 0801 Capitol Cement Co., Inc. 97.0000 69,840.00 69,840.00 1552 Dunnet Bay Construction Company 97.0000 69,840.00 69,840.00 2520 Herlihy Mid-Continent Company 97.0000 69,840.00 69,840.00 3127 Kenny Construction Company 97.0000 69,840.00 69,840.00 3505 Lorig Construction Company 98.0000 70,560.00 70,560.00 3702 Martam Construction Incorporated 84.0000 60,480.00 60,480.00 5570 Sjostrom & Sons, Inc. 97.0000 69,840.00 69,840.00 M4202285 PCC PVT 280 JOINTED 5,885.000 SQ M 0204 Areatha Construction Co., Inc. 88.5000 520,822.50 520,822.50 0801 Capitol Cement Co., Inc. 75.0000 441,375.00 441,375.00 1552 Dunnet Bay Construction Company 71.7500 422,248.75 422,248.75 2520 Herlihy Mid-Continent Company 65.0000 382,525.00 382,525.00 3127 Kenny Construction Company 82.0000 482,570.00 482,570.00 3505 Lorig Construction Company 65.0000 382,525.00 382,525.00 3702 Martam Construction Incorporated 60.0000 353,100.00 353,100.00 5570 Sjostrom & Sons, Inc. 60.0000 353,100.00 353,100.00 M4205000 BR APPR PAVT 458.000 SQ M 0204 Areatha Construction Co., Inc. 335.0000 153,430.00 153,430.00 0801 Capitol Cement Co., Inc. 285.0000 130,530.00 130,530.00 1552 Dunnet Bay Construction Company 325.0000 148,850.00 148,850.00 2520 Herlihy Mid-Continent Company 400.0000 183,200.00 183,200.00 3127 Kenny Construction Company 305.0000 139,690.00 139,690.00 3505 Lorig Construction Company 300.0000 137,400.00 137,400.00 3702 Martam Construction Incorporated 290.0000 132,820.00 132,820.00 5570 Sjostrom & Sons, Inc. 445.1200 203,864.96 203,864.96 M4205200 PROTECTIVE COAT 3,203.000 SQ M 0204 Areatha Construction Co., Inc. 1.7000 5,445.10 5,445.10 0801 Capitol Cement Co., Inc. 0.7500 2,402.25 2,402.25 1552 Dunnet Bay Construction Company 2.5000 8,007.50 8,007.50 2520 Herlihy Mid-Continent Company 1.0000 3,203.00 3,203.00 3127 Kenny Construction Company 1.1000 3,523.30 3,523.30 3505 Lorig Construction Company 1.0000 3,203.00 3,203.00 3702 Martam Construction Incorporated 1.0000 3,203.00 3,203.00 5570 Sjostrom & Sons, Inc. 4.1800 13,388.54 13,388.54 M4206100 BR APPR PVT CON (PCC) 35.000 SQ M 0204 Areatha Construction Co., Inc. 225.0000 7,875.00 7,875.00 0801 Capitol Cement Co., Inc. 470.0000 16,450.00 16,450.00 1552 Dunnet Bay Construction Company 325.0000 11,375.00 11,375.00 2520 Herlihy Mid-Continent Company 850.0000 29,750.00 29,750.00 3127 Kenny Construction Company 145.0000 5,075.00 5,075.00 3505 Lorig Construction Company 65.0000 2,275.00 2,275.00 3702 Martam Construction Incorporated 220.0000 7,700.00 7,700.00 5570 Sjostrom & Sons, Inc. 566.8300 19,839.05 19,839.05 M4230200 PCC DRIVEWAY PAVT 200 470.000 SQ M 0204 Areatha Construction Co., Inc. 89.0000 41,830.00 41,830.00 0801 Capitol Cement Co., Inc. 65.0000 30,550.00 30,550.00 1552 Dunnet Bay Construction Company 51.0000 23,970.00 23,970.00 2520 Herlihy Mid-Continent Company 75.0000 35,250.00 35,250.00 3127 Kenny Construction Company 53.7500 25,262.50 25,262.50 3505 Lorig Construction Company 85.0000 39,950.00 39,950.00 3702 Martam Construction Incorporated 52.0000 24,440.00 24,440.00 5570 Sjostrom & Sons, Inc. 147.3300 69,245.10 69,245.10 M4240125 PC CONC SIDEWALK 125 1,910.000 SQ M 0204 Areatha Construction Co., Inc. 40.3000 76,973.00 76,973.00 0801 Capitol Cement Co., Inc. 67.0000 127,970.00 127,970.00 1552 Dunnet Bay Construction Company 44.0000 84,040.00 84,040.00 2520 Herlihy Mid-Continent Company 60.0000 114,600.00 114,600.00 3127 Kenny Construction Company 46.5000 88,815.00 88,815.00 3505 Lorig Construction Company 59.0000 112,690.00 112,690.00 3702 Martam Construction Incorporated 52.0000 99,320.00 99,320.00 5570 Sjostrom & Sons, Inc. 83.0900 158,701.90 158,701.90 M4400750 HMA SURF REM 50 5,033.000 SQ M 0204 Areatha Construction Co., Inc. 4.0000 20,132.00 20,132.00 0801 Capitol Cement Co., Inc. 4.0000 20,132.00 20,132.00 1552 Dunnet Bay Construction Company 4.0000 20,132.00 20,132.00 2520 Herlihy Mid-Continent Company 11.0000 55,363.00 55,363.00 3127 Kenny Construction Company 4.0000 20,132.00 20,132.00 3505 Lorig Construction Company 4.5000 22,648.50 22,648.50 3702 Martam Construction Incorporated 3.5000 17,615.50 17,615.50 5570 Sjostrom & Sons, Inc. 4.0000 20,132.00 20,132.00 M4402000 PAVEMENT REM 2,540.000 SQ M 0204 Areatha Construction Co., Inc. 15.0000 38,100.00 38,100.00 0801 Capitol Cement Co., Inc. 12.0000 30,480.00 30,480.00 1552 Dunnet Bay Construction Company 20.0000 50,800.00 50,800.00 2520 Herlihy Mid-Continent Company 15.0000 38,100.00 38,100.00 3127 Kenny Construction Company 25.0000 63,500.00 63,500.00 3505 Lorig Construction Company 33.0000 83,820.00 83,820.00 3702 Martam Construction Incorporated 12.0000 30,480.00 30,480.00 5570 Sjostrom & Sons, Inc. 47.8200 121,462.80 121,462.80 M4402010 DRIVE PAVEMENT REM 500.000 SQ M 0204 Areatha Construction Co., Inc. 14.0000 7,000.00 7,000.00 0801 Capitol Cement Co., Inc. 15.0000 7,500.00 7,500.00 1552 Dunnet Bay Construction Company 18.0000 9,000.00 9,000.00 2520 Herlihy Mid-Continent Company 14.0000 7,000.00 7,000.00 3127 Kenny Construction Company 20.0000 10,000.00 10,000.00 3505 Lorig Construction Company 19.0000 9,500.00 9,500.00 3702 Martam Construction Incorporated 12.0000 6,000.00 6,000.00 5570 Sjostrom & Sons, Inc. 23.2700 11,635.00 11,635.00 M4402040 COMB CURB GUTTER REM 501.000 METER 0204 Areatha Construction Co., Inc. 12.0000 6,012.00 6,012.00 0801 Capitol Cement Co., Inc. 12.0000 6,012.00 6,012.00 1552 Dunnet Bay Construction Company 20.0000 10,020.00 10,020.00 2520 Herlihy Mid-Continent Company 12.0000 6,012.00 6,012.00 3127 Kenny Construction Company 25.0000 12,525.00 12,525.00 3505 Lorig Construction Company 42.0000 21,042.00 21,042.00 3702 Martam Construction Incorporated 16.0000 8,016.00 8,016.00 5570 Sjostrom & Sons, Inc. 39.4400 19,759.44 19,759.44 M4402060 APPROACH SLAB REM 347.000 SQ M 0204 Areatha Construction Co., Inc. 56.4000 19,570.80 19,570.80 0801 Capitol Cement Co., Inc. 51.0000 17,697.00 17,697.00 1552 Dunnet Bay Construction Company 55.0000 19,085.00 19,085.00 2520 Herlihy Mid-Continent Company 85.0000 29,495.00 29,495.00 3127 Kenny Construction Company 40.0000 13,880.00 13,880.00 3505 Lorig Construction Company 62.0000 21,514.00 21,514.00 3702 Martam Construction Incorporated 38.0000 13,186.00 13,186.00 5570 Sjostrom & Sons, Inc. 227.7000 79,011.90 79,011.90 M4402540 PAVT BREAKING 1,547.000 SQ M 0204 Areatha Construction Co., Inc. 8.0000 12,376.00 12,376.00 0801 Capitol Cement Co., Inc. 8.0000 12,376.00 12,376.00 1552 Dunnet Bay Construction Company 4.0000 6,188.00 6,188.00 2520 Herlihy Mid-Continent Company 8.0000 12,376.00 12,376.00 3127 Kenny Construction Company 12.0000 18,564.00 18,564.00 3505 Lorig Construction Company 10.0000 15,470.00 15,470.00 3702 Martam Construction Incorporated 3.0000 4,641.00 4,641.00 5570 Sjostrom & Sons, Inc. 6.5600 10,148.32 10,148.32 M5020100 STRUCTURE EXCAVATION 176.000 CU M 0204 Areatha Construction Co., Inc. 40.0000 7,040.00 7,040.00 0801 Capitol Cement Co., Inc. 60.0000 10,560.00 10,560.00 1552 Dunnet Bay Construction Company 65.0000 11,440.00 11,440.00 2520 Herlihy Mid-Continent Company 85.0000 14,960.00 14,960.00 3127 Kenny Construction Company 90.0000 15,840.00 15,840.00 3505 Lorig Construction Company 50.0000 8,800.00 8,800.00 3702 Martam Construction Incorporated 65.0000 11,440.00 11,440.00 5570 Sjostrom & Sons, Inc. 87.7100 15,436.96 15,436.96 M5030280 CONCRETE ENCASEMENT 14.000 CU M 0204 Areatha Construction Co., Inc. 1,443.0000 20,202.00 20,202.00 0801 Capitol Cement Co., Inc. 3,675.0000 51,450.00 51,450.00 1552 Dunnet Bay Construction Company 1,000.0000 14,000.00 14,000.00 2520 Herlihy Mid-Continent Company 4,500.0000 63,000.00 63,000.00 3127 Kenny Construction Company 1,285.0000 17,990.00 17,990.00 3505 Lorig Construction Company 700.0000 9,800.00 9,800.00 3702 Martam Construction Incorporated 900.0000 12,600.00 12,600.00 5570 Sjostrom & Sons, Inc. 578.7700 8,102.78 8,102.78 M5030350 CONC STRUCT 171.200 CU M 0204 Areatha Construction Co., Inc. 1,100.0000 188,320.00 188,320.00 0801 Capitol Cement Co., Inc. 1,025.0000 175,480.00 175,480.00 1552 Dunnet Bay Construction Company 875.0000 149,800.00 149,800.00 2520 Herlihy Mid-Continent Company 1,450.0000 248,240.00 248,240.00 3127 Kenny Construction Company 1,171.0000 200,475.20 200,475.20 3505 Lorig Construction Company 800.0000 136,960.00 136,960.00 3702 Martam Construction Incorporated 1,200.0000 205,440.00 205,440.00 5570 Sjostrom & Sons, Inc. 1,726.3900 295,557.97 295,557.97 M5030360 CONC SUP-STR 213.200 CU M 0204 Areatha Construction Co., Inc. 1,750.0000 373,100.00 373,100.00 0801 Capitol Cement Co., Inc. 1,135.0000 241,982.00 241,982.00 1552 Dunnet Bay Construction Company 1,725.0000 367,770.00 367,770.00 2520 Herlihy Mid-Continent Company 1,785.0000 380,562.00 380,562.00 3127 Kenny Construction Company 1,371.0000 292,297.20 292,297.20 3505 Lorig Construction Company 1,100.0000 234,520.00 234,520.00 3702 Martam Construction Incorporated 1,200.0000 255,840.00 255,840.00 5570 Sjostrom & Sons, Inc. 2,117.5400 451,459.53 451,459.53 M5030390 BR DECK GROOVING 427.000 SQ M 0204 Areatha Construction Co., Inc. 10.3000 4,398.10 4,398.10 0801 Capitol Cement Co., Inc. 8.7000 3,714.90 3,714.90 1552 Dunnet Bay Construction Company 8.6400 3,689.28 3,689.28 2520 Herlihy Mid-Continent Company 8.7000 3,714.90 3,714.90 3127 Kenny Construction Company 7.6000 3,245.20 3,245.20 3505 Lorig Construction Company 11.0000 4,697.00 4,697.00 3702 Martam Construction Incorporated 11.0000 4,697.00 4,697.00 5570 Sjostrom & Sons, Inc. 16.7100 7,135.17 7,135.17 M5030450 PROTECTIVE COAT 636.000 SQ M 0204 Areatha Construction Co., Inc. 1.8500 1,176.60 1,176.60 0801 Capitol Cement Co., Inc. 2.0000 1,272.00 1,272.00 1552 Dunnet Bay Construction Company 2.5000 1,590.00 1,590.00 2520 Herlihy Mid-Continent Company 2.0000 1,272.00 1,272.00 3127 Kenny Construction Company 1.1000 699.60 699.60 3505 Lorig Construction Company 1.0000 636.00 636.00 3702 Martam Construction Incorporated 3.0000 1,908.00 1,908.00 5570 Sjostrom & Sons, Inc. 3.5800 2,276.88 2,276.88 M5080205 REINF BARS, EPOXY CTD 40,970.000 KG 0204 Areatha Construction Co., Inc. 3.0500 124,958.50 124,958.50 0801 Capitol Cement Co., Inc. 2.6500 108,570.50 108,570.50 1552 Dunnet Bay Construction Company 2.7700 113,486.90 113,486.90 2520 Herlihy Mid-Continent Company 2.7000 110,619.00 110,619.00 3127 Kenny Construction Company 3.4500 141,346.50 141,346.50 3505 Lorig Construction Company 2.7500 112,667.50 112,667.50 3702 Martam Construction Incorporated 3.0000 122,910.00 122,910.00 5570 Sjostrom & Sons, Inc. 3.4600 141,756.20 141,756.20 M5090010 ALUM RAILING TY L 18.000 METER 0204 Areatha Construction Co., Inc. 290.0000 5,220.00 5,220.00 0801 Capitol Cement Co., Inc. 320.0000 5,760.00 5,760.00 1552 Dunnet Bay Construction Company 300.0000 5,400.00 5,400.00 2520 Herlihy Mid-Continent Company 350.0000 6,300.00 6,300.00 3127 Kenny Construction Company 290.0000 5,220.00 5,220.00 3505 Lorig Construction Company 325.0000 5,850.00 5,850.00 3702 Martam Construction Incorporated 320.0000 5,760.00 5,760.00 5570 Sjostrom & Sons, Inc. 290.0000 5,220.00 5,220.00 M5090500 BICYCLE RAILING 214.000 METER 0204 Areatha Construction Co., Inc. 370.0000 79,180.00 79,180.00 0801 Capitol Cement Co., Inc. 390.0000 83,460.00 83,460.00 1552 Dunnet Bay Construction Company 382.0000 81,748.00 81,748.00 2520 Herlihy Mid-Continent Company 425.0000 90,950.00 90,950.00 3127 Kenny Construction Company 370.0000 79,180.00 79,180.00 3505 Lorig Construction Company 400.0000 85,600.00 85,600.00 3702 Martam Construction Incorporated 420.0000 89,880.00 89,880.00 5570 Sjostrom & Sons, Inc. 370.0000 79,180.00 79,180.00 M5090530 PARAPET RAILING 23.000 METER 0204 Areatha Construction Co., Inc. 255.0000 5,865.00 5,865.00 0801 Capitol Cement Co., Inc. 275.0000 6,325.00 6,325.00 1552 Dunnet Bay Construction Company 264.0000 6,072.00 6,072.00 2520 Herlihy Mid-Continent Company 315.0000 7,245.00 7,245.00 3127 Kenny Construction Company 255.0000 5,865.00 5,865.00 3505 Lorig Construction Company 290.0000 6,670.00 6,670.00 3702 Martam Construction Incorporated 300.0000 6,900.00 6,900.00 5570 Sjostrom & Sons, Inc. 255.0000 5,865.00 5,865.00 M5120128 FUR M S PILE 305X4.55 1,298.000 METER 0204 Areatha Construction Co., Inc. 165.0000 214,170.00 214,170.00 0801 Capitol Cement Co., Inc. 57.0000 73,986.00 73,986.00 1552 Dunnet Bay Construction Company 130.0000 168,740.00 168,740.00 2520 Herlihy Mid-Continent Company 65.0000 84,370.00 84,370.00 3127 Kenny Construction Company 156.0000 202,488.00 202,488.00 3505 Lorig Construction Company 92.0000 119,416.00 119,416.00 3702 Martam Construction Incorporated 146.0000 189,508.00 189,508.00 5570 Sjostrom & Sons, Inc. 216.3300 280,796.34 280,796.34 M5120335 DRIVING PILES 1,298.000 METER 0204 Areatha Construction Co., Inc. 3.6500 4,737.70 4,737.70 0801 Capitol Cement Co., Inc. 55.0000 71,390.00 71,390.00 1552 Dunnet Bay Construction Company 0.1000 129.80 129.80 2520 Herlihy Mid-Continent Company 130.0000 168,740.00 168,740.00 3127 Kenny Construction Company 1.0000 1,298.00 1,298.00 3505 Lorig Construction Company 1.0000 1,298.00 1,298.00 3702 Martam Construction Incorporated 15.0000 19,470.00 19,470.00 5570 Sjostrom & Sons, Inc. 0.1200 155.76 155.76 M5120900 TEMP SHT PILING 71.000 SQ M 0204 Areatha Construction Co., Inc. 570.0000 40,470.00 40,470.00 0801 Capitol Cement Co., Inc. 430.0000 30,530.00 30,530.00 1552 Dunnet Bay Construction Company 1.0000 71.00 71.00 2520 Herlihy Mid-Continent Company 600.0000 42,600.00 42,600.00 3127 Kenny Construction Company 370.0000 26,270.00 26,270.00 3505 Lorig Construction Company 20.0000 1,420.00 1,420.00 3702 Martam Construction Incorporated 400.0000 28,400.00 28,400.00 5570 Sjostrom & Sons, Inc. 1,325.1500 94,085.65 94,085.65 M542E124 PRC FL-END SEC 525 1.000 EACH 0204 Areatha Construction Co., Inc. 650.0000 650.00 650.00 0801 Capitol Cement Co., Inc. 1,000.0000 1,000.00 1,000.00 1552 Dunnet Bay Construction Company 1,300.0000 1,300.00 1,300.00 2520 Herlihy Mid-Continent Company 980.0000 980.00 980.00 3127 Kenny Construction Company 650.0000 650.00 650.00 3505 Lorig Construction Company 1,000.0000 1,000.00 1,000.00 3702 Martam Construction Incorporated 600.0000 600.00 600.00 5570 Sjostrom & Sons, Inc. 1,300.0000 1,300.00 1,300.00 M542E128 PRC FL-END SEC 600 1.000 EACH 0204 Areatha Construction Co., Inc. 700.0000 700.00 700.00 0801 Capitol Cement Co., Inc. 950.0000 950.00 950.00 1552 Dunnet Bay Construction Company 1,300.0000 1,300.00 1,300.00 2520 Herlihy Mid-Continent Company 1,300.0000 1,300.00 1,300.00 3127 Kenny Construction Company 700.0000 700.00 700.00 3505 Lorig Construction Company 1,500.0000 1,500.00 1,500.00 3702 Martam Construction Incorporated 800.0000 800.00 800.00 5570 Sjostrom & Sons, Inc. 1,300.0000 1,300.00 1,300.00 M542E144 PRC FL-END SEC 900 1.000 EACH 0204 Areatha Construction Co., Inc. 1,200.0000 1,200.00 1,200.00 0801 Capitol Cement Co., Inc. 3,000.0000 3,000.00 3,000.00 1552 Dunnet Bay Construction Company 2,100.0000 2,100.00 2,100.00 2520 Herlihy Mid-Continent Company 2,000.0000 2,000.00 2,000.00 3127 Kenny Construction Company 1,200.0000 1,200.00 1,200.00 3505 Lorig Construction Company 2,200.0000 2,200.00 2,200.00 3702 Martam Construction Incorporated 1,200.0000 1,200.00 1,200.00 5570 Sjostrom & Sons, Inc. 2,100.0000 2,100.00 2,100.00 M5504800 SS CLEANED 100.000 METER 0204 Areatha Construction Co., Inc. 30.0000 3,000.00 3,000.00 0801 Capitol Cement Co., Inc. 25.0000 2,500.00 2,500.00 1552 Dunnet Bay Construction Company 50.0000 5,000.00 5,000.00 2520 Herlihy Mid-Continent Company 27.7500 2,775.00 2,775.00 3127 Kenny Construction Company 15.0000 1,500.00 1,500.00 3505 Lorig Construction Company 21.0000 2,100.00 2,100.00 3702 Martam Construction Incorporated 30.0000 3,000.00 3,000.00 5570 Sjostrom & Sons, Inc. 50.0000 5,000.00 5,000.00 M5505530 SS RG CL A 1 300 14.000 METER 0204 Areatha Construction Co., Inc. 130.0000 1,820.00 1,820.00 0801 Capitol Cement Co., Inc. 210.0000 2,940.00 2,940.00 1552 Dunnet Bay Construction Company 150.0000 2,100.00 2,100.00 2520 Herlihy Mid-Continent Company 175.0000 2,450.00 2,450.00 3127 Kenny Construction Company 130.0000 1,820.00 1,820.00 3505 Lorig Construction Company 200.0000 2,800.00 2,800.00 3702 Martam Construction Incorporated 126.0000 1,764.00 1,764.00 5570 Sjostrom & Sons, Inc. 150.0000 2,100.00 2,100.00 M5505540 SS RG CL A 1 375 73.000 METER 0204 Areatha Construction Co., Inc. 125.0000 9,125.00 9,125.00 0801 Capitol Cement Co., Inc. 195.0000 14,235.00 14,235.00 1552 Dunnet Bay Construction Company 162.0000 11,826.00 11,826.00 2520 Herlihy Mid-Continent Company 167.0000 12,191.00 12,191.00 3127 Kenny Construction Company 125.0000 9,125.00 9,125.00 3505 Lorig Construction Company 200.0000 14,600.00 14,600.00 3702 Martam Construction Incorporated 156.0000 11,388.00 11,388.00 5570 Sjostrom & Sons, Inc. 162.0000 11,826.00 11,826.00 M5505560 SS RG CL A 1 525 1.000 METER 0204 Areatha Construction Co., Inc. 250.0000 250.00 250.00 0801 Capitol Cement Co., Inc. 400.0000 400.00 400.00 1552 Dunnet Bay Construction Company 185.0000 185.00 185.00 2520 Herlihy Mid-Continent Company 178.0000 178.00 178.00 3127 Kenny Construction Company 250.0000 250.00 250.00 3505 Lorig Construction Company 200.0000 200.00 200.00 3702 Martam Construction Incorporated 222.0000 222.00 222.00 5570 Sjostrom & Sons, Inc. 185.0000 185.00 185.00 M5505570 SS RG CL A 1 600 15.000 METER 0204 Areatha Construction Co., Inc. 200.0000 3,000.00 3,000.00 0801 Capitol Cement Co., Inc. 200.0000 3,000.00 3,000.00 1552 Dunnet Bay Construction Company 221.0000 3,315.00 3,315.00 2520 Herlihy Mid-Continent Company 240.0000 3,600.00 3,600.00 3127 Kenny Construction Company 200.0000 3,000.00 3,000.00 3505 Lorig Construction Company 275.0000 4,125.00 4,125.00 3702 Martam Construction Incorporated 250.0000 3,750.00 3,750.00 5570 Sjostrom & Sons, Inc. 221.0000 3,315.00 3,315.00 M5505610 SS RG CL A 1 900 5.000 METER 0204 Areatha Construction Co., Inc. 350.0000 1,750.00 1,750.00 0801 Capitol Cement Co., Inc. 700.0000 3,500.00 3,500.00 1552 Dunnet Bay Construction Company 338.0000 1,690.00 1,690.00 2520 Herlihy Mid-Continent Company 434.0000 2,170.00 2,170.00 3127 Kenny Construction Company 350.0000 1,750.00 1,750.00 3505 Lorig Construction Company 450.0000 2,250.00 2,250.00 3702 Martam Construction Incorporated 650.0000 3,250.00 3,250.00 5570 Sjostrom & Sons, Inc. 338.0000 1,690.00 1,690.00 M5505930 SS RG CL A 2 300 271.000 METER 0204 Areatha Construction Co., Inc. 115.0000 31,165.00 31,165.00 0801 Capitol Cement Co., Inc. 195.0000 52,845.00 52,845.00 1552 Dunnet Bay Construction Company 152.0000 41,192.00 41,192.00 2520 Herlihy Mid-Continent Company 166.0000 44,986.00 44,986.00 3127 Kenny Construction Company 115.0000 31,165.00 31,165.00 3505 Lorig Construction Company 185.0000 50,135.00 50,135.00 3702 Martam Construction Incorporated 132.0000 35,772.00 35,772.00 5570 Sjostrom & Sons, Inc. 152.0000 41,192.00 41,192.00 M5505940 SS RG CL A 2 375 26.000 METER 0204 Areatha Construction Co., Inc. 125.0000 3,250.00 3,250.00 0801 Capitol Cement Co., Inc. 195.0000 5,070.00 5,070.00 1552 Dunnet Bay Construction Company 158.0000 4,108.00 4,108.00 2520 Herlihy Mid-Continent Company 175.0000 4,550.00 4,550.00 3127 Kenny Construction Company 125.0000 3,250.00 3,250.00 3505 Lorig Construction Company 200.0000 5,200.00 5,200.00 3702 Martam Construction Incorporated 166.0000 4,316.00 4,316.00 5570 Sjostrom & Sons, Inc. 158.0000 4,108.00 4,108.00 M5505960 SS RG CL A 2 525 95.000 METER 0204 Areatha Construction Co., Inc. 150.0000 14,250.00 14,250.00 0801 Capitol Cement Co., Inc. 225.0000 21,375.00 21,375.00 1552 Dunnet Bay Construction Company 188.0000 17,860.00 17,860.00 2520 Herlihy Mid-Continent Company 178.0000 16,910.00 16,910.00 3127 Kenny Construction Company 150.0000 14,250.00 14,250.00 3505 Lorig Construction Company 200.0000 19,000.00 19,000.00 3702 Martam Construction Incorporated 232.0000 22,040.00 22,040.00 5570 Sjostrom & Sons, Inc. 188.0000 17,860.00 17,860.00 M5505970 SS RG CL A 2 600 183.000 METER 0204 Areatha Construction Co., Inc. 190.0000 34,770.00 34,770.00 0801 Capitol Cement Co., Inc. 250.0000 45,750.00 45,750.00 1552 Dunnet Bay Construction Company 225.0000 41,175.00 41,175.00 2520 Herlihy Mid-Continent Company 241.0000 44,103.00 44,103.00 3127 Kenny Construction Company 190.0000 34,770.00 34,770.00 3505 Lorig Construction Company 260.0000 47,580.00 47,580.00 3702 Martam Construction Incorporated 262.0000 47,946.00 47,946.00 5570 Sjostrom & Sons, Inc. 225.0000 41,175.00 41,175.00 M5505990 SS RG CL A 2 750 6.000 METER 0204 Areatha Construction Co., Inc. 300.0000 1,800.00 1,800.00 0801 Capitol Cement Co., Inc. 1,500.0000 9,000.00 9,000.00 1552 Dunnet Bay Construction Company 300.0000 1,800.00 1,800.00 2520 Herlihy Mid-Continent Company 300.0000 1,800.00 1,800.00 3127 Kenny Construction Company 300.0000 1,800.00 1,800.00 3505 Lorig Construction Company 315.0000 1,890.00 1,890.00 3702 Martam Construction Incorporated 600.0000 3,600.00 3,600.00 5570 Sjostrom & Sons, Inc. 300.0000 1,800.00 1,800.00 M5510025 STORM SEWER REM 300 25.000 METER 0204 Areatha Construction Co., Inc. 50.0000 1,250.00 1,250.00 0801 Capitol Cement Co., Inc. 25.0000 625.00 625.00 1552 Dunnet Bay Construction Company 52.0000 1,300.00 1,300.00 2520 Herlihy Mid-Continent Company 44.0000 1,100.00 1,100.00 3127 Kenny Construction Company 50.0000 1,250.00 1,250.00 3505 Lorig Construction Company 55.0000 1,375.00 1,375.00 3702 Martam Construction Incorporated 30.0000 750.00 750.00 5570 Sjostrom & Sons, Inc. 52.0000 1,300.00 1,300.00 M5910100 GEOCOMPOSITE WALL DR 50.000 SQ M 0204 Areatha Construction Co., Inc. 92.9000 4,645.00 4,645.00 0801 Capitol Cement Co., Inc. 22.0000 1,100.00 1,100.00 1552 Dunnet Bay Construction Company 82.0000 4,100.00 4,100.00 2520 Herlihy Mid-Continent Company 35.0000 1,750.00 1,750.00 3127 Kenny Construction Company 44.8000 2,240.00 2,240.00 3505 Lorig Construction Company 18.0000 900.00 900.00 3702 Martam Construction Incorporated 40.0000 2,000.00 2,000.00 5570 Sjostrom & Sons, Inc. 42.9600 2,148.00 2,148.00 M6010605 PIPE UNDERDRAINS 100 40.000 METER 0204 Areatha Construction Co., Inc. 65.6500 2,626.00 2,626.00 0801 Capitol Cement Co., Inc. 80.0000 3,200.00 3,200.00 1552 Dunnet Bay Construction Company 87.0000 3,480.00 3,480.00 2520 Herlihy Mid-Continent Company 101.0000 4,040.00 4,040.00 3127 Kenny Construction Company 60.0000 2,400.00 2,400.00 3505 Lorig Construction Company 110.0000 4,400.00 4,400.00 3702 Martam Construction Incorporated 60.0000 2,400.00 2,400.00 5570 Sjostrom & Sons, Inc. 87.0000 3,480.00 3,480.00 M6011100 P UNDR - STRUCT 100 61.000 METER 0204 Areatha Construction Co., Inc. 96.7500 5,901.75 5,901.75 0801 Capitol Cement Co., Inc. 35.0000 2,135.00 2,135.00 1552 Dunnet Bay Construction Company 101.0000 6,161.00 6,161.00 2520 Herlihy Mid-Continent Company 35.0000 2,135.00 2,135.00 3127 Kenny Construction Company 60.0000 3,660.00 3,660.00 3505 Lorig Construction Company 100.0000 6,100.00 6,100.00 3702 Martam Construction Incorporated 60.0000 3,660.00 3,660.00 5570 Sjostrom & Sons, Inc. 107.0000 6,527.00 6,527.00 M6020180 CB A 1.2M D T23F&G 6.000 EACH 0204 Areatha Construction Co., Inc. 2,200.0000 13,200.00 13,200.00 0801 Capitol Cement Co., Inc. 2,400.0000 14,400.00 14,400.00 1552 Dunnet Bay Construction Company 2,555.0000 15,330.00 15,330.00 2520 Herlihy Mid-Continent Company 2,705.0000 16,230.00 16,230.00 3127 Kenny Construction Company 2,200.0000 13,200.00 13,200.00 3505 Lorig Construction Company 2,800.0000 16,800.00 16,800.00 3702 Martam Construction Incorporated 2,800.0000 16,800.00 16,800.00 5570 Sjostrom & Sons, Inc. 2,555.0000 15,330.00 15,330.00 M6021410 MAN A 1.2D T1F CL 19.000 EACH 0204 Areatha Construction Co., Inc. 1,900.0000 36,100.00 36,100.00 0801 Capitol Cement Co., Inc. 2,300.0000 43,700.00 43,700.00 1552 Dunnet Bay Construction Company 2,200.0000 41,800.00 41,800.00 2520 Herlihy Mid-Continent Company 2,200.0000 41,800.00 41,800.00 3127 Kenny Construction Company 1,900.0000 36,100.00 36,100.00 3505 Lorig Construction Company 2,300.0000 43,700.00 43,700.00 3702 Martam Construction Incorporated 2,600.0000 49,400.00 49,400.00 5570 Sjostrom & Sons, Inc. 2,200.0000 41,800.00 41,800.00 M6060700 COMB CC&G TB15.60 1,263.000 METER 0204 Areatha Construction Co., Inc. 137.5000 173,662.50 173,662.50 0801 Capitol Cement Co., Inc. 81.0000 102,303.00 102,303.00 1552 Dunnet Bay Construction Company 72.0000 90,936.00 90,936.00 2520 Herlihy Mid-Continent Company 60.0000 75,780.00 75,780.00 3127 Kenny Construction Company 64.5000 81,463.50 81,463.50 3505 Lorig Construction Company 85.0000 107,355.00 107,355.00 3702 Martam Construction Incorporated 58.0000 73,254.00 73,254.00 5570 Sjostrom & Sons, Inc. 70.0000 88,410.00 88,410.00 M6300100 SPBGR TY A 162.000 METER 0204 Areatha Construction Co., Inc. 65.0000 10,530.00 10,530.00 0801 Capitol Cement Co., Inc. 65.0000 10,530.00 10,530.00 1552 Dunnet Bay Construction Company 68.0000 11,016.00 11,016.00 2520 Herlihy Mid-Continent Company 65.0000 10,530.00 10,530.00 3127 Kenny Construction Company 65.0000 10,530.00 10,530.00 3505 Lorig Construction Company 68.0000 11,016.00 11,016.00 3702 Martam Construction Incorporated 70.0000 11,340.00 11,340.00 5570 Sjostrom & Sons, Inc. 65.0000 10,530.00 10,530.00 M6320030 GUARDRAIL REMOV 189.000 METER 0204 Areatha Construction Co., Inc. 17.0000 3,213.00 3,213.00 0801 Capitol Cement Co., Inc. 17.0000 3,213.00 3,213.00 1552 Dunnet Bay Construction Company 18.0000 3,402.00 3,402.00 2520 Herlihy Mid-Continent Company 17.0000 3,213.00 3,213.00 3127 Kenny Construction Company 27.0000 5,103.00 5,103.00 3505 Lorig Construction Company 20.0000 3,780.00 3,780.00 3702 Martam Construction Incorporated 20.0000 3,780.00 3,780.00 5570 Sjostrom & Sons, Inc. 17.0000 3,213.00 3,213.00 M6690100 BACKFILL PLUGS 58.000 CU M 0204 Areatha Construction Co., Inc. 160.0000 9,280.00 9,280.00 0801 Capitol Cement Co., Inc. 475.0000 27,550.00 27,550.00 1552 Dunnet Bay Construction Company 100.0000 5,800.00 5,800.00 2520 Herlihy Mid-Continent Company 387.0000 22,446.00 22,446.00 3127 Kenny Construction Company 100.0000 5,800.00 5,800.00 3505 Lorig Construction Company 400.0000 23,200.00 23,200.00 3702 Martam Construction Incorporated 260.0000 15,080.00 15,080.00 5570 Sjostrom & Sons, Inc. 100.0000 5,800.00 5,800.00 M6690200 NON SPL WASTE DISPOSL 505.000 CU M 0204 Areatha Construction Co., Inc. 114.0000 57,570.00 57,570.00 0801 Capitol Cement Co., Inc. 125.0000 63,125.00 63,125.00 1552 Dunnet Bay Construction Company 112.5500 56,837.75 56,837.75 2520 Herlihy Mid-Continent Company 70.0000 35,350.00 35,350.00 3127 Kenny Construction Company 120.0000 60,600.00 60,600.00 3505 Lorig Construction Company 160.0000 80,800.00 80,800.00 3702 Martam Construction Incorporated 134.0000 67,670.00 67,670.00 5570 Sjostrom & Sons, Inc. 125.0000 63,125.00 63,125.00 M7030100 SHORT-TERM PAVT MKING 400.000 METER 0204 Areatha Construction Co., Inc. 3.3000 1,320.00 1,320.00 0801 Capitol Cement Co., Inc. 3.3000 1,320.00 1,320.00 1552 Dunnet Bay Construction Company 3.3000 1,320.00 1,320.00 2520 Herlihy Mid-Continent Company 3.3000 1,320.00 1,320.00 3127 Kenny Construction Company 6.0000 2,400.00 2,400.00 3505 Lorig Construction Company 3.3000 1,320.00 1,320.00 3702 Martam Construction Incorporated 1.0000 400.00 400.00 5570 Sjostrom & Sons, Inc. 3.3000 1,320.00 1,320.00 M7030220 TEMP PVT MK LINE 100 2,240.000 METER 0204 Areatha Construction Co., Inc. 0.6500 1,456.00 1,456.00 0801 Capitol Cement Co., Inc. 1.7500 3,920.00 3,920.00 1552 Dunnet Bay Construction Company 0.5900 1,321.60 1,321.60 2520 Herlihy Mid-Continent Company 0.5900 1,321.60 1,321.60 3127 Kenny Construction Company 0.5900 1,321.60 1,321.60 3505 Lorig Construction Company 0.6000 1,344.00 1,344.00 3702 Martam Construction Incorporated 0.7500 1,680.00 1,680.00 5570 Sjostrom & Sons, Inc. 0.5900 1,321.60 1,321.60 M7030240 TEMP PVT MK LINE 150 52.500 METER 0204 Areatha Construction Co., Inc. 1.5000 78.75 78.75 0801 Capitol Cement Co., Inc. 2.0000 105.00 105.00 1552 Dunnet Bay Construction Company 0.8000 42.00 42.00 2520 Herlihy Mid-Continent Company 0.8000 42.00 42.00 3127 Kenny Construction Company 0.8000 42.00 42.00 3505 Lorig Construction Company 0.8500 44.63 44.63 3702 Martam Construction Incorporated 1.0000 52.50 52.50 5570 Sjostrom & Sons, Inc. 0.8000 42.00 42.00 M7030260 TEMP PVT MK LINE 300 81.200 METER 0204 Areatha Construction Co., Inc. 3.0000 243.60 243.60 0801 Capitol Cement Co., Inc. 3.0000 243.60 243.60 1552 Dunnet Bay Construction Company 1.6500 133.98 133.98 2520 Herlihy Mid-Continent Company 1.6500 133.98 133.98 3127 Kenny Construction Company 1.6500 133.98 133.98 3505 Lorig Construction Company 1.7500 142.10 142.10 3702 Martam Construction Incorporated 2.0000 162.40 162.40 5570 Sjostrom & Sons, Inc. 1.6500 133.98 133.98 M7030280 TEMP PVT MK LINE 600 9.000 METER 0204 Areatha Construction Co., Inc. 10.0000 90.00 90.00 0801 Capitol Cement Co., Inc. 20.0000 180.00 180.00 1552 Dunnet Bay Construction Company 4.9500 44.55 44.55 2520 Herlihy Mid-Continent Company 4.9500 44.55 44.55 3127 Kenny Construction Company 4.9500 44.55 44.55 3505 Lorig Construction Company 5.0000 45.00 45.00 3702 Martam Construction Incorporated 6.0000 54.00 54.00 5570 Sjostrom & Sons, Inc. 4.9500 44.55 44.55 M7031000 WORK ZONE PAVT MK REM 290.000 SQ M 0204 Areatha Construction Co., Inc. 10.0000 2,900.00 2,900.00 0801 Capitol Cement Co., Inc. 9.2500 2,682.50 2,682.50 1552 Dunnet Bay Construction Company 6.4600 1,873.40 1,873.40 2520 Herlihy Mid-Continent Company 8.0500 2,334.50 2,334.50 3127 Kenny Construction Company 6.4600 1,873.40 1,873.40 3505 Lorig Construction Company 7.0000 2,030.00 2,030.00 3702 Martam Construction Incorporated 8.0000 2,320.00 2,320.00 5570 Sjostrom & Sons, Inc. 6.4600 1,873.40 1,873.40 M7040100 TEMP CONC BARRIER 180.000 METER 0204 Areatha Construction Co., Inc. 176.6000 31,788.00 31,788.00 0801 Capitol Cement Co., Inc. 155.0000 27,900.00 27,900.00 1552 Dunnet Bay Construction Company 100.0000 18,000.00 18,000.00 2520 Herlihy Mid-Continent Company 160.0000 28,800.00 28,800.00 3127 Kenny Construction Company 150.0000 27,000.00 27,000.00 3505 Lorig Construction Company 85.0000 15,300.00 15,300.00 3702 Martam Construction Incorporated 96.0000 17,280.00 17,280.00 5570 Sjostrom & Sons, Inc. 53.1700 9,570.60 9,570.60 M7040200 REL TEMP CONC BARRIER 180.000 METER 0204 Areatha Construction Co., Inc. 35.1000 6,318.00 6,318.00 0801 Capitol Cement Co., Inc. 35.0000 6,300.00 6,300.00 1552 Dunnet Bay Construction Company 30.0000 5,400.00 5,400.00 2520 Herlihy Mid-Continent Company 40.0000 7,200.00 7,200.00 3127 Kenny Construction Company 17.0000 3,060.00 3,060.00 3505 Lorig Construction Company 8.0000 1,440.00 1,440.00 3702 Martam Construction Incorporated 32.0000 5,760.00 5,760.00 5570 Sjostrom & Sons, Inc. 89.2300 16,061.40 16,061.40 M7800100 THPL PVT MK LTR & SYM 9.000 SQ M 0204 Areatha Construction Co., Inc. 54.0000 486.00 486.00 0801 Capitol Cement Co., Inc. 53.8200 484.38 484.38 1552 Dunnet Bay Construction Company 20.0000 180.00 180.00 2520 Herlihy Mid-Continent Company 53.8200 484.38 484.38 3127 Kenny Construction Company 53.8200 484.38 484.38 3505 Lorig Construction Company 55.0000 495.00 495.00 3702 Martam Construction Incorporated 60.0000 540.00 540.00 5570 Sjostrom & Sons, Inc. 53.8200 484.38 484.38 M7800105 THPL PVT MK LINE 100 2,240.000 METER 0204 Areatha Construction Co., Inc. 2.6000 5,824.00 5,824.00 0801 Capitol Cement Co., Inc. 2.5600 5,734.40 5,734.40 1552 Dunnet Bay Construction Company 2.5600 5,734.40 5,734.40 2520 Herlihy Mid-Continent Company 2.5600 5,734.40 5,734.40 3127 Kenny Construction Company 2.5600 5,734.40 5,734.40 3505 Lorig Construction Company 3.0000 6,720.00 6,720.00 3702 Martam Construction Incorporated 3.0000 6,720.00 6,720.00 5570 Sjostrom & Sons, Inc. 2.5600 5,734.40 5,734.40 M7800115 THPL PVT MK LINE 150 52.500 METER 0204 Areatha Construction Co., Inc. 4.9500 259.88 259.88 0801 Capitol Cement Co., Inc. 4.9200 258.30 258.30 1552 Dunnet Bay Construction Company 5.0000 262.50 262.50 2520 Herlihy Mid-Continent Company 4.9200 258.30 258.30 3127 Kenny Construction Company 4.9200 258.30 258.30 3505 Lorig Construction Company 4.9200 258.30 258.30 3702 Martam Construction Incorporated 5.5000 288.75 288.75 5570 Sjostrom & Sons, Inc. 4.9200 258.30 258.30 M7800125 THPL PVT MK LINE 300 81.200 METER 0204 Areatha Construction Co., Inc. 9.8500 799.82 799.82 0801 Capitol Cement Co., Inc. 9.8400 799.01 799.01 1552 Dunnet Bay Construction Company 10.0000 812.00 812.00 2520 Herlihy Mid-Continent Company 9.8400 799.01 799.01 3127 Kenny Construction Company 9.8400 799.01 799.01 3505 Lorig Construction Company 5.0000 406.00 406.00 3702 Martam Construction Incorporated 12.0000 974.40 974.40 5570 Sjostrom & Sons, Inc. 9.8400 799.01 799.01 M7800140 THPL PVT MK LINE 600 9.000 METER 0204 Areatha Construction Co., Inc. 19.7000 177.30 177.30 0801 Capitol Cement Co., Inc. 19.6900 177.21 177.21 1552 Dunnet Bay Construction Company 55.0000 495.00 495.00 2520 Herlihy Mid-Continent Company 19.6900 177.21 177.21 3127 Kenny Construction Company 19.6900 177.21 177.21 3505 Lorig Construction Company 21.0000 189.00 189.00 3702 Martam Construction Incorporated 25.0000 225.00 225.00 5570 Sjostrom & Sons, Inc. 19.6900 177.21 177.21 M7802010 POLYUREA PM T1 LN 100 182.300 METER 0204 Areatha Construction Co., Inc. 16.4500 2,998.84 2,998.84 0801 Capitol Cement Co., Inc. 20.4100 3,720.74 3,720.74 1552 Dunnet Bay Construction Company 16.4100 2,991.54 2,991.54 2520 Herlihy Mid-Continent Company 16.4100 2,991.54 2,991.54 3127 Kenny Construction Company 16.4100 2,991.54 2,991.54 3505 Lorig Construction Company 17.0000 3,099.10 3,099.10 3702 Martam Construction Incorporated 18.0000 3,281.40 3,281.40 5570 Sjostrom & Sons, Inc. 16.4100 2,991.54 2,991.54 M8100060 CON T 50 GALVS 406.000 METER 0204 Areatha Construction Co., Inc. 65.3000 26,511.80 26,511.80 0801 Capitol Cement Co., Inc. 65.3000 26,511.80 26,511.80 1552 Dunnet Bay Construction Company 65.3000 26,511.80 26,511.80 2520 Herlihy Mid-Continent Company 27.5000 11,165.00 11,165.00 3127 Kenny Construction Company 27.5000 11,165.00 11,165.00 3505 Lorig Construction Company 28.0000 11,368.00 11,368.00 3702 Martam Construction Incorporated 30.0000 12,180.00 12,180.00 5570 Sjostrom & Sons, Inc. 65.3000 26,511.80 26,511.80 M8100070 CON T 65 GALVS 4.600 METER 0204 Areatha Construction Co., Inc. 81.3000 373.98 373.98 0801 Capitol Cement Co., Inc. 81.3000 373.98 373.98 1552 Dunnet Bay Construction Company 82.0000 377.20 377.20 2520 Herlihy Mid-Continent Company 35.2500 162.15 162.15 3127 Kenny Construction Company 35.2500 162.15 162.15 3505 Lorig Construction Company 37.0000 170.20 170.20 3702 Martam Construction Incorporated 40.0000 184.00 184.00 5570 Sjostrom & Sons, Inc. 81.3000 373.98 373.98 M8101050 CON P 50 GALVS 110.000 METER 0204 Areatha Construction Co., Inc. 88.8000 9,768.00 9,768.00 0801 Capitol Cement Co., Inc. 88.8000 9,768.00 9,768.00 1552 Dunnet Bay Construction Company 89.0000 9,790.00 9,790.00 2520 Herlihy Mid-Continent Company 56.7500 6,242.50 6,242.50 3127 Kenny Construction Company 56.7500 6,242.50 6,242.50 3505 Lorig Construction Company 58.0000 6,380.00 6,380.00 3702 Martam Construction Incorporated 60.0000 6,600.00 6,600.00 5570 Sjostrom & Sons, Inc. 88.8000 9,768.00 9,768.00 M8101060 CON P 65 GALVS 5.000 METER 0204 Areatha Construction Co., Inc. 110.4000 552.00 552.00 0801 Capitol Cement Co., Inc. 110.4000 552.00 552.00 1552 Dunnet Bay Construction Company 111.0000 555.00 555.00 2520 Herlihy Mid-Continent Company 63.5000 317.50 317.50 3127 Kenny Construction Company 63.5000 317.50 317.50 3505 Lorig Construction Company 65.0000 325.00 325.00 3702 Martam Construction Incorporated 70.0000 350.00 350.00 5570 Sjostrom & Sons, Inc. 110.4000 552.00 552.00 M8120230 CON EMB STR 50 PVC 18.500 METER 0204 Areatha Construction Co., Inc. 39.4000 728.90 728.90 0801 Capitol Cement Co., Inc. 39.4000 728.90 728.90 1552 Dunnet Bay Construction Company 40.0000 740.00 740.00 2520 Herlihy Mid-Continent Company 57.2500 1,059.13 1,059.13 3127 Kenny Construction Company 57.2500 1,059.13 1,059.13 3505 Lorig Construction Company 58.0000 1,073.00 1,073.00 3702 Martam Construction Incorporated 60.0000 1,110.00 1,110.00 5570 Sjostrom & Sons, Inc. 39.4000 728.90 728.90 M8190200 TR & BKFIL F ELECT WK 411.000 METER 0204 Areatha Construction Co., Inc. 0.5000 205.50 205.50 0801 Capitol Cement Co., Inc. 0.5000 205.50 205.50 1552 Dunnet Bay Construction Company 0.5000 205.50 205.50 2520 Herlihy Mid-Continent Company 8.0000 3,288.00 3,288.00 3127 Kenny Construction Company 8.0000 3,288.00 3,288.00 3505 Lorig Construction Company 8.0000 3,288.00 3,288.00 3702 Martam Construction Incorporated 9.0000 3,699.00 3,699.00 5570 Sjostrom & Sons, Inc. 0.5000 205.50 205.50 M8731210 ELCBL C SIGNAL 14 2C 201.000 METER 0204 Areatha Construction Co., Inc. 3.5000 703.50 703.50 0801 Capitol Cement Co., Inc. 3.5000 703.50 703.50 1552 Dunnet Bay Construction Company 3.5000 703.50 703.50 2520 Herlihy Mid-Continent Company 6.0000 1,206.00 1,206.00 3127 Kenny Construction Company 6.0000 1,206.00 1,206.00 3505 Lorig Construction Company 6.0000 1,206.00 1,206.00 3702 Martam Construction Incorporated 7.0000 1,407.00 1,407.00 5570 Sjostrom & Sons, Inc. 3.5000 703.50 703.50 M8731220 ELCBL C SIGNAL 14 3C 201.000 METER 0204 Areatha Construction Co., Inc. 3.9000 783.90 783.90 0801 Capitol Cement Co., Inc. 3.9000 783.90 783.90 1552 Dunnet Bay Construction Company 3.9000 783.90 783.90 2520 Herlihy Mid-Continent Company 6.0000 1,206.00 1,206.00 3127 Kenny Construction Company 6.0000 1,206.00 1,206.00 3505 Lorig Construction Company 6.0000 1,206.00 1,206.00 3702 Martam Construction Incorporated 7.0000 1,407.00 1,407.00 5570 Sjostrom & Sons, Inc. 3.9000 783.90 783.90 M8731240 ELCBL C SIGNAL 14 5C 31.000 METER 0204 Areatha Construction Co., Inc. 4.5000 139.50 139.50 0801 Capitol Cement Co., Inc. 4.5000 139.50 139.50 1552 Dunnet Bay Construction Company 4.5000 139.50 139.50 2520 Herlihy Mid-Continent Company 6.0000 186.00 186.00 3127 Kenny Construction Company 6.0000 186.00 186.00 3505 Lorig Construction Company 6.0000 186.00 186.00 3702 Martam Construction Incorporated 7.0000 217.00 217.00 5570 Sjostrom & Sons, Inc. 4.5000 139.50 139.50 M8731300 ELCBL C LEAD 14 1PR 83.000 METER 0204 Areatha Construction Co., Inc. 2.7000 224.10 224.10 0801 Capitol Cement Co., Inc. 2.7000 224.10 224.10 1552 Dunnet Bay Construction Company 2.7000 224.10 224.10 2520 Herlihy Mid-Continent Company 6.0000 498.00 498.00 3127 Kenny Construction Company 6.0000 498.00 498.00 3505 Lorig Construction Company 6.0000 498.00 498.00 3702 Martam Construction Incorporated 7.0000 581.00 581.00 5570 Sjostrom & Sons, Inc. 2.7000 224.10 224.10 M8731800 ELCBL C SERV 6 2C 37.000 METER 0204 Areatha Construction Co., Inc. 7.3000 270.10 270.10 0801 Capitol Cement Co., Inc. 7.3000 270.10 270.10 1552 Dunnet Bay Construction Company 7.3000 270.10 270.10 2520 Herlihy Mid-Continent Company 16.7500 619.75 619.75 3127 Kenny Construction Company 16.7500 619.75 619.75 3505 Lorig Construction Company 16.7500 619.75 619.75 3702 Martam Construction Incorporated 20.0000 740.00 740.00 5570 Sjostrom & Sons, Inc. 7.3000 270.10 270.10 M8750050 TS POST 3.00 1.000 EACH 0204 Areatha Construction Co., Inc. 727.4000 727.40 727.40 0801 Capitol Cement Co., Inc. 727.4000 727.40 727.40 1552 Dunnet Bay Construction Company 730.0000 730.00 730.00 2520 Herlihy Mid-Continent Company 925.0000 925.00 925.00 3127 Kenny Construction Company 925.0000 925.00 925.00 3505 Lorig Construction Company 1,000.0000 1,000.00 1,000.00 3702 Martam Construction Incorporated 1,000.0000 1,000.00 1,000.00 5570 Sjostrom & Sons, Inc. 727.4000 727.40 727.40 M8750090 TS POST 4.25 1.000 EACH 0204 Areatha Construction Co., Inc. 775.7000 775.70 775.70 0801 Capitol Cement Co., Inc. 775.7000 775.70 775.70 1552 Dunnet Bay Construction Company 776.0000 776.00 776.00 2520 Herlihy Mid-Continent Company 985.0000 985.00 985.00 3127 Kenny Construction Company 985.0000 985.00 985.00 3505 Lorig Construction Company 1,000.0000 1,000.00 1,000.00 3702 Martam Construction Incorporated 1,100.0000 1,100.00 1,100.00 5570 Sjostrom & Sons, Inc. 775.7000 775.70 775.70 M8750110 TS POST 4.85 3.000 EACH 0204 Areatha Construction Co., Inc. 892.9000 2,678.70 2,678.70 0801 Capitol Cement Co., Inc. 892.9000 2,678.70 2,678.70 1552 Dunnet Bay Construction Company 895.0000 2,685.00 2,685.00 2520 Herlihy Mid-Continent Company 1,025.0000 3,075.00 3,075.00 3127 Kenny Construction Company 1,025.0000 3,075.00 3,075.00 3505 Lorig Construction Company 1,100.0000 3,300.00 3,300.00 3702 Martam Construction Incorporated 1,200.0000 3,600.00 3,600.00 5570 Sjostrom & Sons, Inc. 892.9000 2,678.70 2,678.70 M8860100 DET LOOP T1 52.000 METER 0204 Areatha Construction Co., Inc. 68.4000 3,556.80 3,556.80 0801 Capitol Cement Co., Inc. 68.4000 3,556.80 3,556.80 1552 Dunnet Bay Construction Company 68.4000 3,556.80 3,556.80 2520 Herlihy Mid-Continent Company 67.5000 3,510.00 3,510.00 3127 Kenny Construction Company 67.5000 3,510.00 3,510.00 3505 Lorig Construction Company 70.0000 3,640.00 3,640.00 3702 Martam Construction Incorporated 75.0000 3,900.00 3,900.00 5570 Sjostrom & Sons, Inc. 68.4000 3,556.80 3,556.80 M8950230 REM ELCBL FR CON 1,391.000 METER 0204 Areatha Construction Co., Inc. 2.0000 2,782.00 2,782.00 0801 Capitol Cement Co., Inc. 2.0000 2,782.00 2,782.00 1552 Dunnet Bay Construction Company 2.0000 2,782.00 2,782.00 2520 Herlihy Mid-Continent Company 3.1500 4,381.65 4,381.65 3127 Kenny Construction Company 3.1500 4,381.65 4,381.65 3505 Lorig Construction Company 3.1500 4,381.65 4,381.65 3702 Martam Construction Incorporated 3.5000 4,868.50 4,868.50 5570 Sjostrom & Sons, Inc. 2.0000 2,782.00 2,782.00 XX003136 CATCH BASIN TYPE C 2.000 EACH 0204 Areatha Construction Co., Inc. 850.0000 1,700.00 1,700.00 0801 Capitol Cement Co., Inc. 1,500.0000 3,000.00 3,000.00 1552 Dunnet Bay Construction Company 1,000.0000 2,000.00 2,000.00 2520 Herlihy Mid-Continent Company 1,230.0000 2,460.00 2,460.00 3127 Kenny Construction Company 850.0000 1,700.00 1,700.00 3505 Lorig Construction Company 1,300.0000 2,600.00 2,600.00 3702 Martam Construction Incorporated 1,200.0000 2,400.00 2,400.00 5570 Sjostrom & Sons, Inc. 1,000.0000 2,000.00 2,000.00 X0322936 REMOV EX FLAR END SEC 4.000 EACH 0204 Areatha Construction Co., Inc. 500.0000 2,000.00 2,000.00 0801 Capitol Cement Co., Inc. 25.0000 100.00 100.00 1552 Dunnet Bay Construction Company 300.0000 1,200.00 1,200.00 2520 Herlihy Mid-Continent Company 284.0000 1,136.00 1,136.00 3127 Kenny Construction Company 500.0000 2,000.00 2,000.00 3505 Lorig Construction Company 300.0000 1,200.00 1,200.00 3702 Martam Construction Incorporated 150.0000 600.00 600.00 5570 Sjostrom & Sons, Inc. 300.0000 1,200.00 1,200.00 X0325938 TEMP WIR INTERCON COM 1.000 L SUM 0204 Areatha Construction Co., Inc. 5,579.3000 5,579.30 5,579.30 0801 Capitol Cement Co., Inc. 5,579.3000 5,579.30 5,579.30 1552 Dunnet Bay Construction Company 5,600.0000 5,600.00 5,600.00 2520 Herlihy Mid-Continent Company 15,000.0000 15,000.00 15,000.00 3127 Kenny Construction Company 15,000.0000 15,000.00 15,000.00 3505 Lorig Construction Company 15,000.0000 15,000.00 15,000.00 3702 Martam Construction Incorporated 16,600.0000 16,600.00 16,600.00 5570 Sjostrom & Sons, Inc. 5,579.3000 5,579.30 5,579.30 X0962500 REMOV EX TS EQUIP 1.000 L SUM 0204 Areatha Construction Co., Inc. 992.0000 992.00 992.00 0801 Capitol Cement Co., Inc. 992.0000 992.00 992.00 1552 Dunnet Bay Construction Company 1,000.0000 1,000.00 1,000.00 2520 Herlihy Mid-Continent Company 1,800.0000 1,800.00 1,800.00 3127 Kenny Construction Company 1,800.0000 1,800.00 1,800.00 3505 Lorig Construction Company 1,800.0000 1,800.00 1,800.00 3702 Martam Construction Incorporated 2,000.0000 2,000.00 2,000.00 5570 Sjostrom & Sons, Inc. 992.0000 992.00 992.00 X4022000 TEMP ACCESS- COM ENT 3.000 EACH 0204 Areatha Construction Co., Inc. 1,605.0000 4,815.00 4,815.00 0801 Capitol Cement Co., Inc. 2,500.0000 7,500.00 7,500.00 1552 Dunnet Bay Construction Company 2,871.0000 8,613.00 8,613.00 2520 Herlihy Mid-Continent Company 3,500.0000 10,500.00 10,500.00 3127 Kenny Construction Company 2,500.0000 7,500.00 7,500.00 3505 Lorig Construction Company 4,000.0000 12,000.00 12,000.00 3702 Martam Construction Incorporated 900.0000 2,700.00 2,700.00 5570 Sjostrom & Sons, Inc. 13,126.6800 39,380.04 39,380.04 X5020501 UNWAT STR EX PROT L1 1.000 EACH 0204 Areatha Construction Co., Inc. 50,000.0000 50,000.00 50,000.00 0801 Capitol Cement Co., Inc. 25,000.0000 25,000.00 25,000.00 1552 Dunnet Bay Construction Company 50,000.0000 50,000.00 50,000.00 2520 Herlihy Mid-Continent Company 30,000.0000 30,000.00 30,000.00 3127 Kenny Construction Company 5.0000 5.00 5.00 3505 Lorig Construction Company 1,000.0000 1,000.00 1,000.00 3702 Martam Construction Incorporated 30,000.0000 30,000.00 30,000.00 5570 Sjostrom & Sons, Inc. 257,737.5500 257,737.55 257,737.55 X5020502 UNWAT STR EX PROT L2 1.000 EACH 0204 Areatha Construction Co., Inc. 50,000.0000 50,000.00 50,000.00 0801 Capitol Cement Co., Inc. 25,000.0000 25,000.00 25,000.00 1552 Dunnet Bay Construction Company 50,000.0000 50,000.00 50,000.00 2520 Herlihy Mid-Continent Company 30,000.0000 30,000.00 30,000.00 3127 Kenny Construction Company 5.0000 5.00 5.00 3505 Lorig Construction Company 1,000.0000 1,000.00 1,000.00 3702 Martam Construction Incorporated 30,000.0000 30,000.00 30,000.00 5570 Sjostrom & Sons, Inc. 271,102.8900 271,102.89 271,102.89 X8050015 SERV INSTALL POLE MT 1.000 EACH 0204 Areatha Construction Co., Inc. 2,069.2000 2,069.20 2,069.20 0801 Capitol Cement Co., Inc. 2,069.3000 2,069.30 2,069.30 1552 Dunnet Bay Construction Company 2,070.0000 2,070.00 2,070.00 2520 Herlihy Mid-Continent Company 1,450.0000 1,450.00 1,450.00 3127 Kenny Construction Company 1,450.0000 1,450.00 1,450.00 3505 Lorig Construction Company 1,450.0000 1,450.00 1,450.00 3702 Martam Construction Incorporated 1,600.0000 1,600.00 1,600.00 5570 Sjostrom & Sons, Inc. 2,069.3000 2,069.30 2,069.30 X8620020 UNINTER POWER SUPPLY 1.000 EACH 0204 Areatha Construction Co., Inc. 5,552.9000 5,552.90 5,552.90 0801 Capitol Cement Co., Inc. 5,552.9000 5,552.90 5,552.90 1552 Dunnet Bay Construction Company 5,555.0000 5,555.00 5,555.00 2520 Herlihy Mid-Continent Company 7,800.0000 7,800.00 7,800.00 3127 Kenny Construction Company 7,800.0000 7,800.00 7,800.00 3505 Lorig Construction Company 7,800.0000 7,800.00 7,800.00 3702 Martam Construction Incorporated 8,400.0000 8,400.00 8,400.00 5570 Sjostrom & Sons, Inc. 5,552.9000 5,552.90 5,552.90 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0204 Areatha Construction Co., Inc. 8,000.0000 8,000.00 8,000.00 0801 Capitol Cement Co., Inc. 37,500.0000 37,500.00 37,500.00 1552 Dunnet Bay Construction Company 30,000.0000 30,000.00 30,000.00 2520 Herlihy Mid-Continent Company 17,000.0000 17,000.00 17,000.00 3127 Kenny Construction Company 17,900.0000 17,900.00 17,900.00 3505 Lorig Construction Company 100,000.0000 100,000.00 100,000.00 3702 Martam Construction Incorporated 22,000.0000 22,000.00 22,000.00 5570 Sjostrom & Sons, Inc. 39,976.6900 39,976.69 39,976.69 Z0030240 IMP ATTN TEMP NRD TL2 2.000 EACH 0204 Areatha Construction Co., Inc. 3,400.0000 6,800.00 6,800.00 0801 Capitol Cement Co., Inc. 2,700.0000 5,400.00 5,400.00 1552 Dunnet Bay Construction Company 3,600.0000 7,200.00 7,200.00 2520 Herlihy Mid-Continent Company 3,600.0000 7,200.00 7,200.00 3127 Kenny Construction Company 3,600.0000 7,200.00 7,200.00 3505 Lorig Construction Company 4,000.0000 8,000.00 8,000.00 3702 Martam Construction Incorporated 4,000.0000 8,000.00 8,000.00 5570 Sjostrom & Sons, Inc. 3,600.0000 7,200.00 7,200.00 Z0030340 IMP ATTN REL NRD TL2 2.000 EACH 0204 Areatha Construction Co., Inc. 500.0000 1,000.00 1,000.00 0801 Capitol Cement Co., Inc. 600.0000 1,200.00 1,200.00 1552 Dunnet Bay Construction Company 450.0000 900.00 900.00 2520 Herlihy Mid-Continent Company 450.0000 900.00 900.00 3127 Kenny Construction Company 450.0000 900.00 900.00 3505 Lorig Construction Company 500.0000 1,000.00 1,000.00 3702 Martam Construction Incorporated 500.0000 1,000.00 1,000.00 5570 Sjostrom & Sons, Inc. 450.0000 900.00 900.00 50100100 REM EXIST STRUCT 1.000 EACH 0204 Areatha Construction Co., Inc. 129,664.0000 129,664.00 129,664.00 0801 Capitol Cement Co., Inc. 88,000.0000 88,000.00 88,000.00 1552 Dunnet Bay Construction Company 185,000.0000 185,000.00 185,000.00 2520 Herlihy Mid-Continent Company 68,000.0000 68,000.00 68,000.00 3127 Kenny Construction Company 330,000.0000 330,000.00 330,000.00 3505 Lorig Construction Company 300,000.0000 300,000.00 300,000.00 3702 Martam Construction Incorporated 180,000.0000 180,000.00 180,000.00 5570 Sjostrom & Sons, Inc. 255,000.0000 255,000.00 255,000.00 50300100 FLOOR DRAINS 2.000 EACH 0204 Areatha Construction Co., Inc. 152.0000 304.00 304.00 0801 Capitol Cement Co., Inc. 145.0000 290.00 290.00 1552 Dunnet Bay Construction Company 500.0000 1,000.00 1,000.00 2520 Herlihy Mid-Continent Company 145.0000 290.00 290.00 3127 Kenny Construction Company 150.0000 300.00 300.00 3505 Lorig Construction Company 175.0000 350.00 350.00 3702 Martam Construction Incorporated 250.0000 500.00 500.00 5570 Sjostrom & Sons, Inc. 328.1700 656.34 656.34 50800515 BAR SPLICERS 207.000 EACH 0204 Areatha Construction Co., Inc. 36.2500 7,503.75 7,503.75 0801 Capitol Cement Co., Inc. 19.0000 3,933.00 3,933.00 1552 Dunnet Bay Construction Company 25.0000 5,175.00 5,175.00 2520 Herlihy Mid-Continent Company 19.0000 3,933.00 3,933.00 3127 Kenny Construction Company 28.0000 5,796.00 5,796.00 3505 Lorig Construction Company 38.0000 7,866.00 7,866.00 3702 Martam Construction Incorporated 28.0000 5,796.00 5,796.00 5570 Sjostrom & Sons, Inc. 38.1900 7,905.33 7,905.33 51203200 TEST PILE MET SHELLS 4.000 EACH 0204 Areatha Construction Co., Inc. 11,000.0000 44,000.00 44,000.00 0801 Capitol Cement Co., Inc. 10,500.0000 42,000.00 42,000.00 1552 Dunnet Bay Construction Company 9,500.0000 38,000.00 38,000.00 2520 Herlihy Mid-Continent Company 15,000.0000 60,000.00 60,000.00 3127 Kenny Construction Company 5,200.0000 20,800.00 20,800.00 3505 Lorig Construction Company 5,000.0000 20,000.00 20,000.00 3702 Martam Construction Incorporated 4,000.0000 16,000.00 16,000.00 5570 Sjostrom & Sons, Inc. 8,889.3500 35,557.40 35,557.40 51500100 NAME PLATES 1.000 EACH 0204 Areatha Construction Co., Inc. 500.0000 500.00 500.00 0801 Capitol Cement Co., Inc. 355.0000 355.00 355.00 1552 Dunnet Bay Construction Company 500.0000 500.00 500.00 2520 Herlihy Mid-Continent Company 500.0000 500.00 500.00 3127 Kenny Construction Company 430.0000 430.00 430.00 3505 Lorig Construction Company 300.0000 300.00 300.00 3702 Martam Construction Incorporated 600.0000 600.00 600.00 5570 Sjostrom & Sons, Inc. 507.1700 507.17 507.17 60208230 CB TC T23F&G 20.000 EACH 0204 Areatha Construction Co., Inc. 850.0000 17,000.00 17,000.00 0801 Capitol Cement Co., Inc. 1,550.0000 31,000.00 31,000.00 1552 Dunnet Bay Construction Company 1,400.0000 28,000.00 28,000.00 2520 Herlihy Mid-Continent Company 1,800.0000 36,000.00 36,000.00 3127 Kenny Construction Company 850.0000 17,000.00 17,000.00 3505 Lorig Construction Company 2,000.0000 40,000.00 40,000.00 3702 Martam Construction Incorporated 1,500.0000 30,000.00 30,000.00 5570 Sjostrom & Sons, Inc. 1,400.0000 28,000.00 28,000.00 60251730 CB ADJ NEW T23F&G 4.000 EACH 0204 Areatha Construction Co., Inc. 600.0000 2,400.00 2,400.00 0801 Capitol Cement Co., Inc. 550.0000 2,200.00 2,200.00 1552 Dunnet Bay Construction Company 475.0000 1,900.00 1,900.00 2520 Herlihy Mid-Continent Company 850.0000 3,400.00 3,400.00 3127 Kenny Construction Company 600.0000 2,400.00 2,400.00 3505 Lorig Construction Company 1,000.0000 4,000.00 4,000.00 3702 Martam Construction Incorporated 800.0000 3,200.00 3,200.00 5570 Sjostrom & Sons, Inc. 475.0000 1,900.00 1,900.00 60261530 INLETS ADJ NEW T23F&G 9.000 EACH 0204 Areatha Construction Co., Inc. 600.0000 5,400.00 5,400.00 0801 Capitol Cement Co., Inc. 550.0000 4,950.00 4,950.00 1552 Dunnet Bay Construction Company 475.0000 4,275.00 4,275.00 2520 Herlihy Mid-Continent Company 665.0000 5,985.00 5,985.00 3127 Kenny Construction Company 600.0000 5,400.00 5,400.00 3505 Lorig Construction Company 700.0000 6,300.00 6,300.00 3702 Martam Construction Incorporated 800.0000 7,200.00 7,200.00 5570 Sjostrom & Sons, Inc. 475.0000 4,275.00 4,275.00 60500060 REMOV INLETS 6.000 EACH 0204 Areatha Construction Co., Inc. 150.0000 900.00 900.00 0801 Capitol Cement Co., Inc. 150.0000 900.00 900.00 1552 Dunnet Bay Construction Company 50.0000 300.00 300.00 2520 Herlihy Mid-Continent Company 390.0000 2,340.00 2,340.00 3127 Kenny Construction Company 150.0000 900.00 900.00 3505 Lorig Construction Company 400.0000 2,400.00 2,400.00 3702 Martam Construction Incorporated 200.0000 1,200.00 1,200.00 5570 Sjostrom & Sons, Inc. 50.0000 300.00 300.00 63100085 TRAF BAR TERM T6 4.000 EACH 0204 Areatha Construction Co., Inc. 2,900.0000 11,600.00 11,600.00 0801 Capitol Cement Co., Inc. 3,200.0000 12,800.00 12,800.00 1552 Dunnet Bay Construction Company 2,993.0000 11,972.00 11,972.00 2520 Herlihy Mid-Continent Company 2,900.0000 11,600.00 11,600.00 3127 Kenny Construction Company 2,900.0000 11,600.00 11,600.00 3505 Lorig Construction Company 2,950.0000 11,800.00 11,800.00 3702 Martam Construction Incorporated 3,200.0000 12,800.00 12,800.00 5570 Sjostrom & Sons, Inc. 2,900.0000 11,600.00 11,600.00 63100167 TR BAR TRM T1 SPL TAN 2.000 EACH 0204 Areatha Construction Co., Inc. 2,100.0000 4,200.00 4,200.00 0801 Capitol Cement Co., Inc. 2,100.0000 4,200.00 4,200.00 1552 Dunnet Bay Construction Company 2,168.0000 4,336.00 4,336.00 2520 Herlihy Mid-Continent Company 2,100.0000 4,200.00 4,200.00 3127 Kenny Construction Company 2,100.0000 4,200.00 4,200.00 3505 Lorig Construction Company 2,200.0000 4,400.00 4,400.00 3702 Martam Construction Incorporated 2,300.0000 4,600.00 4,600.00 5570 Sjostrom & Sons, Inc. 2,100.0000 4,200.00 4,200.00 63100169 TR BAR TRM T1 SPL FLR 2.000 EACH 0204 Areatha Construction Co., Inc. 2,500.0000 5,000.00 5,000.00 0801 Capitol Cement Co., Inc. 2,500.0000 5,000.00 5,000.00 1552 Dunnet Bay Construction Company 2,580.0000 5,160.00 5,160.00 2520 Herlihy Mid-Continent Company 2,500.0000 5,000.00 5,000.00 3127 Kenny Construction Company 2,500.0000 5,000.00 5,000.00 3505 Lorig Construction Company 2,500.0000 5,000.00 5,000.00 3702 Martam Construction Incorporated 2,700.0000 5,400.00 5,400.00 5570 Sjostrom & Sons, Inc. 2,500.0000 5,000.00 5,000.00 66900450 SPL WASTE PLNS/REPORT 1.000 L SUM 0204 Areatha Construction Co., Inc. 6,300.0000 6,300.00 6,300.00 0801 Capitol Cement Co., Inc. 6,500.0000 6,500.00 6,500.00 1552 Dunnet Bay Construction Company 8,350.0000 8,350.00 8,350.00 2520 Herlihy Mid-Continent Company 750.0000 750.00 750.00 3127 Kenny Construction Company 5,100.0000 5,100.00 5,100.00 3505 Lorig Construction Company 12,000.0000 12,000.00 12,000.00 3702 Martam Construction Incorporated 500.0000 1,000.00 500.00 500.00- 5570 Sjostrom & Sons, Inc. 3,100.0000 3,100.00 3,100.00 66900530 SOIL DISPOSAL ANALY 1.000 EACH 0204 Areatha Construction Co., Inc. 1,000.0000 1,000.00 1,000.00 0801 Capitol Cement Co., Inc. 1,000.0000 1,000.00 1,000.00 1552 Dunnet Bay Construction Company 4,050.0000 4,050.00 4,050.00 2520 Herlihy Mid-Continent Company 1,500.0000 1,500.00 1,500.00 3127 Kenny Construction Company 4,200.0000 4,200.00 4,200.00 3505 Lorig Construction Company 1,850.0000 1,850.00 1,850.00 3702 Martam Construction Incorporated 1,000.0000 1,000.00 1,000.00 5570 Sjostrom & Sons, Inc. 695.0000 695.00 695.00 67000400 ENGR FIELD OFFICE A 12.000 CAL MO 0204 Areatha Construction Co., Inc. 2,100.0000 25,200.00 25,200.00 0801 Capitol Cement Co., Inc. 2,500.0000 30,000.00 30,000.00 1552 Dunnet Bay Construction Company 1,850.0000 22,200.00 22,200.00 2520 Herlihy Mid-Continent Company 3,050.0000 36,600.00 36,600.00 3127 Kenny Construction Company 3,500.0000 42,000.00 42,000.00 3505 Lorig Construction Company 3,000.0000 36,000.00 36,000.00 3702 Martam Construction Incorporated 2,800.0000 33,600.00 33,600.00 5570 Sjostrom & Sons, Inc. 3,878.3400 46,540.08 46,540.08 67100100 MOBILIZATION 1.000 L SUM 0204 Areatha Construction Co., Inc. 257,000.0000 257,000.00 257,000.00 0801 Capitol Cement Co., Inc. 225,000.0000 225,000.00 225,000.00 1552 Dunnet Bay Construction Company 227,000.0000 227,000.00 227,000.00 2520 Herlihy Mid-Continent Company 109,707.0000 109,707.00 109,707.00 3127 Kenny Construction Company 245,000.0000 245,000.00 245,000.00 3505 Lorig Construction Company 205,000.0000 205,000.00 205,000.00 3702 Martam Construction Incorporated 200,000.0000 200,000.00 200,000.00 5570 Sjostrom & Sons, Inc. 329,749.6100 329,749.61 329,749.61 70101800 TRAF CONT & PROT SPL 1.000 L SUM 0204 Areatha Construction Co., Inc. 18,500.0000 18,500.00 18,500.00 0801 Capitol Cement Co., Inc. 100,000.0000 100,000.00 100,000.00 1552 Dunnet Bay Construction Company 15,000.0000 15,000.00 15,000.00 2520 Herlihy Mid-Continent Company 13,000.0000 13,000.00 13,000.00 3127 Kenny Construction Company 12,350.0000 12,350.00 12,350.00 3505 Lorig Construction Company 100,000.0000 100,000.00 100,000.00 3702 Martam Construction Incorporated 132,350.0000 132,350.00 132,350.00 5570 Sjostrom & Sons, Inc. 12,350.0000 12,350.00 12,350.00 70106800 CHANGEABLE MESSAGE SN 28.000 CAL MO 0204 Areatha Construction Co., Inc. 1,100.0000 30,800.00 30,800.00 0801 Capitol Cement Co., Inc. 1,100.0000 30,800.00 30,800.00 1552 Dunnet Bay Construction Company 1,000.0000 28,000.00 28,000.00 2520 Herlihy Mid-Continent Company 1,100.0000 30,800.00 30,800.00 3127 Kenny Construction Company 1,000.0000 28,000.00 28,000.00 3505 Lorig Construction Company 1,050.0000 29,400.00 29,400.00 3702 Martam Construction Incorporated 1,100.0000 30,800.00 30,800.00 5570 Sjostrom & Sons, Inc. 1,000.0000 28,000.00 28,000.00 78100100 RAISED REFL PAVT MKR 204.000 EACH 0204 Areatha Construction Co., Inc. 26.5000 5,406.00 5,406.00 0801 Capitol Cement Co., Inc. 26.5000 5,406.00 5,406.00 1552 Dunnet Bay Construction Company 26.5000 5,406.00 5,406.00 2520 Herlihy Mid-Continent Company 26.5000 5,406.00 5,406.00 3127 Kenny Construction Company 26.5000 5,406.00 5,406.00 3505 Lorig Construction Company 27.0000 5,508.00 5,508.00 3702 Martam Construction Incorporated 30.0000 6,120.00 6,120.00 5570 Sjostrom & Sons, Inc. 26.5000 5,406.00 5,406.00 78100105 RAISED REF PVT MKR BR 18.000 EACH 0204 Areatha Construction Co., Inc. 41.5000 747.00 747.00 0801 Capitol Cement Co., Inc. 41.5000 747.00 747.00 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 41.5000 747.00 747.00 3127 Kenny Construction Company 41.0000 738.00 738.00 3505 Lorig Construction Company 42.0000 756.00 756.00 3702 Martam Construction Incorporated 50.0000 900.00 900.00 5570 Sjostrom & Sons, Inc. 41.5000 747.00 747.00 78200420 GUARDRAIL MKR TYPE B 8.000 EACH 0204 Areatha Construction Co., Inc. 10.0000 80.00 80.00 0801 Capitol Cement Co., Inc. 10.0000 80.00 80.00 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 10.0000 80.00 80.00 3127 Kenny Construction Company 10.0000 80.00 80.00 3505 Lorig Construction Company 10.0000 80.00 80.00 3702 Martam Construction Incorporated 15.0000 120.00 120.00 5570 Sjostrom & Sons, Inc. 10.0000 80.00 80.00 78201000 TERMINAL MARKER - DA 4.000 EACH 0204 Areatha Construction Co., Inc. 40.0000 160.00 160.00 0801 Capitol Cement Co., Inc. 40.0000 160.00 160.00 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 40.0000 160.00 160.00 3127 Kenny Construction Company 40.0000 160.00 160.00 3505 Lorig Construction Company 40.0000 160.00 160.00 3702 Martam Construction Incorporated 50.0000 200.00 200.00 5570 Sjostrom & Sons, Inc. 40.0000 160.00 160.00 78300200 RAISED REF PVT MK REM 129.000 EACH 0204 Areatha Construction Co., Inc. 15.0000 1,935.00 1,935.00 0801 Capitol Cement Co., Inc. 10.0000 1,290.00 1,290.00 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 15.0000 1,935.00 1,935.00 3127 Kenny Construction Company 20.0000 2,580.00 2,580.00 3505 Lorig Construction Company 7.0000 903.00 903.00 3702 Martam Construction Incorporated 20.0000 2,580.00 2,580.00 5570 Sjostrom & Sons, Inc. 5.0000 645.00 645.00 81400100 HANDHOLE 4.000 EACH 0204 Areatha Construction Co., Inc. 1,478.3000 5,913.20 5,913.20 0801 Capitol Cement Co., Inc. 1,478.3000 5,913.20 5,913.20 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 975.0000 3,900.00 3,900.00 3127 Kenny Construction Company 975.0000 3,900.00 3,900.00 3505 Lorig Construction Company 975.0000 3,900.00 3,900.00 3702 Martam Construction Incorporated 1,200.0000 4,800.00 4,800.00 5570 Sjostrom & Sons, Inc. 1,478.3000 5,913.20 5,913.20 85000200 MAIN EX TR SIG INSTAL 1.000 EACH 0204 Areatha Construction Co., Inc. 1,984.0000 1,984.00 1,984.00 0801 Capitol Cement Co., Inc. 1,984.0000 1,984.00 1,984.00 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 3,500.0000 3,500.00 3,500.00 3127 Kenny Construction Company 3,500.0000 3,500.00 3,500.00 3505 Lorig Construction Company 3,500.0000 3,500.00 3,500.00 3702 Martam Construction Incorporated 4,000.0000 4,000.00 4,000.00 5570 Sjostrom & Sons, Inc. 1,984.0000 1,984.00 1,984.00 87800115 CONC FDN TY A 2.000 EACH 0204 Areatha Construction Co., Inc. 951.0000 1,902.00 1,902.00 0801 Capitol Cement Co., Inc. 951.0000 1,902.00 1,902.00 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 475.0000 950.00 950.00 3127 Kenny Construction Company 475.0000 950.00 950.00 3505 Lorig Construction Company 475.0000 950.00 950.00 3702 Martam Construction Incorporated 550.0000 1,100.00 1,100.00 5570 Sjostrom & Sons, Inc. 951.0000 1,902.00 1,902.00 87900200 DRILL EX HANDHOLE 2.000 EACH 0204 Areatha Construction Co., Inc. 297.6000 595.20 595.20 0801 Capitol Cement Co., Inc. 297.6000 595.20 595.20 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 275.0000 550.00 550.00 3127 Kenny Construction Company 275.0000 550.00 550.00 3505 Lorig Construction Company 275.0000 550.00 550.00 3702 Martam Construction Incorporated 325.0000 650.00 650.00 5570 Sjostrom & Sons, Inc. 297.6000 595.20 595.20 88030020 SH LED 1F 3S MAM 2.000 EACH 0204 Areatha Construction Co., Inc. 797.5000 1,595.00 1,595.00 0801 Capitol Cement Co., Inc. 797.5000 1,595.00 1,595.00 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 1,075.0000 2,150.00 2,150.00 3127 Kenny Construction Company 1,075.0000 2,150.00 2,150.00 3505 Lorig Construction Company 1,075.0000 2,150.00 2,150.00 3702 Martam Construction Incorporated 1,250.0000 2,500.00 2,500.00 5570 Sjostrom & Sons, Inc. 797.5000 1,595.00 1,595.00 88030050 SH LED 1F 3S BM 2.000 EACH 0204 Areatha Construction Co., Inc. 789.4000 1,578.80 1,578.80 0801 Capitol Cement Co., Inc. 789.4000 1,578.80 1,578.80 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 1,015.0000 2,030.00 2,030.00 3127 Kenny Construction Company 1,015.0000 2,030.00 2,030.00 3505 Lorig Construction Company 1,025.0000 2,050.00 2,050.00 3702 Martam Construction Incorporated 1,200.0000 2,400.00 2,400.00 5570 Sjostrom & Sons, Inc. 789.4000 1,578.80 1,578.80 88030110 SH LED 1F 5S MAM 2.000 EACH 0204 Areatha Construction Co., Inc. 1,143.5000 2,287.00 2,287.00 0801 Capitol Cement Co., Inc. 1,143.5000 2,287.00 2,287.00 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 1,450.0000 2,900.00 2,900.00 3127 Kenny Construction Company 1,450.0000 2,900.00 2,900.00 3505 Lorig Construction Company 1,500.0000 3,000.00 3,000.00 3702 Martam Construction Incorporated 1,600.0000 3,200.00 3,200.00 5570 Sjostrom & Sons, Inc. 1,143.5000 2,287.00 2,287.00 88030220 SH LED 2F 5S BM 1.000 EACH 0204 Areatha Construction Co., Inc. 2,053.6000 2,053.60 2,053.60 0801 Capitol Cement Co., Inc. 2,053.6000 2,053.60 2,053.60 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 2,375.0000 2,375.00 2,375.00 3127 Kenny Construction Company 2,375.0000 2,375.00 2,375.00 3505 Lorig Construction Company 2,500.0000 2,500.00 2,500.00 3702 Martam Construction Incorporated 2,600.0000 2,600.00 2,600.00 5570 Sjostrom & Sons, Inc. 2,053.6000 2,053.60 2,053.60 88030240 SH LED 2F 1-3 1-5 BM 1.000 EACH 0204 Areatha Construction Co., Inc. 1,723.7000 1,723.70 1,723.70 0801 Capitol Cement Co., Inc. 1,723.7000 1,723.70 1,723.70 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 2,100.0000 2,100.00 2,100.00 3127 Kenny Construction Company 2,100.0000 2,100.00 2,100.00 3505 Lorig Construction Company 2,200.0000 2,200.00 2,200.00 3702 Martam Construction Incorporated 2,300.0000 2,300.00 2,300.00 5570 Sjostrom & Sons, Inc. 1,723.7000 1,723.70 1,723.70 88102710 PED SH LED 1F BM 3.000 EACH 0204 Areatha Construction Co., Inc. 762.3000 2,286.90 2,286.90 0801 Capitol Cement Co., Inc. 762.3000 2,286.90 2,286.90 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 950.0000 2,850.00 2,850.00 3127 Kenny Construction Company 950.0000 2,850.00 2,850.00 3505 Lorig Construction Company 1,000.0000 3,000.00 3,000.00 3702 Martam Construction Incorporated 1,100.0000 3,300.00 3,300.00 5570 Sjostrom & Sons, Inc. 762.3000 2,286.90 2,286.90 88200210 TS BACKPLATE LOU ALUM 4.000 EACH 0204 Areatha Construction Co., Inc. 165.7000 662.80 662.80 0801 Capitol Cement Co., Inc. 165.7000 662.80 662.80 1552 Dunnet Bay Construction Company * 2520 Herlihy Mid-Continent Company 115.0000 460.00 460.00 3127 Kenny Construction Company 115.0000 460.00 460.00 3505 Lorig Construction Company 115.0000 460.00 460.00 3702 Martam Construction Incorporated 130.0000 520.00 520.00 5570 Sjostrom & Sons, Inc. 165.7000 662.80 662.80 88800100 PED PUSH-BUTTON 4.000 EACH 0204 Areatha Construction Co., Inc. 258.6000 1,034.40 1,034.40 0801 Capitol Cement Co., Inc. 258.6000 1,034.40 1,034.40 1552 Dunnet Bay Construction Company 259.0000 1,036.00 1,036.00 2520 Herlihy Mid-Continent Company 395.0000 1,580.00 1,580.00 3127 Kenny Construction Company 395.0000 1,580.00 1,580.00 3505 Lorig Construction Company 400.0000 1,600.00 1,600.00 3702 Martam Construction Incorporated 450.0000 1,800.00 1,800.00 5570 Sjostrom & Sons, Inc. 258.6000 1,034.40 1,034.40 89502200 MOD EX CONTR 2.000 EACH 0204 Areatha Construction Co., Inc. 2,362.0000 4,724.00 4,724.00 0801 Capitol Cement Co., Inc. 2,362.0000 4,724.00 4,724.00 1552 Dunnet Bay Construction Company 2,362.0000 4,724.00 4,724.00 2520 Herlihy Mid-Continent Company 1,500.0000 3,000.00 3,000.00 3127 Kenny Construction Company 1,500.0000 3,000.00 3,000.00 3505 Lorig Construction Company 1,500.0000 3,000.00 3,000.00 3702 Martam Construction Incorporated 1,650.0000 3,300.00 3,300.00 5570 Sjostrom & Sons, Inc. 2,362.0000 4,724.00 4,724.00 89502380 REMOV EX HANDHOLE 4.000 EACH 0204 Areatha Construction Co., Inc. 480.0000 1,920.00 1,920.00 0801 Capitol Cement Co., Inc. 479.1000 1,916.40 1,916.40 1552 Dunnet Bay Construction Company 500.0000 2,000.00 2,000.00 2520 Herlihy Mid-Continent Company 400.0000 1,600.00 1,600.00 3127 Kenny Construction Company 400.0000 1,600.00 1,600.00 3505 Lorig Construction Company 400.0000 1,600.00 1,600.00 3702 Martam Construction Incorporated 400.0000 1,600.00 1,600.00 5570 Sjostrom & Sons, Inc. 479.1000 1,916.40 1,916.40 89502385 REMOV EX CONC FDN 1.000 EACH 0204 Areatha Construction Co., Inc. 480.0000 480.00 480.00 0801 Capitol Cement Co., Inc. 479.1000 479.10 479.10 1552 Dunnet Bay Construction Company 500.0000 500.00 500.00 2520 Herlihy Mid-Continent Company 400.0000 400.00 400.00 3127 Kenny Construction Company 400.0000 400.00 400.00 3505 Lorig Construction Company 400.0000 400.00 400.00 3702 Martam Construction Incorporated 400.0000 400.00 400.00 5570 Sjostrom & Sons, Inc. 479.1000 479.10 479.10 * - PAY ITEM UNIT PRICE AND/OR BIDDER TOTAL PRICE WAS OMITTED