|
The
project consists of replacing the concrete deck overlay
and bridge rail and doing earthquake modifications on
seven structures at the Illinois Route 3 ramps and
Interstate 55/70/64 near the Poplar Street Bridge in
East St. Louis and Sauget , Illinois .
The work to replace the concrete deck overlay and
bridge rail will be done in four phases and will require
the ramps to be completely closed. Marked detours will
be established to aid the motorists during the ramp
closure periods.
For Project Information Call 618-346-3354
|