|
Form |
Formerly |
Description |
Word |
Excel |
PDF |
Revised Date |
|
AER 1 |
AER M-1 |
Acceptance Testing for
Density Bituminous Mixes |
|
 |
|
12/16/11 |
|
AER 2 |
AER M-2 |
Mean (X) and Standard
Deviation Test for Outliers |
|
 |
|
12/16/11 |
|
AER 3 |
AER M-3 |
Acceptance Testing for
Strength 501 Concrete Mixes |
|
 |
|
12/16/11 |
|
AER 4 |
AER M-4 |
Concrete Plant
Production Mix Verification |
|
 |
|
12/17/09 |
|
AER 5 |
AER M-5 |
Assignment of Material
Description |
 |
|
|
6/26/08 |
|
AER 6 |
AER M-6 |
Concrete Moisture
Determination Adjusted Oven Dry Method |
|
 |
|
12/21/09 |
|
AER 7 |
AER M-7 |
Plastic Concrete Air,
Slump and Quantity |
 |
|
|
|
|
AER 8 |
AER M-8 |
P.C. Concrete Strength
Report |
 |
|
|
6/26/08 |
|
AER 9 |
AER M-9 |
Bituminous Mixture Daily
Plant Output |
 |
|
|
|
|
AER 10 |
AER M-10 |
Bituminous Core Density
Testing |
|
 |
|
12/31/09 |
|
AER 11 |
AER M-11 |
Bituminous Mixtures
Extraction |
 |
|
|
|
|
AER 12 |
AER M-12A AER M-12B |
Concrete Batch Weight
Calculations/Field Gradations |
 |
|
|
|
|
AER 12A |
AER M-12B Blended CA &
AER M-12A |
Concrete Batch Weight
Calculations/Field Gradations (Blended Aggregate) |
 |
|
|
|
|
AER 13 |
AER M-13 |
Test Strip Growth Curve |
 |
|
|
12/16/11 |
|
AER 14 |
AER M-14 |
Bituminous Testing
Summary |
 |
|
|
9/7/11 |
|
AER 15 |
AER M-15 |
PCC Testing Summary |
|

|
|
01/11/10 |
|
AER 16 |
AER M-16 |
Bituminous Nuclear
Density Testing |
 |
|
|
|
|
AER 17 |
AER M-17 |
Field Soil Compaction
(Nuclear) |
 |
|
|
|
|
AER 18 |
Not Numbered |
Aggregate Certification
of Compliance |
 |
|
|
08/09/10 |
|
AER 19 |
AER M-19 |
Aggregate Moisture
Determination Pycnometer Jar Method |
 |
|
|
|
|
AER 20 |
AER M-20 |
Mixer Performance Tests |
 |
|
|
12/16/11 |
|
AER 21 |
Not Numbered |
Preliminary Bituminous
Mix Design |
 |
|
|
|
|
AER 22 |
Not Numbered |
Preliminary PCC Mix
Design |
 |
|
|
9/15/10 |
|
AER 23 |
Not Numbered |
PCC Test Batch
Documentation Report |
 |
|
|
03/07/11 |
|
AER 24 |
Not Numbered |
Sample Identification |
 |
|
|
3/30/11 |
|
AER 34 |
|
Airport Resident Application |
 |
|
|
02/16/12 |
|
AER 37C |
|
Two Week Calendar Day Record |
|

|
|
02/16/12 |
|
AER 51 |
|
Authorization of Contract Changes |
|

|
|
01/11/10 |
|
AER 1015 |
|
Materials Documentation Review Worksheet |
 |
|
|
7/8/09 |
|
AER 1016 |
|
Contract Time Suspension/Resumption Notification |
 |
|
|
02/16/12 |
|
AER 2020 |
|
Construction Phase Engineering Amendment Application |
 |
|
|
02/16/12 |