|
The revision eliminated the following information from the form:
Contract Adjustment / Change Order
Partnered / Non-Partnered
Letting Date
Time Extension Required
Emergency Change
The A/D column
Signature places for the Engineers of Design and Local Roads
ISO Number
Added were the proper names of the Secretary, Director of F&A and
Chief Counsel.
This revision is effective immediately and users should begin
using this version today. The Bureau of Construction will be
posting this as an Excel form in the near future.
|