IDOT Home IDOT Home

IDOT Home

Rod R. Blagojevich, Governor
90/94 On the Move to Improve
 Home
 Project Information
 Calendar of Events
 Environmental  Action
 News
 Resources
 Project Scrapbook
 Traffic Info
 Contracting & Jobs
 Supportive Services  Program
 Contact Us
 Contents
 Search

 IDOT Homepage
 Kingery Const. Site
 Borman Const. Site
 CDOT
 CTA
 Illinois Tollway
 PACE
 Metra
 Share the Drive
 Illinois Roads
 Secretary of State

[Search Tips]

   Current Focus   

diagonal image

IDOT FORMS MANAGEMENT
 


Date: January 22, 2007

Forms Topic: Bureau of Bridges and Structures

Description:
Title:
BBS 2680: Scour Critical Bridge Plan of Action (POA) (NEW)
Body:
In order to comply with Federal Regulations, all bridges that may be adversely affected by scour must have a Plan of Action prepared to provide information for use in addressing the safety of the bridges, especially during a significant flood event.  The form provides a standard outline for use by personnel responsible for developing a Plan of Action for structures that have been identified as being scour critical bridges, based on federal guidelines.

 

Title:
BBS SFI-1: Special Feature Inspection Report (NEW)
Body:
This form is completed by bridge inspectors (state, local and consultants) to report that a special feature inspection has been completed or that one is required.

Forms Topic: District 4 Forms

Title:
D4 PI0101: Borrow Area Entry Agreement (NEW)
Body:
This form is for the contractor to get permission from the property owner to let IDOT's field personnel and geotechnical staff obtain soil samples.

 

 

Forms Management

Navigation

FAQ's
Contact Us
Announcements
Site Map | IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility | Contact Us