www.dot.state.il.us - /DistrictStandards/District 3/D3SpecialProvisions/


[To Parent Directory]

Monday, March 10, 2014 10:53 AM 127488 0 - DISTRICT 3 SPECIALS CHECK SHEET January 1, 2012.doc
Monday, August 19, 2013 10:43 AM 13276 10A - QUALITY CONTROL LABORATORY FOR CONCRETE MIXTURES.docx
Wednesday, November 27, 2013 12:55 PM 14859 10B - GRANULAR MATERIALS.DOCX
Thursday, October 06, 2011 2:48 PM 24064 1A - TITLE PAGE.doc
Monday, January 24, 2011 3:15 PM 30720 1B - STATUS OF UTILITIES TO BE ADJUSTED.doc
Wednesday, October 04, 2006 1:54 PM 28160 1C - REPAIR AND MAINTENANCE OF HAUL ROADS.doc
Wednesday, October 04, 2006 1:54 PM 25088 1D - HAUL ROADS.doc
Wednesday, October 04, 2006 1:54 PM 25088 1E - DUST CONTROL.doc
Wednesday, October 04, 2006 1:54 PM 28160 1F - INCENTIVE PAYMENT PLAN NO 1.doc
Wednesday, October 04, 2006 1:54 PM 28160 1G - INCENTIVE PAYMENT PLAN NO 2.doc
Thursday, April 22, 2010 9:59 AM 26624 1H - WETLAND AREAS.doc
Wednesday, October 04, 2006 1:54 PM 27136 1I - LANE RENTAL.doc
Wednesday, October 04, 2006 1:54 PM 27648 1J - TEMPORARY CONSTRUCTION - WATERWAY PERMITS (CORPS OF ENGINEERS).doc
Wednesday, October 04, 2006 1:54 PM 29184 1K - TEMPORARY CONSTRUCTION WATERWAY PERMITS (IDNR).doc
Thursday, October 06, 2011 2:49 PM 22016 1L - COMPLETION DATE.doc
Wednesday, April 02, 2008 9:28 AM 25600 1M - DELAYED START OF MULTIPLE CONTRACTS.doc
Thursday, October 06, 2011 2:49 PM 11664 1N - EQUIPMENT ON STRUCTURES WITH LEGAL LOAD LIMITS.docx
Thursday, February 07, 2013 9:47 AM 22528 1O - COOPERATION BY CONTRACTOR.doc
Wednesday, November 27, 2013 12:55 PM 12061 2A - EXCAVATING AND GRADING EXISTING SHOULDER.DOCX
Wednesday, September 30, 2009 11:53 AM 11752 2B - BORROW AND FURNISHED EXCAVATION.docx
Friday, February 19, 2010 3:07 PM 24064 2C - FURNISHED EXCAVATION.doc
Wednesday, October 04, 2006 1:54 PM 24576 2D - EMBANKMENT.doc
Wednesday, October 04, 2006 1:54 PM 25088 2E - EXPLORATION TRENCH, SPECIAL.doc
Wednesday, October 04, 2006 1:54 PM 24064 2F - MULCH METHOD 2.doc
Tuesday, October 11, 2011 10:26 AM 17255 2H - ROCK FILL.docx
Tuesday, November 13, 2012 4:43 PM 22186 3A - AGGREGATE SUBGRADE IMPROVEMENT DISTRICT 3.docx
Wednesday, October 04, 2006 1:54 PM 24064 4A - AGGREGATE SURFACE COURSE TYPE B.doc
Wednesday, October 04, 2006 1:54 PM 24576 4B - HOT-MIX ASPHALT SURFACE COURSE, CUT OFF DATE.doc
Thursday, October 06, 2011 2:50 PM 12192 4C - BITUMINOUS MATERIALS PRIME COAT.docx
Friday, February 20, 2009 4:04 PM 26624 4D - HOT-MIX ASPHALT SURFACE REMOVAL (SPECIAL).doc
Thursday, August 01, 2013 1:38 PM 29575 4E - Hot-Mix Asphalt - Prime Coat.docx
Wednesday, October 04, 2006 1:54 PM 24576 4F - SURFACE COURSE PAVING SEQUENCE.doc
Wednesday, November 27, 2013 12:55 PM 11232 4G - Vibratory Roller Restriction DRAFT.DOCX
Wednesday, October 04, 2006 1:54 PM 26112 4H - PORTLAND CEMENT CONCRETE PAVING REQUIREMENTS.doc
Thursday, February 18, 2010 11:29 AM 22528 4I - PATCHING JOINTED CONCRETE PAVEMENT.doc
Wednesday, October 04, 2006 1:54 PM 24576 4J - CROSSING STRUCTURES WITH MATERIAL TRANSFER DEVICE.doc
Wednesday, October 04, 2006 1:54 PM 24576 4K - AGGREGATE SHOULDERS TYPE B.doc
Thursday, November 09, 2006 10:26 AM 50176 4L - APPROACH SLAB REPAIR.doc
Thursday, October 06, 2011 2:50 PM 22528 4M - AGGREGATE SHOULDERS TYPE B - RAP.doc
Wednesday, March 03, 2010 2:18 PM 27136 4N - HOT-MIX ASPHALT PAVEMENT PATCHING (PARTIAL DEPTH).doc
Friday, February 20, 2009 4:05 PM 23040 4O - RUMBLE STRIP.doc
Wednesday, October 04, 2006 1:54 PM 24576 4P - RAISED JOINT REMOVAL.doc
Thursday, October 06, 2011 2:50 PM 12030 4R - PREPARATION OF BASE.docx
Tuesday, March 20, 2012 8:13 AM 14547 4S - STRINGLESS CONSTRUCTION OPTION.docx
Thursday, October 06, 2011 2:51 PM 25088 5B - RUBBED FINISH (MODIFIED).doc
Wednesday, October 15, 2008 9:23 AM 27136 5C - STORM SEWER, RUBBER GASKET.doc
Wednesday, October 15, 2008 9:25 AM 29184 5D - STORM SEWER (WATER MAIN REQUIREMENTS).doc
Wednesday, October 04, 2006 1:54 PM 25088 5E -STORM CULVERT OR CULVERT TO BE FILLED.doc
Tuesday, January 26, 2010 9:26 AM 11556 5F - BRIDGE DECK LATEX OR MICROSILICA CONCRETE OVERLAY CUT OFF DATE.docx
Wednesday, October 04, 2006 1:54 PM 24064 6A - PERMANENT SURVEY MARKERS.doc
Thursday, March 12, 2009 1:27 PM 22528 6B - COMPUTER CABINET.doc
Thursday, October 06, 2011 2:51 PM 22528 6C - UNPUBLISHED TELEPHONE NUMBERS FOR ENGINEER'S FIELD OFFICE.doc
Monday, August 19, 2013 10:44 AM 12811 6E - PIPE UNDERDRAINS 4 INCH MODIFIED.docx
Thursday, October 06, 2011 2:51 PM 27648 6F - CELLULAR PHONES.doc
Tuesday, May 22, 2012 9:04 AM 12818 6G - FRAMES AND LIDS TO BE ADJUSTED SPECIAL and WATER VALVES TO BE ADJUSTED SPECIAL.docx
Monday, August 19, 2013 10:44 AM 12567 6H - SHOULDER STABILIZATION AT GUARDRAIL.docx
Wednesday, July 03, 2013 4:30 PM 14979 7A - TRAFFIC CONTROL PLAN.docx
Thursday, October 06, 2011 2:52 PM 23040 7AA - PREFORMED PLASTIC PAVEMENT MARKING - TYPE B - INLAID.doc
Thursday, October 06, 2011 2:52 PM 23552 7AB - PAVEMENT MARKING REMOVAL-WORKZONE PAVEMENT MARKING REMOVAL.doc
Thursday, October 06, 2011 2:52 PM 23552 7AC - TEMPORARY PAINT PAVEMENT MARKING.doc
Friday, October 28, 2011 2:51 PM 12712 7AE - PAINT PAVEMENT MARKING - TWO APPLICATIONS.docx
Friday, January 21, 2011 12:33 PM 23552 7B - CONTRACTOR ACCESS.doc
Wednesday, October 04, 2006 1:54 PM 24064 7C - VEHICLE PARKING.doc
Wednesday, October 04, 2006 1:54 PM 24064 7D - EQUIPMENT ILLUMINATION.doc
Thursday, April 15, 2010 2:40 PM 14645 7E - TEMPORARY BRIDGE TRAFFIC SIGNALS.docx
Monday, August 19, 2013 10:44 AM 12721 7F - KEEPING ROADS OPEN TO TRAFFIC.docx
Thursday, August 07, 2008 10:41 AM 24576 7G - CHANGEABLE MESSAGE SIGN.doc
Thursday, December 10, 2009 5:26 PM 10908 7H - UNEVEN LANES.docx
Wednesday, October 31, 2007 1:57 PM 24064 7L - PLASTIC DRUMS.doc
Monday, November 16, 2009 4:46 PM 14752 7N - Radar Speed Trailer.docx
Tuesday, April 01, 2014 2:00 PM 27136 7O - TRAFFIC CONTROL AND PROTECTION STANDARDS 701400 (SPECIAL) AND 701401 (SPECIAL) - revised.doc
Monday, August 19, 2013 10:43 AM 14628 7P - Portable Vehicle Mounted Changeable Message Sign.docx
Thursday, September 27, 2012 2:55 PM 25600 7Q - Alternate Route Signing.doc
Tuesday, January 26, 2010 9:25 AM 13419 7R - MAXIMUM DROP-OFFS FOR TWO-LANE TWO-WAY TRAFFIC.docx
Tuesday, December 03, 2013 9:13 AM 26624 7S - TEMPORARY INFORMATION SIGNING.doc
Wednesday, October 04, 2006 1:54 PM 31232 8A - LOOP DETECTOR TESTING.doc
Wednesday, October 04, 2006 1:54 PM 25088 8B - SERVICE INSTALLATION.doc
Friday, October 07, 2011 11:32 AM 11895 8C - UNDERGROUND CONDUIT.docx
Friday, October 07, 2011 11:31 AM 24064 8D - INDUCTIVE LOOP DETECTOR.doc
Wednesday, October 04, 2006 1:54 PM 31232 8E - FULL ACTUATED CONTROLLER AND TYPE IV CABINET, SPECIAL.doc
Wednesday, October 04, 2006 1:54 PM 24576 8F - CONCRETE HANDHOLE OR CONCRETE DOUBLE HANDHOLE.doc
Wednesday, April 02, 2008 9:28 AM 26624 8G DRILLED SHAFT FOUNDATIONS.doc
Wednesday, October 04, 2006 1:54 PM 25600 8H - FIBER OPTIC CABLE IN CONDUIT.doc
Wednesday, October 04, 2006 1:54 PM 29184 8I- RE-OPTIMIZE TRAFFIC SIGNAL SYSTEM.doc
Thursday, July 26, 2007 3:54 PM 25600 8J - RESTORATION OF WORK AREA.doc
Friday, October 07, 2011 11:32 AM 23040 8K - CONDUIT, FLEXIBLE, WEATHERPROOF.doc
Wednesday, October 04, 2006 1:54 PM 35840 8L - SERVICE INSTALLATION, GOUND MOUNTED.doc
Friday, April 04, 2014 11:54 AM <dir> Revision Memos